1.0 Scope
This standard covers the design, selection, application, fabrication , and
installation procedures for field engineered pipe supports on non-process lines
up to 1-1 /2" size, with certain exceptions, which are noted below.

2.0 Codes
The fabrication, assembly, and erection of field pipe supports shall be in
accordance with the requirements of the following codes . All references to
codes herein shall be deemed to be references to the latest issue of said
codes.
Industry Standards:
AISC , Inc. Manual of Steel Construction
American Society of Mechanical Engineers (ASME) standards:
ASME B31 .1 Power Piping
ANSI B31.3 Process Piping
Manufacturer's Standardization Society (MSS) standards:
MSS-SP-58 Pipe Hanger and Support - Materials, Design and Manufacture
MSS-SP-69 Pipe Hangers and Supports - Selection and Application
MSS-SP-89 Pipe Hangers and Supports- Fabrication and Installation
Practices
American National Standards Institute (ANSI) standards:
ANSI-B1 .1 Unified Screw Threads (UN and UNR Thread Forms)
ANSI-B1 .20.1 Pipe Threads, General Purpose
ANSI-B18.2.1 Square and Hex Bolts and Screws
ANSI-B18.2.2 Square and Hex Nuts
Research Council on Structural Connections (Endorsed by AISC) :
Specification for Structural Joints Using ASTM A325 or A490 Bolts
American Welding Society (AWS) standard:
AWS 01 .1 Structural Welding Code
Owner Technical Standards:
11 -130-11 Engineered Pipe Supports

3.0 General
The erection contractor will be responsible for field engineering of pipe
supports on non-process lines 1-1 /2" and smaller in accordance with the
requirements of this Technical Standard. There are exceptions to this general
rule; the following piping classifications require engineered pipe supports in
accordance with Technical Standard 11 - 130-11.
3.1 High Temperature Service (350°F and above)
3.2 Pulsating service
3.3 Relief valve lines
3.4 Lines connected to rotating equipment
Technical Standard
Field Engineered Pipe Supports 11-130-10
SHEET 2 OF 10
(
Date: 10/03

3.5 Control valve stations


3.6 Lines which require support from a vessel or other equipment.
3.7 Groups of lines 1-112'' and smaller, for which a common support is
required.
3.8 Non-metallic and lined pipes
3.9 All process designated piping.
All lines requiring field-engineered supports will be designated on the
piping isometric drawing or plan drawing by the note "Field Support."

4.0 Engineering of Field Pipe Supports


To standardize the appearance and design of field engineered pipe supports,
drawings titled "Typical Field Supports for Lines 1-1/2" and Smaller" are
attached within this standard. These drawings are to be used in the manner
............
outlined herein .
·:::::.
These drawings illustrate typical types of hangers, brackets, and supports as
generally required by small bore piping. The field erection contractor will , upon
noting the size, location, physical characteristics, and available supporting
structures, use the drawings as a guide to choose the type of support most
applicable.
The details shown on the drawings are not considered to be mandatory, but
are preferred. The contractor may utilize other supports (upon BASF approval) (
where it can be shown that a standard support is not suitable.
Maximum loads for Field Engineered pipe supports, shown in attachment "E"
of this Technical Standard apply to the pipe support structure only. The
existing steel to which they are attached should be checked for this imposed
loading; especially in applications where the loading will be eccentric and/or
torsional ; or where the existing steel is very light, as in pre-fab buildings.
Reference will be made to the Technical Data sheets (Attachments A, B, C,
and D) for spans, overhang, unsupported length variations, and allowable
loads.
Non-insulated pipelines shall rest directly on support steel. Insulated lines
shall use a shoe to elevate the insulation above the support steel. Shoe types
shall be selected from those shown in Technical Standard 11-130-11 .

5.0 Fabrication
All materials shall be new, free from defects impairing strength, durability, or
appearance, and shall conform to specifications outlined in MSS-SP58, Pipe
Hanger and Support- Materials, Design, and Manufacture.
(:: : :(( Material of construction shall be ASTM A992 for Wand WT rolled shapes and
A36 for all others unless otherwise noted. Plates, rods, bars, etc., which are
used for the fabrication of field pipe support assemblies, can be cut to shape or
size by shearing, sawing, machining, grinding or thermal cutting .

(
Technical Standard
Field Engineered Pipe Supports 11-130-10
SHEET 3 OF 10
Date: 10/03

Thermal cutting processes shall be suitable for the materials to which they are
applied. After thermal cutting , slag shall be removed prior to further fabrication
or use. Discoloration remaining on the flame cut surface is not considered to
be detrimental oxidation.
Screw threads shall be in conformance with ANSI B1 .1 Class 1A, 2A and 2B
for coarse thread series, and Class 2A and 2B for the eight thread series. Pipe
threads shall be in conformance with ANSI B1 :20.1 either straight or tapered ,
as required.
All threaded rods shall be hot-dip galvanized.
Welding of structural steel support components shall be in accordance with the
welded joint requirements specified in the AISC Manual of Steel Construction
and the AWS code. When welding any attachment to a pipe, governed by the
rules of ASME B31 .3 such welding shall conform to the specific applicable
welding procedures which have been qualified in accordance with Section IX of
the ASME Boiler & Pressure Vessel Code.
Welding of galvanized components to alloy or stainless steel is not allowed.
In areas where field welding is not permitted, pipe support connections to
existing steel may be made by bolting.
A copy of the fabricator's procedures and weld qualification record shall be
submitted for Owner review and record, prior to fabrication .
Where justified by site conditions (no welding, grinding or cutting) or by project
directive, channel framing systems such as Uni-Strut, Multi-Strut or Halfen may
be employed to support pipes covered by this Technical Standard. Such
systems must be designed in accordance with the manufacturers rules for
maximum loading and span criteria .

6.0 Painting
Dependent upon the requirements of the particular plant installation, fabricated
pipe support material shall be painted or galvanized. The Mechanical Contract
documents will specify the particular system to be used.
6.1 Painted Finish:
Fabricated pipe support shall be abrasive blasted and painted per the
Mechanical Contract, unless documented otherwise. Bolt threads in
assembled components may be painted . Stainless steel or other
corrosion resistant material need not be painted.
6.2 Galvanized Finish :
Fabricated pipe supports shall be galvanized in accordance with Technical
Standard 33-211-01 . Touch-up of field welded areas shall be in
accordance with Technical Standard 10-245-50.
Technical Standard
Field Engineered Pipe Supports 11-130-10
Date: 10/03 SHEET 4 OF 10 (

7.0 Installation
The field erection contractor will be responsible for providing the appropriate
type , quantity, and quality of support on lines 1-1/2" and smaller as defined by
this Technical Standard. Maximum allowable deflection for these pipelines
shall be 5/8". Additionally, lines shall be sufficiently guided to prevent
excessive sway and/or vibration, and to maintain alignment. Guides shall be
installed per requirements shown in Attachment "A". Guide types may be
selected from those shown in Technical Standard 11-130-11 .

(
Technical Standard
( Field Engineered Pipe Supports 11-130-10
SHEET 5 OF 10
Date: 10/03

ATTACHMENT "A"
TECHNICAL DATA

Weight
Weight Weight
Maximum Horizontal Vertical Sch.80
Line Sch.80 Sch. 80
Size
Support Guide Guide
c.s. c.s. c.s.
Spacing* Spacing Spacing Pipe/Water/
Pipe Pipe/Water
Insulation
%JJ 10ft 30ft 20ft 1.5 lb/ft 1.71b/ft 2.2 lb/ft
1" 12ft 30ft 20ft 2.2 lb/ft 2.5 lb/ft 2. 2 lb/ft
1 %" 15ft 40ft 22ft 3.6 lb/ft 4.4 lb/ft 5.7 lb/ft

* Spans are based on 5/8" maximum allowable deflection; and maximum bending stress
due to weight < 7,500 PSI.
Technical Standard
11-130-10
FIELD ENGINEERED

Date: 10/03
PIPE SUPPORTS
SHEET 6 OF 10
(

ATTACHMENT "B"
PERMISSIBLE OVERHANG VARIA TIONS

POINT OF
SUPPORT

PLAN

LINE DIMENSION ' A' DIMENSION ' B' DIMENSION 'C'


SIZE <FT.) <FT.) <FT. l

1'4 ' 1.25 2.5 3.75 5 6 12 9 6 3 1.25 5 2. 5 2. 75 3.25 3.5

I' 1.25 2.5 4 5 .25 6.5 13 9.75 6.5 3.25 1.25 5 .25 2. 75 3.25 3.5 4

Jli2' 1.5 3 4.5 6 7.5 15 11.25 7.5 3.75 1.5 6 3.25 3.5 4.25 4.5

COLUMN
NO. 8 0 0 8 0 8 0 0 8 0 8 0 0 8 0
TO DETERMINE PERMI SSIBLE OVERHANGS-
MATCH COLUMN NO. FOR DIMENSION ' A' WITH
SIMILAR COL UMN NUMBER FOR DIMENSION 'B' & DIMENSION ' C'

r
\

_ _ _I
Technical Standard
11-130-10
FIELD ENGINEERED
( Date: 10/03
PIPE SUPPORTS
SHEET 7 OF 10

ATTACHMENT "C"
PERMISSIBLE OVERHANG VARIATIONS

'A'

I c)
I

co
POINT OF SUPPORT
\_POINT OF SUPPORT

(
- -
r
,)''
PLAN

LINE DIMENSION 'A' DIMENSION 'B'


SIZE 1FT .l IFT.l

1'4' 4 5 5 7 8 7 5 5 4 3

I' 4 5 5 7 8 8 7 5 5 4

1'12' 5 5 7 8 9 8.5 7.5 5.5 5.5 4.5

COLUMN
NO. 8 0 0 8 0 8 0 0 8 0
TO DETERMINE PERMISSIBLE OVERHANGS-
MATCH COLUMN NO. FOR DIMENSION 'A' WITH
( SIMILAR COLUMN NUMBER FOR DIMENSION 'B'
Technical Standard
11-130-10
FIELD ENGINEERED

Date: 10/03
PIPE SUPPORTS
SH EET 8 OF 10
(

ATTACHMENT uou
PERMISSIB LE OVERHANG VARIATIONS
'A'

I
I (
I )

co POINT OF SUPPORT

I (
I )

(
PL AN

LINE DIMENSION 'A ' DIMENSION 'B'


SIZE (F T. ) (FT .)

y4· 2. 5 3 3.5 4 4. 5 10 7 5 4 2

I" 3 3.5 4 4.5 5 9 5.5 5 3 1.5

1112' 3 3.5 4 4.5 5 12 9 7. 5 5 4

COLUMN
NO. 8 CD 0 8 0 8 CD 0 8 0
TO DE TERMINE PERMISSIBLE OVERHANGS-
MATCH COLUMN NO. FOR DIMENSION ' A' WITH
SIMILAR COLUMN NUMBER FOR DIMENSION 'B'
Technical Standard
11-130- 10
FIELD ENGINEERED
( PIPE SUPPORTS
Date: 10/03 SHEET 9 OF 10

ATTACHMENT "E"
TYPICAL FIELD SUPPORT FOR LINES I lf2' & SMALLER

L2" x 2"x~"
CTYP. >

LOAD = 300 LBS TOTAL

(
_J
w
w
1-
Vl

1-
Vl
X
w

1/4'CTYP.>
L-U-BOL T
MAX. LOAD = 300 LBS TOTAL GRINNELL FIG.I37
MAX. LOADS BASED ON l "ll OR EOUALCTYP.)
PIPES WITH INSULATION SPACED
8" D.C. AND SPANNING 12'-0" MAX/LOAD = 150 LBS

EXIST.
STEEL L2"x 2"x~"
CTYP. >

L2' X

Ty p. \..........,_(.tr--7'- -...-
'/4'
MAX. LOAD = 100 LBS
MAX/LOAD = 100 LBS
Technical Standard
11-130-10
FIELD ENGINEERED

Date: 10/03
PIPE SUPPORTS
SHEE T 10 OF 10 (
ATTACHMENT "F"
TYPICAL FIELD SUPPORT FOR LINES l 1/2 ' & SMALLER

DIM. MAX.LOAD MAX.LOAD


' A' ro 'A' ~ ' A'

12' 100 LBS . 100 LBS.

18' 75 LBS. U- BOL T !GRINNE LL F IG.I37l OR EQUAL 18' 7 5 LBS.


!L OOSE WHEN USED AS GUIDE,
24 ' 50 LBS. TIGHT WHEN USED AS SUPPORT.l 24 ' 50 LBS.

WELDED B E A M -
X
<(
ATTACHMENT
:::;;: GRINNELL --- %· 0 TH'D ROD
0I FIG. 66 OR EQUAL
NUT <TYP .l
(
c., WELDLESS EYE
NUT GRINNELL ~
FIG . 290 OR EQUAL

U- BOLT
GRINNEL FIG.I3 7
OR EQUAL
!PULL TIGHTl ~I MAX. HGR. LENGTH

LPIPE CLAMP
MAX . LOAD = ISO LBS. FOR NON-INSULA TED LINES
USE GRINNELL FIG. 212
OR EQ UAL

- - 2' OR LARGER <TYP.l


f2'
11 OR SMALLER - -
!SUPPOR TING LINEl

U-BOLT ON LARGE
LINES T O BE TIGHT.

U- BOL T ON SMALL
LINE:
LOOSE WHEN USED
AS GUIDE ,
U-BOLT TIGHT WHEN USED
AS SUPPORT.
GRINNELL l1/2' OR SMALLER - -
FIG .I3 7 <TYP .l
OR EQUAL PIPE TO PIPE SUPPOR T
~~=-~~~~=-~~~~~
PIPE TO PIPE SUPPORT
- VERTICAL - HORIZON TAL
Technical Standard
11-130-11
Approved: H. Zoghbi Std Cat
(signed original on file) Engineered Pipe Supports SHEET 1 OF 98
R
Date: 02/08

1.0 Scope
This standard covers the fabrication and installation procedures for engineered
pipe supports, including spring hangers. This generally applies to piping 2"
diameter and larger, and includes .eJ.! process piping.
For all other piping , BASF Technical Standard 11-130-10 (Field Engineered
Pipe Supports) shall apply.

2.0 Standards and Data Sheets

American Institute of Steel Construction (AISC)


AISC Manual of Steel Construction
American Society of Mechanical Engineers (ASME) standards:
B31 .1 Power Piping
B31 .3 Process Piping
American National Standards Institute (ANSI)
B18.2.1 Square and Hex Bolts and Screws (Inch Series)
B18.2.2 Square and Hex Nuts (Inch Series)
B1 .1 Unified Screw Threads (UN and UNR Thread Form)
B1 .20.1 Pipe Threads, General Purpose (Inch Series)

Research Council on Structural Connections (Endorsed by AISC)

Specification for Structural Joints Using ASTM A325 or


A490 Bolts
American Welding Society (AWS)

Dl.J Structural Steel Welding Code


BASF Technical Standards
11 -130-10 Field Engineered Pipe Supports
12-130-02 Piping Design Requirements
11 -130-12 Piping Flexibility and Stress Analysis
18-225-03 Field Pressure Testing of Piping
32-210-04 Concrete Foundations - Bolts in Concrete
33-211-01 Specifications for Structural Steel
Manufacturer's Standardization Society (MSS)
Pipe Hanger and Support-Materials, Design and
SP-58
Manufacture
SP-69 Pipe Hangers and Supports - Selection and Application
Pipe Hangers and Supports - Fabrication and Installation
MSS-SP-89 Practices
Technical Standard
11 -130-11
Date: 2/08
Engineered Pipe Supports
SHEET 2 OF 98
(

2.1 Refer to BASF Technical Standard 11-130-12 for information regarding


flexibility analysis for use in determining proper pipe support locations.

3.0 Pipe Support Detail Drawings


3.1 Detail drawings of spring hangers and special pipe supports are issued
per project. Details of standard pipe supports are included in this
Standard. The detail drawings show specific information which consists
of (but not limited to) the following :
Material of Construction
Load and Movement Data
Supplementary Steel
Field or Shop Welds
Shop or Field Drilled Holes
Reference drawings and or line number
Support Identity
3.2 Dimensioning of the details shall be to a tolerance of 1/8" ±.
3.3 The material call-out on the detail drawing indicates all components of
the support assembly. Identification of standard catalog components is
made by manufacturer's figure number, type and size. These figure
numbers refer to "Grinnell Pipe Hanger Catalog" - (latest Edition). The
Mechanical Contractor may substitute components from other Vendors , (
provided they meet the load carrying capabilities of the components
shown on the detail drawings.
3.4 Operating and installation loads, direction and amount of vertical
movement will be shown on the detail drawing for variable or constant
spring hangers.
3.5 For supplementary steel furnished as part of the support assembly
complete information will be shown on the detail drawing.
Supplementary steel is shown on the detail drawing, which is either
existing in-place or not furnished , and will be clearly marked.
3.6 All field welds and shop welds of non-catalog items will be indicated on
the detail drawing using American Welding Society standard welding
symbols.
3.7 The location of pipe supports/assemblies is usually shown dimensionally
on the piping isometric (fabrication & installation) drawing. In some
cases a separate "Pipe Support Location Plan" may be generated.
3.8 The support identification on the detail drawing will consist of a prefix (to
identify the general type of the support), and a serial number. Examples
of prefixes are as follows:
BS Base Ell/Line Support
DL Dummy Leg Support
DS Directional Stop
F Foundation Detail
PA Pipe Anchor
PG Pipe Guide
Technical Standard
11-130-11
Engineered Pipe Supports
Date: 2/08 SHEET 3 OF 98

PH Pipe Hanger
PL Pipe Lug
PS Pipe Support
s Shoe
SH Spring Hanger
vc Vessel Clip
U8 U-8olt
WP Wear Pad
(Section 10.0 shows specific details.)
Example of support identification mark number: PS-80.

4.0 Dimensional Tolerances


4.1 This section covers maximum tolerances in fabricated pipe supports
except for cast or forged products.
4.2 Tolerances for raw materials such as strip, sheet, bar, plate, pipe, tubing ,
structural and bar size shapes shall be in accordance with recognized
standards and specifications. Tolerances for casting and forgings shall
be to the individual manufacturers standards.
4.3 Manufacturing Tolerances
4.3.1 Cut Lengths - Linear
a) Hanger rods ± 1/2 in.
b) Structural shapes, pipe, tubing± 1/8 in.
c) Plates & bars ± 1/8 in.
4.3.2 Threads
~t~~~~~ a) Screw threads to ASME 81 .1, Class 1A, 2A and 28
b) Pipe threads to /ASME 81 .20.1
4.3.3 Weld Sizes - all welds plus only, no minus.
4.3.4 Angularity- all manufacturing methods to ± 4 degrees.
4.3.5 Holes - Drilled or Punched Only
a) Location - center to edge, or center to center, ± 1/16 in.
b) Diameter- plus .2 times metal thickness or minus 1/32 in.

5.0 Fabrication
This section covers fabrication of pipe support components and assemblies.
5.1 Material of construction shall be ASTM A992 for W and WT rolled
shapes and ASTM A36 for all others unless otherwise noted. Plates,
rods, bars, etc., which are used for the fabrication of support assemblies
may be cut to shape or size by shearing , sawing, machining, grinding or
thermal cutting.
5.2 Thermal cutting processes shall be suitable for the material to wh ich it is
applied. After thermal cutting , slag shall be removed prior to further
fabrication or use. Discoloration rema ining on the flame cut surface is
not considered to be detrimental oxidation.
5.3 Drilling and punching shall be performed as required by drawings and
specifications.
Technical Standard
11-130-11
Engineered Pipe Supports
Date: 2/08 SHEET 4 OF 98
(

5.4 Screw threads shall be in conformance with ASME B1.1 Class 1A, 2A
and 2B for coarse thread series and Class 2A & 2B for the eight thread
series.
5.5 Pipe threads shall be in accordance with ASME B1.20.1 either straight or
tapered as required.
5.6 All threaded rod shall be hot-dip galvanized .
5. 7 Welding shall be performed where indicated on the detail drawings in
accordance with the welded joint requirements specified in the AISC
Manual of Steel Construction. When welding any attachment to a pipe
governed by the rules of ASME B31 Codes, such welding shall be to the
specific applicable welding procedures which have been qualified in
accordance with Section IX of the ASME Boiler & Pressure Vessel Code.
A copy of the fabricator's procedures and weld qualification record shall
be submitted for owner review and record.
5.8 Bolting of structural components where noted shall be ASTM A325 high
strength bolts.

6.0 Finish - (Painting/Galvanizing)


6.1 Fabricated support material shall be painted or galvanized as noted in
contract documents and in accordance with BASF Technical Standard
33-211-01 . Paint system shall be noted on the contract documents.
6.2 Bolt threads in assembled components may be painted . Stainless steel (
or other corrosion-resistant material need not be painted .

7.0 Marking
When pipe supports are to be shop fabricated , each pipe support shall have its
identifying mark number painted on with water-proof paint in letters at least 3/4"
high.

8.0 Pipe Support Installation


This section outlines the recommended field practices during pipe support
installation, adjustment, testing and final inspection.
8.1 Engineered pipe supports shall be located in strict accordance with the
pipe support location drawing. Relocation and reorientation of any pipe
support from the specified location shall not be permitted without written
permission of the Principal Construction Engineer.
8.2 Installed pipe supports shall be used only for their intended purpose.
They shall not be used for rigging or erection purposes.
8.3 The contractor is responsible for developing an installation sequence
giving priority to major components and groups of piping closest to the
supporting structure.
Technical Standard
11-130-11
Engineered Pipe Supports
Date: 2/08 SHEET 5 OF 98

8.4 Support Types (with Cautionary Notes)


8.4.1 Rod Hangers, either rigid or spring type, are adjustable vertical
assemblies consisting of structural attachment, hanger rod (with
or without intermediate components) , and pipe attachment.
Installation of rod hangers requires either direct attachment to
building structure or installation of supplementa l framing to
existing members.
8.4.2 Brackets are cantilevered members with or without a knee brace,
designed to withstand the gravity load and horizontal forces.
Brackets may be installed by welding or bolting to structure,
poured in-place embedments, or through the use of drilled
concrete fasteners. For bolted-on brackets, it is important to
tighten threaded fasteners equally to assure proper load
distribution.
8.4.3 Anchors may be weldments or clamp type and are used to fix
selected points on a piping system in order to control forces,
moments and thermal movement in each section of the total pipe
run . Installation of anchors may be by bolting or welding to a rigid
structure capable of withstanding all of the design forces. The
pipe is secured to the anchor by clamping, welding, or both.
Integrity of rigid structure should be reviewed .
( 8.4.4 Guides may be sliding, rolling or spider type . The design is based
upon thermal movement, load, direction of travel and thickness of
pipe insulation. Guides are used to control piping movement,
provide lateral stability, control sway and to assure proper piping
alignment at expans ion joints and loops. Installation of guides
may be by bolting or we lding the base to the supporting structure
as indicated on the detail drawing. Care must be taken at the
time of initial installation to maintain the proper alignment,
elevation and clearance.
8.4.5 Base Supports are used to support piping from below. They
encompass a family of supports, guides, slides, anchors, springs,
etc. Attachment to the pipe may be by bolted-on clamps,
U-bolts, or by welding . Load is transferred to the bui lding
structure through the use of a cradle, pipe or structural member
which may be fastened directly to the bu ilding structure, or
provided with a base plate. During installation, the supported
pipe must be adequately braced to maintain stability until the
system is completely installed.
8.4.6 Spring Supports are designed so that they cannot become
disengaged by movement of the supported pipe. All springs
shall be under compression , so that failure will not result in the
complete release of the load. Hot load and cold load settings
shall be permanently stamped on the scale plate of each spring
support. The spring shall be factory-set to the calculated cold
load (shown on the support detail drawing) by means of an easily
Technical Standard
11-130-11
Engineered Pipe Supports
Date: 2/08 SHEET 6 OF 98
(

removable spacer piece or pin. This device shall be so designed


that the support assembly will act as a rigid support before its
removal. It shall be clearly labeled with a caution tag warning
that the device must be removed before start up. Do not remove
this device, or make any load or travel scale adjustments until
hydrotest (if required) is complete. After installation, spring
supports shall first be checked for indicated load, and adjustment
made to the spring turnbuckle or adjustment device to
compensate for initial dead load deflections or for minor
dimensional errors. Special attention should be paid to spring
supports on piping connected to rotating machinery. Such piping
in steam, air, gas or vapor service should be balanced by the
spring-supports before flange connections are bolted up to
ensure that practically no piping loads are imposed on the
machinery prior to start-up. This must be achieved without
adjusting the load scale setting. Liquid lines to pumps may call
for special procedures, and these will be described on the detail
sheets when necessary.
Actual piping loads may vary from the calculated loads for a
number of reasons and some field adjustment may be
necessary.
8.4.7 Before hydrotest (when required) , all spring supports shall be (
inspected at this time, the location, spring support number,
installation and possible interference shall be checked . The
support location drawing and the support detail drawing provide
the necessary information for this check. The pipe shall be free
to move up or down the required amount without interfering with
other piping, electrical conduit, trays, ductwork or structural steel.
The travel stops shall still be in place and the support assembly
shall be carrying a load (for example, rods shall be tight or the
load flange shall be in contact with the pipe or support shoe).
8.4.8 After hydrotest, in accordance with BASF Technical Standard
18-225-03 (when required) , the travel stops shall be removed
and the spring support inspected again to check the load setting.
On lines which carry liquid, the load indicator will normally be at a
position above the cold setting , because the line is empty. If the
stops are specifically required to be left in place for the empty
condition , a tag must be attached to each stop indicating this.

9.0 Specific Details


9.1 The following pages show pipe supports that have been standardized.
Under normal conditions , the pipe supports required for a particular
project will consist of standardized details and special details. Specials
are supports not used often enough to justify a standard detail, or one in
which the complexity of the design is such that an individual detail is
required.
(
\
Technical Standard
11-130-11
Engineered Pipe Supports
Date: 2/08 SHEET 7 OF 98

9.2 Load limits given are for pipe supports only and not for the structural
elements supporting them. Pipe support details, which affect structural
elements, shall be coordinated with the Civil/Structural Engineer for the
project prior to specifying them on the piping drawings.
9.3 Pipe support details, which affect vessels, shall be coordinated with the
Mechanical Engineer for the project prior to specifying them on the
piping drawings.
9.4 Some pipe support details indicate alternate bolted connections to field
welding for attachments to structural components . Shop welding or shop
drilling of holes for field bolting are preferred methods of attachments.
The contract documents shall indicate the choice for attachments.
9.5 Unless noted otherwise, pipe support anchoring to concrete shall be
"HIT HY 150" HIL Tl adhesive anchors or Owner approved equal.
Minimum depth of embedment (E) into concrete shall be as noted.
9.6 Details for pipe guides (PG) and pipe supports (PS) where only field
welding is shown for connection to existing structural member, engineer
has option to specify equivalent field bolted connection with minimum 2-
5/8" dia bolts and 3/8" thick plate as required .

(
Technical Standard
11-130-11
Date: 2/08
Engineered Pipe Supports
SHEET 8 OF 98
(

·:::::.
PIPE SPAN TABLE

Pipe Size Schedule Thickness Maximum Span


Between Supports
NPS inch feet
%" S/40 .0109 6.0
%" S/80S 0.147 7.0
%" S/40 0.113 7.9
%" S/80S 0.154 9.0
1 S/10S 0.109 8.5
1 S/80 0.179 9.6
1.5 S/10S 0.109 10.3
1.5 S/80 0.200 12.0
2 S/10S 0.109 13.3
2 S/40 0.154 14.8
3 S/10S 0.120 17.5
3 S/40 0.216 20.8
4 S/10S 0.120 20.0
4 S/40 0.237 24.5
6 S/10S 0.134 25.0
6 S/40 0.280 30.7
8 S/10S 0.148 27.8 (
8 S/40 0.322 35.5
10 S/ 10S 0.165 31 .0
10 S/40 0.365 39.7
12 S/10S 0.180 33.4
12 S/40S 0.375 42.4
14 S/10S 0.188 34.7
14 S/30 0.375 43.6
16 S/10S 0.188 35.8
16 S/30 0.375 45.4
20 S/10S 0.218 34.6
20 S/20 0.375 48.1

NOTES:
1. The span table shown is based on an average value of L2 from Table 1 d and 1e in
Global Procedure G-P-PI-270 Appendix 1. This aligns more closely with the true
end condition (fixed/free) at the rack piping support, and provides for a more
conservative span length.
2 . Span table calculation based on the following modeling:
a. Simply supported beam with uniform loading
b. Low-carbon steels and austenitic stainless steel materials.
c. Water filled weight case plus insulation/jacket at 3" thickness with a
combined weight of 9.54 lf/ft2.
d. Wind loading not considered. This requirement is part of the Civil/Structural
assessment of the pipe rack.
Maximum stress limited to 5.8 ksi (roughly 0.25SA for low-carbon steel materials,
and 0.4SA for austentic SS).Maximum deflection center span limited to< 5/8" (

\
Technical Standard
11-130-11
( Date: 2/08
Engineered Pipe Supports
SHEET 9 OF 98

ENGINEERED PIPE SUPPORT SCHEDULE


NEW DETAIL# DESCRIPTION DATE REVISED OLD DETAIL#
BS- 1 BASE ELL/LINE SUPPORT 08/03 PS- 49
BS- 2 BASE ELL/LINE SUPPORT 08/03 PS- 49
BS- 3 BASE ELL/LINE SUPPORT 08/03 PS- 50
BS-4 BASE ELL/LINE SUPPORT 08/03 PS- 50
BS-5 BASE ELL/LINE SUPPORT 08/03 NEW
BS-6 BASE ELL/LINE SUPPORT 08/03 NEW
DL- 1 DUMMY LEG SUPPORT 08/03 NEW
DL-2 DUMMY LEG SUPPORT 08/03 NEW
DL-3 DUMMY LEG SUPPORT 08/03 NEW
DL-4 DUMMY LEG SUPPORT 08/03 NEW
DL-5 DUMMY LEG SUPPORT 08/03 PS- 91
DL-6 DUMMY LEG SUPPORT 08/03 PS- 91
DL-7 DUMMY LEG SUPPORT 08/03 NEW
DL-8 DUMMY LEG SUPPORT 08/03 NEW
DS -1 DIRECTIONAL STOP 08/03 DS- 1
DS-2 DIRECTIONAL STOP 08/03 DS - 2
DS-3 DIRECTIONAL STOP 08/03 DS-3
DS-4 DIRECTIONAL STOP 08/03 DS-4
DS - 5 DIRECTIONAL STOP 08/03 DS-5
F- 1,2, & 3 FOUNDATION DETAIL 08/03 F -1,2, & 3
F-4 FOUNDATION DETAIL 08/03 F-4
PA - 1 PIPE ANCHOR 08/03 NEW
PA - 2 PIPE ANCHOR 08/03 NEW
PG - 1 PIPE GUIDE 08/03 PG -1
PG - 2 PIPE GUIDE 08/03 PG -2
PG- 3 PIPE GUIDE 08/03 PG- 3
PG - 4 PIPE GUIDE 08/03 PG-4
PG - 5 THRU 10 PIPE GUIDE 08/03 PG- 5 THRU 10
PG - 11 PIPE GUIDE 08/03 PG -11
PG - 12 PIPE GUIDE 08/03 PG -12
PG - 13 PIPE GUIDE 08/03 PG -13
PG - 15 ANGLE GUIDE SUPPORT 08/03 PG- 60
PG - 16 ANGLE GUIDE SUPPORT 08/03 PG- 64
PG -17 ANGLE GUIDE SUPPORT 08/03 PG- 84
PG -18 ANGLE GUIDE SUPPORT 08/03 PG- 85
PG -19 ANGLE GUIDE SUPPORT 08/03 PG- 86
PG - 20 ANGLE GUIDE SUPPORT 08/03 PG - 87
PG - 21 ANGLE GUIDE SUPPORT 08/03 PG- 88
PG - 22 ANGLE GUIDE SUPPORT 08/03 PG- 89
PG- 23 ANGLE GUIDE SUPPORT 08/03 NEW
PG- 24 GUIDE FROM VESSEL 08/03 PG- 35
PG- 25 GUIDE FROM VESSEL 08/03 PG - 31
PG- 26 GUIDE FROM VESSEL 08/03 PG - 32
PG- 27 GUIDE FROM VESSEL 08/03 PG - 34
PH -1 PIPE HANGER SUPPORT 08/03 NEW
(
Technical Standard
11-130-11
Date: 2/08
Engineered Pipe Supports
SHEET 10 OF 98
(

ENGINEERED PIPE SUPPORT SCHEDULE


NEW DETAIL# DESCRIPTION DATE REVISED OLD DETAIL#
PH-2 PIPE HANGER SUPPORT 08/03 NEW
PH- 3 PIPE HANGER SUPPORT 08/03 NEW
PH-4 PIPE HANGER SUPPORT 08/03 PH - 20
PH- 5 PIPE HANGER SUPPORT 08/03 PH- 21
PH- 6 PIPE HANGER SUPPORT 08/03 PH -22
PH -7 PIPE HANGER SUPPORT 08/03 PH -23
PH- 8 PIPE HANGER SUPPORT 08/03 PH -24
PH- 9 PIPE HANGER SUPPORT 08/03 PH - 25
PL-1 PIPE LUG 08/03 WL - 1&2
PS- 1 PIPE FLANGE SUPPORT 08/03 NEW
PS -2 VERTICAL PIPE SUPPORT 08/03 PS -41
PS- 3 HORIZONTAL PIPE SUPPORT 08/03 PS- 42
PS -4 VERTICAL PIPE SUPPORT 08/03 PS- 43
PS- 5 HORIZONTAL PIPE SUPPORT 08/03 PS -44
PS- 6 HORIZONTAL PIPE SUPPORT 08/03 PS- 45
PS -7 HORIZONTAL PIPE SUPPORT 08/03 PS- 46
PS -8 VERTICAL PIPE SUPPORT 08/03 PS -47
PS -9 ANGLE PIPE SUPPORT 08/03 PS -48
PS -10 ANGLE PIPE SUPPORT 08/03 PS- 61
PS- 11 ANGLE PIPE SUPPORT 08/03 PS -65
PS -12 ANGLE PIPE SUPPORT 08/03 PS -71
PS -13 W4x13 PIPE SUPPORT 08/03 PS- 80
PS - 14 W4x13 PIPE SUPPORT 08/03 PS- 81 (
PS -15 ANGLE PIPE SUPPORT 08/03 PS - 82
PS- 16 ANGLE PIPE SUPPORT 08/03 PS- 83
PS- 17 ANGLE PIPE SUPPORT 08/03 PS- 90
PS -18 ANGLE PIPE SUPPORT 08/03 PS- 94
PS -19 ANGLE PIPE SUPPORT 08/03 PS- 92
PS- 20 RISER CLAMP SUPPORT 08/03 PS- 93
PS- 21 ANGLE PIPE SUPPORT 08/03 PS- 95
PS- 22 ANGLE PIPE SUPPORT 08/03 PS- 96
PS -23 ANGLE PIPE SUPPORT 08/03 NEW
PS -24 ANGLE PIPE SUPPORT 08/03 NEW
PS -25 ANGLE PIPE SUPPORT 08/03 PS- 100
PS- 26 ANGLE PIPE SUPPORT 08/03 PS- 101
PS- 27 ANGLE PIPE SUPPORT 08/03 PS- 102
PS- 28 "T" TYPE PIPE SUPPORT 08/03 PS- 103
PS- 29 PIPE SUPPORT FROM COLUMN 08/03 PS- 104
PS- 30 PIPE SUPPORT FROM COLUMN 08/03 PS- 105
PS- 31 PIPE SUPPORT FROM COLUMN 08/03 PS -106
PS- 32 PIPE SUPPORT FROM COLUMN 08/03 PS- 107
PS- 33 PIPE SUPPORT FROM COLUMN 08/03 PS- 108
PS- 34 TRAPEZE TYPE SUPPORT 08/03 PS- 109
PS- 35 TRAPEZE TYPE SUPPORT 08/03 PS- 110
PS -36 MULTIPLE PIPE SUPPORT 08/03 PS- 111
PS- 37 MULTIPLE PIPE SUPPORT 08/03 PS- 112
PS- 38 MULTIPLE PIPE SUPPORT 08/03 PS - 113
PS- 39 MULTIPLE PIPE SUPPORT 08/03 PS- 114
PS- 40 STRUCTURAL MEMBER SUPPORT 08/03 PS- 115
PS- 41 STRUCTURAL MEMBER SUPPORT 08/03 PS- 116
PS -42 STRUCTURAL MEMBER SUPPORT 08/03 PS- 117
PS- 43 STRUCTURAL MEMBER SUPPORT 08/03 PS - 118 (
Technical Standard
11-130-11
( Date: 2/08
Engineered Pipe Supports
SHEET 11 OF 98

ENGINEERED PIPE SUPPORT SCHEDULE


NEW DETAIL# DESCRIPTION DATE REVISED OLD DETAIL#
PS- 44 MULTIBLE PIPE SUPPORT 08/03 PS- 119
PS -45 PIPE SUPPORT FROM VESSEL 08/03 PS -36
PS -46 PIPE SUPPORT FROM VESSEL 08/03 PS- 37
PS -47 PIPE SUPPORT FROM VESSEL 08/03 PS- 26
PS -48 PIPE SUPPORT FROM VESSEL 08/03 PS- 27
PS- 49 PIPE SUPPORT FROM VESSEL 08/03 PS- 28
PS- 50 PIPE SUPPORT FROM VESSEL 08/03 PS - 29
PS- 51 PIPE SUPPORT FROM VESSEL 08/03 PS - 30
PS- 52 PIPE SUPPORT FROM VESSEL 08/03 PS- 33
S- 1 & S -1A C. S. PIPE SHOE 08/03 s- 1
S - 2&S-2A C. S. PIPE SHOE 08/03 S-2
S - 3/3A THRU 5/5A C. S. PIPE SHOE 08/03 S- 3 THRU 5
S - 6/6A THRU 8/8A C. S. PIPE SHOE 08/03 S- 6 THRU 8
s -10 C. S. I ALLOY PIPE SHOE 08/03 NEW
S-11&11A ALLOY PIPE SHOE 08/03 S -1AL
S-12&12A ALLOY PIPE SHOE 08/03 S -2AL
S- 13/13A THRU ALLOY PIPE SHOE 08/03 S- 3 AL THRU 6AL
15/15A
S- 16/16A THRU ALLOY PIPE SHOE 08/03 NEW
18/18A

( S- 20 & 20A
S- 21 & 21A
S - 22/22A THRU
ALLOY PIPE SHOE
ALLOY PIPE SHOE
ALLOY PIPE SHOE
08/03
08/03
NEW
NEW
08/03 NEW
24/24A
S-25/25A THRU ALLOY PIPE SHOE 08/03 NEW
27/27A
s- 29 CRADLE PIPE SHOE 08/03 NEW
s- 30 COLD PIPE SHOE 08/03 ss -1
s- 31 COLD PIPE SHOE 08/03 NEW
s- 32 COLD PIPE SHOE/GUIDE 08/03 NEW
s- 33 COLD PIPE SHOE/ANCHOR 08/03 NEW
SH -1 SPRING HANGER SUPPORT 08/03 SH -10
SH-2 SPRING HANGER SUPPORT 08/03 SH- 11
SH-3 SPRING HANGER SUPPORT 08/03 SH -13
SH-4 SPRING HANGER SUPPORT 08/03 SH- 15
SH-5 SPRING CAN SUPPORT 08/03 SH- 14
vc- 1 VESSEL CLIP 08/03 vc- 1
vc -2 VESSEL CLIP 08/03 vc- 2
vc -3 VESSEL CLIP 08/03 VC-3
vc -4 VESSEL CLIP 08/03 vc -4
UB - F U-BOLT FASTENER 08/03 NEW
UB -G U-BOLT GUIDE 08/03 NEW
NON-METALLIC WEAR PAD FOR 01 /08 NEW
~r~ ~ ~ ~ WP-1
UNISULATED LINES
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 12 OF 98
(
rp
I
.I ,...... DO NOT BURN
LPIPE "A"~
EL . "E"
~V'"'~" ~ THRU PIPE
CTYP . l
---~-- - - - -- -- -h---- -~-----.!{-- -fr- -- -- -- --/ -- - --
WI!) ...
ID~ + !"<NOTE Dl
w ..... C) /PIPE "C':--- , TYP .
:llllz N
..... <NOTE Al ~~ .. v
s~a: ....
~ o~a: DISSIMILAR WELD FOR
- (/)-z ~t ALLOY PIPE "A" ONLY
<NOTE Cl
wOo
~~~
It
:I:o / ~~~~WEEP HOLE ~ -PIPE "B" <NOTE Bl
1-J:
Ill BASE f ~
<TYP . l
EL . II FII
I I

z
....
:::!;
TYPE I TYPE II STEEL MOUNT BY STRUCTURAL
<WELD BASE f TO STEEL U. N. O. l

=:
I

~-1]··5[·SCHED~E
~v

SEE

(
BASE e DETAIL

ADJUSTABLE SUPPORT SCHEDULE.


PIPE PIPE "B"
II All PIPE "C" BASE ~ "L"
STD WT MIN SI ZE SIZE SIZE MAX LENGTH
1 " - 1~" 1~II SCH 8~ 1" SCH 8~ 6 11 x6 11 x~" 3 ' -~"

211-3 11 2" SCH 4~ 1 ~" SCH 8~ 6 .. x6 .. x~~~ 3'-0"


411-611 3" SCH 40 2~" STD WT 7"x7"x~" 3'-6"
8"-1~" 6" SCH 80 5" STD WT 9"x9"x~" 3 ' -6"
12"-14" 10" SCH 140 8" STD WT 14"x14"x~" 4'-0"
16" - 18" 14 " SCH xs 12" STD WT 18"x18" X~ " 4' -~ "

20 "-24" 18" SCH 80 16" STD WT 20" x 20"x~" 4'-0"


26"-30" 24" SCH 120 12" STD WT 26"x26"x~" 4'-6"

NOTES :
A. PIPE "C" MATERIAL SHALL BE THE SAME AS PIPE IIA" .
B. PIPE "B" TO BE A53 GR. B OR EQUAL .
c. DISSIM ILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. ON SHOP FABRICATED PIPING UPPER SUPPORT PIPE "C" TO BE INSTALLED IN SHOP, LOWER SUPPORT
PIPE "B" WITH BASE ~ TO BE FABRICATED BY SHOP AND SHIPPED TACK WELDED TO UPPER SUPPORT
PIPE "C" .

BS-1
PIPE / ELBOW ADJUSTABLE SUPPORT
EITHER DIMENSION "L" OR ELE VATI ONS "E" AND "F" ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 13 OF 98
(

rI
I
_r-PIPE -i- ,..... DO NOT BURN
/
EL . "E" . - ·h--_·-. -~-.-.-It-. -hr-··_-
·-·r-:·-·-·-· __-_
"A"~

"" -tr-"·-./ ·v~ . ~


-.3.-·
_-_
THRU PIPE
<TYP. l

+ PIPE "C"---..._ I r<NOTE Dl


/ <NOTE Al --....... i _/'""' V TYP .
' 0""' ~II
, DISSIMILAR WELD FOR
I ALLOY PIPE "A" ONLY
i' <NOTE Cl
' 1-
_,.--~"¢WEEP HOLE----.,. I -PIPE "B" <NOTE Bl

EL . 11

F
11
/
:t=~~W:!-~
BASE f '
~
i
1_ <TYP . l

i /TYPE 'I /TYPE I I CONCRETE MOUNT


1" GROUT MIN .
II All
I! I I <l

~v !·-··r --
~'tiS--
- • --,-- T - BASE f
I , , SEE SCHEDULE
, I
SEE SCHEDULE FOR ANCHOR BOLTS--------~
( OR CONCRETE ANCHOR SIZES
, •
<NOTE El BASE e DETAIL

ADJUSTABLE SUPPORT SCHEDULE


PIPE "A" PIPE "8" PIPE "C" BASE f All DIM II
BOLT "L"
STD WT MIN SIZE SIZE SIZE SIZE HOLE MAX LENGTH
1" - 1 ~II 1 ~" SCH 80 1" SCH 80 6 .. x6 .. x~ .. 1~" ~II ~II 3'-0"
2"-3" 2" SCH 40 1~" SCH 80 6 11 x6"x~" 1~" ~II ~II 3'-0"
411-611 3" SCH 40 2~" STD WT 7"x7"x~" 1~" ~II ~II 3'-6"
8"-10" 6" SCH 80 5" STD WT 10"x10"x~" 1~" ~II ~II 3'-6"
12"-14" 10" SCH 140 8" STO WT 14"x14"x~" 1~" ~II ~II 4'-0"
16"-18" 14" SCH xs 12" STD WT 18"x18"X~" 1~" ~II ~II 4'-0"
20"-24" 18" SCH 60 16" STD WT 20"x20"x~" 1~ " ~II ~II 4'-0 "
26"-30" 24" SCH 120 20" STD WT 26"x26"x~" 1~" ~II ~II 4'-6"

NOTES :
A. PIPE "C" MATERIAL SHALL BE THE SAME AS PIPE "A" .
B. PIPE "B" TO BE A53 GR . B OR EQUAL .
C. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. ON SHOP FABRICATED PIPING UPPER SUPPORT PIPE "C" TO BE INSTALLED IN SHOP, LOWER SUPPORT
PIPE "B" WITH BASE f TO BE FABRICATED BY SHOP AND SHIPPED TACK WELDED TO UPPER SUPPORT
PIPE "C" .
E. SEE SECTION 10 . 5 FOR ANCHOR TYPE . <EMBEDMENT E=MIN. l

BS-2
EIH£R DIMENSION "L" OR ELEVATIONS " E" ANO "f"" ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEE T 14 OF 98
(
n=I
I ,.... DO NOT BURN
,;~PIP£ "A"~ -+ ~~~~~ THRU PIPE
<TYP. l
--+--'-----co- ---- ii!------~---h---------+--~
EL "E" ~
. - I ~ V TYP .
w~~ ;;-, U.r---PIPE "C"____.~ Y.i"
DISSIMILAR WELD FOR
5 :ti ~ (NOTE Al ALLOY PIPE "A" ONLY
= s~a:: (NOTE Cl
.J I
-
-
u
~
::E Q.
(J')...,.z
r---PIPE
(NOTE Bl
··a··____.
wOo
~~i
Io
>-I
VY.\ "11) WEEP HOLE~
(/) BASE ~
~
EL . IIFII
I I
z
,_.
::::;;
TYPE I TYPE II STEEL MOUNT BY STRUCTURAL
(WELD BASE ~ TO STEEL U. N. O. l

I
~v

tg)-D•As£• , SEE SCHEDULE

(
BASE f DETAIL
ADJUSTABLE SUPPORT SCHEDULE
PIPE All PIPE IIBII 8 ucu
II
BASE ~ "L"
STD WT MIN CS/ALLOY SIZE MAX LENGTH
2" 2" 6ux6~~x~~~ 3'-0"
3" 2" 6"x6 11 x~ 11 3'-6"
4" 3" 7" x7" x Y.!" 3'-6"
6" 4" 8"x8"xY.!" 4 ' -0"
8" 6" 10"x10"x~" 4'-0"
10" 6" 10"x10"x~" 4'-0"
12" 8" 12"x 12"xY.!" 4'-0"
14" 10" 14"x14"x~" 4'-0"
16" 12" 16"x16"x%" 4'-0"
18" 14" 18"x18"x%" 4'-6"
20" 16" 18"x18"x%" 4'-6"
24" 18" 20" x20" x%" 4'-6"
30" 24" 26"x26"x%" 4'-6"

NOTES :
A. PIPE "C" MATERIAL SHALL BE THE SAME AS PIPE "A" AND STD WT.
B. PIPE "B" TO BE STD WT A53 GR. B OR EQUAL .
C. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 .3.
D. ON SHOP FABRICATED PIPING, FABRICATOR TO SUPPLY SUPPORT WELDED TO SPOOL .

BS-3
PIPE/ELBOW NON-ADJUSTABLE SUPPORT/LINE SIZE
EITHER DIMENSION "L" OR ELEVATIONS "E" AND "F" ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130- 11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 15 OF 98

n=

_
f
f
DO NOT BURN

-+'L_5~ ~t -~:~'_":"~ --t JV:~" ~


THRU PIPE
<TYP . l

._; = f ~ V TYP .
lll ~ ,., ~ .....__pIPE "C II_______.~ c:::.__ ~II
~,_ e> f <NOTE Al -DISSIMILAR WELD FOR
i5~~ · ALLOY PIPE "A" ONLY
~ ':!:' . 2; I ..__ ____. <NOTE C l
: l;l2a. I ~PIPE "B"----
"' a ts I <NOTE Bl
~~~
~£ .I I _,--~"¢ WEEP HOLE~
- -"'-=.::....:...._..;__ _f,_=-)ii:!;! !:V:("' . BASE ~ ~
..L EL. "F" + ~

i :YPE ~ -':'--Y-P-E+---1~ ~~N~~0~ MOUNT


MIN.
"Au
'I ~ ' I I <t

~v ~ te-
- - ..
!---r --
-..,-- T - BASE ~
I , , SEE SCHEDUL E
, I
SEE SCHEDULE FOR ANCHOR BOLTS--------~ , •
OR CONCRETE ANCHOR SIZES
<NOTE E > BASE f DETAIL

ADJUSTABLE SUPPORT SCHEDULE


PIPE "A u PIPE "8 " & "C" BASE ~ BOLT "L"
STD WT MIN CS/ALLOY SIZE "A" DIM MAX LENGTH
SI ZE HOLE
200 200 6"x6"x~ 11 1~" ~II ~II 3'-6"
300 200 7"x7"x~ 11
1~00 ~00 ~II 3 ' -6 00
400 300 8 00 x8 00 x ~oo 1~00 ~ II ~II 3'-6 00
6" 400 10" x 10 "x~ " 1 ~00 ~00 ~00 4'-0"
8" 6 00 10 x10 X~
00 00 00 1~ 00 ~II ~II 4'-0 00
10" 600 10"x10" x~" 1~00 ~00 ~II 4'-0"
12 00 8 00 1 2 "x1 2 " x~ 00
1~" ~II ~II 4 '-6 00
14" 10 00 14 00
x14"x~" 1~00 ~00 ~II 4' - 6 00
16 00 12 00 16 "x16"x~ 00 1~00 ~00 ~II 4'-6 00
18 00 14 00 18 00 x18 00 X~ 00 1 ~00 ~00 ~00 4'-6 00
20 00 16" 18 x18"x~"
00 1~00 ~II ~II 5'-0"
24" 18 00 20 x20 X~
00 00 00 1~00 ~00 ~II 5'-0"
30 00 24 00 26 00 x26" X~ 11 1~" ~00 ~00 5'-0"
NOTES :
A. PIPE "C00 MATERIAL SHALL BE THE SAME AS PIPE "A" AND STD WT .
B. PIPE "B" TO BE STD WT A53 GR . B OR EQUAL .
C. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. ON SHOP FABRICATED PIPING, FABRICATOR TO SUPPLY SUPPORT WELDED TO SPOOL .
E. SEE SECTION 10 . 5 FOR ANCHOR TYPE . <EMBEDMENT E=MIN . l

BS-4
PIPE/ ELBOW NON-ADJUSTABLE SUPPORT/LINE SIZE
EITHER DI'-E:NSION "L" OR ELEVATIONS "E" AND "F" ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 16 OF 98
(
PIPE "A" LINE CLASS
s.w. OR SCR'D TEE
PIPE "A"

PIPE PIPE
-- -fEL·.- -.~·,;- · "'-- - - L -~-·-·- · --
EL . "E"
SOLID
.,. HEAD PLUG
~ +
CLASS MATER IAL>
PIPE "C "
:;; N
<NOTE AJ BIMETALLIC WELD <TYP . J
-
\!) '
_j <TYP . J IF PIPE "A"
I I S ALLOY <TYP. J
<NOTE B & CJ
-_j 'B ' t- -t•B•
<TYP . J

t-
:::> .
.
0
~

Oz
a:: .... EXIST STEEL II
~L
<.:>:;;
SLAB
=
TYPE I
TYPE II (
TYP.

.,.--+-- rf-r
~~~ THK .
BASEPLATE
0
(/')
6-r
---- i1-$. il mlI
1-+~11 ~~~ THK.
il.._1:1 ~I
1 ~~~
!TYP . J
.I
-· :• <4J~"~ HOLES
~~~~ ANCHORS
FOR
I'V II• 'T' I
1.1
Ill
BASEPLATE

( 4 ) ~ II~ HOLEs FOR --t--t-o~-t--t--S_T_D_.__G_A_G__E_____"_G_"_F_O


_R
<NOTE EJ
~~~~ BOLTS EXIST . STEEL
SECTION •A-A• <ONLY WHEN SPECIFIED
ON SUPPORT LOCN . DWG. J
BASEPLATE MAY ALSO BE
WELDED TO EXI ST. STEEL
<ONLY WHEN SPECIFIED
ON SUPPORT LOCN . DWG. J
NOTES :
SECTION •s-B•
A. PIPE "B" & "C" TO BE CARBON STEEL .
B. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 .3.
C. DISSIMILAR WELD TO BE MADE IN SHOP FOR S. W. PIPING THAT IS SHOP FABRICATED .
D. FOR SHOP FABRICATED S.W. PIPING LOWER SECTION OF SUPPORT PIPE "B" WITH BASE 1e TO BE FABRICATED AND SHIPPED
TACK WELDED TO UPPER SECTION PIPE "C" . ON T~'O PIPING SYSTEM SUPPORT TO BE BY FIELD .
E. FOR ANCHOR TYPE SEE SECTION 10. 5, <EMBEDMENT E=MIN . J
ADJUSTABLE SUPPORT SCHEDULE
BS-5 PIPE "A"
S IZE
PIPE "B"
SIZE
PIPE "C"
SIZE
FOR S . W. AND THO . PIPING UP TO
2 SIZE IN C.S . OR s.s. EITHER
II I ~II
" -~~~~h~~~-ll
DIMENSION "L" OR ELE VA TI ONS "E" AND.....-:--'-
"F" ARE REQUIRED ON PIP ING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 17 OF 98
(

EXIST . PIPE
<4>~"~ HOLES FOR
J-2"~ ANCHORS
TRUNNION D1 <MIN . EMBEDMENT "E"= 4~"
<NOTE B> SEE SECTION 10 . 5>
1~"
<TYP . )
z<..?
0~
~" PLATE

I
ALT. C~.

1~"~ X 10" LG
TO PIPE
MACHINE BOLT
W/C2>HVY . HEX .
lD:.f-----_C,;::!~~~l.__ NUTS

(
~
=
j SEE BASE
PL . DETAIL
BASE If DETAIL

EXIST CONC .
SLAB OR PIER
ELEVATION

EXIST . PIPE TRUNNION BASE ~ DIA . 'K'


SIZE D1 II All DIM .

1>2" & 2" 1>2" xs 8" 2>2"


3" 2" SCH . 40 8" 3"
4" 2" SCH . 40 10" 3"
6" 3" SCH . 40 10" 4"
8" & 10" 4" SCH . 40 12" 5"
12" 6" SCH . 40 12" 7"

NOTE
- - :
A. USE AROUND EQUIPMENT INLET/ OUTLET CONNECTIONS .
B. ON SHOP FAB . PIPING THE TRUNNION D1 WILL BE SUPPLIED WELDED TO THE PIPE SPOOL.

BS-6
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 18 OF 98

DISSIMILAR WELD IF REO'D .


(
PIPE "C" <NOTE Cl
<NOTE Al
DUMMY WELD ~II WEEP HOLE
DO NOT BURN
THRU PIPE ~~ Y P I P<NOTE
E "B"B>
c .s. le
PIPE " A " \ ~" THK . , PIPE liB II ¢ +J-2"
~ <SEAL WELDl
= I

---·-- ---=---=--k--=-·-=---=--- =M -- - --;-- - ------(----- - · -·- · - · - ·

_t/'>Y
~ I
3"
I
:t
SAME
B .O. P . ~ ~
Lie
I 11 lu 10"
I SEE PIPING OWG . I

« SUPPORT

ELEVATION

s . s . DUMMY EXTENSION SCHEDULE C. S . DUMMY EXTENSION SCHEDULE


(
PIPE "L" MA X MAX LOAD SPAN PIPE PIPE DIM "L" MAX MAX LOAD SPAN
"Au LENGTH LBS BASIS II All 11
B"&"C" "Y" LENGTH LBS BASI S
2" 2 '-0" 120 12 ' -6" 2" 1~" ~II 2'-6" 120 16' - 0"
3" 2 '-6" 175 13'-0" 3" 2" %;" 3 ' -0" 275 21 ' -0"
4" 2 '-6" 300 14'-0" 4" 3" ~II 3 ' -6" 475 22' -0"
6" 3'-0" 500 16'-0" 6" 4" 1~" 4 ' -6 " 650 24'-0"
8" 5 ' -0" 850 17'-0" 8" 6" 1 II 5'-0" 1000 30 ' -0"
10" 4 ' -6" 1200 18'-0" 10" 8" 1~" 5' - 6" 1350 34'-0"
12" 4' - 6" 2000 18 ' -0" 12" 8" 2~" 5'-6" 1600 36'-0"
14" 4'-6" 2500 18'-0" 14" 10" 1~" 5'-6" 2000 38'-0"
16" 4'-6" 3000 20' - 0" 16" 12" 1~" 5'-6" 3000 38'-0"
18" 4'-6" 4000 20'-0" 18" 14" 2" 5'-6" 3250 38'-0"
20" 4'-6" 6500 20'-0" 20" 14" 3" 5'-6" 4000 38'-0"
24" 14" 5" 6'-0 " 4500 38'-0"
NOTES :
A. PIPE "C" MATERIAL AND SCHEDULE SHALL BE THE SAME AS PIPE .. A.. .
B. PIPE "B" TO BE STD WT C. S .
c . DISSIMILAR WELD TO BE MADE WITH PIPE "A " CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. MAXIMUM LENGTH AND LOADS MAY BE INCREASED USING LINE SIZE DUMMY EXTENSION WITH PIPING SUPPORT
ENGINEER'S APPROVAL .
E . ON SHOP FABRICATED PIPING DUMMY EXTENSION TO BE INSTALLED IN SHOP .
F . PIPE SPECS USING SCH . 10S PIPE REQUIRES SIZE ON SIZE DUMMY LEG.

(
DL-1
ELBOW/ DUMMY SuPPORT
Technical Standard

ENGINEERED 11-130-11
PIPE SUPPORTS
Date: 2108 SHEET 19 OF 98

t SUPPORT
ulu 10"
j SEE PIPING DWG .
ric
:~
PIPE " A " \ ; 3"

4
-
-.-.-.
Lf-
/)
---=-·-=---h----=-·-=---=---=~*--.-
I
---.---.-.-. -r----- Jt-.---.-·-.
~I

SAME B. O.P .
y \ : P IPE "8"

Y.i II
1

<NOTE B>
WEEP HOLE
C.S. IE
Y.i" THK. X PIPE 11811 ~
<SEAL WELD>
+J-2"

DUMMY WELD
DO NOT BURN DISSIMILAR WELD IF REO'D .
THRU PIPE
Y.i~ <NOTE C>
PIPE ~~c"
<NOTE A>

ELEVATION

( s .s . DUMMY EXTENSION SCHEDULE C. S . DUMMY EXTENSION SCHEDULE


PIPE "L" MAX MAX LOAD SPAN PIPE PIPE DIM "L" MAX MAX LOAD SPAN
"A" LENGTH LBS BASIS II All uauaucu uyu LENGTH LBS BASIS
2" 2'-0" 120 12'-6" 2" 1~" ~II 2'-6" 120 16'-0"
3" 2 '-6" 175 13'-0" 3" 2" %:;" 3 '-0 " 275 21 -0"
I

4" 2'-6" 300 14'-0" 4" 3" ~" 3' -6" 475 22'-0"
6" 3'-0" 500 16'-0" 6" 4" 1\i; " 4 '-6" 650 24'-0"
8" 5'-0" 850 17' -0 " 8" 6" 1" 5'-0" 1000 30'-0"
10" 5'-0" 1250 18'-0" 10" 8" 1\i;" 5'-6" 1350 34'-0"
12" 4'-6" 2000 18'-0" 12" 8" 2\i;" 5'-6" 1600 36' -0"
14" 4'-6" 2500 18'-0" 14" 10" 1~" 5'-6" 2000 38' - 0"
16" 4'-6" 3250 20'-0" 16" 12" 1~" 5 ' -6" 3000 38'-0"
18" 4'-6" 4000 20'-0" 18" 14" 2" 5'-6" 3250 38'-0"
20" 4'-6" 6500 20'-0" 20" 14" 3" 5'-6" 4000 38'-0"
24" 14 " 5" 6'-0" 4500 38'-0"

NOTES :
A. PIPE "C" MATERIAL AND SCHEDULE SHALL BE THE SAME AS PIPE .. A...
B. PIPE "B" TO BE STD WT C. S .
C. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. MAXIMUM LENGTH AND LOADS MAY BE INCREASED USING LINE SIZE DUMMY EXTENSION WITH PIPING SUPPORT
ENGINEER 'S APPROVAL .
E. ON SHOP FABRICATED PIPING DUMMY EXTENSION TO BE INSTALLED IN SHOP .
F . PIPE SPECS USING SCH. 10S PIPE REQUIRES SIZE ON SIZE DUMMY LEG .

DL-2
ELBOW/ DUMMY SUPPORT
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 20 OF 98
(
~
~
!;
-b------ ~y'j-- --1---------- -------1-
PLAN
DISSIMI LAR WELD IF REQ'D .
<NOTE C l

DUMMY WELD Y.i" WEEP HOLE


DO NOT BURN
~PIPE
~P ~
THRU PIPE <NOTE "B"
B>
c . s. le
Y.i THK. X PIPE "B"
II ¢ +~"
PIPE "A"\ : <SEAL WELD)
I
I
-----------h---IE- -7 - -.-if- - ------ __ -t------
I_ - -

I
I i 3" w
0..
PIPE II ell I I
<NOTE A> 6" i
I --.:...-;
I
i '' L ''
'SEE PIPING DWG .
10" (
i SUPPORT
I

ELEVATION
S.S. DUMMY EXTENSION SCHEDULE C. S . DUMMY EXTENSION SCHEDULE
PI PE PIPE "L" MAX MAX LOAD SPAN PIPE PIPE "L" MAX MAX LOAD SPAN
II All usuaucu LENG TH LBS BASIS "A" "B"& "C" LENGTH LBS BASIS
2" 2" 3'-0" 120 16'-0 " 2" 2" 4'-0" 120 17'-0'
3" 3" 4' - 0 " 200 20' - 0" 3" 3" 5'-0" 300 21 ' - 0'
4" 4" 6 '-0" 350 20'-0" 4" 4" 6' - 0" 500 24' - 0 '
6" 6" 6'-0" 1000 24 ' -0" 6" 6" 6' - 0" 2000 28 ' -0'
8" 8" 6' - 0" 2000 26 ' -0" 8" 8" 6 '-0" 5000 33'-0'
10" 10" 6'-0 " 3000 28'-0" 10" 10" 6 ' -0" 7500 37' - 0'
12" 12" 6' - 0 " 4500 32' - 0" 12" 12" 6' - 0" 10000 39'-0 '
14" 14" 6 '-0" 5000 38' - 0" 14" 14" 6'-0" 15000 40 ' -0"
16" 16" 6'-0" 6500 38'-0" 16" 16" 6 '-0" 17000 40 '-0"
18" 18" 6'-0" 7500 38' - 0" 18" 18" 6 ' -0" 19000 40 ' -0"
20" 20" 6'-0" 8500 40'-0" 20" 20" 6' - 0" 22500 40'-0"
24 " 24" 6'-0" 25000 40'-0"
NOTES:
A. P IPE "C" MATERIAL AND SCHEDULE SHALL BE THE SAME AS PIPE II AII .
B. PIPE "B" TO BE STD WT C.S .
c . DISSIMILAR WELD TO BE MADE WITH P I PE "A" CLASS WELD ROD AND BE PER ASME B31 . 3 .
D. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WI TH PIPING SUPPORT ENGINEER ' S APPROVAL .
E . ON SHOP FABRI CATED P IPING DUMMY EXTENSION TO BE I NSTALLED IN SHOP .

DL - 3
ELBOW/ DUMMY SUPPORT !FLAT TURN >
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 21 OF 98
(

I ''L''
~ SUPPORT
10 11
I SEE PIPING DWG .
I

-c
~ c.s. ~
3" / P I PE "B" ~II THK . X PIPE liB II ¢ +J.2"
PIPE ~~c·:----........... I <NOTE B l I w <SEAL WELD>
<NOTE A>
~ I I I Cl.

0
- . - ·!-(-· t- -+-.-.-.---.-.-.-.-. --- i---.- --

PIPE "A"
·~ !~
!
i
'
~~~WEEP HOLE
j
i
'
I
q___ DISSIMILAR WELD IF REO'D .
I <NOTE Cl

DUMMY WELD
1..::7 DO NOT BURN

( ~
~ THRU PIPE

ELEVATION
S . S . DUMMY EXTENSION SCHEDULE C. S. DUMMY EXTENSION SCHEDULE
PIPE PI PE ulu MAX LOAD PIPE PIPE "L" MAX LOAD
II All "8"8 11 C 11 MAX LENGTH LBS II All "8"8"C" MAX LENGTH LBS
111 1" 1' -6 11 90 111 111 1 ' -9 11 90
1~11 1~11 1'-9 11 175 1~11 1~11 2'-0 11 200
211 1~11 1'-9 11 125 211 1~11 2' -0 11 200
311 211 2'-0 11 200 311 211 2'-0 11 200
411 311 2 '-0 11 600 411 3" 2 ' -6 11 700
611 411 2'-0 11 1000 611 411 3'-0 11 1500
811 611 2'-6 11 2000 811 611 3'-0 11 4200
10 11 811 2'-6 11 4000 10 11 811 3' -0 11 7500
12 11 811 3'-0 11 6000 12 11 8" 3'-6 11 7000
14 11 10 11 3'-6 11 7500 14 11 10 11 3'-9 11 10000
16 11 12 11 3'-6 11 10000 16 11 12 11 4'-0 11 14000
18" 12 11 3'-9 11 12000 18 11 12 11 4'-0 11 14000
20 11 14 11 4'-0 11 14500 20 11 14 11 4'-0 11 18000
24 11 14 11 4'-0 11 20000
NOTES :
A. PIPE 11 C11 MATERIAL AND SCHEDULE SHALL BE THE SAME AS PIPE "A" .
B. PIPE 11 B11 TO BE STD WT C.S.
c . DISSIMILAR WELD TO BE MADE WITH PIPE A CLASS WELD ROD AND BE PER ASME B31 3 II II 0 0

D. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WITH PIPING SUPPORT ENGI NEER'S APPROVAL.
E. ON SHOP FABRICATED PIPING DUMMY EXTENSION TO BE INS TALLED IN SHOP .

DL-4
VERTICAL/DUMMY SUPPORT
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 22 OF 98
(

LINE CLASS TEE.~~·


I
SEE PIPING DWG .
" I
'!' I
~~
Q.
~-,;'·TH~
X PIPE DIA.+>2"
CSEAL WELD>
j ~ i

/ \:3"
n

-· -~ . :H. ·r·»iiH+~ -1-- - - - - - . .,.. - - -~•--


PIPE "A" .L_ u~l'j ~"
Jf SUPPORT
!I) WEEP HOLE
'Ill'

~
~ SCREWED SOL ID ROUND HEAD PLUG
CLINE CLASS MATERIAL>
I

NOTES: ELEVATION
A. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 .3 .
B. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WITH PIPING SUPPORT ENGINEER'S APPROVAL.
DUMMY EXTENSION SCHEDULE
PIPE "A" "L " MAX. MAX. LOAD
SIZE LENGTH LBS.
3'-0" 35
1 II
3' - 0" 45
1>2" 3'-6" 100
2" 4'-0" 150 DL-5 (
DUMMY SUPPORT
LINES 2" AND SMALLER SCREWED PIPE

LINE CLASS TEE~ :· SEE PIPING DWG . ·:· ~~ ~-,;' ·TH~


X PIPE DIA . +>2"
~ i "'.. I i 0.: (SEAL WELD>
---~-- . ·-·-· ·-:JL-·r·tt·- · ·t- · -------.----· ·I ·-

L u-~ \:3" l/~01


I
pIPE II AII ~'----------.1 /4 1 SUPPORT
¢ WEEP HOLE

SOLID ROUND HEAD PLUG


CLINE CLASS MATERIAL>

NOTES : ELEVATION
A. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME B31 .3 .
B. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WITH PIPING SUPPORT ENGINEER'S APPROVAL .
C. ON SHOP FABRICATED PIPING DUMMY EXTENSION TO BE INSTALLED BY SHOP.
DUMMY EXTENSION SCHEDULE
PIPE "A" "L" MAX . MAX . LOAD
SIZE LENGTH LBS .
3'-0" 35
1 II 3'-0" 45
1 >2 II 3'-6" 100
2" 4'-0" 150 DL-6
DUMMY SUPPORT
LINES 2" AND SMALLER SOCKET WELD PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 23 OF 98

1
1
I
r
"L"
DISSIMILAR WELD
IF REO'D . <NOTE A>
t SUPPORT
! 10" c . s . le
LINE CLASS TEE~l SEE /!PING DWG . : ~~ ~" THK X PIPE DIA .+J2"
<SEAL WELD>
-- +-Jt:tH+~ -J- - - - - -- - - - u---
PIPE "A"- __:?! ~~~~~ ~PIPE "B" C.S .
LINE SIZE STD . WT.
I ~" !Zl WEEP HOLE
I
1 SCREWED SOLID ROUND HEAD PLUG
<LINE CLASS MATERIAL>
NOTES: ELEVATION
A. DISSIMILAR WELD TO BE MADE WITH PIPE "A" CLASS WELD ROD AND BE PER ASME 831 . 3 .
B. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WITH PIPING SUPPORT ENGINEER 'S APPROVAL .
DUMMY EXTENSION SCHEDULE
PIPE "A .. "L" MAX . MAX . LOAD
SIZE LENGTH LBS.
~II 3'-0" 25
1 II 3'-0" 35
1J2" 3'-6" 50
( 2" 4'-0" 75
DUMMY SUPPORT
DL-7
LINES 2" AND SMALLER SCREWED PIPE

TEE~
"L"
r
DISSIMILAR WELD
IF REO ' D. <NOTE A>
t SUPPORT
! 10" c.s. le
~I
LINE CLASS SEE PIPING DWG. ~II THK X pIPE DI A. +J2 II

~I <SEAL WELD >

--~X- _.__ - - --- - - -~·--


PIPE "A"-----1~ ~ ~PIP:"B" C. S .
LINE SIZE STD . WT .
I ~" !Zl WEEP HOLE
I
1 SOLID ROUND HEAD PLUG
<LINE CLASS MATERIAL>
NOTES :
ELEVATION
A. DISSIMILAR WELD TO BE MADE WITH PIPE "A " CLASS WELD ROD AND BE PER ASME B31 . 3 .
B. MAXIMUM LENGTH AND LOADS MAY BE INCREASED WITH PIPING SUPPORT ENGINEER'S APPROVAL .
C. ON SHOP FABRICATED PIPING DUMMY EXTENSION TO BE INSTALLED BY SHOP.
DUMMY EXTENSION SCHEDULE
PIPE "A" "L" MAX . MAX . LOAD
SIZE LENGTH LBS .
( ~II 3'-0" 25
1 II 3'-0" 35
1J2" 3'-6" 50
2" 4'-0" 75 DL-8
DUMMY SUPPORT
LINES 2" AND SMALLER SOCKET WELD PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 24 OF 98
(
SHOE NO T FURNISHED
WITH THIS SUPPORT

L 3 x 3 x%' x 6'
(2 PER SET>

1nrJ
II Vs' GAP (U.N.O.> (TYP.>
(FREE TO SLIDE IN
LATERAL DIRECTION>

OS-I
\ _ EXISTING STEEL
UP TO 10' PIPE

(
SHOE NOT FURMSHED
WITH THIS SUPPORT

----
----

012
D

EXISTING STEEL (4>%' THK. STIFFENER


PLATES WELD TO
EXIS T. STEEL

DS-2
02' TO 16' PIPE>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 25 OF 98
(

WT 3 X 6
X 4' LONG
<2 PER SET>

EXIST. STEEL /a' GAP


1
!U.N.O.l !TYP.l
!FREE TO SLIDE
DS-3 IN LATERAL DIRECTION>
!2' TO 10' C.S. PIPE>

(
~-W 6 X 15
X 12' LONG
!2 PER SET>

EXIST. STEEL

DS-4
!12' TO 24' C.S. PIPE>

~I

SHEAR LUG
I' x I' x 1/4'
!2 REO'Dl

EXIST. STEEL '/a' GAP !U.N.O.l !TYP.>


!FREE TO SLIDE IN
LATERAL DIRECTION>

DS-5
l'/2' & SMALLER C.S. PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 26 OF 98
(

-:::.. 0.:
>-
I-

SECTION A-A <F-2> SECTION 8-8 <F- 3>

P <KIPS> H <KIPS>
DEPTH
BELOW F-IB NOTES
F-IA F-2A F-IC F-2A F-28
GRADE F-28 F-3
* F3
I. VAL.l.(S GIVEN IN TAB.E ARE BASED (J1I
2'-0' 1.6 2.5 3.8 0.3 0.4 2881 lbs.ISO. H SOIL II:ARING
3' -0' 2.3 3.4
CAPACITY
1.5 0.6 0.8 FI:R VERTICAL LOAD AND 5e8 lbs.ISO. H
4'-0' 1.3 2.1 3.0 0.8 1.1 PASSIVE PRESSUI: FI:R HI:RIZ(J11TAL. LOAD.
2. THIS STD. SHALL BE USED KRE
*DEPTH TO FROST LINE OR THERE IS NO CIKRETE PAVING
AS NOTED. WHICHEVER IS
LARGER 3. THIS STD. SHALL BE USED (J11LY AFTER
REVIEI BY CIVIL ENGINEER.
Fl, 2, & 3
CPOS THOLE TYPE FOUND ATIONl
Technical St andard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 27 OF 98
(

A SQUARE
18" <MAX . l
HILT! ANC HORS FOR
4-114 REBARS TOG EL . EL . "F "

~- -
.I ...
:~.~··
-- -- -+-- -- ·
I• :<t ......
:
z
:::E

EXI ST . CONC. SLAB _ / •


6" THK. MIN .
PLAN <SLOPED> ELEVATION

NOTE

USE THIS STD. WHERE BASE-TYPE PIPE SUPPORT S ARE SPECIFIED ON A SLOPED SL AB.
(
F-4

21 3 PIPE O.D.

--l--~~~---

WT4 X 15.5 X

EXISTING ELEVATION NOTE:A NCHOR MA Y BE WELDED


STEEL
OR BOLTED TO STEEL.
PA-l OR BOLTED TO CONCRE TE
<ANCHOR BOL TS PER T.S. 32-210-04>

PIPE ANC HOR FOR C.S. STEEL PIPE 10' TO 24' SIZE
MAXIMUM AXIAL LOAD IS 15,000 LBS WH EN ANCHORED TO STEEL
AND 5,000 LBS WHEN ANCHORED TO CONCRETE.
WHERE FORCE IS GREA TER THAN SHOWN ABOVE,
CAUTIONs
A SPECIAL ANCHOR SHALL BE DESIGNED. SEE SECTION 10.2
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 28 OF 98
(

213 PIPE O.D.

--f-__ !:_1?~------
EL. 'E'
----
/==~~~~';'~~- Ys' ALLOY
PLATE(USE SAME
AS PIPE>
<TYPl
lfz' C.S. PLATE
X 8'SOUARE

EXISTING ELEVATION
STEEL NOTE:ANCHOR MAY BE WELDED
OR BOLTED TO STEEL.
PA-2 OR BOLTED TO CONCRETE
(ANCHOR BOLTS PER T.S. 32-210-04>
PIPE ANCHOR FOR ALLOY PIPE 10' TO 24' SIZE
MAXIMUM AXIAL LOAD IS 15,000 LBS WHEN ANCHORED
TO STEEL AND 5,000 LBS WHEN ANCHORED TO CONCRETE.
WHERE FORCE IS GREATER THAN SHOWN ABOVE, CAUTION:
(
A SPECIAL ANCHOR SHALL BE DESIGNED.
SEE SEC TION 10.2

(2) L 1'/z x 1'/z x 1/4 x 4' LONG


PER SET

I
SHOE NOT FURNISHED_./ t ......,_~
__ :;~__if!:"=t
WITH THIS SUPPORT __
11
EXISTING STEEL ~1:
·I!
Ill
iii

lfs' GAP (U.N.O.>


(TYP.>
(
PG-1
(UP TO 10' PIPE>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 29 OF 98
(
SHOE NOT FURNSHEO
WITH THIS SUPPORT

1211. 2 X 2 X ""X -i" LONC


PER SET

""l ..
:~

l~
q~
:~
c::~.:..:· _ EXIST. STEEL
y8 • GAP <U.N.O.>
<TYP.l

(
PG-2
112' TO 2-i" PIPE)

<2> L 11/z X IYz X lj4•


PER SET

-~· ·

EXISTING STEEL
PG-3
<UP TO 4' PIPE>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 30 OF 98
(

EXIST ING STEEL _ __,.

PG-4
!6' TO 10' PIPEl
(

TYP. AT
EACH >---.-or----'.
LEG
MEMBER 'A"
MEMBER 'B'

%' STIFFENER
If. ' S
!TYP.l EXISTING STEEL
SEAL WELD TO
ANGLE & TO PIPE

DIMENSIONS
MARK NO. LINE SIZE MEMBER 'A' MEMBER 'B'
·x· •y•
PG-5 12' 5 3' L 2'h X 2'h X% • WT4 X 9
PG-6 14' 6 3'/' L 3 X 3 X 7'a' WT4 X 9
PG-7 16' 1 4'/~' L 4 X 4 X 7'a' WT4 X 9
PG-8 18' 8 4¥4 L4 X 4 Xo/,' WT4 X 9
PG-9 20' 8 8' 5' L4 X 4 X?'i ' WT4 X 9
PG-10 24' 10 71h' L4 X 4 Xo/,' WTS X II

PG-5 THRU 10
!12' TO 24' PIPEl
Technical Standard
11-130 - 11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEE T 31 OF 98
(

INSULATION PRO TECTION


SHIELD <GRINNELL FIG. 16 7l
OR EQU AL S-30 <NOT FURNI SHED THIS DET AIU

COLD INSULATION & 2' x1/ 4' FLA T BAR


METAL JACKET
Ys' GAP <U.N.O.>

I
=+=
PG-11 EXISTING STEEL
4' WIDE, !MIN.>
( <FOR USE W/COLD INSUL. PIPING>

r
FOR GUIDE CLIP ORIENT ATION
PIPE SEE SUPPORT LOCATION DWG.
4' <2>PIPE CLAMPS,
~ <TYP.l GRINNELL FIG. 212
OR EQUAL
>38 _[ IYz' <TYP.>

CLIPS

PIPE DIMN.
SIZE ' T'
<TYP.l 1/ 4'
2'
3' %•
ELEVATION 4' %" PLAN
6' Yz'
a· Yz'
10' Yz'
12' Yz'

PG - 12
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 32 OF 98

3"x~" x 4" LONG


GALV . BAR
CTOP PLATE >

2'x l/2'x4' LONG


GALV.BAR
<BOTTOM PLA TEl

g + 1 ~II Ya' GAP <U.N.OJ


<TYPJ

11
/ 16 ' DIA. HOLES

"--
+---- - -4- - -~ -

GUIDE PLATE DETAIL

PG-13 (
BOLT -ON GUIDE <UP TO 10' PIPE>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 33 OF 98

SUPPORTED I
~
LINE 'A'
U-BOLT
SUPPORTING GRINNELL FIG. 137
LINE '8' OR EQUAL
ADJUST TO Ylr.'
CLEARANCE

. . . . . .! EL. 'E'

\L3x3x%

3' 'L' 3'


SECTION ·A-A•

U-BOLT
_) PLAN
~
GRINNELL FIG. 137
OR EQUAL PG-15
( PULL TIGHT

SUPPORTING SUPPORTED
LINE '8' LINE 'A'
U- BOLT
U-BOLT GRINNELL FIG. 137
GRINNELL FIG. 137 OR EQUAL
OR EQUAL ADJUST TO Y1r.'
CLEARANCE
PULL TIGHT

EL. 'E'

'L'

\ _ L2 X 2 X 1/4

PLAN SECTION ·A-A•

PG-16
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 34 OF 98
(
U-BOL T - - - - - . . . .
GRINNELL FIG. 137 L3
OR EQUAL
ADJUST TO Yi&' CLEARANCE

r.
+[ EXIST. STEEL <TYP.l

"'7.1 SECTION 'X-X' L3x3x% <TYP.l "'7.1


~
1
/4

EL. 'E' I EL. 'E'

I
3' i ' L' 08 ' MAX.l 'L' 08' MAX.l

ELEVATION ELEVATION
TYPE I PG-17 TYPE II
(
<LOAD LIMIT 500 lbs. HORIZONT AU
SEE SECTIONS 10.2 & 10.6

'/8 ' GAP CU.N.O.l TYP.


EXIST. STEEL

L3x3x%
CTYP.l

3' 'L' 08' MA X.l

<TYP.l GUIDE CLIPS NOT


FURNISHED THIS
SUPPORT
ELEVATION
PLAN
NOTE:
GUIDE BRACKET MAY BE WELDED TO
TOP OR BOTTOM OF EXISTING STEEL PG-18
<LOAD LIMIT 1000 lbs. HORIZONT AU
SEE SECTIONS 10.2 & 10.6
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 35 OF 98
(
EXIS T. STEEL L3x3x%

3' 'L' 08' MAX.>


CLIP PLATE
<DETAIL ll
ci
SHOE NOT
z
WITH THIS SFURNISHEO :::i
UPPORT
a_
ELEVATION <{~

PG-19 PLAN <.:>0:


•>-
~!::::
SEE SECTIONSI~ •.2HORIZONT
0
(LOAD LIMIT 500 5
& 10.6 AU

(
SHOE NOT
WITH THIS S
FUUPRNISHED
PORT

Ya' GAP
(TYP.l
(U N 0
' ' •
>
I
t PIPE
I

L3 X 3 X % (TYP.l

ELEVATION

PG-20 DETAIL 1
(LOAD SE CT500
SEELIMIT IONSI~sO..2HORIZONT
& 10.6 AU
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 36 OF 98
(
'L'
CLIPS NOT FURNISHED
(18' MAX.> WITH THIS SUPPORT
L2 X 2 X1f6

EXIST. STEEL
Ya' GAP
(U.N.O.>
(Typ.)

EL. 'E'

L3 X 3 X%
(2 PC>
TYP.

ELEVATION PLAN
PG-21
(LOAD LIMIT 1000 lbs. HORIZONT AU
SEE SECTIONS 10.2 & 10.6
(

EXIST. STEEL
U-BOLT
GRINNELL FIG. 137 OR EQUAL
(ADJUST TO Yr6' CLEARANCE>

<l co u
X
:::!:<I:
~ '/4
LL.I LL.I LL.I
::::!!:
EL. ' E'
~
...J
~
...J
~
...J ~

L3 X 3 X%
(TYP.>
J
~ 0

Lr
(5' -0' MAX.>

PLAN ELEVATION

PG-22
(LOAD LIMIT 1000 lbs. HORIZONT AU
SEE SECTIONS 10.2 & 10.6
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 37 OF 98

I
' PIPE RETAINING CLIP
EXIST . STEEL~~
~ <2 REQ'D . >
SHEAR LUG I II THICK
1"x1"xJi.i" I II
I
EL . 11
E 11
<:..;:_1 g:
t-:<t
a: I
I
I
I
Ill ~ ~~ PIPE
(-·-·-
Ill : a.: u
Ill$:;>-
_)II I-

IST. STEEL]~]~:_
EX
~II
SHOE NOT FURNISHED
PER THIS DWG. FOR INSULATED
PIPE ONLY

ELEVATION PLAN

PG-23
( <LOAD LIMIT 500 lbs . HORIZONTAL >
SEE SECTION 10 . 2

"L" 3"
<18" MAX.>
(L3 x3xY,
EL. "E"

U-BOLT
GRINNELL FIG.• 137
OR EQUAL
ADJUST TO ~ 6 "CLEAR.
EXIST. VESSEL
<USE WHEN FIELD WELDING TO
EXISTING VESSEL IS PERMITTED>

ELEVATION SECTION "Y-Y"

\
PG-24
USE UP TO 3" MAX. PIPE SIZE
<SEE SECTION 10.3>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 38 OF 98
(
EXIST. VESSEL
CLIPS VC- 2
0° <TYP.l L3x3 x%
6'
~VESSEL (2) REO'O.
<TYP.l
L4 X 4 X %
<2> REO'O.

3 X%
<2> REO'O.

Ya' GAP <U.N.O.>


18 ' !MAX.> !TYP ON ALL SIDES>

PLAN (
2'.

2'

!TYPl

'---H>- !T YPl

2 -~"¢ BOLTS

ELEVATION

PG-25
<SEE SECTIONS 10.2 & 10.3>
Technical St andard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 39 OF 98
(
EXIST. VESSEL
CLIPS VC -2
CTYP.l

L4 X 4
C2l REO' O.

TYP.

X 3 X %
TYP. C2l REQ'O.

'LI' /s'
1
GAP CU.N.O.l
18' CM AX.l CTYP ON ALL SIOESl

EXIS T. CLIPS
CNOT FURNSHEO
W/ THIS SUPPORTl

CTYP.l

I
CTYP.l I

. 2 -
!• }.;4" ~ BOLT S
I

ELEVATION

PG-26
<SEE SECTI ON 10 .2 & 10.3l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 40 OF 98
(
00
I
~VESSEL
U- BOL T <GRINNELL FI G.I37l OR EQUAL

ADJUST TO ~~~

'L' !18' MAX.l

3'
EXIST.
VESSEL
CLIP
VC -1

L3 x 3 x%
<TYP.l

USE UP TO 3• MAX. PIPE SIZE (


PLAN

EL. 'E'

I 2 - ~ II¢ BOLTs
.~

ELEVATION
PG-27
<SEE SECTION 10 .2 & 10.3>
Technical Standard
11-130- 11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 41 OF 98

EXIST. STEEL

}_._ 0::;~
· El , 'E'
PIPE
SIZE

UP TO 2'
ROD
Ji1'D'

¥a·
MAX.LOAD
<LBSl

610

~ DRILL HOLE IN
FLANGE OF
EXIST STEEL
2Y2' TO 3' Y2 ' 1130

WELDLESS EYE NUT


GRINNELL FIG.290 <TYPl 'D' Ji1 TH'D ROD
OR EQUAL W/ !3l HEX. NUTS
PIPE CL AMP
GRINNELL FIG.295 FOR INSUL. LINES
/ GRINNELL FIG.212 FOR BARE PIPE
EL. 'F' OR EQUAL
------- -1:.-------

ELEVATION

PH-I
!USE UP TO 3' PIPE SIZEl

PIPE ROO MAX.LOAO


SIZE Ji1'D' <LBSl
EL. 'E'
UP TO 2' ¥a' 400

21/2' TO 3' Y2 ' 400


C-CLAMP W/LOCKNUT
GRINNELL FIG. 86
OR EQUAL

WELOLESS EYE NUT


GRINNELL FIG.290 <TYPl '0' Ji1 TH'O ROO
OR EQUAL W/ (1) HEX. NUT
PIPE CLAMP
GRINNELL FIG.295 FOR INSUL. LINES
/ GRINNELL FIG.212 FOR BARE PIPE
EL. 'F' OR EQUAL
--------1:.-------

ELEVATION

PH-2
!US E UP TO 3' PIPE SIZEl
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 42 OF 98
(

EXIST STEEL
(TYP.l

EL. 'E'

BEAM CLAMP_/ BEAM CLAMP


GRINNELL W/WELDLESS BEAM CLAMP
FIG 133 OR EQUAL EYE NUT GRINNELL
GRINNELL FIG 228 OR EQUAL
FIG 292 OR EQUAL

B c

w X y z

THD.ROD

II
WELDLESS EYE NUT (TYPl
GRINNELL FIG. 290
HEX. NUT OR EQUAL
<TYPI

__ j_ __!_l~~-­
t EL. 'F'

ADJ. CLEVIS ADJ. CLEVIS \__ 2 BOLT CLAMP


GRINNELL 3 BOLT CLAMP
GRINNELL GRINNELL I GRINNELL
FIG. 260 OR EQUAL FIG. 300
OR EQUAL FIG 212 OR EQUAL ' FIG 295 OR EQUAL

NOTES:
THIS HANGER DETAIL ALLOWS THE COMBINATION OF VARIOUS BEAM CLAMPS AND PIPE CLAMPS.
THE HANGER SHOULD BE SPECIFIED AS
PH-3-C- Y-65Y2 ' FOR EXAMPLE.
WHERE C INDICATES THE TOP CONNECTION,
AND Y INDICATES THE BOTTOM CONNECTION
65Y2 ' INDICATES DIMENSION 'H'
(_
THE LOADING CRITERIA MUST BE CHECKED FOR EACH COMBINATION SELECTED

PH-3
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEE T 43 OF 98

EXIST. STEEL t = ==I====:;___ ____:E=L.:....


• .....:'E:....
'
PIPE
SIZE

UP TO 2'

2Yz' TO 3'
ROD
.0''D'

%'
Yz'
MAX.LOAD
<LBSl

610

1130
~ WELDED BEAM ATTACHMENT
W/PIN <GRINNELL FIG.66l
4' %' 1810
OR EQUAL 6' 1'4' 2710

WELDLESS EYE NUT a· TO 12' Ya· 3770


GRINNELL FIG.290 <TYPl 1-1---- '0' .0' TH'O ROO
OR EQUAL W/ !2! HEX. NUTS 14' TO 1a· I' 4960

PIPE CLAMP
GRINNELL FIG.295 FOR INSUL. LINES
/ GRINNELL FIG.212 FOR BARE PIPE
EL. 'F' OR EQUAL
-·-·-·-·i·-·- ·-·

ELEVATION PH-4
FOR ROO LENGTH
LESS THAN 6 FEET

EXIST. STEEL t = ==I====::)____ ___,E::..::L"'. --'=-E'_


PIPE
SIZE

UP TO 2'

2'12' & 3'


ROD
.0''D'

%'
Yz'
MAX.LOAO
<LBS>

610

1130

~ WELDED BEAM ATTACHMENT


W/PIN GRINNELL FIG.66
4' %' 1810
OR EQUAL 6' %' 2710

.-f----- '0' .0' TH'O ROO


a· TO 12' Ya· 3770
WELOLE SS EYE NUT / W/ !2lHEX.NU TS 14' TO Ia'
GRINNELL FIG.290 I' 4960
OR EQUAL

TURNBUCKLE ------......::1"
GR I NNELL FIG . 230 - - - - - 1 '-0" LG. LEFTHAND
OR EQUAL THR'D ROD "0"~
WELDLESS EYE NUT W/ !2! HEX MJTS
LEFT HAND THR ' D. PIPE CLAMP
GR INNELL FIG . 290L
OR EQUAL GRINNELL FIG.295 FOR INSUL. LINES
EL. ' F'
-·f·-·-·-·-·-·-· GRINNELL FIG. 212 FOR BARE PIPE
OR EQUAL

PH-5
ELEVATION FOR ROD LENGTH
MORE THAN 6 FEE T
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 44 OF 98
(
• _d_ . _. _. _ . _ .~.'=f'_Q_R_l!.~Q. JJ~I. _. _
~:: EL. ' E'

ADJUSTABLE CLEV~
GRINNELL FIG.300 FOR INSULATED LINES
GRINNELL FIG.260 FOR BARE PIPE
OR EQUAL
~ 'D' ~ TH'D ROD WI <3JHEX.NUTS

WELDLESS EYE NUT


<GRINNELL FIG.290l
OR EQUAL
· --- g- - - -~~~~R_!_E_~-~~~ -<~·-~~~:>_
PIPE CLAMP
-----1..1---- EL . ' F'

SUPPORTED ROD
GRINNELL FIG.295 FOR INSULATED LINES LINE SIZE ~ ·D·
GRINNELL FIG.212 FOR BARE PIPE
OR EQUAL
UP TO 2' %'
ZYz' & 3' Yz'
ELEVATION

(
PH-6

EXIST. STEEL

I
I

EXIST. ~I
STEEL
BOTTOM OF STEEL
EL. 'E'

WELDED BEAM ATTACHMENT <2 REQ' Dl


HEX NUTS GRINNELL FIG.66 W/ PIN OR EQUAL
<6 REQ 'Dl
o/s" WELDLE SSEYENUT <TYP.l
GRINNELL FIG. 290 OR EQUAL

•...,..____ o/s'~ THD. ROD <TYP.l

T.O.S. EL. ' F'


L3 x 3 x %

ELEVATION

PH-7
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 45 OF 98

ALT. CONN. TO
EXIST. STEEL
EL. 'E'

EL. 'E'

\ _ EXIST. STEEL
L3x3x% _j
2' ·x· ITYP.l
112' MAX.l

THRO.ROD
13/ 8' DIA. UP TO 2' PIPE,
ADJUSTABLE CLEVIS~ '/2 ' DIA. FOR 3' PIPE!.
' IGRINNELL FIG.260 _ __ ' W/ 14l HEX. NUTS
I
FOR NON- INSULATED PIPE
GRINNELL FIG.300
FOR INSULA TED PIPEl
- {-~~ _'£.'__ OR EQUAL PIPE MAY BE
SHOWN ROTATED

L FROM TRUE PLANE.

ELEVATION
( PH-8
ILOAD LIMIT 250 lbs.
SEE SECTION 10.2l

EXIST. STEEL

PIPE ROD MA X.
SIZE Ji!f'D' LOAD

EL. 'E' UP TO 2' %" 250 LBS.

WELDED BEAM ATTACHMENT 2'lz' & 3' 'l z' 350 LBS.
I GRINNELL FIG.66, W/ PIN)
OR EQUAL 4' %' 400 LBS.

WELDLESS EYE NUT 6' TO 8' r~· 900 LBS.


IGRINNELL FIG.290l
OR EQUAL

..- '0' TH'O. ROO, W/ 13l HEX NUTS


CLEVIS CLAMP
IGRINNELL FIG.260l NOTE:
OR EQUAL
SELECT CLAMP & SHIELD
SIZE TO SUPPORT PIPE
ON OUTSIDEOF INSULATION.
COLO INSULATION
°
180 MOLDED RIGID
POL YURETHANE FOAM
INSERT x 6' LONG
W/ BONOEO VAPOR BARRER &
GALVANIZED STEEL SHIELD
POWER PIPE SUPPORTS INC .
POWERFOAM FIG. NO. 9050
OR EQUAL
PH-9
IFOR COLD INSUL. PIPINGl
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 46 OF 98

D
w
T THICK ~ Rl T T HICK~ ~

....------,.---+~...........
. v- i HOLE • H ,
... " .
~v _____
R2

r
" _L

A '/• ~ ~~~~:-~:~~~~:~1
!}-1: L.
·~4~ ~
o--------
I
----n---) -t--
~

t:i--
1

TYPE I TYPE II
ELBOW LU G PIPE LUG

(
ELB OW/PIPE DIMENSIONS <INS>
SIZE A B c D H Rl R2 T w
1 1
2 8 3 4 3Yz "lr. IYz 1/4 /4 2Yz
11/4
3 8 3 4 Wz
3Yz
%
%
IYz

11/4
* 2Yz
5 IYz
*
4 9 4 2Yz
6 10 5 6 Wz lYe IYz 1'14 Yz 2Yz
8 10¥4 5 Wz Wz lYe IYz 11/4 Yz 2Yz
10 11¥4 5 Wz Wz lYe IYz 11/4 Yz 2Yz
12 12 5 7 Wz lYe IYz 1'14 Yz 2Yz

GENERAL NOTES:
I. DO NOT BURN OR CU T THRU' ELBOW OR PIPE WALL.

2. THESE LUGS ARE DESIGNED FOR USE WITH STD. WT. PIPING.

3. LUG MATERIAL SHALL BE THE SAME AS THE RUN PIPE, UNLESS OTHERWISE NOTED.

PL-1
PIPE LUG
l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 47 OF 98
ISO• FLANGE

L3 x3x¥e
\ _ SEE OET All "X"
x
<
;-l :::;
:.0I
'
::::

EL. 'E'
·at
• q 0 0 I •f •O
I- • ~ • • 0

6 z .. • I I

~"{!)
~ ~ ~<:;"

~
1
'-(2)
ANCHO"RS
EXIST. CONC. /
(£=4~" MIN.>
PIER OR SLAB EXIST. STEEL

( TYPE I TYPE 2

(2l HOLES F DIA ~"¢ BOLTS ON


BEAM GAGE - STEEL
~"¢ HOLES - CONC.

D
E

B c

A
DETAIL ·x·
PIPE
SIZE A B c D E F R SECTION "A-A"
I' 31'4' 21/4' 1'4 ' 5'/s' 41'4' %' I'
1'/z' 4'/z' 21'4' Ya' 5'/z' 5' %' 1'/z'
2' 5' 3% 11'16 • 6' 5'/s' 1'4' 1%'
3' 6' 41/4'
Ya· 61'4' 5'/z' 1'4' 2114'
4' 5' 2Ya' IYI6. 7'/z' SY16' %' 2Ya'
6' 6' 3%' lo/r6. 8'/z' 5%6' Ya' 3Ya'
PS-I
USE UP TO 6' MAX. PIPE SIZE
EITHER DIMENSION 'L' OR ELEVATIOS 'E' & 'F' ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 48 OF 98
(

1
L2 X 2 X /4

Ya
U-BOLT
SHEAR LUG GRINNELL FIG. 137
OR EQUAL

EL. 'F'

TY P. >---r-r---'

X SECTION ·s-s·
(
<(
L3x3x% • ::::!:
....J,
• <i)
I

f %' HOLES TYP •

. • • 0 I • t •0
• • I • e
••• I

~ ~"·ANCHORS
~q •

<2>
<E=4~" MIN . l

EXIST. CONC.
PIER OR SLAB

ELEVATION

PS-2 (
USE UP TO 2' MAX. PIPE SIZE
EITHER DIMENSION 'L' OR ELEVATIONS 'E' & 'F' ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 49 OF 98

U-BOLT

YIG . CLEARANCE>

<2 )~ 11 ¢ HOLE S

3 X %

X
<{
• :::i!
....J,
• <.0

GRADE
·•·o
• <2•>~ 11 0 ANCHORS
a.-----+-- • ·•·o • ·•• •o •
<E=4~ 11)

\ _ CONC. SLAB
OR PIER
ELEVATION
PS-3
( USE UP TO 2" MAX. PIPE SIZE <LOAD LIMIT 125 lb s.>
EITHER DIMENSION "L' OR ELEVATIONS "E" & "F" ARE REQUIRED ON PIPING DRAWING

1{6 .
SHEAR
1 11 X 1 11 X~ 11
SAME MAT 'L
AS PIPE EL. 'F'

--+-~-I"

X
<
- :::i!
;:-l =
U-BOLT
L3x3x% --~
- ti)
I
GRINNELL FIG. 137
OR EQUAL <;!"
~

EL. "E'

WELD BASE PLATE TO EXIST.


STEEL OR PLATFORM UNLESS
PLAN OTHERWISE NOTED.
ELEVATION
SECTION ·x-x·
PS-4
USE UP TO 2" MA X. PIPE SIZE <LOAD LIMIT 125 lbs.>
EITHER DIMENSION "L" OR ELEVATIONS 'E" & "F" ARE RE QUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 50 OF 98
(
U-BOLT
GRINNELL FIG. 137

~
OR EQUAL
<ADJUST TO \/16' CLEARANCEl

---=;E,.::.L:._.'_
F _'_ _ _
I . ·ii-· I
L2 x2x 1/4_j
X

. <X
:::;

F
..J •
'lD

L3x3 x¥s
•;..
EL. 'E'

WELD BASE PLATE TO EXIST.


STEEL OR PLATFORM UNLES S
OTHERWISE NOTED.
ELEVATION
PS-5 (
USE UP TO 2' MAX. PIPE SIZE <LOAD LIMIT 125 lbs. SEE SECTION 10.2l
EITHER DIMENSION 'L' OR ELEVATIONS 'E' & 'F' ARE REQUIRED ON PIPING DRAWING

U-BOL T
GRINNELL FIG. 137
OR EQUAL
<ADJUST TO ~6' CLEARANCEl

--:-~ ~r~t2•
EL . 'F'

L3x3x 1/4
X
.
..J
<X
:::;
• I j I
• 0
I
! 3Yz' ! 3'/z' !
.
!••I••!.
10'
GRADE SLAB

t· •.
.. •..-....,., ___I.,.,.__
OR PIER
0 : •
~;, • • SECTION ·x-x·
(2 l ~"0 ANCHORS
CE=5"l

ELEVATION
PS-6
FOR 3' & 4' PIPE <LOAD LIMIT 500 lbs. SEE SECTION 10.2l
EITHER DIMENSION ' L' OR ELEVATIONS 'E' & 'F' ARE REQUIRED ON PIPING DRAWING
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 51 OF 98

U-BOLT
GRINNELL FIG.I37 /\2>~"11> BOLTS
OR EQUAL ON Bt:AM GAGE
!ADJUST TO Y16' CLEARANCE>

~ 1 L4 X
Ux 3 X /4
X

. <{
~

G- ~
_)
b I
\.!)

EL. 'E'

!LOAD LIMIT 125 lbs.l


SECTION ·x-x·
BOLTED ALTERNATE
EXIST. STEEL OR PLATFORM !LOAD LIMIT 500 lbs.>

ELEVATION
<LOAD LIMIT 500 lbs.l PS-7
FOR 3' & 4' PIPE <LOAD LIMIT AS NOTED SEE SECTION 10.2>
EITHER DIMENSION 'L' OR ELEVATIONS 'E' & 'F' ARE REQUIRED ON PIPING DRAWING

<TYP.> 1f4

~ WT 4 X 6.5 <TYP>
!CUT AS SHOWN>

EXIST.
TOE It \_ EXIST.
PLATFORM

ELEVATION
NOTE: SUPPORT TO REST ON
PLATFORM OR ON TOE ~
PS-8
<LOAD LIMIT 250 lbs.
SEE SECTION 10 .2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 52 OF 98
(

'LI'
<2'-0' MAX.> ..I
T.O.S. EL. 'E'

.,_---'-- L3 X 3 X %
<TYP .>
T.O.C. EL. 'F'

·~
I
: ~ ~0 7
~~~~ ANCHORS
~

'·' (
<E=4~" >
l EXIST. CONC. WALL <TYP.l

ELEVATION TYPE ELEVATION TYPE II

PS-9
<LOAD LIMIT 500 lbs. VERTICAL LOAD
(
AND 250 lbs . HORIZONTAL !WIND> LOAD
SEE SECTION 10.2>

SUPPORTING L4 SUPPORTED
LINE 'B' i LINE 'A'

U-BOL T
GRINNELL FIG. 137
OR EQUAL U-BOLT
PULL TIGHT SHEAR LUG GRINNELL FIG. 137
l'xl'xl/4'
OR EQUAL
ADJUST TO YIG.
EL. 'E' CLEARANCE

/
...olll............

L3x3x%

3' 'L ' 3'

ELEVATION (
PS-10
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 53 OF 98

SUPPORTING SUPPORT ED

LINE 'B' LINE 'A'


U-BOLT
U-BOL T GRINNELL FIG. 137
GRINNELL FIG. 137 OR EQUAL
OR EQUAL ADJUST TO ~6'CLEARANCE
PULL TIGHT

EL. 'E'

'L • ~L2 x

ELEVATION SECTION "A-A"

( PS-11

SUPPORTING LINE ' B'


SUPPORTED LINE ' A'
U-BOLT
GRINNELL U-BOLT
FIG.I37 3 GRINNELL
OR EQUAL FIG.I37
OR EQUAL
L3 X 3 X %'

I" X I' X 1/4'


SHEAR LUG

EL. 'E'

~~----·-L_'<_I2_'_M_AX_._> ~~-3-'~
I
__

PLAN
SECTION "X-X"
PS-12
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 54 OF 98

NOTE:COPE W4 AS SHOWN
'L' 'L'
CIS' MAX.l CIS' MAX.l

T.O.S. EL. 'E'


T.O.S. EL. 'E'

W4 X 13
EXIST.J •• ·· -' W4 X 13

STEEL
ELEVATION TYPE I ELEVATION TYPE Ill

EXIST. _j -, ..
EXIST. _j -, ..
STEEL STEEL

T.O.S. EL. 'E' T.O.S. EL. 'E'

W4 X 13 W4 X 13
"L 1" "L2" "L1"

CIS' MAXI CIS' MAXI CIS' MAXI

ELEVATION TYPE II PS-13 ELEVATION TYPE IV (


LOAD LIMIT 500 lbs.
SEE SECTIONS 10.2 & 10 . 6

'L'

~ '71
X IST CONCRETE 4' 4'
CIS' MAX.l
L

4
0

0
0 ..

0 ---
W4 X 13

<4>~"~ ANCHORS
<E=5"l
·x· <41 11/16 ' OIA. HOLES
~
ELEVATION SECTION 'X-X'

PS-14
(
LOAD LIMIT 2000 lb s. TOTAL
SEE SECTION 10 .2
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 55 OF 98

U-BOL T <GRINNELL FIG. 137> OR EQUAL


EXIST. STEEL

EL. 'E'

x< EL. 'F'


:.::!;

~
x<
I L3 X 3 x% :.::!;
N
EL. 'F' ~
I

~L3x
EXIST. STEEL U-BOLT
<GRINNELL FIG. 137>
OR EQUAL 3 x% '

ELEVATION TYPE I ELEVATION TYPE II

PS-15
<SEE SECTIONS 10.2 & 10.6>

U-BOL T <GRINNELL FIG. 137>


OR EQUAL
ADJUST TO
1/ 16 ' CLEARANCE
EXIST. STEEL <TYP.l

f L3x3x%
I

I
<TYP.l

EL. 'E' EL. 'E'

SHEAR LUG
I' X I' x 1/4 '

3' 'L' 2' 'L' 2'

!18' MAX.> <18' MAX.>

ELEVATION TYPE I ELEVATION TYPE II SECTION X-X

PS-16
!LOAD LIMIT 250 lbs.l
<SEE SECTIONS 10.2 & 10.6>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 56 OF 98
(

I' X I' X1/4" SHEAR LUG

X 3 X% <TYP.l
~
~ EL. 'E'
;;-1
~ '/4

i 'L2' !·u· i
i .. _.1,. .-j U-BOLT (TYP.l
GRINNEL FIG. 137
PLAN OR EQUAL ELEVATION
PS-17
LOAD LIMIT 250 lbs.
SEE SECTIONS 10.2 & 10.6l
(

• • •• • • •• • ... • ._,•
•• i I
PIPE & SLEEVE

f •
9
• •• •
I
I

I
• • •• I I
•• I I
-----r---- -- --~-----
1 I
• • I I
•• I !


• • • . ;9
1'12' I
L3 X 3 X
I
3/8' •
<TYP. l
;-- (80TH SIDES OF WALU
I
FIELD DRILL HOLES IN

ELEVATION
WALL FOR '/2 '¢ THRO. ROO
THRU'-BOL TS. SECTION
(
L PS-18
(LOAD LIMIT 1000 lbs. TOTAL
SEE SECTION 10.2l
Techn ical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 57 OF 98
(

EXISTING STEEL ~
EL. 'E'
L3x3x%
(TYP .>
x
<(
:::E HEAR LUG
0I I' X I' X 1/4 '
N 'lz'
EL . 'F' 0

1-
,
'L'
• .I
LT OR EQUAL
1GRINNEll FIG.I371

ADJUST TO Y1s' CLEARANCE

(6' MAX.>

ELEVATION SECTION "X-X"


( PS-19
<LOAD LIMIT 250 lbs.
SEE SECTIONS 10.2 & 10.6l

I
~PIPE
I
I
<2l SHEAR LUGS
I l'x 1/ 4' x l'
080' APARTJ

STD. RISER CLAMP


<GRINNELL FIG.261 l
OR EQUAL
TACKWELD TO GRATING

T.O.G. EL. 'E'

L EXISTING PLATFORM
GRATING

ELEVATION

PS-20
<LOAD LIMIT 250 lbs. TOTAL
SEE SECTION 10.2l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Oate: 2/08 SHEET 58 OF 98
(
, ... 'L' .-i

m
I
l

II
!18' MAX.> !
.I
i
EL. 'E' EL . ' E'

l
U-BOL T <TYP.l
GRINNELL FIG.I37
II OR EQUAL

i :
II
ADJUST TO
Yr6' CLEAR. ~
I I L3 x 3x%

~ '/4
i ""---- EXIST. STEEL
~ EXIST. STEEL
ELEVATION TYPE I ELEVATION TYPE 2

I / _ EXIST. STEEL <TYP.J

~/ I l: X 3 X 'Is CTYP.I (
[I::: . ~
EL. 'E' EL. 'E'

II

4J j ..
'L'
... 2' 'L'
.. !
2'
<18' MA X.> <18' MAX.l

ELEVATION TYPE 3 ELEVATION TYPE 4

U-BOL T
<GRINNELL FIG. 137l
OR EQUAL
ADJUST TO
Yr6' CLEARANCE SHEAR LUG
I' X I' x 1/4'
(

I
PS-21
SECTION "X-X" <LOAD LIMIT 500 lbs. TOTAL
SEE SECTIONS 10.2 & 10.6l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 59 OF 98

I' X I'X1/4'
U-BOLT SHEAR LUG

f
<GRINNELL FIG. 137 l
OR EQUAL
ADJUST T0~6'CLEAR

EL. ' E'

3 x%
SECTION "A-A"

·a· L3 X 3 X% x 4' LG.


PLAN

PS-22
( <LOAD LIMIT 500 lbs. TOTAL
SECTION ·a-a·
SEE SEC TIONS 10.2 & 10.6>

'L' ·w· 'L '

!2'-0' MAX.l !2'-0' MAX.l

EL. ' E' EL. 'E'

L3x3x% L3x3x:Ya

DRILL'¥.& ' DIA. HOLES


FOR%" DIA. BOLTS
"G" GAGE

ELEVATION TYPE ELEVATION TYPE II

PS-23
<LOAD LIMIT 500 lbs. TOTAL
SEE SECTIONS 10.2 & 10.6>
Techn ical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 60 OF 98
(
'L'
<18'MAX.J
EXIST. _j -, ..
STEEL
T.O.S. EL. 'E'

T.O.S. EL. 'E'

EXIST.J•. ··-• L3x 3x3/ 8 L3x 3x3/ 8


'LI'
STEEL
<18' MAX>
ELEVA liON TYPE I
ELEVA liON TYPE II

EXIST.
STEEL
_j -, ..

T.O.S. EL. 'E'

L3 x 3x3/ 8

<18' MA X> (18' MAX>


PS-24 (
ELEVA liON TYPE Ill (LOAD LIMIT 250 lbs. TOTAL
SEE SECTIONS 10.2 & 10.6>

EXIST. STEEL
[

~J EL. 'E'

L3 X 3 X% x<t
(TYP.l ~

bI
~

T.O.S. EL. 'F'

08' MA X.l
'LI'

08' MAX.l
J
ELEVA liON

PS-25
(LOAD LIMIT 500 lbs. TOTAL
SEE SECTIONS 10.2 & 10.6>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 61 OF 98

r
EXIS T. STEEL CHANNEL
EXIST. STEEL CHANNEL

EL. 'E' EL. 'E '


(" - --=.:,_=---r-

X X
<! <!
::::!! ::::!!
lDI lDI
v v

,. .... EL. 'F '

I... .I...
'L 2'

08' MAX.l
'LI'
08' MAX.>
L3 x 3 x%' (TYP.l 'LI '
(18' MAX.>
.1. 'LZ'
08' MAX.>
j
ELEVATION TYPE ELEVATION TYPE II
PS-26
( (LOAD LIMIT 500 lbs . TOTAL
SEE SECT IONS 10.2 & 10.6>

'LI' 'L2'
(18' MAX.l 08' MA X.l

EL. 'E'

L3 X 3 XYa'

EL. 'F'

II
c::L
EXIST. STEEL

ELEVATION
NOTE1 SUPPORT MAY BE
PS-27 ROTATED FROM
POSITION SHOWN.
(LOAD LIMIT 500 lbs. TOTAL
SEE SECTIONS 10.2 & 10.6>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 62 OF 98

'L' 'L' 'L' 'L'


UB' MAX.l US' MAX.l U8' MAX.l U8' MAX.l

$1 $1
I T.O.S. EL. 'E' I T.O.S. EL. 'E'

W4 X 13 W4 X 13
<TYP .l X
<(
<TYP.> X
<(
~ ::::;;
bI 0I
Co C4l~"(l) BOLTS \ Co
ON BEAM GAGE ~"le
EL. 'F'

EXI STING
STEEL

TYPE I-A 12" TYPE I-B


1}2" 9"
~
TYPE IIA - ~"¢ HOLE .-';TYPE liB

(
(\J

TYPE IIA~= TYPE liB - Ja"(l) HOLE

~ 9"

'L' 'L'
BASE Je DETAIL 'l' I 'L'

US' MAX.l I U8' MAX.I


FOR II-A & II-B 3'-6' MAX. i 3'-6' MAX.
I
¥ ~
T.O.S. EL. ' E' T.O.S. EL. 'E'

X X
<( <(
W4 X 13 ::::;; W6 X 15 ::::;;
<TYP.l 0I <TYP.l 0
C4> ~"¢ ANCHORS I

Co
CE=6~" l

TYPE II-A <LOAD LIMIT 2~~~ lbs . VERTICAL


AND 5~0 lbs. HORIZONTAL !WIND> LOAD
TYPE II-B
SEE SECTION 10.2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 63 OF 98

'L'

<2'-0' MAX.l

II II T.O.S. EL. 'E'


II I
EXIST. STEEL --ootl
~--------~----------
W4 X 13

ELEVATION

PS-29
( <LOAD LIMIT 500 lbs. TOTAL
SEE SEC TIONS 10.2 & 10.6l

'L'

!2'-0' MAX.l

T.O.S. EL.'E'

EXIS T. STEEL - - - - 4

W4 X 13

ELEVATION
PS-30
!LOAD LIMIT 500 lbs. TOTAL
SEE SEC TIONS 10.2 & 10.6)
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 64 OF 98

W4 X 13 'L2 '
'LI'
<5' - 0' MAX.> (18' MAX.l

T.O.S. EL. ' E'

EXIST. STEEL

X 6.5

W.P. -fl---h

ELEVATION
BOLTED ALTERNATE (
W4 X 13 'L2'
'LI'
(5' - 0' MAX.> U8' MA X.l

W.P.

T.O.S. EL. ' E'


EXIST. STEEL

II
II

II X 6.5
II

TYP. AT
CONNS. TO
EXISTING STEEL

ELEVATION

PS-31
<LOAD LIMIT 500 lbs ./FT
SEE SECTION 10 .2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 65 OF 98

' LI' 'L2'

TYP. AT <5' -0' MAX.> <18' MA X.>


CONNS. TO
EXIS TING STEEL

EL. 'E'

W4 X 13

EXIST. STEEL --~

WT4 X 6.5

BOLTED ALTERNATE
SIMILAR TO PS-31
<TYP.l
ELEVATION
( PS-32
<LOAD LIMIT 500 lbs./FT
SEE SEC TION 10.2>

I
"W"· 'LI' 'L 2'
TYP. AT <18' MAX.>
CONNS. TO
EXISTING STEEL W.P.

EL. 'E'
ALTERNATE
-·<2·>~-;-;~-Bol..rs-·crYr..) . .....-.......-----•III!IP9-rt~.
EXIST. STEEL C4x7.25 <T YP.l
"G"

W.P. ALT . BOLTED CONNECTION


2-96"~ BOLTS

ELEVATION
PS-33
<LOAD LIMIT 500 lbs./FT
SEE SEC TION 10.2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 66 OF 98

EXIST. CHANNEL
EXIST. STEEL

-- ~ I
I

--
X
<(

~
0
'
;:,... L3 x 3x % CTYP.l
'---- ALTERNA TE
,. EL. "F" ( 2 ) ~II 0 BOLT s

T
~
<TYP.l I

1- "L" I
( 2 ) ~ II 0 BOLT s
<5' -0" MA X.l STAGGERED ON
BEAM GAGE
ELEVATION

PS-34 (
<LOAD LIMIT 250 lbs./FT ALTERNATE CONNS.
SEE SECTION 10.2> TO EXISTING STEEL

"L"

(6' -6 " MA X.>

--

. . . .1 - - - WT4 x 6.5
x
<(
~
<TYP.l
TYP 0
v'
W4 X 13
EL. "F"

TYP

I
~ < 2 > ~ 11 0 BOLTS PS-35
I ON BEAM GAGE
<LOAD LIMIT 500 lbs./FT
BOLTED ALTERNATE SEE SECTION 10.2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 67 OF 98

<2 l~ "~ BOLTS


ON Bt:AM GAGE

"L"
!6'-6" MA X.l

EL. 'E'

BOLTED ALTERNATE

ox
'<!
TYP. AT W4 X 13 v~
CONNS. TO CTYP.l
EXISTING STEEL

EXIST. STEEL ELEVATION


( PS-36
<LOAD LIMIT 500 lbs./FT
SEE SECTION 10.2>

BOLTED ALTERNATE 'L'


SIM ILAR TO PS-31
!6'-6' MAX.l

TYP.AT
CONNS. TO
EXISTING STEEL

EL. 'E'

ljl ox
l.j '<
EXISTING llj <:r~
W4 X 13
COLUMN ljl
1·1 lj4 <TYP.l
1!1
lu
1·1
I!F=
111
-- EL. 'F"

1·1
1!1 BOLTED ALTERNATE
Ill SIMILAR TO PS-36
I'
11L=
~r
--
1'1
~~~
Iii ELEVATION EXIST. STEEL

PS-37
!LOAD LIMIT 500 lbs./FT
SEE SECTION 10.2l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 68 OF 98

[EXIST. STEE~ = ====J


BOLTED ALTERNATE
SIMILAR TO PS-35

EXISTING
COLUMN --...-.!
WT4 X 6.5
TYP.A T ox
CONNS. TO l<t
EXISTING STEEL v~

BOLTED ALTERNATE W4 X 13
SIMILAR TO PS-31
'L'
<6'-6' MA X.>

ELEVATION
PS-38 (
<LOAD LIMIT 500 lbs./FT
SEE SEC TION 10.2>

'L'
<6'-6' MAX.>

EXIST. STEEL _ _.. BOLTED ALTERNATE


SIMILAR TO PS-35
EL. 'E'

EXIST. STEEL

TYP.AT ox
CONNS. TO TYP. '<t
v~
EXIS TING STEEL

WT4 X 6.5
<TYP.> EL. 'F'

W4 X 13
ELEVATION

PS-39
<LOAD LIMIT 500 lbs./FT
SEE SECTION 10.2>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 69 OF 98

EXIST. STEEL

\T
CTYP.>

T t 'j,V <2l~"O BOLTS----1


I

I / TYP
I
I STAGGERED ON
BEAM GAGE
jlj
j j

-1..
- 1.. EL. 'E'

W4 x l3
_/ BOLTED ALTERNATE

4' ·u· 'L2"

(8' -0" MAX.> (4'-0' MAX.>

ELEVATION

PS-40
( CLOAD LIMIT 500 lbs. / FT
SEE SECTION 10 . 2J

C2J CLIP ANGLES

r
COPE STEEL L2x2xo/i6x 2' LONG
AS SHOWN EXIST. STEEL
CTYP.l CTYP .>
W4 xl3 EL. 'E'

~~----~~------------~~~

'L'
(6'-6' MAX.>

C2l~"¢ BOLTS

ELEVATION

BOLTED ALTERNATE PS-41


CLOAD LIMIT 500 lb s . / FT
SEE SECTION 10.2J
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 70 OF 98

'LI' ' L2'

<8 ' -0' MAXl (4'-0' MAX.l


EXIS TING
STEEL~
~
<TYP.l
I BOLTED ALTERNATE
SIMILAR TO PS-40

t I

EL . 'E'

W4 X 13

ELEVATION
PS-42
<LOAD LIMIT 500 lbs./FT (
SEE SECTION 10.2l

'LI' 'L2'

<8' -0' MAX.l <4'-0' MAX.l

BOLTED ALTERNATE
SIMIL AR TO PS-40

EXISTING _ __.
STEEL
<TYP.l EL. 'E'

BOLTED ALTERNATE
SIMILAR TO PS-41

W4 X 13

ELEVATION
PS-43
<LOAD LIMIT 500 lbs./FT
SEE SECTION 10.2l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 71 OF 98

"L"
(6'-6" MAX . >
EL . "E"

BOLTED ALTERNATE
SIMILAR TO PS-35 ~
BOLTED ALTERNATE X
SIMILAR TO PS-34 <(
::::0

ISl
I

EL . "F"

ELEVATION WT4 x 6 . 5 CTYP . )

PS-44
CLOAD LIMIT 500 lbs . /FT
SEE SECTION 10.2>
"L" 3"
~~·---(-1~8-"~M~A~X-.->--~·:~~~~

EL . "E" SHEAR LUG


1 X 1 X ~

U-BOLT
GRINNELL FIG . 137
L3 X 3 X ~
OR EQUAL . ADJUST
TO ~II CLEAR
I
---EXIST . VESSEL;
CUSE WHEN FIELD WELDING TO
EXISTING VESSEL IS PERMITTED> •:•1
ELEVATION SECTION uy_yu
PS-45
USE UP TO 3" MAX . PIPE SIZE
CSEE SECTION 10 .3>
'L'
(18" MA X.>

L3x3x%
EXIST. VESSEL
CUSE WHEN FIELD WELDING TO
EXISTING VESSEL IS PERMITTED>

ELEVATION PS-46
USE UP TO 3' MAX. PIPE SIZE
CSEE SECTION 10.3>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 72 OF 98
(
EXIST. VESSEL
CLIPS VC-4
CTYP.l
'L3'

EXIST. TRUNNION

'----+-i~ ( TYP .l

3' CTYP.l

X 4 X %'

'LI'

PLAN
( 3 >~ "~ BOLTS
(TYP. > i i i
..i.,..j....j.. SHIM TO SUIT
2' i I I (BY FIELD>

·{-·--

/
4' /
/
/
ELEVATION (
/~
/
PS-47
(SEE SECTION 10.3l
Technical Standard
11-130- 11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 73 OF 98

EXIS T. VESSEL
CLIPS VC-3
(TYP.l
'L 2'
~ VESSEL
EXIST. TRUNNION
W/PIPE ~

'-----+-7- <T y p ,)
lf4'

3' (TYP. l

·u·
l'-u X 3 X %

~
PLAN
( ( 2 ) ~ II SZI BOLTs
<TYP.l I I
----i ~3'
I SHIM TO
2' SUIT BY
FIELD

EL. 'E'
- ·-·-·{·-·

LG X 4 X
LONG LE G W.P.

l4 X 4 X %
<CU T AS SHOWN>
·if·-·
2'

ELEVATION

PS-48
<SEE SECTION 10.3>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 74 OF 98

EXIST. VESSEL
CLIPS VC-2
(TYP .J 'L2'

~VESSEL
EXIST. TRUNNION

'N (TYP.J

I ~X 3 X ¥a

~
'LI'

2' 2'
(

L r-,...--_j
% 'PLATE

f:!.J-Nf____ ~~(BY
. SHIM TO SUI T

...........
F___,IELDl ~-~ EL.'E'

·-·-·-·-· C8 X 11.5 (l YP.l

N~
(TYP.l

I
i ,.( 2 >~"~ BOLTS
I

ELEVATION
PS-49
CSEE SECTION 10.3>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 75 OF 98

00

~VESSEL 'L' (18' MAX.>

'LI'

EXIST .
VESSEL
CLIP
VC-1

STD. U-BOL T
<GRINNELL FIG. 137>
TYP.OR EQUAL
PLAN
NOTEz-
PIPE MAY BE SUPPORTED
( HORIZONTALLY OR VERTICALLY
AS SHOWN.

~ Ya' JZf HOLES


SHEAR LUG

lt_____-t
I' X I' X 1/4'
<VERTICAL PIPE ONL Yl

4' x%'

: -~·-·-·-·- - -~-
N

I
' <2>~" f/J BOLTS
!-

ELEVATION

PS-50
<SEE SECTION 10.3>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 76 OF 98

EXIST. VESSEL CLIPS


ISIMILAR TO VC-3l

WT 4 x 6.5 ICUT AS SHOWNl

'L' 13' -0' MAXl

PLAN
'L'
(

2'

3'

SHOWNl
PIPE HANGER
INOT FURNISHED
WITH THI S SUPPORTl

I I 3' ELEVATION
~~
( 2 l~ "0 BOLTS •• I
ITYP.l I I
PS-51
ISEE SECTION 10 . 3l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEE T 77 OF 98
(
0
I
~ VE SSEL
U-BOL T <GRINNELL FIG.I3 7> OR EQUAL

ADJUST TO 1/8 ' CLEAR

'L' <18' MA X. >

3'
EXIST.
VESSEL
CUP
VC-1

L3 x 3 x ¥s
<TYP.>

USE UP TO 3• MAX. PIPE SIZE


( PLAN I'X I/ 4' X I' SHE AR
LUG - FIELD WELD
TO PIPE
I

t
. ,! 2' 1...
2' I'

- -~ -
EL. 'E'

- ~~~ ~

' ( 2 ) ~ II {I) BOLT s


!•

ELEVATION

PS-52
<SEE SE CTI ON 10 . 3)
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 78 OF 98
NOTES :
A. USE CONTINUOUS FILLET WELD WHEN SHOES ARE USED FOR GUIDES OR DIRECTIONAL STOPS.
B. "INTERLOCK" CLAMP ON SHOE <S-10> MAY BE USED AS AN ALTERNATIVE TO THIS DETAIL
WHEN GUIDE OR STOP IS NOT BEING USED.
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP.
1J2" 3" 3" 1J2 "

B~O ~~ ~~
e
WT 4X6 . 5 <S-1 >
MAX . 3J2" INSULATION
WT 6X8 <S-1Al
MAX. 5J2" INSULATION

TYP >--i+--Y
NOTE 6" 6"
A & C
¢ SUPPORT
S-1 & S-1A
PIPE SHOE FOR 4" AND SMALLER c.s. PIPE
NOTES :
A. USE CONTINUOUS FILLET WELD WHEN SHOES ARE USED FOR GUIDES OR DIRECTIONAL STOPS .
B. "INTERLOCK" CLAMP ON SHOE <S-10) MAY BE USED AS AN ALTERNATIVE TO THIS DETAIL
WHEN GUIDE OR STOP IS NOT BEING USED UP TO 8" ONLY .
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP .
I

<{
(
C\J
I TYP .
(/)

WT 4X7 . 5 <S-2>
TYP. MAX . 3J2" INSULATION
1J2" I WT 6X9 . 5 <S-2Al
TYP . 2".1 I· MAX . 5J2" INSULATION
NOTE
A &C
¢ SUPPORT
S-2 & S-2A
PIPE SHOE FOR 6" THRU 10" C.S. PIPE
NOTES:
A. USE CONTINUOUS FILLET WELD WHEN SHOES ARE USED FOR GUIDES OR DIRECTIONAL STOPS .
B. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP.
<{
l{)

l{) cO
= =
cO::.f:! ~;$:!
<Tr') . _l{) .
- ...J <{ ...J
r0 . ::> r0 . ::>
I~~ I~~
B.O . P . U1 ::E ...... U1 ::E ......

-
<T
• ____._I CUT TO SUIT
TYP . AT
EACH >---r-r¥ MARK PIPE MEMBER
FLANGE 6" 6" NO . SIZE SIZE
NOTE A & B S-3 12" W8X18
¢ SUPPORT S-3A 12" W8X31
s 4 14" W8X18
S-4A 14" W8X3 1
S-3/3A,S-4/4A & S-5/5A S-5 16" W10X22
S-5A 16" W10X33
PIPE SHOE FOR 12" THRU 16" C.S . PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 79 OF 98
(
NOTES:
A. USE CONTINUOUS FILLET WELD WHEN SHOES ARE USED FOR GUIDES OR DIRECTIONAL STOPS.
B. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP.

<(
co

-b-------·+--'. --r-----·--Q---
co oO

"' ;, I
3" I 3 "
I )
~- ~ ~ ~ ~
Wx~Wx~
1 1
:-
« ;,
-- ---
I
--- ..

v---:---
• <(Z <( Z I
~--i---· B.O . P . ~ ~ ...... ~ ~ ......
----- -
~
-
w =fCUT TO SUIT
TYP.AT i
EACH
FLANGE"'~ V 611 I
I
611
NOTE A & B !
¢ SUPPORT MARK PIPE MEMBER
NO. SIZE SIZE
S-6 18 11 W12X26
S-6A 18 11 W12X53
s 7 20 11 W14X30
S-7A 20 11 W14X61
S-8 24 11 W16X36
S-8A 24 11 W16X67

( S-6/GA,S-7/?A & S-8/BA


PIPE SHOE FOR 18 11 THRU 24 11 c.s. PIPE
1' -0 11 STATIC

6
~~ s~~ liS" PIPE uwn LOAD
SIZE liS" 11 TK 11 lb .
I (VERTICAL>

,.-(-~ -
-l~l
r-rrI
-t~
--
I
~-----t
I
:

I
- {]-
I
111
1 ~11
211
311
311
311
311
311
3"
~II
~II
~II
50
88
126
'----'

• .J[A'
311 3 11 311 ~II 263
;i{e .,.= ~I 411 311 3 11 ~II 400
;_y; ';.y; 6 11 411 411 ~ II 800

I. .I
r--- 411 ~II 1000
liE' 8" 4"
NOTE
··w~~
ORDERING IN='ORMAT I~
ELEVATI~ PIPE SIZE SHOE SHOE ISOLATION/HEAT TRACE
~ HEIGHT LENGTH THERMAL BOOT
11 THRU
11
8 11 1 0 [JEJ ~
TRI SYSTEMS
NOTES 6461 SEIGEN LANE
BATON ROUGE, LA 70808
A. ALL PLATE IS TO BE A-36 C.S.
B. BOLTS ARE TO BE ~~~ A-449 WITH 2 HEX HEAD NUTS.
c. CLAMP ON PIPE SHOE IS TO BE INTERLOCK OR EQUAL.
D. DO NOT USE WITH GUIDE OR DIRECTI ONAL STOP .
E. FOR SS PIPE USE 16 GA . SS INSULATION SHIELD. 1 '-2 11 LONG x CIRCUMFERENCE OF PIPE
PLUS 111 . SECURE SHIELD WITH ~~~ x . 02 SS BANDS (BY FI ELD> MACHINE TIGHTEN (TYP . 2>.
S-10
PIPE SHOE FOR 8 11 AND SMALLER
C. S. & S . S. PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 80 OF 98
(
NOTES:
A. "INTERLOCK" CLAMP ON SHOE <S-H'l> MAY BE USED AS AN ALTERNATIVE TO THIS WHEN GUIDE OR
STOP IS NOT BEING USED .
B . DO NOT USE THIS SHOE FOR GUIDES OR DIRECTIONAL STOP. <USE DETAIL "S-20" >

CLAMPS
FIG . 212
<(

- -
I
B.O . P .!fl
~

I
(/)

WT4X6.5 <S -11>


MAX. 3J.2" INSULATION
WT6X8 <S- 11Al
MAX. 5J.2" INSULATION

6" 6"

SUPPORT

S-11 & S-11A


(
PIPE SHOE FOR 4" AND SMALLER ALLOY PIPE
NOTES :
A. "INTERLOCK" CLAMP ON SHOE <S-10) MAY BE USED AS AN ALTERNATIVE TO THI S WHEN GUIDE OR
STOP IS NOT BEING USED UP TO 8" PIPE .
B . DO NOT USE THIS SHOE FOR GUIDES OR DIRECTIONAL STOP . <USE DETAIL "S-21 ">

CLAMPS
FIG . 212

<(
N
-
N
I
(/) ~"IE <TYP. >

WT4X7.5 <S-12>
MAX . 3J.2" INSULATION
WT6X9.5 <S-12A>
MAX. 5J.2" INSULATI ON

SUPPORT

S-12 & S-12A


PIPE SHOE FOR 6" THRU 10" ALLOY PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 81 OF 98
( NOTES :
A. DO NOT USE THIS SHOE FOR GUIDES OR DIRECTIONAL STOP. <USE DETAIL "S-22,23 & 24"l

z z
0 0
...... ......
1- 1-
<t <t<t
C2l PIPE CLAMPS
1.()~
..J
1.()5
GRINNELL FIG. 212
-
-(f)

OR EQUAL -z
...... oO~ I
~
'=' oO
-

--~ -·-·-~- +- ~-- -~B-O.P .1 -ti-'-- ~-


<t :
::!:!
f()
<;t
::!:!
_I.()
I/ I~
<t
f()
X X

~lLd
<t I <t
::::;: (/) ::::;:
-· j - . - .;- ~
- I - --
1- - - -t - - •!I <;t
=
c.D
-=:=I CUT TO SUIT
I
1"
I CTYP . l
6" 6"
I MARK PIPE MEMBER
! TYP . AT NO . SIZE SIZE
¢ SUPPORT EACH ~v
FLANGE S- 13 12" W8X18
S-13A 12" W8X31
S-14 14" W8X18
S-14A 14" W8X31
S- 15 16" W10X22
S-15A 16" W1 0X33
S-13/13A, S-14/14A & S-15/15A
PIPE SHOE FOR 12" THRU 16" ALLOY PIPE
NOTES :
A. DO NOT USE THIS SHOE FOR GUIDES OR DIRECTIONAL STOP. <USE DETAIL "S-25,26 & 27">

z z
0 0
...... ......
1- 1-
<t <t<t
C2l PIPE CLAMPS ..J
co- z::::> cos
-
GRINNELL FIG. 212

--
(/) - (f)

OR EQUAL ...... oO
z
..... I
~ oO

--~·-- -~-+ i- ---1~- - ~


=
~~~
<t
1'-

-~- '--~-
::!:! ::!:!
f() _I.()
<t
c.D

- :. A
X X

~
O. P <t I <t
::::!': (/) ::::;:
-~r- i -_.;-
~---t--·~
-
<;t c.D
==t cuT TO SUIT
I
1"
I CTYP. l
6" I 6" MARK PIPE MEMBER
! TYP . AT NO . SIZE SIZE
¢ SUPPORT EACH ~v
FLANGE S-16 18" W12X26
S- 16A 18" W12X53
S-17 20" W14X30
S-17A 20" W14X61
S- 18 24" W16X36
S-18A 24" W16X67
S-16/lGA, S-17/17A & S-18/18A
PIPE SHOE FOR 18" THRU 24" ALLOY PIPE
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 82 OF 98
(
NOTES :
A. USE CONTINUOUS FILLET WELD FOR SHOE ATTACHMENT PLATE "C" EXCEPT SKIP J-2" OF WELD
@ B. O. P . FOR BLOW BACK VENT.
B. SHOE MATERIAL TO BE TRIMMED THE THI CKNESS OF PLATE "C" TO MAINTAIN 4" OR 6" SHOE
HEIGHT FROM B. O.P.
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP .

1"
NOTE <TYP . )
A &C

45°
!TYPl

WT4 X6 . 5 <S-20) ---<'---M - -


«t 1.0
MAX. 3!.2" INSULATION ATTACHMENT PLATE "C"
WT6X8 <S-20A) ~"IE SAME MATERIAL
MAX. 5!.2" INSULATION AS PIPE "A" I 6"
• I I: I
6" .. I DISSIMILAR
WELD
t SUPPORT <NOTE C>

S-20 & S-20A (


PIPE SHOE FOR 4" AND SMALLER ALLOY PIPE
<FOR USE WITH GUIDES OR DIRECTIONAL STOPS ONLY )
NOTES:
A. USE CONTINUOUS FILLET WELD FOR SHOE ATTACHMENT PLATE "C" EXCEPT SKIP J-2" OF WELD
@ B. O. P . FOR BLOW BACK VENT .
B. SHOE MATERIAL TO BE TRIMMED THE THICKNESS OF PLATE "C" TO MAINTAIN 4" OR 6" SHOE
HEIGHT FROM B.O . P .
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP .

1"
NOTE (I) (I)
<(
A & C -w -w
N I- N I-
I 0 I 0
40° <6" & 8" PIPE~-- rJ) z rJ) z
500 <10" PIPE> · \ ...-
<TYP.) ATTACHMENT PLATE "C" :
<:r
~"IE SAME MATERIAL 1.0

WT4X7 . 5 <S-21 >-----"""'1~. .4- AS PIPE "A"


MAX. 3!.2" INSULATION ~"IE _ _____... 1 J-2"
WT6X9 . 5 <S-21 A) <TYP . 4 > ---"--t--1- c<t---.-~-< DISSIMILAR
MAX. 5!.2" INSULATION 6" 6" WELD
<NOTE C>
~ SUPPORT

S-21 & S-21A


PIPE SHOE FOR 6" THRU 10" ALLOY PIPE
<FOR USE WITH GUIDES OR DIRECTIONAL STOPS ONLY>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 83 OF 98
( NOTES :
A. USE CONTINUOUS FILLET WELD FOR SHOE ATTACHMENT PLATE "C" EXCEPT SKIP ~" OF WELD
@ B. O. P . FOR BLOW BACK VENT .
B. SHOE MATERIAL TO BE TRIMMED THE THICKNESS OF PLATE "C" TO MAINTAIN 4" OR 6" SHOE
HEI GHT FROM B.O .P.
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP . z z
0 0
,__,
1-
<t
<t~
'<t_J
_J N:::>
<:t=>
(\J(/)
z cO~
~
,__,
oa- <t
r<> -
NOTE 1"
(\J~
A8 C ~6 V ~ I ( TYP . l ~~ .L{)

-~
<t

40•\ - ~ L)
l~~
2J
-+-- --~-B. O.P. ~ ~ Nx
~<t
(/):::!;

. !l~==~:::S"'
<TYPl\ / / (
PIPE "A" -'<t
I ~CUT TO
) SUIT ATTACHMENT PLATE "C"_j I . ___,~:------+---t
~ "~ SAME MATERIAL I
MARK PIPE MEMBER AS PIPE "A" <NOTE Bl 6" ! 6"
NO. SIZE SIZE 1 DISSIMILAR
S-22
S-22A
12"
12"
W8X18
W8X31 f. SUPPORT ~~"V
WELD
!TYP . l
S-23 14" W8X18 !NOTE Cl
S-23A 14" W8X31
S-24 16" W10X22
S-24A 16" W10X33

S-22/22A, S-23/23A & S-24/24A


PIPE SHOE FOR 12" THRU 16" ALLOY PIPE
!FOR USE WITH GUIDES OR DIRECTIONAL STOPS ONLY >
NOTES :
A. USE CONTINUOUS FILLET WELD FOR SHOE ATTACHMENT PLATE "C" EXCEPT SKIP ~" OF WELD
@ B. O.P. FOR BLOW BACK VENT .
B. SHOE MATERIAL TO BE TRIMMED THE THICKNESS OF PLATE "C" TO MAINTAIN 4" OR 6" SHOE
HEIGHT FROM B. O. P. z z
0
C. ON SHOP FABRICATED PIPING SHOE TO BE INSTALLED IN SHOP . 0
,__,
1- <tl-
<t 1'-<t
_J
I'-=> NS
(\J(/)
z cO~
~ oa- <t
,__,
NOTE A 1" lD =
A 8 C % V \'-
\ "\_ I !TYP . l ~-~
,.,
(\J~
.L{)

~ -44
<t

~x
L{)

\ ""- i e (\JX

l~-~-~-- --~- th ~
l<l
(/):::;;
40. ~ j) 2J B. O. P .
<TYP /~..
...,....
.....
PIPE "A" . !l~==~:::S ~ w
~CUT TO
1
1 SUIT ATTACHMENT PLATE "C"_j I , "'___,~:------+---t
~"~ SAME MATERIAL !
AS PIPE "A" <NOTE B> 6" ! 6"
MARK PIPE MEMBER DISSIMILAR
NO . SIZE SIZE
1

f SUPPORT
'-' l/4
~
v WELD
S-25 18 " W12X26 !TYP . l
S-25A 18" W12X53 !NOTE Cl
S-26 20" W14X30
S-26A 20" W14X61
( S-27
S-27A
24"
24"
W16X36
W16X67

S-25/25A, S-26/26A & S-27/27A


PIPE SHOE FOR 18" THRU 24" ALLOY PIPE
!FOR USE WITH GUIDES OR DIRECTIONAL STOPS ONLY>
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 84 OF 98
(

~ II X . 02 II s . s .
BANDS <BY FIELD>
MACHINE TIGHTEN INSULATION 8.~
ME TAL JACKET '\

INSULATION PROTECTION
f
~-'f
~==== - ==!

SHIELD X 12 LONG 11

GRINNELL FIG . NO . 167 OR EQUAL ~EXISTING


STEEL
ELEVATION <FOR SIZE SEE GRINNEL CATALOG. l SECTION "A-A"

S-29
PIPE SHOE FOR 1~ 11
AND SMALLER C. S. AND S . S . PIPE

180° MOLDED RIGID POLYURETHANE FOAM


INSERT W/ BONDED VAPOR BARRIER 8.
GALVANIZED STEEL SHIELD .
POWER PIPE SUPPORTS INC.
POWER FOAM FIG. NO . 9050 OR EQUAL
~" X . 02" S. S. BANDS
<MACHINE TIGHTEN > INSULATION 8.
METAL JACKET

LINE - NO.
-f-·-· ·- ·-

1"
<TYP . >""
II :
JL [~=
ELEVATION
~EXISTING
(4 11
STEEL
WIDE MIN . l
PIPE MAX . ALLOW . PIPE MAX. ALLOW .
SIZE SPAN SIZE SPAN
~II 10 FT . 6" 17 FT .
1" 12 FT . 8" 15FT .
1~" 15FT. 10" 13 FT.
2" 17FT . 12" 12 FT .
3" 21 FT . 14" 11 FT . S-30
4" 21 FT . 16" 10 FT . PIPE SHOE FOR COLD INSULATED PIPING
.---....
(\

I o

T ~------------ W

li
AXIAL MVMT
±5~"
-i-( -t- - '1-------- -
1\)

~
INSULA TI ON - <, B. O . p . j ~ CD

1
", u"'
t- p I
o
1 II
It ~------
16"
j
~ <TYP.>'

ELEVATION

INSULATION I LOADS SCHEDULE


PIPE p 1 oo INSUL p 1~oo INSUL p 2" INSUL p 2~ 00 I NSUL p 3oo INSUL p 3~ 00 INSUL p 4 INSUL
00
p 4~ 00 I NSUL
SIZE LOAD ooHoo oowoo LOAD ooH oo oowoo LOAD ooHoo oowoo LOAD ooHoo oow " LOAD ooHoo "Woo LOAD ooHoo oow" LOAD ooH oo "Woo LOAD ooHoo "W" ,
~ .. 224# 4" 2~ 00 336# 4 00 2Ji!oo 418# 4 00 4" 551# 4" 4~" 633# 4" 5~ 00 715# 4" 6~" 797# 6" 6:l'i! 00 879# 7~" ,,
:;;
~" 2431t 4 00 2~oo 3351t 4 00 3 00 4171t 4" 4" 55 11t 4" 4~oo 6331t 4" 5~oo 71611 4" 6~" 7981t 6" 6Ji! " 880# 6" 7~ " Z
CJ)C')
1" 297# 4" 2~" 37911 4" 3~" 46811 4" 4" 55311 4" 4~" 635# 4" 5~" 71711 4" 6~" 79911 6" 6lfl" 881# 6" 7~" ,,
c: z
1~" 3 12# 4" 2~" 3 13# 4" 3~" 347# 4" 4" 41211 4" 4~" 474# 4 00 5~ 00 53611 4 00 6~ 00 597# 6" 6:l'i! 00 668# 6" 75.-
78
" ,,
0::0
1~" 336# 4" 2:l'i! 00
418# 4 00
3~" 551# 4 00
4~ 63311 00
4 00
5~" 715# 4 00
6~ 7971100
4" 6lfl 00
89011 6 00
7~" 961# 6" 8~ 00 ~a
2" 375# 4 00 3~ 00 463# 4 00 4" 549# 4 00 4~ 00 631# 4 00 5~" 713# 4 00 6~" 79511 4 00 6:l'i! 00 888# 6 00 7~" 959# 6 00 8~ 00 "'

~.. 464# 4 00 4 00 58011 4 00 5 00 66211 4 00 5~ 00 74411 4 00 6~ 00 82611 4" 7~ 00 92011 4 00 8 00 1002# 6 00 8~" 107611 6" 9~"
00 00 00
4" 5491t 4" 4 ~ oo 63111 4 00
5~" 7131t 4 00
6~ 79511 4 00
6Ji!oo 88911 4 00
7~ 97111 4" 8~ 105311 6 00 9" 11 58# 6" 10 00
6" 1 077~ 4 00 6~ 00 120 111 4" 6:l'i! 00 134 111 4 00 7~ 00 1465# 4 00 8~ 00 1048# 4 00 9 00 115 111 4" 10 00 1233# 6 00 10~ 00 1332# 6" 11 ~ 00
8" 2004~ 4 00
7~ 00
2 19811 4 00
8~ 00
1572# 4 00
9 00
172711 4 00
10 00
185011 4" 10~" 1973# 4 00
11 ~ 00
209611 6 00
12 00
224311 6" 12Ji!oo
18" 2401A 4 00 9~ " 26 18# 4 00 10" 2804 # 4 00 10~"2991# 4 00 11~ 00 3178# 4 00 12" 3365# 4" 12~ 00 3552 # 6" 1 3~ 00 3801# 6 00 14~"
12" 4 162~ 4" 1 0~" 448711 4" 11~ 00
4767# 4" 12" 504711 4" 12~" 532711 4 00
1 3~ 00
560711 4" 14~" 3925# 6" 14 lfl" 417511 6" 15lfl"
14" 4512~ 4" 11~"479211 4" 1 2~"5072# 4 00 12lfl 00 535211 4 00 13~ 00 563211 4 00 14~ 00 59 1 211 4" 15" 6 19211 6 00 15lfl 00 64721t 6" 16~"
16" 84531 4 00 12:l'i!" 356811 4 00 1 3~" 375511 4" 1 4~ 00 985311 4" 15" 6192# 4" 15~" 647211 4" 16~" 675211 6" 17" 7032# 6" 1 7~ "

~
A. RILCO MANUFACTUR ING CO., INC .: PART11 IG-90-SL-R. OR EQUAL ~ ~
B. APPLICATION: LOW TEMPERATURE PIPE SUPPORT, SINGLE LAYER INSULATION - SHOE, UNRESTRAINED < "P" LOAD ONLY>. ~ ~
C. TO ORDER SPECIFY: PART NO. , PIPE SIZE , INSULATION THICKNESS , B.O.P. DIMENSION. ~ _ S
D. THI S SUPPORT CAN BE USED WITH A GUIDE. GUIDE LOAD NOT TO EXCEED 20?. OF VER TICAL LOAD, USE S-32 FOR HIGHER LOADS . ~ Z ~
""'-
0 (.1)
S-31 ~ ~ ~
a.
PIPE SHOE 1" THRU 4~" INSULATION ~ ~
LINES ~ " THRU 16 " TEMP. RANGE - 4 75•F TO 275•F a.
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 86 OF 98
(

14"

INSULATION
THICKNESS

f-
wa::
W<t
I
VAPOR BARRIER
(f)
u TO EXTEND TO
END OF INSULATION

ELEVATION

(
INSULATION I LOADS SCHEDULE
PIPE 1" INSUL 1U" INSUL 2" INSUL 2!.2" INSUL 3" INSUL VERTICAL MAX
SIZE BOP O. D. BOP O. D. BOP O. D. BOP O. D. BOP O. D. LOAD Ltlo~~AL
1 )2II 4" 4~" 411 5~" 411 7~11 4" 8~" 611 9~" 2H2J# 42#
2" 4" 5~" 4" 6~11 4" 7~" 4" 8~" 611 9~" 260# 52#
3" 4" 6~11 411 7~11 4" 8~11 411 9~11 611 10~ 11
470# 94#
411 4" 7~" 4" 8~11 4" 9~" 411 10~" 611 11J.2" 61 0# 122#
611 411 9~" 4" 10)2 11 4" 11!.2" 4" 12 !.2II 611 13)2" 1340# 268#
8" 411 1 1!.2
II 411 12!.2 4" 13!.2 11
II 611 14~ 11 611 15~ 11 2400# 480#
10" 411 13!.2" 4" 14}4 4" 15}4"
II 611 16~" 6" 16~ 11 3100# 620#
12 11 411 15~" 411 16}4" 4" 17}4" 611 18~ 11 611 19~" 6000# 1200#
14" 4" 17~ 11 411 18~ 11 411 19~ 11 611 20~ 11 6 11 21~ 11 6600# 1320#
16 11 611 19~" 611 20~ 11 6" 21~" 6" 22~" 6" 23~ 11 7600# 1520#
18" 6" 21~" 611 22~ 11
6" 23~" 6" 24~ 11
6" 25~ 11
8500# 1700#
~
A. RILCO MANUFACTURING CO . , INC .: PART# CG-4100 OR EQUAL.
B. APPLICATION : LOW TEMPERATURE SLIDING SUPPORT/ GUIDE, HEAVY DUTY .
C. TO ORDER SPECIFY : PART NO . , PIPE SIZE , INSULATION THK ., VERTICAL AND LATERAL
LOAD, AXIAL MOVEMENT, AND OPERATING TEMPERATURE .
D. USE THIS SUPPORT ONLY IF GUIDE LOADS EXCEED S-31.

l
S-32
SLIDING PIPE SHOE GUIDE FOR COLD LINE
LINES 1)2" THRU 18" <HEAVY DUTY>
TEMP . RANGE - 275° F TO 425° F
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 87 OF 98

METAL JACKET

INSULATION
THI CKNESS

a.. . 1-
.::::;; wa:
a- W<l
·0 Vl i
CD U

ELEVATION

c INSULATION I LOADS SCHEDULE


PIPE VERTICAL 2" INSUL 2~" INSUL 3" INSUL MAX . LOAD
SIZE LOAD BOP 0 .0 . BOP 0 .0 . BOP 0 . 0 . AXIAL LATERAL
2" 260# 4" 7~" 4" 8~ " 6" 9~" 550# 52#
3" 470# 4" 8~" 4" 9~ " 6" 10~" 650# 94#
4" 610# 4" 9~" 4" 10~" 6" 11 l2" 760# 122#
6" 1340# 4" 11 ~II 4" 12~" 6" 13~" 1510# 268#
8" 2400# 4" 1 3~" 6" 15Ja" 6" 16Ja" 1860# 480#
10" 3100# 4" 16 Ja" 6" 17Ja" 6" 18Ja" 2370# 620#
12" 6000# 4" 18}2" 6" 19}2" 6" 20}2" 4570# 1200#
14" 6600# 4" 19}2" 6" 20}2" 6" 21 l2" 4370# 1320#
16" 7600# 4" 2 1l2" 6" 22}2" 6" 23}2" 4910# 1520#
18" 8500# 4" 23}2" 6" 24}2" 6" 25}2" 5460# 1700#

MQI.E.S.;
A. RILCO MANUFACTURING CO ., INC .: PART# CA-4100 OR EQUAL .
B. APPLICATION : LOW TEMPERATURE SUPPORT / ANCHOR , HEAVY DUT Y.
C. TO ORDER SPECIFY : PART NO., PIPE SIZE, INSULATION THK. , VERT ICAL, AXIAL AND LATERAL
LOAD, AND OPERATING TEMPERATURE .
D. SEE RILCO ASSEMBLY/ I NSTALLATION OWG . NO . R-A-97 .

S-33
PIPE SHOE ANCHOR FOR COLD LINE
LINES 2" THRU 18" <HEAVY DUTY>
Technical St andard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 88 OF 98

c-
-- J_..-- EXIST.
STEEL

= EL. 'E'

·~m~ A
WELDED BEAM
ATT ACHM ENT
GRINNELL ! '14"---.;r
FIG.66 W/PIN

~SPRI NG
OR EQUAL I
I GRINNELL
TYPE B OR EQUAL
ii iii

"0"1!) TH'D ROD W/ ! 2l HEX . NUTS

WELDLESS EYE NUT

j~
GRINNELL FIG.290
PIPE CLAMP OR EQUAL
GRINNELL

$- +Eh·:~EVATION
FIG.295 FOR
INSUL. PIPE
FIG. 212 FOR
BARE PIPE
OR EQUAL - NOTE:
I.L.=INS TALLED LOAD <LBSl
O.L.=OPERA TING LOAD CLB Sl

SUPPORT
LINE NO. LOCATION ~ EL EVA TION SPR ING DA TA >
D w
TAG NO. DWG. NO. g~ E F FIG. SIZ E MV T. O.L. I.L. flf a::

SH-1
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 89 OF 98

c= ]~EXIST.
STEEL

WELDED BEAM
ATTACHMENT
GRINNELL
=~
.. [l.•[•

FIG.66 W/ PIN '14'


OR EQUAL
SPRING GRINNELL
ii iii TYPE 8 OR EQUAL

FORGED STEEL
CLE VIS W/ PIN
GRINNEL FIG.299
- "0"¢ TH'D ROD W/ <2> HE X. NUTS

OR EQUAL
•,$
.. LUG FURNISHED WITH PIPE

<SEE DETAIL PL -ll ~


·c· s-
·-· -,. __~
{---f-·-9-·-
<SEE DEl AIL PL -ll

·- ·-i·-~~-T-
I
H- ELEVATION
NOTE:
LJ: I.L.=INST ALL ED LOAD <LBSl
O.L. =OPERA liNG LOAD <LBSl

SUPPOR T LOCATION s:: ELEVATION SPRING DATA D >

c TAG NO.
LINE NO. ·"
DWG. NO. g~ E F FIG. SIZE MV T. O.L. I.L . Jlf c w
0:::

SH-2
Technical St andard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 90 OF 98

EXIST.STEEL

7'
~

EL. ' E'

WEL DED BE AM
ATTACHMENT W/PIN

-~
GRINNEL L
FIG.66 <T YP.) OR EQUAL
L/2 i L/2 "'- / TYP.
WELDLE SS EYE NUT lj 4• v '
GRINNELL FIG. 290 I
<TYP) OR EQUAL I
"0"0 TH 'D ROD I
W/2 HEX NUTS<TYP.) I

~~~
SHOE NOT FURNISHED ......._
WITH THIS SUPPOR T

~
(
EL ' F'
I
... J
SPRING ASSY. I
GRINNELL TYPE ' G'
OR EQUAL ~

NO TE:
ELEVATION I.L.=INS TALLED <COLO) LOAD, LBS PER SPRING
O.L.= OPERATING !HOT> LOAD. LBS PER SPRING

SUPPOR T
LI NE NO. LOCAT ION ~ ELE VATI ON SPRING OAT A 0 >
w
TAG NO. OWG. NO. g~ E F FIG. SIZE MVT. O.L. I.L. L flf a:

SH-3
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Dat e: 2108 SHEET 91 OF 98
(
~ ~ I
TYP
"' I GRINNELL SPRING TYPE '0'

~
/4V
1 I OR EQUAL
I
I
I EL. ' E'
EXIST. STEEL
(T YPl ._.
1
=-
b. "0" 0 THREADED ROO
WI (1 l PL ATE WA SHER
AND <3 l HE X . NUTS
PIPE CLAMP
<GRINNELL FIG. 295,
FOR INSULA TEO PIPE

$-
FI G.212 FOR BARE PIPE> WELOLESS EYE NUT
OR EQUAL j ~ <GR<NNELL F<G.290J

EL .,. OR EQUAL
- - -~- - -----·------ · - ··
NOTE:
ELEVATION I.L.=INSTALL EO LOAD, <LBSl
O.L.=OPERA TING LOAD, <LBS>

SUPPORT
LINE NO. LOCA TION .r~ ELE VA TION SPRING DA TA >
D w
TAG NO. DWG. NO. ~~ E F FI G. SIZE MV T. O.L. I.L. Jlf 0::

SH-4
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2108 SHEET 92 OF 98

-(Ch} GRINNELL TYPE 'F'


SPRING INCLUDING
~
- .(Ct;} ~ <4l ¥.- O<A.
ANCHORS

INSTALLED
HEIGHT
'H' !TYP.l
1.1

I
I
EL. 'E'
LOAD FLANGE !TYPl
OR EQUAL

I" GROUT
BY FIELD :-t
EL. 'E' a
I I

!
!
1 •
r CE=3%' MIN.)

EXIS T. CONC. PIER


OR SLAB

TYP 4 SIDE S
~/·-,!r'"" •••

•I I •I . ·•• ~
-Et1-
:I: EXIS T STEEL
WV 4 !i!-
'•'
' • •• I I I
- ~

c:~l~..) I ll
I
TYPE I I TYPE II
ELEVATION . I I• ELEVATION
. ·-,!r'"" ·
:I:
J•J
...
·I· J-2" ~ TO MATCH SPRING BASE

NOTE: wv -eJ c:~l~..) BOLT HOLES C~" LARGER l


TO MATCH SPRING BASE
I.L. =INSTALLED LOAD CLBSl
O.L.=OPERATING LOAD CLBSl ALTERNATE
SUPPORT ~ SPRING DATA w
>
LOCATION a_
TA G NO.
LINE NO.
Q~
OW G. NO. zn::
ELEVATION
FIG. SIZE MVT. O.L. I.L. H 1-
w
>- 0::

SH-5
Technical Standard

ENGINEERED
11-130-11
PIPE SUPPORTS
Date: 2108 SHEET 93 OF 98
(

0
I
I
I ·c· t Ya' DIA. HOLES

~
I I
I
<(-"
<Y 3' 2' I
I

O;r
4ttt /~-1- ~
TYPE lA N
.....
I
N ELEV. 'E'
~
~ (<'·
C' ~ ......
. -
<(
··~·
I

--
I
! VESSEL
I

---------------- -- ------- -----------·--


oool~~30o
j.,.,''
I
~

TYP .
!

i LOAO
N
·-I

TYPE IB ~

PLAN ELEVATION
(
VE SSEL CLIP ORIENT. DIMENSION LOAD <LBS.l REMARKS
LINE NO. ELEV. E O.R.
MK NO. TYPE ANGLE A B c VER T. HORIZ.

NOTES :
I. VESSEL VENDOR TO CONFIRM CLIP DESIGN.

2. CLIP PLATES TO BE %' THICK MIN. AND TO BE FABRICATED OF THE SAME


MATERIAL AS THE METAL TO WHICH THEY ARE BEING WELDED.
3. PLATES ARE TO BE WELDED TO EACH OTHER AND TO THE SHELL WITH
CONTINUOUS %'FILLET WELDS.

4. ORIENT AT ION ANGLE IS MEASURED CL OCK WISE FR OM REFERENCE 0 DEC.

VC-1
VESSEL CLIP
TYPE tA 8 tB
(SEE SECTION 10 . 3)
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
2108 94 98
c
Date: SHEE T OF

0
I
I
I "C' t %' DIA. HOLES

~
I I
I I
I ~· I

lt
C)'
I

Ofi>
4'11 /~1--
N
--.
I
N ELEV. 'E'

- ~-Q~:___
___ ' ~--. -;r. ~-···
I

__.,___ _____~ ·-·-·-···-


30°
I

i
N
...
I

I
~YP . LOAD
l VESSEL J
I
~

:
~

PLAN ELEVATION
(_
VESSEL ORIEN T. DIMENSION LOAD <LBS.l REMARKS
LINE NO. ELEV. E O.R.
MK NO. ANGLE A B c VERT. HORIZ.

NOTES :
I. VESSEL VENDOR TO CONFIRM CLIP DESIGN.

2. CLIP PLATES TO BE % ' THICK MIN. AND TO BE FABRICA TED OF THE SAME
MATERIAL AS THE METAL TO WHICH THEY ARE BEING WELDED.
3. PL ATES ARE TO BE WELDED TO EACH OTHER AND TO THE SHELL WITH
CONTINUOUS % 'FILLET WELDS.
4. ORIENT A TION ANG LE IS MEASURED CLOCK WISE FROM REFERENCE 0 DEG.

VC-2
VESSEL CLIP
<SEE SECTI ON 10.3)
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 95 OF 98

·c·
. /

.I • /
/

CY 3' 3' 2' , N •


! ~1 // LOAD

! ! I~ ~
I
l
1
Ya' DIA. HOLES .LJ I
.,/ I

~0-1 n
.

./ / I
<(
0
I 4' /
/___
N
' I
,...... \rYP
._ . {o ~ . /

- I ./ 2·

~ I.
/ ,

I I ' ")

c PLAN ~ ELEVATION
VESSEL ORIENT. ELEV. E DIMENSION LOAD !LBS.l
LINE NO. O.R. REMARKS
MK NO. ANGLE A B C VERT. HORIZ.

NOTES :-
1. VESSEL VENDOR TO CONFIRM CLiP DESIGN.

2. CLiP PLATES TO BE %" THICK MIN. AND TO BE FABRICATED OF THE SAME


MATERIAL AS THE METAL TO WHICH THEY ARE BEING WELDED.
3. PLATES ARE TO BE WELDED TO EACH OTHER AND TO THE SHELL WITH
CONTINUOUS %" FILLET WELDS.

4. ORIENTATION ANGLE IS MEASURED CLOCKWISE FROM REFERENCE 0 DEC.

VC-3
VESSEL CLIP
<SEE SECTION 10.3l
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 96 OF 98

'l
"A"
3" 3" 2~'
0

~--r----~_ ._':'_.~._, ~----~!:_~~.-~E_' ~-


I
·c·
I • ____
.i 1 • • /

3'!'/{~
.iI .
/
/ LOAD

71\0 I IAJ,
v:v
/:d~
~/

4-t--C'~-t-__, \~;-
--r--y
l Ya' 71.
DIA. HOLES / / /
• I

_l!____ ~ ·----·-·- _______/~~~---~-~-~-


I 6' /
~ !---j //
~ I I · .?.

)~ ~
1

: L0 AO

t VESSEL
lO

--"--.....1...-..!t--.f
/.
• Jif(
")
")

PLAN /J : ELEVATION
(
VESSEL ORIENT. ELEV. E DIMENSION LOAD <LBS.>
LINE NO. O.R. REMARKS
MK NO. ANGLE A B C VERT. HORIZ.

NOTES :-
1. VESSEL VENDOR TO CONFIRM CLIP DESIGN.

2. CLIP PLATES TO BE % ' THICK MIN. AND TO BE FABRICATED OF THE SAME


MATERIAL AS THE METAL TO WHICH THEY ARE BEING WELDED.
3. PLATES ARE TO BE WELDED TO EACH OTHER AND TO THE SHELL WITH
CONTINUOUS %'FILLET WELDS.
4. ORIENT A TION ANGLE IS MEASURED CLOCKWISE FROM REFERENCE 0 DEG.

VC-4
VESSEL CLIP
<SEE SECTION 10.3)
Technical Standard
11-130-11
ENGINEERED
PIPE SUPPORTS
Date: 2/08 SHEET 97 OF 98

U-BOLT

/ GRINNELL FIG.I37 OR EQUAL


PULL TIGHT

U-BOLT FASTENER
VERTICAL OR HORIZONTAL APPLICATION

c UB-F

U-BOLT
GRINNELL FIG.I37 OR EQUAL
ADJUST TO ~6'CLEARANCE

U-BOL T GUIDE
VERTICAL OR HORIZONTAL APPLICATION

UB-G
Technical Standard
ENGINEERED 11 - 130-11
PIPE SUPPORTS

Date: 2/08 SHEET 98 OF 98

~---~---------~---~
I• IlLII

I
NOTE 6

PIPE SIZE PAD THK. STD. ANGLE .. A..


Y2" TO 4" 'I.e" go•
6" TO 10" •;.... 60°
12" TO 20" •;.... 3o•
24" TO 48" %" 30° (
NOTES
1. ALLOWABLE TEMPERATURE RANGE -57• TO •4QQ• F.
2. MAXIMUM COMPRESSIVE STRENGTH 40,000 PSI.

3 . WEAR PAD TO BE MADE OF VINYL ESTER FIBERGLASS REINFORCED


COMPOSITE MATERIAL.

4. PAD IS TO BE INSTALLED BY FIELD IN ACCORDANCE WITH


MANUFACTURER'S INSTRUCTIONS.

5. WEAR PADS TO BE ADVANCED PIPING PRODUCTS "PROTEK"


OR APPROVED EQUAL .

6. ST ANOARO LENGTHS ARE 12" & 14". OTHER LENGTHS, THICKNESSES,


& DEGREES OF COVERAGE ARE AVAILABLE UPON REQUEST .

WP-1
NON-METALLIC WEAR PAD
FOR UNINSULATEO LINES

Das könnte Ihnen auch gefallen