Address:
Part No:
Purpose of the Audit : Routine Audit / Major Quality Issue / Change in Process / ECM (Please tick )
Check Machine, Tooling, Job Location, clamping,speed,feed, depth of cut are suitable and adhered as per control plan.
Check Adequacy and Accuracy of all Processes.
Check Availability of SOBs, Availability of gauges and instruments etc.
Check set up approval & Patrolling inspection reports.
3.1 Process 1
Process 2
Process 3
Process 4
Process 5
Process 6
Process 7
Process 8
Process 9
Process 10
3.5 Check Tool monitoring system (Auditor can check critical samples
from Control plan and verify)
3.8 Check the Preservation & Packing as per control plan /SOB
etc.
3.9 Check the Non-conformance handling and Deviation
process
Overall Score
Audit Rating Scale:
Summary of Total Audit Rating
0 No System is in Place
Note
Overall Score - Min 80 % to be achieved. CAPA to be implemented within 1 month time to reach 100 %
Overall Score - 60 to 79.9 - CAPA to be implemented within 1 week time. 100 % Inspection to be in place till CAPA is implemented
Overall Score - less than 60 - Process to be stopped. Need immediate correction / SOB to be changed to alternate source
Supplier Code:
TAFE Observations
Scored - 0 Rating
Scored - 40 Rating
Scored - 60 Rating
Scored - 80 Rating
each 100 %
Subject / Purpose :
SNO
Minute
ject / Purpose :
What
Minutes of Meeting
Supplier:
Who When
ting
Date:
lier:
How
Status