A211.1 Establishment and removal of offices for the Engineer's staff sum Site Agent
A211.2 Maintenance of offices for the Engineer's staff sum Site Agent
A222.1 Provide telephones for the Engineer's staff - fixed sum Site Agent
A222.2 Maintain telephones for the Engineer's staff - time related wk Site Agent
A229 Set of progress photographs comprising six prints - per week nr Site Engineer
A250 Testing of materials - Concrete test cubes samples and methods of testing as Specification clause nr Site Engineer
A311.2 Maintain offices for the duration of construction - time-Related wk Health and Safety
A315.2 Operate canteens and messrooms for the duration of construction - time-Related wk Health and Safety
A321.1 Set up electricity supply and standby generator - Fixed sum Health and Safety
A322.2 Water supply for the duration of construction - time-Related wk Health and Safety
A327 Welfare facilities complying with HSAW regulations for duration of construction - time-Related wk Health and Safety
A332.1 Bring to site and install wheel wash - fixed sum Environmental
MEng 4 Page 1
The Monorail Project
A371 Management and supervision for the duration construction - time-Related wk Site Agent
A372 Administration for the duration of construction - time Related wk Site Agent
Provisional sums
Nominated Subcontractors
A51.1 Prime cost item - diversion of gas main by TRANSCO sum 15000 Environmental
A51.2 Prime cost item - diversion of watermain by Portsmouth Water sum 8000 Environmental
B112 Trial pits and trenches in material other than rock. Max depth 1 -2m nr 10 Ground Investigation
D413 Brickwork buildings not exceeding 250 cubic metres sum Demolition
D416 Brickwork buildings not exceeding 2500 cubic metres sum Demolition
D427 Concrete builings not exceeding 5000 cubic meters sum Demolition
D531 Other structures, wall, masonary not exceeding 50 cubic metres sum Demolition
Class E: Earthworks
Station Details
Excavation
E323.1 Excavation for pile caps in material other than topsoil etc. max depth ne 1m m3 Earthworks Stations
E343.1 Excavation for pile caps in existing road structure exposed at commencing surface. max depth ne 1m m3 Earthworks Stations
Excavation Ancilliaries
E522.1 Preparation of excavation for pile caps in material other than topsoil etc. max depth m2 Earthworks Stations
ne 1m
E522.2 Preparation of excavation for pad foundations in material other than topsoil etc. max m2 Earthworks Stations
depth ne 1m
E524.1 Preparation of excavation for pad foundations for hard station in existing road m2 Earthworks Stations
structure exposed at commencing surface. max depth ne 1m
E532.1 Disposal of excavated material m3 Earthworks Stations
MEng 4 Page 2
The Monorail Project
Landscaping
Track Details
Excavation
E323.2 Excavation for pad foundations for track supports in material other than topsoil etc. max depth ne 1m m3 Earthworks Track
E324.1 Excavation for pile caps in material other than topsoil etc. max depth ne 2m m3 Earthworks Track
E343.2 Excavation for pad foundations for track supports in existing road structure exposed at commencing m3 Earthworks Track
E343.3 Excavation for pad foundations for hard station in existing road structure exposed at commencing s m3 Earthworks Track
Excavation Ancilliaries
E524.2 Preparation of excavation for pile caps in existing road structure exposed at m2 Earthworks Track
commencing surface. max depth ne 1m
E524.3 Preparation of excavation for pad foundations for track supports in existing road m2 Earthworks Track
structure exposed at commencing surface. max depth ne 1m
E532.2 Disposal of excavated material m3 Earthworks Track
Landscaping
Station Details
Provision of Concrete
Placing of concrete
F624.1 Reinforced in pile caps - 2.70 x 1.00 x 1.40 mht m3 Labour Stations
F624.2 Reinforced in ground beams under shear walls - 0.6 x 0.8 mht m3 Labour Stations
Track Details
Provision of Concrete
Placing of concrete
Station Details
Formwork
G143 Rough finish Plane vertical to ground slab width ne 0.2 - 0.4 m m2 Formwork
G144.1 Fair finish Plane vertical to pile caps width ne 1.22 m m2 Formwork
G144.2 Fair finish Plane vertical to ground beams width ne 1.22 m m2 Formwork
MEng 4 Page 3
The Monorail Project
Reinforcement
G522 Deformed high yield bars to BS4449 8mm dia t Steel fixing Stations
G524 Deformed high yield bars to BS4449 12mm dia t Steel fixing Stations
G527 Deformed high yield bars to BS4449 25mm dia t Steel fixing Stations
G56 Steel Fabric to BS 4483,nominal mass not exceeding 2-3 kg/m2 m Steel fixing Stations
Concrete Ancilliaries
G811.1 Wood float finish to top surfaces of pile caps and ground beams m2 Labour Stations
Track Details
Formwork
G144.1 Rough Finish Plane vertical to pile caps width ne 1.22 m m2 Formwork
Reinforcement
G525 Deformed high yield bars to BS4449 16mm dia t Steel fixing Track
G526 Deformed high yield bars to BS4449 20mm dia t Steel fixing Track
G528.1 Deformed high yield bars to BS4449 32mm dia t Steel fixing Track
G528.2 Deformed high yield bars to BS4449 40mm dia t Steel fixing Track
Concrete Ancilliaries
G811.2 Wood float finish to top surfaces of pile caps and ground beams m2 Labour Track
Station Detail
Track Details
M323 Fabrication of beam sections straight on plan and cambered t Steel Fabrication
M361 Fabrication of bracings, purlins and cladding rails straight on plan t Steel Fabrication
M480 Fabrication of anchorages and holding down bolts assemblies nr Steel Fabrication
M643 Permenant Use of HSFG general grade bolts 20 - 24mm dia nr Steel erection
M644 Permenant Use of HSFG general grade bolts 24 - 30mm dia nr Steel erection
M86 Off site hot dip galvanising to steel frame m2 Steel Fabrication
M87 Off site two part spray painting to steel frame m2 Steel Fabrication
MEng 4 Page 4
The Monorail Project
Class P:PILES
P111 Bored, cast in place concrete piles - Diameter 300mm nr Piling Stations
P112 Bored, cast in place concrete piles - Diameter 300mm, total length of concrete m Piling Stations
P113 Bored, cast in place concrete piles - Diameter 300mm, Depth bored to maximum stated length m Piling Stations
P141.1 Bored, cast in place concrete piles - Diameter 600mm nr Piling Stations
P141.2 Bored, cast in place concrete piles - Diameter 750mm nr Piling Track
P142.1 Bored, cast in place concrete piles - Diameter 600mm, total length of concrete m Piling Stations
P142.2 Bored, cast in place concrete piles - Diameter 750mm, total length of concrete m Piling Track
P143.1 Bored, cast in place concrete piles - Diameter 600mm, Depth bored to maximum stated length m Piling Stations
P143.2 Bored, cast in place concrete piles - Diameter 750mm, Depth bored to maximum stated length m Piling Track
P151 Bored, cast in place concrete piles - Diameter 900mm nr Piling Track
P152 Bored, cast in place concrete piles - Diameter 900mm, total length of concrete m Piling Track
P153 Bored, cast in place concrete piles - Diameter 900mm, Depth bored to maximum stated length m Piling Track
Q111 Cast inplace concrete piles - Pre-boring, diameter 300mm m Piling Stations
Q114.1 Cast inplace concrete piles - Pre-boring, diameter 600mm m Piling Stations
Q114.2 Cast inplace concrete piles - Pre-boring, diameter 750mm m Piling Track
Q115 Cast inplace concrete piles - Pre-boring, diameter 900mm m Piling Track
Q121 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 300mm m Piling Stations
Q124.1 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 600mm m Piling Stations
Q124.2 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 750mm m Piling Track
Q125 Cast inplace concrete piles - Backfilling empty bore with stated material, diameter 900mm m Piling Track
Q181 Cast inplace concrete piles - Preparing heads 300mm diameter nr General Labour
Q184 Cast inplace concrete piles - Preparing heads 600mm diameter nr General Labour
Q184.2 Cast inplace concrete piles - Preparing heads 750mm diameter nr General Labour
Q185 Cast inplace concrete piles - Preparing heads 900mm diameter nr General Labour
Q211.1 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: not exceeding 25mm t Steel fixing Stations
Q211.2 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: not exceeding 25mm t Steel fixing Track
Q212 Cast inplace concrete piles - Reinforcement, straignt bars, nominal size: exceeding 25mm t Steel fixing Track
Q213.1 Cast inplace concrete piles - Helical bars 12 mm dia t Steel fixing Stations
Q213.2 Cast inplace concrete piles - Helical bars 16 mm dia t Steel fixing Track
Q213.3 Cast inplace concrete piles - Helical bars 20 mm dia t Steel fixing Track
Q812 Pile tests - Maintained loading with various reactions, 100-200t nr Site Engineer
R117 Subbase, granular material DTP specified type 2,300mm thick m2 Roadworks
Facing Brickwork
MEng 4 Page 5
The Monorail Project
Z432 Surface finishes, flexible sheet cverings, sloping upper surfaces m2 Cladding
MEng 4 Page 6
Demolition Schedule
D1 2.1 hectares
D416 One pair of semi-detached houses, brick built with tile roof, overall size 12m by 15m by 8
191
Role Health and Safety Environmental Quality
Likely Likely Likely
Impact £ Impact £ Impact £
Site Agent 300000 Fire 15000 Disposal of rubbish. 500000 Liquidated Damages
Site Engineer 300000 Chainmen 150000 Disruption to Traffic 50000 Accuracy of Survey instruments
Environmental 300000 Trespassers 15000 Mud on Roads. 150000 Complaints
Health and Safety 100000 Contamination of water supply 15000 Disposal of waste water 150000 Loss of consents
Plant 100000 Maintainence of Plant 15000 Storage of diesel. 50000 Load Testing of Cranes
Temporary Works 300000 Protection of 'live' edges 15000 Disposal of temporary roads. 50000 Competence of scaffolders
Ground Investigation 100000 Contaminated Land 150000 Unforeseen ground conditions 50000 Quality assurance of Laboratory.
Demolition 100000 Noise 15000 Dust 50000 Competence of supervision
Piling Track 300000 Existing Services 15000 Disposal of piling arisings. 50000 Ultra sonic testing
Earthworks Track 300000 Excavation collapse 15000 Disposal of excavation arisings. 50000 Depth of Excavation
Earthworks Stations 300000 Personnel falling in excavation 15000 Disposal of water from excavations. 50000 Area of Excavation
Piling Stations 100000 Personnel falling in bore 15000 Removal of obstructions 50000 Load testing
Formwork 100000 Nails left in timber 15000 Storage of shutter oil. 50000 Accuracy of drawings
General Labour 100000 Heavy Lifting 15000 Noise of breaking down piles. 50000 Competence of workforce
Materials 300000 Reversing Lorries 15000 Disposal of waste concrete 50000 Quality Scheme for Ready Mixed Concrete
Labour Track 100000 Dermatitis 15000 Storage of curing membrane 50000 Slump of Concrete
Labour Stations 100000 Eye infections 150000 Wet weather working 150000 Temperature
Steel fixing Stations 300000 High Winds 15000 Disposal of waste steel 15000 Quality assurance of reinforcement
Steel fixing Track 100000 Eye damage 150000 Flooding of Excavation 50000 Correct cover to steel
Roadworks 300000 Collision with traffic 150000 Night Working 50000 Quality control of road materials
Pre-cast 300000 Lifting with cranes 150000 Week end working 50000 Quality assurance of pre cast yard.
Steel Fabrication 100000 Galvanising 15000 Delivery to site 50000 Quality assurance of fabrication yard.
Steel erection 300000 Working at height 15000 Storage of touch up paint 50000 Tolerances of frame
Cladding 300000 Cleaning Glass 15000 Disposal of waste bricks and mortar. 50000 Watertightness.
500000 Impact 6 Contract Risk 150000 Impact 4 Unforeseen Circumstances 50000 Impact 2 Quality Failure
300000 Impact 5 Fatality 100000 Impact 3 Injury 15000 Impact 1 Environmental Fine