Beruflich Dokumente
Kultur Dokumente
Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation
Totco
Totco
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
(m)
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date 16/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation
OOH stinger string f/ 395 m t/ surface. B/O & L/D sealing nipple.
H FS + 16 X 133#, K55, BTC 26”CSG t/ 175 m.Repair time: TDS failure, can not turn TD body.RIH FS + 35 X 133
G every 5 jnts.R/D casing running equipment.RIH stinger string w/ sealing nipple + 1 stand 5" HWDP (with 1 cent
aling nipple to float shoe w/ 3-4 T.M/U cementing head t/ stinger string. Circulation before cementing. Meanwhile R
x.Cement operation:Pump 80 bbl water as spacer f/ cement unit. Pump 360 bbl 15.8 ppg cement slurry w/ 5 bpm
ale shakers. Displace 20 bbl system mud, f/ cement unit. POOH, B/O & L/D 1X5" DP. Circulate inside stinger strin
95 m t/ surface. B/O & L/D sealing nipple.
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
Team Crew
Days on Akram Maqsud
Days on Kovan waleed
Days on Twana alias
ure, can not turn TD body.RIH FS + 35 X 133#, K55, BTC 26”CSG t/ 404 m. Fill
ealing nipple + 1 stand 5" HWDP (with 1 centralizer) + 40 jnt 5" DP t/ 404 m. Set
g. Circulation before cementing. Meanwhile R/U cement lines and prepare cement
mp 360 bbl 15.8 ppg cement slurry w/ 5 bpm f/ cement unit. Observe cement on
& L/D 1X5" DP. Circulate inside stinger string w/ system mud.POOH stinger string
Basis of Pick