00000000PART 1 - GENERAL
1.1 DESCRIPTION:
A. The Work under this Section consists of furnishing and installing a complete
drainage system including soil, waste, drainage, and vent system up to the
interface point as indicated on the drawings and as specified herein.
1.2 REFERENCES:
ASTM D 2564 Solvent Cement for Polyvinyl Chloride (PVC) Plastic Pipe
and Fittings.
ITCC in Riyadh
Residential Complex 15420-1 Drainage & Vent System
J10-13300
ASTM D 2665 Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent
Pipe and Fittings.
ASTM D 3311 Drain, Waste, and Vent (DWV) Plastic Fittings Patterns.
1.3 SUBMITTALS:
B. Coordination Drawings: Prepare and submit coordination drawings for the soil,
waste, drainage and vent piping.
ITCC in Riyadh
Residential Complex 15420-2 Drainage & Vent System
J10-13300
Plumbing Code (UPC) - 1994 Edition, BOCA, National Plumbing Code and the
local utility authority.
00PART 2 - PRODUCTS
A. Pipes and fittings for soil, waste, drainage and vent lines, inside building, shall be
as follows:
3. Jointing System:
A. Cleanout Plugs: Cast iron with tapered body for caulking, raised head rough lead
seal plug.
B. Floor Cleanouts: Cast iron body and frame with round adjustable scoriated
secured nickel-bronze top, closure plug; and spigot outlet.
C. Wall Cleanouts: Cast iron body adaptable to pipe with cast bronze or brass
cleanout plug, stainless steel cover plate with vandal-proof center screw secured
to cleanout plug.
2.3 DRAINS:
A. Floor Drains: Adjustable, cast iron body and flashing collar, with protector top and
polished bronze strainer head with secured, vandal-proof square hold grate.
B. Roof Drains: Cast iron body, combined flashing collar and gravel stop, cast iron
dome, deep sump body.
C. Planter's Area Drains: Where required, shall be cast iron body and flashing
collar with adjustable 300 mm diameter top and bar grate with sediment bucket.
D. Area Drain and Trench Drain Outlets: Shall be of cast iron with hinged grate and
perforated sediment bucket.
E. Trench Drain and Grating: Shall be cast iron with hinged grate and perforated
sediment bucket. Trench drain grating shall be of cast iron, medium duty; size
ITCC in Riyadh
Residential Complex 15420-3 Drainage & Vent System
J10-13300
shall be as shown on the drawings.
F. Parking Drain: Shall be cast iron bodied area drain with flashing collar. Parking
drain shall be of type as shown on drawing.
A. All drainage piping shall be insulated. For Insulation refer to Section 15250
Mechanical Insulations.
00PART 3 - EXECUTION
A. See Section 15050 - BASIC PIPING MATERIALS AND METHODS for general
piping installation instructions. Refer to the drawings for further details.
B. All cast iron piping, underground and inside masonry walls, shall be wrapped with
DENSO tape.
B. Piping shall run as direct as possible making changes in direction with long
sweeps, 1/8 or 1/16 bends.
C. Connections shall be made to horizontal lines with Y's and 1/8 bends.
D. Horizontal lines shall be graded not less than 1% for piping 101 mm and larger,
and not less than 2% per for piping 76 mm and smaller.
E. Rough fixture connections and open ends of pipe shall be plugged and capped
ITCC in Riyadh
Residential Complex 15420-4 Drainage & Vent System
J10-13300
during construction using approved test plugs.
H. Roof leader expansion joints shall be installed on all roof leaders immediately
below drain.
I. All drip lines or drain tube shall extend to the nearest floor drain or service sink.
This shall include but shall not be limited to the discharge from pressure and
temperature relief valves, automatic air vents and vent connections on backflow
preventers.
A. Cleanouts
2. Cleanouts shall be located on bases of each soil and waste stacks, change
of direction of piping greater than 45 o on all horizontal runs, and intervals on
all horizontal runs where required or shown on drawings.
5. Where they occur in floors, cleanouts shall be piped to just below floor level
and shall be provided with plug and floor access plate flush with floor.
6. Where they occur in walls, cleanouts shall be provided with plug and wall
access plate.
B. Flashing Flanges: Install flashing flange and clamping device with each stack
and cleanout passing through waterproof membrane.
C. Vent Flashing Sleeves: Install on stacks passing through roof, secure over stack
flashing in accordance with manufacturer's instructions.
A. Floor Drains
ITCC in Riyadh
Residential Complex 15420-5 Drainage & Vent System
J10-13300
4. Install drain flashing collar or flange so that no leakage occurs between
drain and adjoining flooring. Maintain integrity of waterproof membranes,
where penetrated.
B. Roof Drains
1 Install roof drains at low points of roof areas, in accordance with the roof
membrane manufacturer's installation instructions.
2 Install drain flashing collar or flange so that no leakage occurs between roof
drain and adjoining roofing. Maintain integrity of waterproof membranes,
where penetrated.
A. Inspection: Do not enclose, cover, or put into operation drainage and vent piping
system until it has been inspected, tested and approved by the Engineer or the
authority having jurisdiction. Notify the Engineer, in writing, at least 24 hours prior
to the time such inspection must be made. Perform tests specified below in the
presence of the Engineer.
2. Finished Plumbing: After the plumbing fixtures have been set and traps filled
with water, test connections and prove they are gastight and watertight.
Plug the stack openings on the roof and building drains where they leave
building. Introduce air into piping system equal to a pressure of 250 Pa.
Use a U-tube or manometer inserted in the trap of water closet to measure
this pressure. Air pressure must remain constant without the introduction of
additional air throughout the period of inspection. Inspect all plumbing
fixture connections for gas and water leaks.
3. Repair all leaks and defects using new materials and retest system or portion
thereof until satisfactory results are obtained. Prepare reports for all tests
and required corrective action.
A. Clean interior of piping system. Remove dirt debris as work progresses. Clean
drain strainers, domes and traps, and remove dirt and debris.
B. Protect drains during remainder of construction period, to avoid clogging with dirt
and debris, and to prevent from traffic and construction work. Place plugs on
uncompleted piping at end of day or whenever work stops.
ITCC in Riyadh
Residential Complex 15420-6 Drainage & Vent System
J10-13300
END OF SECTION