Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation
Totco
Totco
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
(m)
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9
Operations 00:00–06:00
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date 20/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation
mplete inspection of 21 1/4" x 2 K mud cross and 21 1/4" X 2 K riser spool and get the inspection reports
U From the bottom , 2 1/4" x 2 K CHH + 21 1/4" X 2 K RISER SPOOL + 21 1/4" X 2 K MUD CROSS W/
" X 2 K DOUBLE RAM ( 5" PIPE RAM + BLIND RAM ) + 21 1 /4" X 2 K ANNULAR BAG. + BELL NIPPLE
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
Team Crew
Days on Ranjdar Ahmed
Days on Ahmed Adnan
Days on Hemn salih
riser spool and get the inspection reports.And bring back to rig.
SPOOL + 21 1/4" X 2 K MUD CROSS W/ 4 1/16 X 5 K SIDE OUTLET + 21
" X 2 K ANNULAR BAG. + BELL NIPPLE
Basis of Pick