BHARAT HEAVY ELECTRICALS

LTD. Industrial Systems Group


Prof. CNR Rao Circle, IISc. Post,
BANGALORE - 560 012
DRAWING SUBMITTED FOR INDICATED BY ()
FOR APPROVAL

FOR INFORMATION
Job No: IS-1-11-2008
Project: RMHS FOR 3MTPA STEEL
PLANT,NAGARNAR CHHATTISGARH
DDT :207………………………
Date :13.06.2012…………………

Checked by: …P.RAJU………………………


Page 1 of 30
Page 2 of 30
Page 3 of 30
Page 4 of 30
Page 5 of 30
Page 6 of 30
Page 7 of 30
Page 8 of 30
Page 9 of 30
Page 10 of 30
Page 11 of 30
Page 12 of 30
Page 13 of 30
Page 14 of 30
Page 15 of 30
Page 16 of 30
Page 17 of 30
Page 18 of 30
Page 19 of 30
Page 20 of 30
Page 21 of 30
Page 22 of 30
Page 23 of 30
Page 24 of 30
Page 25 of 30
Page 26 of 30
Doc. No. NMDC/BHEL/01/50/BE/‐‐/902

Tecpro Systems Ltd. By


App. By
VD
SKM
Date 8/Jun/12
Project : 3.0 MTPY INTEGRATED STEEL PLANT
Client: BHARAT HEAVY ELECTICALS LIMITED
Consultant: MECON LIMITED

RECTANGULAR HOPPER VOLUME CALCULATION


Top Portion  Bottom  Top Portion  Bottom  Height  Area of  Area of  Volume of 
3
Length of  Portion Length  Length of  Portion Length  of  Top  Bottom  Section (m ) 
Description Section in  of Section  Section in  of Section  Section  Portion  Portion  [h/3*(A1+A2+(A1
2 2
View 1‐1 (mm) View 1‐1 (m) View 2‐2 (m) View 2‐2 (m) (m) (m ) (m ) *A2)0.5)]

JH‐J21 (COKE)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1800 3100 1000 2300 490 1.80 7.13 2.04
Sec‐2 1800 3100 1000 2300 490 1.80 7.13 2.04
Sec‐3 6200 7500 2300 3600 490 14.26 27.00 9.94
Sec‐4 7500 7500 3600 5000 527 27.00 37.50 16.92
Sec‐5 7500 7500 5000 6363 1027 37.50 47.72 43.66
Sec‐6 7500 6858 6363 6838 607 47.72 46.90 28.72
Sec‐7 6858 1200 6838 1000 5359 46.90 1.20 99.31
Total Volume (m3) [Sum of All Sections] 202.64
Required Volume (m3) 200.00
Volume Achieved or Not Yes
JH‐J21C (G.COKE)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 750 9250 750 9250 3203 0.56 85.56 99.36
Sec‐2 9250 9250 9250 9250 708 85.56 85.56 60.58
Sec‐3 9250 1200 9250 1000 10089 85.56 1.20 325.86
3
Total Volume (m ) [Sum of All Sections] 485.80
3
Required Volume (m ) 450.00
Volume Achieved or Not Yes
JH‐J26 (SINTER‐TYPE‐A)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 600 2800 1000 3200 829 0.60 8.96 3.28
Sec‐2 600 2800 1000 3200 829 0.60 8.96 3.28
Sec‐3 5600 7700 3200 5300 791 17.92 40.81 22.62
Sec‐4 7700 7700 5300 7700 904 40.81 59.29 44.99
Sec‐5 7700 7700 7700 7700 5376 59.29 59.29 318.74
Sec‐6 7700 1200 7700 1200 8600 59.29 1.44 200.58
3
Total Volume (m ) [Sum of All Sections] 593.49
Required Volume (m3)
Required Volume (m 500 00
500.00
Volume Achieved or Not Yes
JH‐J26 (SINTER‐TYPE‐B)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 7100 1000 7700 2524 1.00 54.67 53.06
Sec‐2 7100 7100 7700 7700 5376 54.67 54.67 293.91
Sec‐3 7100 1200 7700 1200 8600 54.67 1.44 186.28
Total Volume (m3) [Sum of All Sections] 533.25
Required Volume (m3) 450.00
Volume Achieved or Not Yes
JH‐J34 (Coke Fines‐Type A)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 1200 6700 1200 6250 51.59 1.44 128.44
3
Total Volume (m ) [Sum of All Sections] 309.37
3
Required Volume (m ) 300.00
Volume Achieved or Not Yes
JH‐J34 (Coke Fines‐Type B)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 3857 6700 5666 3695 51.59 21.85 131.81
Sec‐5 3857 1200 2833 1200 2555 10.93 1.44 13.91
Sec‐6 3857 1200 2833 1200 2555 10.93 1.44 13.91
Total Volume (m3) [Sum of All Sections] 340.57
Required Volume (m3) 300.00
Volume Achieved or Not Yes
JH‐J34 (Lime Stone‐Type A)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 3857 6700 5666 3695 51.59 21.85 131.81
Sec‐5 3857 1200 2833 1200 2555 10.93 1.44 13.91
Sec‐6 3857 1200 2833 1200 2555 10.93 1.44 13.91
Total Volume (m3) [Sum of All Sections] 340.57
Required Volume (m3) 300.00
Volume Achieved or Not Yes

Page 27 of 30
JH‐J34 (Lime Stone‐Type B)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 1200 6700 1200 6250 51.59 1.44 128.44
Total Volume (m3) [Sum of All Sections] 309.37
3
Required Volume (m ) 300.00
Volume Achieved or Not Yes
JH‐J34 (DOLOMITE)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 1200 6700 1200 6250 51.59 1.44 128.44
Total Volume (m3) [Sum of All Sections] 309.37
Required Volume (m3) 300.00
Volume Achieved or Not Yes
JH‐J34 (R.S)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 6700 1000 6700 2148 1.00 44.89 37.65
Sec‐2 6700 7700 6700 6700 377 44.89 51.59 18.17
Sec‐3 7700 7700 6700 6700 2425 51.59 51.59 125.11
Sec‐4 7700 1200 6700 1200 6250 51.59 1.44 128.44
3
Total Volume (m ) [Sum of All Sections] 309.37
3
Required Volume (m ) 300.00
Volume Achieved or Not Yes
JH‐J34 (M.S)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1200 3750 800 3350 961 0.96 12.56 5.44
Sec‐2 3750 7700 3350 3350 1488 12.56 25.80 27.95
Sec‐3 7700 7700 3350 3350 2501 25.80 25.80 64.51
Sec‐4 7700 1000 3350 1000 6250 25.80 1.00 66.40
3
Total Volume (m ) [Sum of All Sections] 164.32
Required Volume (m3) 150.00
Volume Achieved or Not Yes
JH‐J34 (ORE FINES)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1200 6700 1200 6700 1926 1.44 44.89 34.91
Sec‐2 6700 7700 6700 6700 350 44.89 51.59 16.87
Sec‐3 7700 7700 6700 6700 2674 51.59 51.59 137.95
Sec‐4 7700 1200 6700 1200 6250 51.59 1.44 128.44
( 3) [Sum of All Sections]
TTotal Volume (m
lV l ) [S f All S i ] 318 16
318.16
Required Volume (m3) 300.00
Volume Achieved or Not Yes
JH‐J34 (F.D)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1200 3750 800 3350 736 0.96 12.56 4.17
Sec‐2 3750 7700 3350 3350 1140 12.56 25.80 21.42
Sec‐3 7700 7700 3350 3350 3074 25.80 25.80 79.29
Sec‐4 7700 1000 3350 1000 6250 25.80 1.00 66.40
Total Volume (m3) [Sum of All Sections] 171.28
Required Volume (m3) 150.00
Volume Achieved or Not Yes
JH‐J34 (LD SLAG)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1200 3750 800 3350 595 0.96 12.56 3.37
Sec‐2 3750 7700 3350 3350 921 12.56 25.80 17.30
Sec‐3 7700 7700 3350 3350 3434 25.80 25.80 88.58
Sec‐4 7700 1000 3350 1000 6250 25.80 1.00 66.40
3
Total Volume (m ) [Sum of All Sections] 175.66
Required Volume (m3) 150.00
Volume Achieved or Not Yes
JH‐J44(Type‐A/L.O)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 2340 1000 2340 469 1.00 5.48 1.38
Sec‐2 2340 4720 2340 7100 1666 5.48 33.51 29.17
Sec‐3 4720 7100 7100 7100 1666 33.51 50.41 69.43
Sec‐4 7100 7100 7100 7100 7145 50.41 50.41 360.18
Sec‐3 7100 1000 7100 1000 8054 50.41 1.00 157.08
Total Volume (m3) [Sum of All Sections] 617.24
Required Volume (m3) 600.00
Volume Achieved or Not Yes

Page 28 of 30
JH‐J44(Type‐C/L.S/DOLO)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 7100 1000 7100 2136 1.00 50.41 41.66
Sec‐2 7100 7100 7100 7100 8810 50.41 50.41 444.11
Sec‐3 7100 1000 7100 1000 8054 50.41 1.00 157.08
3
Total Volume (m ) [Sum of All Sections] 642.85
3
Required Volume (m ) 600.00
Volume Achieved or Not Yes
JH‐J46 (COKE)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 7000 1000 7000 2261 1.00 49.00 42.96
Sec‐2 7000 7000 7000 7000 1843 49.00 49.00 90.31
Sec‐3 7000 1200 7000 1000 5196 49.00 1.20 100.23
Total Volume (m3) [Sum of All Sections] 233.49
Required Volume (m3) 200.00
Volume Achieved or Not Yes
JH‐J50 (L.S/DOLO)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1050 5000 1050 5000 1488 1.10 25.00 15.55
Sec‐2 5000 5000 5000 5000 162 25.00 25.00 4.05
Sec‐3 5000 5000 5000 4600 376 25.00 23.00 9.02
Sec‐4 5000 1200 4600 1000 3574 23.00 1.20 35.09
3
Total Volume (m ) [Sum of All Sections] 63.71
3
Required Volume (m ) 50.00
Volume Achieved or Not Yes
JH‐J52 (COKE FINES‐TYPE‐A)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1600 7500 1600 7500 2223 2.56 56.25 52.47
Sec‐2 7500 7500 7500 7500 3950 56.25 56.25 222.19
Sec‐3 7500 1200 7500 1000 8227 56.25 1.20 180.08
3
Total Volume (m ) [Sum of All Sections] 454.74
Required Volume (m3) 450.00
Volume Achieved or Not Yes
JH‐J52 (LIMESTONE‐TYPE‐B)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1600 7500 1600 7500 2223 2.56 56.25 52.47
Sec‐2 7500 7500 7500 7500 3950 56.25 56.25 222.19
Sec‐3 7500 1200 7500 1000 8227 56.25 1.20 180.08
Total Volume (m3) [Sum of All Sections] 454.74
3
Required Volume (m ) 450.00
Volume Achieved or Not Yes
JH‐J52 (DOLOMITE‐TYPE‐C)
Symbol a1 b1 a2 b2 h A1 a1 a2
A1=a1*a2 A2 b1 b2
A2=b1*b2 Vn
Sec‐1 1600 7500 1600 7500 2223 2.56 56.25 52.47
Sec‐2 7500 7500 7500 7500 3950 56.25 56.25 222.19
Sec‐3 7500 1200 7500 1200 8227 56.25 1.44 182.89
Total Volume (m3) [Sum of All Sections] 457.54
3
Required Volume (m ) 450.00
Volume Achieved or Not Yes
JH‐J53 (COKE FINES)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1200 2250 900 1950 396 1.08 4.39 1.01
Sec‐2 2250 2250 1950 2250 113 4.39 5.06 0.53
Sec‐3 2250 2250 2250 2250 991 5.06 5.06 5.02
Sec‐4 2250 1000 2250 1000 1800 5.06 1.00 4.99
Total Volume (m3) [Sum of All Sections] 11.55
3
Required Volume (m ) 10.00
Volume Achieved or Not Yes
JH‐J55(O.F)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1300 8753 1500 9000 2626 1.95 78.78 81.51
Sec‐2 8753 9000 9000 9000 86 78.78 81.00 6.87
Sec‐3 9000 9000 9000 9000 1314 81.00 81.00 106.43
Sec‐5 9000 1000 9000 1000 7274 81.00 1.00 220.64
3
Total Volume (m ) [Sum of All Sections] 415.46
Required Volume (m3) 400.00
Volume Achieved or Not Yes
JH‐J59 (LUMP ORE‐TYPE‐A)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1600 3600 1600 3600 700 2.56 12.96 4.97
Sec‐2 3600 5450 3600 7300 1295 12.96 39.79 32.57
Sec‐3 5450 7300 7300 7300 1295 39.79 53.29 60.05
Sec‐4 7300 7300 7300 7300 1017 53.29 53.29 54.20
Sec‐5 7300 1000 7300 1000 7993 53.29 1.00 164.10
3
Total Volume (m ) [Sum of All Sections] 315.88
Required Volume (m3) 300.00
Volume Achieved or Not Yes

Page 29 of 30
JH‐J59 (DRI‐TYPE‐B)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1600 3600 1600 3600 625 2.56 12.96 4.43
Sec‐2 3600 5450 3600 7300 1156 12.96 39.79 29.07
Sec‐3 5450 7300 7300 7300 1156 39.79 53.29 53.61
Sec‐4 7300 7300 7300 7300 1371 53.29 53.29 73.06
Sec‐5 7300 1000 7300 1000 7992 53.29 1.00 164.08
Total Volume (m3) [Sum of All Sections] 324.25
Required Volume (m3) 300.00
Volume Achieved or Not Yes
JH‐J61A (LIME FINES)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 2140 3692 4448 6000 606 9.52 22.15 9.33
Sec‐2 3692 7292 6000 7800 1406 22.15 56.88 53.67
Sec‐3 7292 7800 7800 7800 198 56.88 60.84 11.65
Sec‐4 7800 7800 7800 7800 3790 60.84 60.84 230.58
Sec‐5 7800 1200 7800 1200 8500 60.84 1.44 202.98
Total Volume (m3) [Sum of All Sections] 508.22
Required Volume (m3) 500.00
Volume Achieved or Not Yes

JH‐J63 (SLAG)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 800 4000 800 4000 1206 0.64 16.00 7.98
Sec‐2 4000 4000 4000 4000 4594 16.00 16.00 73.50
Sec‐3 4000 1000 4000 1000 3300 16.00 1.00 23.10
3
Total Volume (m ) [Sum of All Sections] 104.58
Required Volume (m3) 100.00
Volume Achieved or Not Yes
JH‐J67 (COAL)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 2888.5 1000 2847 696 1.00 8.22 2.81
Sec‐2 1000 2888.5 1000 2847 696 1.00 8.22 2.81
Sec‐3 5777 5022 2847 4610 664 16.45 23.15 13.08
Sec‐4 5022 4664 4610 4878 315 23.15 22.75 7.23
Sec‐5 4664 1200 4878 1800 3225 22.75 2.16 34.32
Total Volume (m3) [Sum of All Sections] 60.24
Required Volume (m3) 40.00
Volume Achieved or Not Yes
JH‐J70 (COKE)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 1000 4000 1000 4000 1130 1.00 16.00 7.91
Sec‐2 4000 4000 4000 4000 1128 16.00 16.00 18.05
Sec‐3 4000 1200 4000 1000 2642 16.00 1.20 19.01
Total Volume (m3) [Sum of All Sections] 44.96
3
Required Volume (m ) 40.00
Volume Achieved or Not Yes
GH TO JH‐J47 (M.S/F.D/LD SLAG)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 4500 800 4500 800 4000 20.25 0.64 32.65
Total Volume (m3) [Sum of All Sections] 32.65
Required Volume (m3) 25.00
Volume Achieved or Not Yes
GH TO JH‐J60 (L.O)
Symbol a1 b1 a2 b2 h A1=a1*a2 A2=b1*b2 Vn
Sec‐1 4500 800 4500 800 4000 20.25 0.64 32.65
Total Volume (m3) [Sum of All Sections] 32.65
3
Required Volume (m ) 25.00
Volume Achieved or Not Yes

Rev. No Date Description By Chkd App By RECTANGULAR 


1 8/Jun/12 REVISED AS PER COMMENTS NIRRENJEN SKM VD HOPPER 
TITLE
VOLUME 
CALCULATION

Page 30 of 30