Sie sind auf Seite 1von 48

pg 47

Ste 5i - BR2

• When Wall ar,ea set


the point load needs
to, be located by
selecting OK-Set the
Load Location
• As for other
applications select
From Left option and
type in dimensJon to
locate load ..

• Repeat for P2

End of Training Manual

To access the Advanced Competancy As s es s ment, contact Hyne Timber by email


info@hyne.com.au or phone 1300 30 4963. Once completed send back to
info@hyne.com.au.
pg 48

Das könnte Ihnen auch gefallen