New Faraday Avenue Underbridge

e\
_Rout
and permanent road diversion

RW -
New 20m Bridges over Existing Railway

ne_of
2 New 270m Retaining Wall

t
New A446 Underbridges and

i
nuat

07_Li
temporary road diversion
- during construction
Permanent Road

ngs\
DR
New 2050m Viaduct over Flood Plains,

i
Closure and Diversion

on Ref

awi
M42 and New Up Birmingham Line
07-

0_Dr
ARP-

ngs\
erTo H

awi
03 Dr
erTo HS2-

43

4-
Roue8
t

a\
Rout
e848 Rout
e844 Roue8
t 44

ectDat
S2-

oj
3

ARP-

nalPr
on Ref

er
nt
07-

4I
R

00\
ou
t

D
e

209742-
84
i
nuat

R-
New 325m Viaduct over Flood Plain and Existing Railway 6

45

RW -
New 1390m Viaduct carrying New Up

209000\
e8 Permanent Land Requirement
167+000

ut

0
New 100m Retaining Wall New 110m Bridge over Flood Plain Spur Line over M42, Flood Plains, Existing
i

o
166+000
ForCont

R
Railways and New High Speed Mainlines

160+00
165+000

\
031 25

J:
164+000
Permanent Land Requirements

161+000
163+000

162+000
4

New 270m Retaining Wall


New Culvert
New 290m Viaducts over Flood Plain
New Culverts
Permanent Land Requirement
Permanent Green
Lane Diversion
Permanent Road Diversions
New 200m Bridge to carry New
New 100m Bridges to carry
Down Spur Line over M42
New Birmingham Lines over
5 M42 / M6 Slip Roads

Plan
Scale 1:10000

160.0 160.0

150.0 Route 848 Route 844 Route 844 Route 843 150.0
Route 846 Route 845

6 140.0 140.0

130.0 325m Viaduct over Flood Plain 130.0


and Existing Railway New 2050m Viaduct over Flood Plains, M42 and proposed Up Birmingham Line

120.0 120.0
110m Bridge over Flood Plain

110.0 20m Bridges over Existing Railway 110.0

100.0 100.0

90.0 90.0
7

80.0 80.0

3
0

Ch.162+792.
Ch.163+084.
70.0 70.0

6m
1m
New Faraday Avenue New A446 Underbridge

ev.84.
ev.84.
Underbridge
60.0 60.0

El
El
50.0 50.0
3% of Cut Materials Are Unsuitable for Reuse in Earthworks
3% of Cut Materials Are Unsuitable for Reuse in Earthworks
40.0 40.0
166+400

166+300

166+200

166+100

166+000

165+900

165+800

165+700

165+600

165+500

165+400

165+300

165+200

165+100

165+000

164+900

164+800

164+700

164+600

164+500

164+400

164+300

164+200

164+100

164+000

163+900

163+800

163+700

163+600

163+500

163+400

163+300

163+200

163+100

163+000

162+900

162+800

162+700

162+600

162+500

162+400

162+300

162+200

162+100

162+000

161+900

161+800

161+700

161+600

161+500

161+400

161+300

161+200

161+100

161+000

160+900

160+800

160+700

160+600

160+500

160+400

160+300

160+200

160+100

160+000
8

Chainage

0 R=5264.5 L 3
.
L=350. =350.
0 L=320
L=4350.0 L=250.0 L=950.5
Horizontal Alignment

L=3798.
3 L=291.6 L=28463
.
G=0.
09% R=-56000.0 -04
.3%
Vertical Alignment
G=
1

1
2

2
4

4
3

3
9

8
5

5
99.

83.

76.

87.
101.

77.

80.

90.

81.

79.

86.
100.

84.

83.

84.

94.

78.

78.

76.

75.

77.

81.

85.
102.

94.

90.

87.

73.

73.

76.

75.

76.

92.

84.

77.

75.

74.

79.

80.

79.

78.

81.

86.
99.

102.

102.

101.

82.

81.

77.

76.

77.

93.

76.

79.

81.

84.

84.

77.

83.
79.

74.

74.

91.

78.
9
Existing Level
1

1
2

2
0

0
7

6
9

9
5

5
86.

85.

84.

84.

87.

90.
86.

85.

85.

84.

84.

93.

96.
87.

86.

86.

86.

85.

85.

84.

85.

85.

88.

88.

91.

91.

94.
86.

86.

86.

85.

85.

85.

84.

84.

84.

84.

86.

86.

89.

89.

90.

92.

92.

93.

95.

95.

96.
86.

86.

86.

85.

85.

84.

84.

85.

88.

91.

94.
86.

85.

84.

84.

87.

94.
Proposed Level
1

1
2

2
4

4
3

6
9

9
5

5
4.

+6.

0.

+9.

+6.

+11.

+9.
16.

16.

1.

+3.

+4.

0.

+12.

+11.
14.

8.

+8.

7.

6.

+7.

+9.

+12.

+13.

+10.

+12.

+13.

+15.
15.

12.

+1.

+8.

+7.

+11.

+10.

+8.

+9.

+8.

+7.

+6.

+8.

+14.

+12.

+8.

+15.

+8.
12.

+2.

+2.

+3.

+10.

+11.

9.

+3.

+6.

+7.

+5.

+12.

+9.
13.

15.

9.

8.

+13.

+15.
-

-
-

-
-

-
-
-

Cut and Fill


-

-
-

-
-

400km/h 320km/h 315km/h


Maximum Speed:
10

Profile
Scale H 1:10000 V 1:1000
Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown
copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.

Environmental Features Legend Special Areas of Conservation National Parks


Notes Client Job Title Drawing Title

High Speed 2 Route 3


Listed buildings Special Protection Areas Flood Risk Zones 1.For notes and legend information refer to the 3.0 16/
12/
09 SD CL PH Feasibility Study Plan and Profile
keyplan information on drawing no.:
Area of Outstanding Natural Beauty National Nature Reserves HS2-ARP-07-DR-RW-03100
Additional Features Shown Sheet 26 of 30
2.For an outline summary of material and ground Drawing Status Job No
The Arup Campus, Blythe Gate, Blythe Valley Park
RAMSAR Parks and Gardens conditions present beneath scheme refer to final 2.0 11/1109
/ MJEP CB PH
Solihull, West Midlands B90 8AE
report.
Scale at A1 T +44(0)121 213 3000 F +44(0)121 213 3001 For Co-ordination 209742-00
Additional Features Shown 1:10000
www.arup.com
World Heritage Site Scheduled Ancient Monuments 3. Refer to HS2-ARP-05-DR-RW-15000 series Drawing No Issue
Discipline
drawings for detailed information on the Delta Rail
Historical Battlefields
Issue Date By Chkd Appd
HS2-ARP-07-DR-RW-03126 3.0
SSSI Junction layout