Contractor Name: TECNICAS REUNIDAS & DAEWOO Sub-Contractor Name: Al Hajiry Trading LLC
Project: Duqm Refinery Project EPC Package 01 Address: Wadi Kabir, Muscat
Job Description: Work activity involves confined space for construction purpose.
Prepared By Subcontractor:
Name: Jose Kurian Position: HSE Manager Signature: Date:
Reviewed and Approved By Subcontractor:
Name: Shaji NT Position: Project Manager Signature: Date:
Reviewed and Approved By TRD:
Name: Romao Silva cordeiro Position: TRD-HSE Superintendent Signature: Date:
Page 1 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
Operation not permitted; must implement Operation permitted with a time Operation permitted with
Risk Mitigation High controls to reduce risk to an acceptable or Medium Low
limited waiver endorsed by implementation of core HSE program
Controls manageable level. (M) (L)
(H) management. elements.
Page 2 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
1.0
Permit(s) Confined Space
Safe Work Permit
Required:
Hot Work Others
Hard Hat Clear Safety Glasses Dark Safety Glasses Chemical Goggles Cutting Goggles
Dust Mask Welding Hood Welding Aprons
Ear Plugs
Face Shield
Cartridge Respirator Escape Respirator
Welding Leggings
Hazardous
5.0 Materials (attach Carcinogen Irritant Highly Flammable Toxic Explosive
MSDS)
6.0
Other Potential Electrical Pressure (air, water, Mechanical (crush points) Ergonomics Temperature (±)
Hazards Light / Dark
gas)
Ignition Sources
Dust / Vapor Suffocation Other Trades
Additional Drink water and take rest breaks in hot weather conditions/Wear warm/suitable clothes in cold weather conditions. No work
7.0 Instructions during low visibility
Page 3 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
RISK RESIDUAL
SN JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE
RATING RISK
Page 4 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
RISK RESIDUAL
SN JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE
RATING RISK
Page 5 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
RISK RESIDUAL
SN JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE
RATING RISK
Follow all provisions of the under
Alhajiry's Confined Space Program.
Analyze and eliminate through
continuous forced ventilation all
atmospheric hazards and confirmed
through air monitoring as
acceptable.
Alternate Entry:
Actual or potential Reclassify the space as alternate
entry permit-required confined Site Manager
Entry into a confined space hazardous atmosphere
space. Construction
where the only hazard is (i.e.: oxygen deficiency,
actual or potential flammable, explosive, Proceed with work per the general Manager
3 H safe work practices for the space, if L Foreman/supervisor
hazardous atmosphere and toxic) that can be
any (review the confined space HSE supervisor
continuous forced air eliminated through
inventory). First aider
ventilation is sufficient to continuous forced
safely maintain the space ventilation. Alhajiry Construction Safety Entry
for entry. Supervisor continually evaluates
conditions to assure that the terms of
the entry remain valid. This includes
periodic air quality testing to support
the determination that continuous
forced air ventilation protects workers
in the space.
Page 6 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
RISK RESIDUAL
SN JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE
RATING RISK
Page 7 / 8
Duqm Refinery Project EPC Package One
JSA for confined space Rev.0
Signature:
Name:
Emp. No:
Page 8 / 8