Beruflich Dokumente
Kultur Dokumente
Prepared By - Reviewed By -
Rev No. 00
Dtd: Commissioning Commissioning Project
Name
Sign
Approved By :
HEAD – Steering Committee
Copy No:
Issued To:
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
4.0 Safety.
9.0 Staffing
11.0 Appendices:
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
TECHNICAL DETAILS
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
2.2 Proposal
Commissioning of seal oil system is carried out
in the following stages:
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
3.2 Filling of seal oil storage tank with fresh oil and
running of Availability of service air and
thinner/petrol for filter cleaning.
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
6.7 After the seal oil flushing activity, ensure that the
system is normalized.
6.9 Filling of seal oil storage tank with fresh oil and
running of Availability of service air and
thinner/petrol for filter cleaning.
6.12 Ensure that all the shut off and gate valves are
closed as per requirement.
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
7.1.5 When the coolers are filled with oil, turn rotary
transfer valve assembly to the right hand or left
hand stop for keeping one cooler in service and
others as standby.
7.1.7 Charge both seal oil filter with oil as done in case
of cooler and vent it by opening the venting
screws provided on the filter housing.
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
continuously.
7.2.3 Charge both seal oil coolers from oil and water
side as done in case of airside coolers. Carry out
the venting of oil and waterside chambers of
coolers by the vent valves provided. Keep one
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
cooler in service.
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
ITEM 10 REMARK
STAFFING
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
ITEM 11 REMARK
RESPONSIBILITY & COMMUNICATION
11.1 Test team leader responsibilities are: -
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
11.2 Communications:
BHEL
Mechanical erection ____________________
Electrical erection ____________________
C & I erection ____________________
Commissioning team: __________________
RhSTPP
Mechanical erection ____________________
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
Signature
JPL BHEL
Station: JPL, Tamnar JPL Reference no: Turbine/Comm./021 Sheet 1
Stage II: (4X600 MW) of
Plant Area:
Generator
Testing Schedule: Procedure for commissioning of Seal Oil Initial Circulation
DPR vent
MKW13AA506 Gas side Oil isolating valve for Globe Hand
DPR vent
MKW13AA509 Air side Oil isolating valve for Globe Hand
DPR vent
MKW13AA507 Air side Oil & Gas side oil Globe Hand
interconnecting valve
MKW71AA552 Signal isolating valve for Globe Hand
equalizing valve TE
MKW71AA513 Signal isolating valve for Globe Hand
equalizing valve TE
MKW71AA514 Signal line for equalizing valve Globe Hand
TE drain valve
MKW73AA513 Signal isolating valve for Globe Hand
equalizing valve TE
MKW73AA514 Signal line for equalizing valve Globe Hand
TE drain valve
MKW71AA553 Signal isolating valve for Globe Hand
equalizing valve EE
MKW71AA523 Signal isolating valve for Globe Hand
equalizing valve EE
MKW71AA524 Signal line for equalizing valve Globe Hand
EE drain valve
MKW73AA523 Signal isolating valve for Globe Hand
equalizing valve EE
MKW73AA524 Signal line for equalizing valve Globe Hand
EE drain valve
Signature
JPL BHEL