The Monorail Project

Number Item Description Unit Quantity Rate (£) Amount

Class A:General Items

Contractual requirements

A110 Performance bond sum Site Agent

A120 Insurance of the Works sum Site Agent

A130 Third party insurance sum Site Agent

Specified requirements

A211.1 Establishment and removal of offices for the Engineer's staff sum Site Agent

A211.2 Maintenance of offices for the Engineer's staff sum Site Agent

A222.1 Provide telephones for the Engineer's staff - fixed sum Site Agent

A222.2 Maintain telephones for the Engineer's staff - time related wk Site Agent

A229 Set of progress photographs comprising six prints - per week nr Site Engineer

A231.1 Establishment and removal of Office Equipment sum Site Agent

A231.2 Maintenance of office equipment sum Site Agent

A233 Establishment and removal of surveying equipment sum Site Engineer

A242 Attendance upon the Engineer's staff - Chainmen wk Site Engineer

A250 Testing of materials - Concrete test cubes samples and methods of testing as Specification clause nr Site Engineer

A272.1 Traffic regulation - establishment and removal sum Site Engineer

A272.2 Traffic regulation - continuing operation and maintenance wk Site Engineer

Method Related Charges

A311.1 Set up offices - Fixed sum Plant

A311.2 Maintain offices for the duration of construction - time-Related wk Health and Safety

A311.3 Remove offices - Fixed sum Plant

A314.1 Set up stores and materials compound - Fixed sum Environmental

A314.2 Remove stores and materialscompound - Fixed sum Environmental

A315.1 Set up canteens and messrooms - Fixed sum Plant

A315.2 Operate canteens and messrooms for the duration of construction - time-Related wk Health and Safety

A315.3 Remove canteens and messrooms sum Plant

A321.1 Set up electricity supply and standby generator - Fixed sum Health and Safety

A321.2 Electricity Supply - time related wk Health and Safety

A322.1 Provide Water supply - Fixed sum Health and Safety

A322.2 Water supply for the duration of construction - time-Related wk Health and Safety

A323 Site Security - time related wk Health and Safety

A324 Establish and remove site hoardings: fixed sum Environmental

A326 Site transport wk Plant

A327 Welfare facilities complying with HSAW regulations for duration of construction - time-Related wk Health and Safety

A331.1 Mobile Cranes 20T wk Plant

A331.2 Mobile Cranes 50T wk Plant

A332.1 Bring to site and install wheel wash - fixed sum Environmental

A332.2 Operate wheel wash - time related wk Environmental

A332.3 Remove wheel wash - fixed sum Environmental

A353.1 Establish access road sum Temporary Works

A353.2 Remove access road sum Temporary Works

A361.1 Bring to site scaffolding sum Temporary Works

A361.2 Hire of scaffolding wk Temporary Works

A361.2 Remove scaffolding sum Temporary Works

A366.1 Provide temporary hardstanding areas sum Temporary Works

MEng 4 Page 1
The Monorail Project

A366.2 Remove temporary hardstanding areas sum Temporary Works

A371 Management and supervision for the duration construction - time-Related wk Site Agent

A372 Administration for the duration of construction - time Related wk Site Agent

A373.1 General labour - time related wk General Labour

A373.2 Labour for maintenance of plant and site services wk Plant

Provisional sums

A411 Daywork Labour sum 25000 General Labour

A412 Percentage adjustment for daywork Labour % General Labour

A413 Daywork Materials sum 12500 Materials

A414 Percentage adjustment for daywork Materials % Materials

A415 Daywork Plant sum 25000 Plant

A416 Percentage adjustment for daywork Plant % Plant

Nominated Subcontractors

A51.1 Prime cost item - diversion of gas main by TRANSCO sum 15000 Environmental

A51.2 Prime cost item - diversion of watermain by Portsmouth Water sum 8000 Environmental

A54.1 Other Charges TRANSCO sum Environmental

A54.2 Other Charges Portsmouth Water sum Environmental

Class B: Ground Investigation

B112 Trial pits and trenches in material other than rock. Max depth 1 -2m nr 10 Ground Investigation

B233 Light percussion boreholes. Maximum depth 10-20m m 6 Ground Investigation

B421 Samples from boreholes. Open tube. nr 18 Ground Investigation

B512 Samples from site. Ground water level nr 5 Ground Investigation

B721 Laboratory tests. Organic matter nr 18 Ground Investigation

B722 Laboratory tests. Sulphate nr 10 Ground Investigation

B723 Laboratory tests. pH value nr 10 Ground Investigation

B724 Laboratory tests. Contaminants nr 10 Ground Investigation

B831 Professional services. Graduate engineer or geologist h 40 Ground Investigation

B832 Professional services. Chartered engineer or geologist h 8 Ground Investigation

Class D: Demolition and Site Clearance

D1 General site clearance ha Demolition

D21 Trees, girth 500mm -1m nr Demolition

D23 Trees, girth 2 -3m nr Demolition

D413 Brickwork buildings not exceeding 250 cubic metres sum Demolition

D416 Brickwork buildings not exceeding 2500 cubic metres sum Demolition

D427 Concrete builings not exceeding 5000 cubic meters sum Demolition

D531 Other structures, wall, masonary not exceeding 50 cubic metres sum Demolition

D541 Other structures, metal sum Demolition

Class E: Earthworks

Station Details

Excavation

E323.1 Excavation for pile caps in material other than topsoil etc. max depth ne 1m m3 Earthworks Stations

E343.1 Excavation for pile caps in existing road structure exposed at commencing surface. max depth ne 1m m3 Earthworks Stations

Excavation Ancilliaries

E522.1 Preparation of excavation for pile caps in material other than topsoil etc. max depth m2 Earthworks Stations
ne 1m
E522.2 Preparation of excavation for pad foundations in material other than topsoil etc. max m2 Earthworks Stations
depth ne 1m
E524.1 Preparation of excavation for pad foundations for hard station in existing road m2 Earthworks Stations
structure exposed at commencing surface. max depth ne 1m
E532.1 Disposal of excavated material m3 Earthworks Stations

MEng 4 Page 2
The Monorail Project

Landscaping

E85.1 Shrubs in finished area nr Earthworks Stations

E86.1 Trees in finished area nr Earthworks Stations

Track Details

Excavation

E323.2 Excavation for pad foundations for track supports in material other than topsoil etc. max depth ne 1m m3 Earthworks Track

E324.1 Excavation for pile caps in material other than topsoil etc. max depth ne 2m m3 Earthworks Track

E343.2 Excavation for pad foundations for track supports in existing road structure exposed at commencing m3 Earthworks Track

E343.3 Excavation for pad foundations for hard station in existing road structure exposed at commencing s m3 Earthworks Track

Excavation Ancilliaries

E524.2 Preparation of excavation for pile caps in existing road structure exposed at m2 Earthworks Track
commencing surface. max depth ne 1m
E524.3 Preparation of excavation for pad foundations for track supports in existing road m2 Earthworks Track
structure exposed at commencing surface. max depth ne 1m
E532.2 Disposal of excavated material m3 Earthworks Track

Landscaping

E85.2 Shrubs in finished area nr Earthworks Track

E86.2 trees in finished area nr Earthworks Track

CLASS F:Insitu Concrete

Station Details

Provision of Concrete

F223.1 Design mix concrete strength C10 20mm aggregate m3 Materials

F284.1 Design mix concrete strength C40 40mm aggregate m3 Materials

Placing of concrete

F511.1 Mass in blinding, n.e. 150mm m3 Labour Stations

F622 Reinforced in ground floor slabs - thickness 200 mm m3 Labour Stations

F624.1 Reinforced in pile caps - 2.70 x 1.00 x 1.40 mht m3 Labour Stations

F624.2 Reinforced in ground beams under shear walls - 0.6 x 0.8 mht m3 Labour Stations

F632 Reinforced structural topping - thickness 150 mm m3 Labour Stations

F642 Reinforced in suspended slabs -Thickness 150-300mm m3 Labour Stations

F643 Reinforced in walls - 300-500mm m3 Labour Stations

F553 Reinforced in columns and piers - 300-500mm m3 Labour Stations

F564 Reinforced in beams - 300-500mm m3 Labour Stations

Track Details

Provision of Concrete

F223.2 Design mix concrete strength C10 20mm aggregate m3 Materials

F284.2 Design mix concrete strength C40 40mm aggregate m3 Materials

Placing of concrete

F511.2 Mass in blinding, n.e. 150mm m3 Labour Track

F524 Mass in bases, over 500mm m3 Labour Track

F624.3 Reinforced in bases - thickness 600 mm m3 Labour Track

F655 Reinforced in columns over 1m2 m3 Labour Track

Class G : CONCRETE ANCILLIARIES

Station Details

Formwork

G143 Rough finish Plane vertical to ground slab width ne 0.2 - 0.4 m m2 Formwork

G144.1 Fair finish Plane vertical to pile caps width ne 1.22 m m2 Formwork

G144.2 Fair finish Plane vertical to ground beams width ne 1.22 m m2 Formwork

MEng 4 Page 3
The Monorail Project

G281 Fair finish Formwork for constant cross-section beams m Formwork

G282 Fair finish Formwork for constant cross-section columns m Formwork

G283 Fair finish Formwork for constant cross-section walls m Formwork

Reinforcement

G522 Deformed high yield bars to BS4449 8mm dia t Steel fixing Stations

G524 Deformed high yield bars to BS4449 12mm dia t Steel fixing Stations

G527 Deformed high yield bars to BS4449 25mm dia t Steel fixing Stations

G56 Steel Fabric to BS 4483,nominal mass not exceeding 2-3 kg/m2 m Steel fixing Stations

Concrete Ancilliaries

G811.1 Wood float finish to top surfaces of pile caps and ground beams m2 Labour Stations

Track Details

Formwork

G144.1 Rough Finish Plane vertical to pile caps width ne 1.22 m m2 Formwork

G242 Fair finish plane sloping formwork to columns ne 1.22m m2 Formwork

G244 Fair finish plane vertical formwork to columns ne 1.22m m2 Formwork

Reinforcement

G525 Deformed high yield bars to BS4449 16mm dia t Steel fixing Track

G526 Deformed high yield bars to BS4449 20mm dia t Steel fixing Track

G528.1 Deformed high yield bars to BS4449 32mm dia t Steel fixing Track

G528.2 Deformed high yield bars to BS4449 40mm dia t Steel fixing Track

Concrete Ancilliaries

G811.2 Wood float finish to top surfaces of pile caps and ground beams m2 Labour Track

CLASS H: Precast Concrete

Station Detail

Ordinary designed mix mix concrete grade C40

H535 Precast concrete slabs 4 - 15m^2 t Pre-cast

H546 Precast concrete slabs 15 - 50m^2 t Pre-cast

H604 Precast stairs ground level nr Pre-cast

Track Details

Ordinary designed mix concrete grade C40

H167 30m long precast concrete beams for track t Pre-cast

Class M: STRUCTURAL METALWORK

M311 Fabrication of column sections straight on plan t Steel Fabrication

M321 Fabrication of beam sections straight on plan t Steel Fabrication

M323 Fabrication of beam sections straight on plan and cambered t Steel Fabrication

M361 Fabrication of bracings, purlins and cladding rails straight on plan t Steel Fabrication

M380 Holding down bolts and plates t Steel Fabrication

M480 Fabrication of anchorages and holding down bolts assemblies nr Steel Fabrication

M62 Erection of members in frame t Steel erection

M643 Permenant Use of HSFG general grade bolts 20 - 24mm dia nr Steel erection

M644 Permenant Use of HSFG general grade bolts 24 - 30mm dia nr Steel erection

M81 Off site blast cleaning to steel frame m2 Steel Fabrication

M86 Off site hot dip galvanising to steel frame m2 Steel Fabrication

M87 Off site two part spray painting to steel frame m2 Steel Fabrication

Class N: MISCELLANEOUS METALWORK

N12 Permanent steel walkways and platforms t Steel erection

N14 Permanent handrails m Steel erection

MEng 4 Page 4
The Monorail Project

Class P:PILES

P111 Bored, cast in place concrete piles - Diameter 300mm nr Piling Stations

P112 Bored, cast in place concrete piles - Diameter 300mm, total length of concrete m Piling Stations

P113 Bored, cast in place concrete piles - Diameter 300mm, Depth bored to maximum stated length m Piling Stations

P141.1 Bored, cast in place concrete piles - Diameter 600mm nr Piling Stations

P141.2 Bored, cast in place concrete piles - Diameter 750mm nr Piling Track

P142.1 Bored, cast in place concrete piles - Diameter 600mm, total length of concrete m Piling Stations

P142.2 Bored, cast in place concrete piles - Diameter 750mm, total length of concrete m Piling Track

P143.1 Bored, cast in place concrete piles - Diameter 600mm, Depth bored to maximum stated length m Piling Stations

P143.2 Bored, cast in place concrete piles - Diameter 750mm, Depth bored to maximum stated length m Piling Track

P151 Bored, cast in place concrete piles - Diameter 900mm nr Piling Track

P152 Bored, cast in place concrete piles - Diameter 900mm, total length of concrete m Piling Track

P153 Bored, cast in place concrete piles - Diameter 900mm, Depth bored to maximum stated length m Piling Track

Class Q:PILING ANCILLARIES

Q111 Cast inplace concrete piles - Pre-boring, diameter 300mm m Piling Stations

Q114.1 Cast inplace concrete piles - Pre-boring, diameter 600mm m Piling Stations

Q114.2 Cast inplace concrete piles - Pre-boring, diameter 750mm m Piling Track

Q115 Cast inplace concrete piles - Pre-boring, diameter 900mm m Piling Track

Q121 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 300mm m Piling Stations

Q124.1 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 600mm m Piling Stations

Q124.2 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 750mm m Piling Track

Q125 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 900mm m Piling Track

Q181 Cast inplace concrete piles - Preparing heads 300mm diameter nr General Labour

Q184 Cast inplace concrete piles - Preparing heads 600mm diameter nr General Labour

Q184.2 Cast inplace concrete piles - Preparing heads 750mm diameter nr General Labour

Q185 Cast inplace concrete piles - Preparing heads 900mm diameter nr General Labour

Q211.1 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: not exceeding 25mm t Steel fixing Stations

Q211.2 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: not exceeding 25mm t Steel fixing Track

Q212 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: exceeding 25mm t Steel fixing Track

Q213.1 Cast inplace concrete piles - Helical bars 12 mm dia t Steel fixing Stations

Q213.2 Cast inplace concrete piles - Helical bars 16 mm dia t Steel fixing Track

Q213.3 Cast inplace concrete piles - Helical bars 20 mm dia t Steel fixing Track

Q7.1 Remove obstructions nr Piling Stations

Q7.2 Remove obstructions nr Piling Track

Q812 Pile tests - Maintained loading with various reactions, 100-200t nr Site Engineer

Q84 Ultrasonic testing of piles nr Site Engineer

Class R: Roads and Paving

R117 Subbase, granular material DTP specified type 2,300mm thick m2 Roadworks

R223 Surfacing, dense bitumen macadam,75mm thick m2 Roadworks

R224 Roadbase, dry bound macadam,125mm thick m2 Roadworks

R611 Precast concrete kerbs to BS7263:part1,igure 1c, straight m2 Roadworks

R614 Precast concrete kerbs to BS7263:part1,igure 1c, drops m2 Roadworks

R812 Traffic signs, illuminated nr Roadworks

R814 Surface markings, continuous lines m Roadworks

Class U:BRICKWORK - BLOCKWORK AND MASONRY

Facing Brickwork

MEng 4 Page 5
The Monorail Project

U231 Facing brickwork vertical straight walls. m2 Cladding

U286 Wall ties for facing brickwork 4 ties per m2 m2 Cladding

Class Z:SIMPLE BUILDING WORKS

Z361 Cladding double glazed m2 Cladding

Z432 Surface finishes, flexible sheet cverings, sloping upper surfaces m2 Cladding

MEng 4 Page 6
Demolition Schedule

D1 2.1 hectares

D21 10 trees of girth up to 1m

D23 4 trees of girth up to 3m

D413 One brickwork Garage, flat roof, 4m by 5m by2.8m high.

D416 One pair of semi-detached houses, brick built with tile roof, overall size 12m by 15m by 8

D427 One pre cast concretewarehouse, 15m by 20m by 10 m high.

D531 Masonary wall, 0.3 m wide, 4m high 16m in length.

D541 4 no motorway overhead sign gantries, 16 m span.


oof, overall size 12m by 15m by 8m to top of roof.
1 Site Agent 11
2 Site Engineer 8
3 Environmental 10
4 Health and Safety 8
5 Plant 10
6 Temporary Works 7
7 Ground Investigation 10
8 Demolition 8
9 Piling Track 11
10 Earthworks Track 9
11 Earthworks Stations 8
12 Piling Stations 11
13 Formwork 9
14 General Labour 7
15 Materials 6
16 Labour Track 5
17 Labour Stations 10
18 Steel fixing Stations 6
19 Steel fixing Track 8
20 Roadworks 7
21 Pre-cast 4
22 Steel Fabrication 9
23 Steel erection 5
24 Cladding 4

191
Role Health and Safety Environmental Quality
Likely Likely Likely
Impact £ Impact £ Impact £
Site Agent 300000 Fire 15000 Disposal of rubbish. 500000 Liquidated Damages
Site Engineer 300000 Chainmen 150000 Disruption to Traffic 50000 Accuracy of Survey instruments
Environmental 300000 Trespassers 15000 Mud on Roads. 150000 Complaints
Health and Safety 100000 Contamination of water supply 15000 Disposal of waste water 150000 Loss of consents
Plant 100000 Maintainence of Plant 15000 Storage of diesel. 50000 Load Testing of Cranes
Temporary Works 300000 Protection of 'live' edges 15000 Disposal of temporary roads. 50000 Competence of scaffolders
Ground Investigation 100000 Contaminated Land 150000 Unforeseen ground conditions 50000 Quality assurance of Laboratory.
Demolition 100000 Noise 15000 Dust 50000 Competence of supervision
Piling Track 300000 Existing Services 15000 Disposal of piling arisings. 50000 Ultra sonic testing
Earthworks Track 300000 Excavation collapse 15000 Disposal of excavation arisings. 50000 Depth of Excavation
Earthworks Stations 300000 Personnel falling in excavation 15000 Disposal of water from excavations. 50000 Area of Excavation
Piling Stations 100000 Personnel falling in bore 15000 Removal of obstructions 50000 Load testing
Formwork 100000 Nails left in timber 15000 Storage of shutter oil. 50000 Accuracy of drawings
General Labour 100000 Heavy Lifting 15000 Noise of breaking down piles. 50000 Competence of workforce
Materials 300000 Reversing Lorries 15000 Disposal of waste concrete 50000 Quality Scheme for Ready Mixed Concrete
Labour Track 100000 Dermatitis 15000 Storage of curing membrane 50000 Slump of Concrete
Labour Stations 100000 Eye infections 150000 Wet weather working 150000 Temperature
Steel fixing Stations 300000 High Winds 15000 Disposal of waste steel 15000 Quality assurance of reinforcement
Steel fixing Track 100000 Eye damage 150000 Flooding of Excavation 50000 Correct cover to steel
Roadworks 300000 Collision with traffic 150000 Night Working 50000 Quality control of road materials
Pre-cast 300000 Lifting with cranes 150000 Week end working 50000 Quality assurance of pre cast yard.
Steel Fabrication 100000 Galvanising 15000 Delivery to site 50000 Quality assurance of fabrication yard.
Steel erection 300000 Working at height 15000 Storage of touch up paint 50000 Tolerances of frame
Cladding 300000 Cleaning Glass 15000 Disposal of waste bricks and mortar. 50000 Watertightness.

500000 Impact 6 Contract Risk 150000 Impact 4 Unforeseen Circumstances 50000 Impact 2 Quality Failure
300000 Impact 5 Fatality 100000 Impact 3 Injury 15000 Impact 1 Environmental Fine