MECHANICAL

PIPE SITE FABRICATION


DESCRIPTION SIZE PIPE SPOOL
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CARBON STEEL PIPES PARAMETER REMARKS

CARBON STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 1.60 390.00 1.73 421.00
Large Bore 2 1/2" - 6" 3.60 225.00 3.89 243.00
Large Bore 8" - 16" 9.30 120.00 10.04 130.00
Large Bore 18" - 30" 18.00 75.00 19.44 81.00

CARBON STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 2.10 380.00 2.27 410.00
Large Bore 2 1/2" - 6" 4.50 200.00 4.86 216.00
Large Bore 8" - 16" 13.00 100.00 14.04 108.00
Large Bore 18" - 30" 27.50 70.00 29.70 76.00

CARBON STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 2.70 370.00 2.92 400.00
Large Bore 2 1/2" - 6" 6.20 185.00 6.70 200.00
Large Bore 8" - 16" 18.00 80.00 19.44 86.00
Large Bore 18" - 30" 44.00 65.00 47.52 70.00

ALLOY STEEL PIPES PARAMETER REMARKS

ALLOY STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 2.10 500.00 2.27 540.00
Large Bore 2 1/2" - 6" 4.70 295.00 5.08 319.00
Large Bore 8" - 16" 12.10 155.00 13.07 167.00
Large Bore 18" - 30" 23.40 100.00 25.27 108.00

ALLOY STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 2.70 490.00 2.92 529.00
Large Bore 2 1/2" - 6" 5.90 260.00 6.37 281.00
Large Bore 8" - 16" 16.90 130.00 18.25 140.00
Large Bore 18" - 30" 35.80 90.00 38.66 97.00

ALLOY STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 3.50 480.00 3.78 518.00
Large Bore 2 1/2" - 6" 8.10 240.00 8.75 259.00

Page 1 of 90
Large Bore 8" - 16" 23.40 105.00 25.27 113.00
Large Bore 18" - 30" 57.20 85.00 61.78 91.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing.
from laydown area. 2. Stress relieving.
2. Layout and Marking. 3. Surface preparation & painting work.
3. Cutting, bevelling & grinding / end preparation. 4. Pipe wrapping and insulation works.
4. Joint fitting-up & tack welding in-place. 5. Repair of defective joint fit-ups.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Fabrication of pipe support.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Cleaning and preservation work.
joints in-place.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc.
8. Preheating.

Page 2 of 90
MECHANICAL
PIPE SITE FABRICATION
DESCRIPTION SIZE PIPE SPOOL
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
STAINLESS STEEL PIPES PARAMETER REMARKS

STAINLESS STEEL PIPES (SCH 5S - 10S)


Small Bore 1/2" - 2" 1.90 500.00 2.05 540.00
Large Bore 2 1/2" - 6" 4.40 280.00 4.75 302.00
Large Bore 8" - 16" 11.40 150.00 12.31 162.00
Large Bore 18" - 30" 22.10 100.00 23.87 108.00

STAINLESS STEEL PIPES (SCH 40S)


Small Bore 1/2" - 2" 2.00 490.00 2.16 529.00
Large Bore 2 1/2" - 6" 4.50 265.00 4.86 286.00
Large Bore 8" - 16" 11.60 135.00 12.53 146.00
Large Bore 18" - 30"

STAINLESS STEEL PIPES (SCH 80S)


Small Bore 1/2" - 2" 2.60 475.00 2.81 513.00
Large Bore 2 1/2" - 6" 5.60 250.00 6.05 270.00
Large Bore 8" - 16" 16.30 120.00 17.60 130.00
Large Bore 18" - 30"

CS CEMENT LINED PIPES PARAMETER REMARKS

Large Bore 6" - 16" 9.60 130.00 10.37 140.00


Large Bore 18" - 30" 14.10 100.00 15.23 108.00
Large Bore 32" - 48" 21.20 85.00 22.90 92.00

DUCTILE IRON PIPES PARAMETER REMARKS

DUCTILE IRON PIPE SCH 40 (PUSH ON JT)


Large Bore 3" - 6" 3.20 170.00 3.46 184.00
Large Bore 8" - 12" 6.10 110.00 6.59 119.00

DUCTILE IRON PIPE SCH 60 (PUSH ON JT)


Large Bore 3" - 6" 7.00 100.00 7.56 108.00

Page 3 of 90
DUCTILE IRON PIPE SCH 80 (PUSH ON JT)
Large Bore 3" - 6" 3.60 155.00 3.89 167.00
Large Bore 8" - 12" 7.50 90.00 8.10 97.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing.
from laydown area. 2. Surface preparation & painting work.
2. Layout and Marking. 3. Pipe wrapping and insulation works.
3. Cutting, bevelling & grinding / end preparation. 4. Repair of defective joint fit-ups.
4. Joint fitting-up & tack welding in-place. 5. Fabrication of pipe support.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Cleaning and preservation work.
6. Screwed end square cutting, grinding, threading & screwing(make-on)
joints in-place.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc.
MECHANICAL
PIPE A/G INSTALLATION
DESCRIPTION SIZE STRAIGHT RUN PIPE
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CARBON STEEL PIPES PARAMETER REMARKS

CARBON STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 2.00 500.00
Large Bore 2 1/2" - 6" 4.60 280.00
Large Bore 8" - 16" 12.00 150.00
Large Bore 18" - 30" 26.00 90.00
CARBON STEEL PIPES (SCH 80 - SCH 100)
Small Bore 1/2" - 2" 2.70 485.00
Large Bore 2 1/2" - 6" 5.80 260.00
Large Bore 8" - 16" 16.60 130.00
Large Bore 18" - 30" 35.20 80.00
CARBON STEEL PIPES (SCH 120 - SCH 160)
Small Bore 1/2" - 2" 3.50 475.00
Large Bore 2 1/2" - 6" 8.00 240.00
Large Bore 8" - 16" 23.00 100.00
Large Bore 18" - 30" 56.00 70.00

ALLOY STEEL PIPES PARAMETER REMARKS

ALLOY STEEL PIPES (SCH 20 - SCH 60)

Page 4 of 90
Small Bore 1/2" - 2" 2.60 650.00
Large Bore 2 1/2" - 6" 6.00 365.00
Large Bore 8" - 16" 15.60 195.00
Large Bore 18" - 30" 33.80 120.00
ALLOY STEEL PIPES (SCH 80 - SCH 100)
Small Bore 1/2" - 2" 3.50 630.00
Large Bore 2 1/2" - 6" 7.50 340.00
Large Bore 8" - 16" 21.60 170.00
Large Bore 18" - 30" 45.80 105.00
ALLOY STEEL PIPES (SCH 120 - SCH 160)
Small Bore 1/2" - 2" 4.60 620.00
Large Bore 2 1/2" - 6" 10.40 310.00
Large Bore 8" - 16" 29.90 130.00
Large Bore 18" - 30" 72.80 90.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Stress relieving.
2. Layout and Marking. 3. Surface preparation & painting work.
3. Cutting, bevelling & grinding / end preparation. 4. Insulation works.
4. Joint fitting-up & tack welding in-place. 5. Valve installation
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Repair of defective joint fit-ups.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Fabrication of pipe support.
joints in-place. 8. Cleaning and preservation work.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc. 9. In-line instrument installation.
8. Installation of miscellaneous pipe supports.
9. Preheating.
10. Scaffolding. 11. Hydrotesting.

Page 5 of 90
MECHANICAL
PIPE A/G INSTALLATION
DESCRIPTION SIZE STRAIGHT RUN PIPE
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
STAINLESS STEEL PIPES PARAMETER REMARKS

STAINLESS STEEL PIPES (SCH 5S / 10S)


Small Bore 1/2" - 2" 2.50 625.00
Large Bore 2 1/2" - 6" 5.70 360.00
Large Bore 8" - 16" 14.80 190.00
Large Bore 18" - 30" 31.90 110.00

STAINLESS STEEL PIPES (SCH 40S)


Small Bore 1/2" - 2" 2.60 610.00
Large Bore 2 1/2" - 6" 5.80 350.00
Large Bore 8" - 16" 15.00 180.00
Large Bore 18" - 30"
STAINLESS STEEL PIPES (SCH 80S)
Small Bore 1/2" - 2" 3.40 600.00
Large Bore 2 1/2" - 6" 7.30 325.00
Large Bore 8" - 16" 20.80 160.00
Large Bore 18" - 30"

CS CEMENT LINED PIPES PARAMETER REMARKS

Large Bore 6" - 16" 12.30 165.00


Large Bore 18" - 30" 18.00 130.00
Large Bore 32" - 48" 27.00 110.00

DUCTILE IRON PIPES PARAMETER REMARKS

DUCTILE IRON PIPE SCH 40 (PUSH ON JT)


Large Bore 3" - 6" 4.10 210.00
Large Bore 8" - 12" 7.80 140.00

DUCTILE IRON PIPE SCH 60 (PUSH ON JT)


Large Bore 3" - 6" 9.00 130.00
DUCTILE IRON PIPE SCH 80 (PUSH ON JT)
Large Bore 3" - 6" 4.50 200.00
Large Bore 8" - 12" 9.60 120.00

Page 6 of 90
NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Layout and Marking. 3. Insulation works.
3. Cutting, bevelling & grinding / end preparation. 4. Valve installation
4. Joint fitting-up & tack welding in-place. 5. Repair of defective joint fit-ups.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Fabrication of pipe support.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Cleaning and preservation work.
joints in-place. 8. In-line instrument installation.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc.
8. Installation of miscellaneous pipe supports.
9. Scaffolding.
10. Hydrotesting.
MECHANICAL
PIPE A/G INSTALLATION
DESCRIPTION SIZE PREFAB SPOOL
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CARBON STEEL PIPES PARAMETER REMARKS

CARBON STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 1.20 280.00
Large Bore 2 1/2" - 6" 2.50 160.00
Large Bore 8" - 16" 6.50 85.00
Large Bore 18" - 30" 12.60 65.00
CARBON STEEL PIPES (SCH 80 - SCH 100)
Small Bore 1/2" - 2" 1.50 270.00
Large Bore 2 1/2" - 6" 3.20 140.00
Large Bore 8" - 16" 9.10 75.00
Large Bore 18" - 30" 19.20 60.00

CARBON STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 1.90 260.00
Large Bore 2 1/2" - 6" 4.30 130.00
Large Bore 8" - 16" 12.60 65.00
Large Bore 18" - 30" 30.80 55.00

ALLOY STEEL PIPES PARAMETER REMARKS

ALLOY STEEL PIPES (SCH 20 - SCH 60)

Page 7 of 90
Small Bore 1/2" - 2" 1.60 365.00
Large Bore 2 1/2" - 6" 3.30 210.00
Large Bore 8" - 16" 8.50 110.00
Large Bore 18" - 30" 16.40 85.00
ALLOY STEEL PIPES (SCH 80 - SCH 100)
Small Bore 1/2" - 2" 2.00 350.00
Large Bore 2 1/2" - 6" 4.20 180.00
Large Bore 8" - 16" 11.80 100.00
Large Bore 18" - 30" 25.00 80.00
ALLOY STEEL PIPES (SCH 120 - SCH 160)
Small Bore 1/2" - 2" 2.50 340.00
Large Bore 2 1/2" - 6" 5.60 170.00
Large Bore 8" - 16" 16.40 85.00
Large Bore 18" - 30" 40.00 75.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Stress relieving.
2. Layout and Marking. 3. Surface preparation & painting work.
3. Cutting, bevelling & grinding / end preparation. 4. Insulation works.
4. Joint fitting-up & tack welding in-place. 5. Valve installation
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Repair of defective joint fit-ups.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Fabrication of pipe support.
joints in-place. 8. Cleaning and preservation work.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc. 9. In-line instrument installation.
8. Installation of miscellaneous pipe supports.
9. Preheating.
10. Scaffolding. 11. Hydrotesting.
MECHANICAL
PIPE A/G INSTALLATION
DESCRIPTION SIZE PREFAB SPOOL
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
STAINLESS STEEL PIPES PARAMETER REMARKS

STAINLESS STEEL PIPES (SCH 5S / 10S)


Small Bore 1/2" - 2" 1.40 360.00
Large Bore 2 1/2" - 6" 3.10 200.00
Large Bore 8" - 16" 8.00 110.00
Large Bore 18" - 30" 15.50 80.00

Page 8 of 90
STAINLESS STEEL PIPES (SCH 40S)
Small Bore 1/2" - 2" 1.50 350.00
Large Bore 2 1/2" - 6" 3.20 190.00
Large Bore 8" - 16" 8.10 105.00
Large Bore 18" - 30"
STAINLESS STEEL PIPES (SCH 80S)
Small Bore 1/2" - 2" 1.90 340.00
Large Bore 2 1/2" - 6" 4.00 175.00
Large Bore 8" - 16" 11.40 95.00
Large Bore 18" - 30"

CS CEMENT LINED PIPES PARAMETER REMARKS

Large Bore 6" - 16" 6.70 90.00


Large Bore 18" - 30" 9.80 70.00
Large Bore 32" - 48" 14.80 60.00

DUCTILE IRON PIPES PARAMETER REMARKS

DUCTILE IRON PIPE SCH 40 (PUSH ON JT)


Large Bore 3" - 6" 2.20 115.00
Large Bore 8" - 12" 4.20 80.00
DUCTILE IRON PIPE SCH 60 (PUSH ON JT)
Large Bore 3" - 6" 4.90 70.00

DUCTILE IRON PIPE SCH 80 (PUSH ON JT)


Large Bore 3" - 6" 2.50 110.00
Large Bore 8" - 12" 5.20 65.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Layout and Marking. 3. Insulation works.
3. Cutting, bevelling & grinding / end preparation. 4. Valve installation
4. Joint fitting-up & tack welding in-place. 5. Repair of defective joint fit-ups.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Fabrication of pipe support.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Cleaning and preservation work.
joints in-place. 8. In-line instrument installation.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc.
8. Installation of miscellaneous pipe supports.
9. Scaffolding.

Page 9 of 90
10. Hydrotesting.
MECHANICAL
PIPE U/G INSTALLATION
DESCRIPTION SIZE INSTALLATION
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CARBON STEEL PIPES PARAMETER REMARKS

CARBON STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 1.80 450.00
Large Bore 2 1/2" - 6" 4.20 260.00
Large Bore 8" - 16" 10.70 140.00
Large Bore 18" - 30" 20.70 80.00

CARBON STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 2.40 440.00
Large Bore 2 1/2" - 6" 5.20 230.00
Large Bore 8" - 16" 15.00 120.00
Large Bore 18" - 30" 31.60 75.00
CARBON STEEL PIPES (SCH 120 - SCH 160)
Small Bore 1/2" - 2" 3.10 430.00
Large Bore 2 1/2" - 6" 7.10 215.00
Large Bore 8" - 16" 20.70 95.00
Large Bore 18" - 30" 50.60 65.00

ALLOY STEEL PIPES PARAMETER REMARKS

ALLOY STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 2.30 585.00
Large Bore 2 1/2" - 6" 5.50 340.00
Large Bore 8" - 16" 13.90 180.00
Large Bore 18" - 30" 26.90 105.00

ALLOY STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 3.10 570.00
Large Bore 2 1/2" - 6" 6.80 300.00
Large Bore 8" - 16" 19.50 155.00
Large Bore 18" - 30" 41.10 100.00

ALLOY STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 4.00 560.00
Large Bore 2 1/2" - 6" 9.20 280.00

Page 10 of 90
Large Bore 8" - 16" 26.90 125.00
Large Bore 18" - 30" 65.80 85.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Stress relieving.
2. Layout and Marking. 3. Surface preparation & painting work.
3. Cutting, bevelling & grinding / end preparation. 4. Pipe wrapping & Insulation works.
4. Joint fitting-up & tack welding in-place. 5. Valve installation
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Repair of defective joint fit-ups.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Excavation & backfilling works.
joints in-place. 8. Cleaning and preservation work.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc. 9. In-line instrument installation.
8. Preheating.
9. Hydrotesting.
MECHANICAL
PIPE U/G INSTALLATION
DESCRIPTION SIZE INSTALLATION
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
STAINLESS STEEL PIPES PARAMETER REMARKS

STAINLESS STEEL PIPES (SCH 5S / 10S)


Small Bore 1/2" - 2" 2.20 560.00
Large Bore 2 1/2" - 6" 5.20 325.00
Large Bore 8" - 16" 13.20 175.00
Large Bore 18" - 30" 25.40 100.00

STAINLESS STEEL PIPES (SCH 40S)


Small Bore 1/2" - 2" 2.30 550.00
Large Bore 2 1/2" - 6" 5.30 315.00
Large Bore 8" - 16" 13.40 160.00
Large Bore 18" - 30"

STAINLESS STEEL PIPES (SCH 80S)


Small Bore 1/2" - 2" 3.00 540.00
Large Bore 2 1/2" - 6" 6.50 290.00
Large Bore 8" - 16" 18.80 150.00
Large Bore 18" - 30"

Page 11 of 90
CS CEMENT LINED PIPES PARAMETER REMARKS

Large Bore 6" - 16" 11.00 150.00


Large Bore 18" - 30" 16.20 115.00
Large Bore 32" - 48" 24.40 100.00

DUCTILE IRON PIPES PARAMETER REMARKS

DUCTILE IRON PIPE SCH 40 (PUSH ON JT)


Large Bore 3" - 6" 3.70 190.00
Large Bore 8" - 12" 7.00 125.00
DUCTILE IRON PIPE SCH 60 (PUSH ON JT)
Large Bore 3" - 6" 8.00 115.00

DUCTILE IRON PIPE SCH 80 (PUSH ON JT)


Large Bore 3" - 6" 4.10 180.00
Large Bore 8" - 12" 8.50 110.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Layout and Marking. 3. Pipe wrapping & insulation works.
3. Cutting, bevelling & grinding / end preparation. 4. Valve installation
4. Joint fitting-up & tack welding in-place. 5. Repair of defective joint fit-ups.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Excavation & backfilling works.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Cleaning and preservation work.
joints in-place. 8. In-line instrument installation.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc.
8. Installation of miscellaneous pipe supports.
9. Hydrotesting.

MECHANICAL
PIPE FABRICATION/INSTALLATION
DESCRIPTION SIZE PROCESS PIPING
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CARBON STEEL PIPES PARAMETER REMARKS

CARBON STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 2.70 670.00
Large Bore 2 1/2" - 6" 6.20 380.00

Page 12 of 90
Large Bore 8" - 16" 15.80 200.00
Large Bore 18" - 30" 30.60 120.00

CARBON STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 3.60 655.00
Large Bore 2 1/2" - 6" 7.50 350.00
Large Bore 8" - 16" 22.10 180.00
Large Bore 18" - 30" 46.80 110.00

CARBON STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 4.60 635.00
Large Bore 2 1/2" - 6" 10.50 315.00
Large Bore 8" - 16" 30.60 130.00
Large Bore 18" - 30" 74.80 95.00

ALLOY STEEL PIPES PARAMETER REMARKS

ALLOY STEEL PIPES (SCH 20 - SCH 60)


Small Bore 1/2" - 2" 3.50 870.00
Large Bore 2 1/2" - 6" 8.10 495.00
Large Bore 8" - 16" 20.50 260.00
Large Bore 18" - 30" 39.80 155.00

ALLOY STEEL PIPES (SCH 80 - SCH 100)


Small Bore 1/2" - 2" 4.70 850.00
Large Bore 2 1/2" - 6" 9.80 455.00
Large Bore 8" - 16" 28.70 235.00
Large Bore 18" - 30" 60.80 145.00

ALLOY STEEL PIPES (SCH 120 - SCH 160)


Small Bore 1/2" - 2" 6.00 825.00
Large Bore 2 1/2" - 6" 13.70 410.00
Large Bore 8" - 16" 39.80 170.00
Large Bore 18" - 30" 97.20 125.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Stress relieving.
2. Layout and Marking. 3. Surface preparation & painting work.
3. Cutting, bevelling & grinding / end preparation. 4. Pipe wrapping & Insulation works.
4. Joint fitting-up & tack welding in-place. 5. Valve installation
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Repair of defective joint fit-ups.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Excavation & backfilling works.
joints in-place. 8. Fabrication of pipe support.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc. 9. Cleaning and preservation work.

Page 13 of 90
8. Installation of miscellaneous pipe supports. 10. In-line instrument installation.
9. Preheating.
10. Scaffolding. 11. Hydrotesting.
MECHANICAL
PIPE FABRICATION/INSTALLATION
DESCRIPTION SIZE PROCESS PIPING
RANGE
MECHANICAL SHOP JOBSITE
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
STAINLESS STEEL PIPES PARAMETER REMARKS

STAINLESS STEEL PIPES (SCH 5S / 10S)


Small Bore 1/2" - 2" 3.40 840.00
Large Bore 2 1/2" - 6" 7.60 480.00
Large Bore 8" - 16" 19.40 250.00
Large Bore 18" - 30" 37.60 140.00

STAINLESS STEEL PIPES (SCH 40S)


Small Bore 1/2" - 2" 3.50 830.00
Large Bore 2 1/2" - 6" 7.80 475.00
Large Bore 8" - 16" 19.80 240.00
Large Bore 18" - 30"

STAINLESS STEEL PIPES (SCH 80S)


Small Bore 1/2" - 2" 4.50 820.00
Large Bore 2 1/2" - 6" 9.40 440.00
Large Bore 8" - 16" 27.60 225.00
Large Bore 18" - 30"

CS CEMENT LINED PIPES PARAMETER REMARKS

Large Bore 6" - 16" 16.30 220.00


Large Bore 18" - 30" 24.00 170.00
Large Bore 32" - 48" 36.00 145.00

DUCTILE IRON PIPES PARAMETER REMARKS

DUCTILE IRON PIPE SCH 40 (PUSH ON JT)


Large Bore 3" - 6" 5.40 280.00
Large Bore 8" - 12" 10.40 190.00

DUCTILE IRON PIPE SCH 60 (PUSH ON JT)


Large Bore 3" - 6" 11.90 175.00

Page 14 of 90
DUCTILE IRON PIPE SCH 80 (PUSH ON JT)
Large Bore 3" - 6" 6.00 260.00
Large Bore 8" - 12" 12.60 160.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Layout and Marking. 3. Pipe wrapping & insulation works.
3. Cutting, bevelling & grinding / end preparation. 4. Valve installation
4. Joint fitting-up & tack welding in-place. 5. Repair of defective joint fit-ups.
5. All welded pipe fitting, I.e.; couplings, tees, flanges, etc. 6. Excavation & backfilling works.
6. Screwed end square cutting, grinding, threading & screwing(make-on) 7. Fabrication of pipe support.
joints in-place. 8. Cleaning and preservation work.
7. All screwed pipe fittings, I.e.; couplings, tees, flanges etc. 9. In-line instrument installation.
8. Installation of miscellaneous pipe supports.
9. Scaffolding.
10. Hydrotesting.
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL PUSH-ON JOINT BITUMINUOUS JT
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
CAST IRON PIPES PARAMETER REMARKS

CAST IRON (SERVICE WEIGHT)


Large Bore 2" - 6" 1.10 1.20
Large Bore 8" - 16" 2.70 2.80
Large Bore 18" - 30" 5.50 5.60

CAST IRON (EXTRA HEAVY WEIGHT)


Large Bore 2" - 6" 1.30 1.50
Large Bore 8" - 16" 3.30 3.50
Large Bore 18" - 30" 6.80 7.00

CAST IRON PIPES CEMENT JOINT LEAD JOINT REMARKS


MH/LM MH/MT MH/LM MH/MT
CAST IRON (SERVICE WEIGHT)
Large Bore 2" - 6" 1.30 1.50
Large Bore 8" - 16" 3.20 3.60
Large Bore 18" - 30" 6.40 7.20

Page 15 of 90
CAST IRON (EXTRA HEAVY WEIGHT)
Large Bore 2" - 6" 1.60 1.80
Large Bore 8" - 16" 4.00 4.50
Large Bore 18" - 30" 8.00 9.00

CAST IRON PIPES FLANGE JOINT REMARKS


MH/LM MH/MT MH/LM MH/MT
CAST IRON (SERVICE WEIGHT)
Large Bore 2" - 6" 1.80
Large Bore 8" - 16" 4.00
Large Bore 18" - 30" 8.20

CAST IRON (EXTRA HEAVY WEIGHT)


Large Bore 2" - 6" 2.20
Large Bore 8" - 16" 5.00
Large Bore 18" - 30" 10.20

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Joint fitting-up in-place. 3. Pipe wrapping & insulation works.
3. All pipe fitting connection, I.e.: elbows, tees, flanges, etc. 4. Valve installation
4. Installation of miscellaneous pipe supports. 5. Repair of defective joint fit-ups.
5. Hydrotesting. 6. Excavation & backfilling works.
7. Fabrication of pipe support.
8. Cleaning and preservation work.
9. In-line instrument installation.

Page 16 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL ON SLEEPER ON TRENCH
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
COPPER PIPES PARAMETER REMARKS

COPPER PIPES (TYPE K)


Small Bore 1/2" - 1 1/2" 1.40 1.50
Large Bore 2" - 4" 3.30 3.60
Large Bore 5" - 8" 6.00 6.70

COPPER PIPES (TYPE L)


Small Bore 1/2" - 1 1/2" 1.30 1.40
Large Bore 2" - 4" 3.20 3.40
Large Bore 5" - 8" 5.80 6.50

COPPER PIPES (TYPE M)


Small Bore 1/2" - 1 1/2" 1.20 1.30
Large Bore 2" - 4" 3.00 3.20
Large Bore 5" - 8" 5.60 6.10

COPPER PIPES (TYPE DWV)


Small Bore 1/2" - 1 1/2" 1.50 1.70
Large Bore 2" - 4" 3.60 4.00
Large Bore 5" - 8" 6.80 7.60

ALUMINUM PIPES PARAMETER REMARKS


ALUMINUM PIPES (SCH40 TYPE 6061)
Small Bore 1/2" - 1 1/2" 2.60 1,850.00 2.80 1,950.00
Large Bore 2" - 4" 4.60 500.00 4.80 550.00
Large Bore 5" - 8" 9.20 220.00 9.60 240.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.

Page 17 of 90
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

Page 18 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL ON SLEEPER ON TRENCH
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
FIBER GLASS REINF. PLASTIC PIPES PARAMETER REMARKS

PLASTIC PIPES (FRP-RTRP CLASS)


Small Bore 1/2" - 1 1/2" 0.80 1.00
Large Bore 2" - 6" 1.00 2.20
Large Bore 8" - 12" 3.00 3.60
Large Bore 14" - 24" 8.00 9.60
Large Bore 30" - 48" 17.00 20.00

PLASTIC PIPES PARAMETER REMARKS


PLASTIC PIPES (SCH 40)
Small Bore 1/2" - 1 1/2" 0.50 0.60
Large Bore 2" - 6" 0.80 0.90
Large Bore 8" - 12" 1.60 1.80
Large Bore 14" - 24" 2.00 2.20
Large Bore 30" - 48" 4.00 4.20

PLASTIC PIPES (SCH 80)


Small Bore 1/2" - 1 1/2" 0.70 0.80
Large Bore 2" - 6" 1.00 1.20
Large Bore 8" - 12" 1.80 2.00
Large Bore 14" - 24" 2.40 2.50
Large Bore 30" - 48" 4.80 5.00

FLEXIBLE PLASTIC PIPES PARAMETER REMARKS


POLYETHYLENE PIPES (SDR 13.6)
Small Bore 1/2" - 1 1/2" 0.20
Large Bore 2" - 3" 0.40

POLYETHYLENE PIPES (SDR 11.5)


Small Bore 1/2" - 1 1/2" 0.30
Large Bore 2" - 3" 0.50

POLYETHYLENE PIPES (SDR 9)


Small Bore 1/2" - 1 1/2" 0.40
Large Bore 2" - 3" 0.60

Page 19 of 90
NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

Page 20 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL ON PIPERACK INSIDE THE BUILDING
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
COPPER PIPES PARAMETER REMARKS

COPPER PIPES (TYPE K)


Small Bore 1/2" - 1 1/2" 1.70 2.10
Large Bore 2" - 4" 4.00 5.00
Large Bore 5" - 8" 7.50 9.20

COPPER PIPES (TYPE L)


Small Bore 1/2" - 1 1/2" 1.60 2.00
Large Bore 2" - 4" 3.80 4.80
Large Bore 5" - 8" 7.20 9.00

COPPER PIPES (TYPE M)


Small Bore 1/2" - 1 1/2" 1.50 1.80
Large Bore 2" - 4" 3.60 4.50
Large Bore 5" - 8" 6.80 8.40

COPPER PIPES (TYPE DWV)


Small Bore 1/2" - 1 1/2" 1.90 2.40
Large Bore 2" - 4" 4.50 5.60
Large Bore 5" - 8" 8.50 10.50

ALUMINUM PIPES PARAMETER REMARKS


ALUMINUM PIPES (SCH40 TYPE 6061)
Small Bore 1/2" - 1 1/2" 3.50 2,150.00 3.80 2,700.00
Large Bore 2" - 4" 6.00 600.00 6.50 750.00
Large Bore 5" - 8" 12.00 250.00 12.80 320.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.

Page 21 of 90
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

Page 22 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL ON PIPERACK INSIDE THE BUILDING
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
FIBER GLASS REINF. PLASTIC PIPES PARAMETER REMARKS

PLASTIC PIPES (FRP-RTRP CLASS)


Small Bore 1/2" - 1 1/2" 1.10 1.30
Large Bore 2" - 6" 2.50 3.00
Large Bore 8" - 12" 4.00 4.80
Large Bore 14" - 24" 11.00 13.00
Large Bore 30" - 48" 23.00 27.00

PLASTIC PIPES PARAMETER REMARKS


PLASTIC PIPES (SCH 40)
Small Bore 1/2" - 1 1/2" 0.70 0.80
Large Bore 2" - 6" 1.00 1.20
Large Bore 8" - 12" 2.00 2.20
Large Bore 14" - 24" 2.50 2.80
Large Bore 30" - 48" 5.00 5.40

PLASTIC PIPES (SCH 80)


Small Bore 1/2" - 1 1/2" 0.90 1.00
Large Bore 2" - 6" 1.40 1.50
Large Bore 8" - 12" 2.20 2.40
Large Bore 14" - 24" 2.80 3.20
Large Bore 30" - 48" 5.60 6.50

FLEXIBLE PLASTIC PIPES PARAMETER REMARKS


POLYETHYLENE PIPES (SDR 13.6)
Small Bore 1/2" - 1 1/2" 0.30
Large Bore 2" - 3" 0.70

POLYETHYLENE PIPES (SDR 11.5)


Small Bore 1/2" - 1 1/2" 0.40
Large Bore 2" - 3" 0.80

POLYETHYLENE PIPES (SDR 9)


Small Bore 1/2" - 1 1/2" 0.50
Large Bore 2" - 3" 0.90

Page 23 of 90
NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

Page 24 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL AT PROCESS AREA
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
COPPER PIPES PARAMETER REMARKS

COPPER PIPES (TYPE K)


Small Bore 1/2" - 1 1/2" 2.50
Large Bore 2" - 4" 6.00
Large Bore 5" - 8" 11.00

COPPER PIPES (TYPE L)


Small Bore 1/2" - 1 1/2" 2.40
Large Bore 2" - 4" 5.60
Large Bore 5" - 8" 10.30

COPPER PIPES (TYPE M)


Small Bore 1/2" - 1 1/2" 2.20
Large Bore 2" - 4" 5.40
Large Bore 5" - 8" 10.00

COPPER PIPES (TYPE DWV)


Small Bore 1/2" - 1 1/2" 2.80
Large Bore 2" - 4" 5.80
Large Bore 5" - 8" 12.00

ALUMINUM PIPES PARAMETER REMARKS


ALUMINUM PIPES (SCH40 TYPE 6061)
Small Bore 1/2" - 1 1/2" 4.00 2,900.00
Large Bore 2" - 4" 7.00 780.00
Large Bore 5" - 8" 14.00 330.00

NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.

Page 25 of 90
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

Page 26 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE
RANGE
MECHANICAL AT PROCESS AREA
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
FIBER GLASS REINF. PLASTIC PIPES PARAMETER REMARKS

PLASTIC PIPES (FRP-RTRP CLASS)


Small Bore 1/2" - 1 1/2" 1.50
Large Bore 2" - 6" 3.30
Large Bore 8" - 12" 5.40
Large Bore 14" - 24" 14.40
Large Bore 30" - 48" 30.00

PLASTIC PIPES PARAMETER REMARKS


PLASTIC PIPES (SCH 40)
Small Bore 1/2" - 1 1/2" 1.00
Large Bore 2" - 6" 1.50
Large Bore 8" - 12" 2.80
Large Bore 14" - 24" 3.60
Large Bore 30" - 48" 7.00

PLASTIC PIPES (SCH 80)


Small Bore 1/2" - 1 1/2" 1.30
Large Bore 2" - 6" 1.90
Large Bore 8" - 12" 3.00
Large Bore 14" - 24" 4.20
Large Bore 30" - 48" 8.00

FLEXIBLE PLASTIC PIPES PARAMETER REMARKS


POLYETHYLENE PIPES (SDR 13.6)
Small Bore 1/2" - 1 1/2"
Large Bore 2" - 3"

POLYETHYLENE PIPES (SDR 11.5)


Small Bore 1/2" - 1 1/2"
Large Bore 2" - 3"

POLYETHYLENE PIPES (SDR 9)


Small Bore 1/2" - 1 1/2"
Large Bore 2" - 3"

Page 27 of 90
NOTE:
INCLUSION EXCLUSION
1. Material handling/shaking-out, sorting & hauling of pipes & fittings 1. All kinds of testing except hydrotest.
from laydown area. 2. Surface preparation & painting work.
2. Welded end cutting, bevelling & grinding / end preparation. 3. Pipe wrapping & insulation works.
3. Joint fitting-up in-place. 4. Valve installation
4. All pipe fitting connections, I.e.; elbows, tees, flanges, etc. 5. Repair of defective joint fit-ups.
5. Installation of miscellaneous pipe supports.(for inside bldg. & process) 6. Excavation & backfilling works.
6. Scaffolding. 7. Fabrication of pipe support. (I.e., sleeper, trench, piperack, etc.)
7. Hydrotesting. 8. Cleaning and preservation work.
9. In-line instrument installation.

MECHANICAL
PIPE HYDROTESTING
DESCRIPTION SIZE
RANGE
MECHANICAL
PIPING WORKS MH/LM MH/MT MH/LM MH/MT
HYDROTESTING PARAMETER REMARKS

HYDROTESTING OF PIPELINE
Small Bore 1/2" - 2" 0.29
Large Bore 2 1/2" - 6" 0.30
Large Bore 8" - 16" 0.32
Large Bore 18" - 30" 0.38
Large Bore 32" - 36" 0.43

NOTE:
INCLUSION EXCLUSION
1. Setting up & dismantling of temporary waterlines, pumps/drivers & 1. Repair of defective welds.
blanks. 2. Repair of major leaks.
2. Pin-pointing and marking of leakspots.
3. Tightening only to loose bolts and screwed joints.

Page 28 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE VALVE INSTALLATION
RANGE
MECHANICAL 150 # RATING 300 # RATING
PIPING WORKS MH/PC MH/MT MH/LM MH/MT
VALVE INSTALLATION PARAMETER REMARKS

VALVE INSTALLATION (FLANGE TYPE)


Small Bore 1/2" - 2" 1.20 1.50
Large Bore 2 1/2" - 6" 4.00 4.80
Large Bore 8" - 16" 13.50 15.60
Large Bore 18" - 30" 34.00 42.00

PLASTIC PIPES 600 # RATING 900 # RATING REMARKS


MH/PC MH/MT MH/LM MH/MT
VALVE INSTALLATION (FLANGE TYPE)
Small Bore 1/2" - 2" 1.60 1.80
Large Bore 2 1/2" - 6" 5.40 6.00
Large Bore 8" - 16" 18.00 20.00
Large Bore 18" - 30" 45.00 50.00

PLASTIC PIPES 1500 # RATING REMARKS


MH/PC MH/MT MH/LM MH/MT
VALVE INSTALLATION (FLANGE TYPE)
Small Bore 1/2" - 2" 2.40
Large Bore 2 1/2" - 6" 8.00
Large Bore 8" - 16" 30.00
Large Bore 18" - 30" 75.00

NOTE:
INCLUSION EXCLUSION
1. Material handling. 1. Surface preparation & painting work.
2. Installation, setting/aligning. 2. Insulation works.
3. Joint fitting-up / bolting. 3. Wrapping works.
4. Repair of defective joint fit-ups.

Page 29 of 90
MECHANICAL
PIPE
DESCRIPTION SIZE SURFACE PREPARATION
RANGE
MECHANICAL TANKS PIPES STRUCTURES
PIPING WORKS MH/SM MH/SM MH/SM
SURFACE PREPARATION PARAMETER REMARKS

SURFACE PREPARATION WORK


Wire Brushing 1.00 1.08 1.08
Near White Blast 0.75 0.90 0.90
Commercial Blast 0.53 0.63 0.63

NOTE:
INCLUSION EXCLUSION
1. Checking and hauling from stockpile area. 1. Primer and Finish Painting.
2. Retrieving & sieving of blasted consumables for re-use. 2. Scaffolding
3. Checking & inspection of prepared surface.
4. Setting-up and clearing of blasted eqpt.,protective barriers & scaffs.

MECHANICAL
PIPE
DESCRIPTION SIZE PAINTING WORK
RANGE
MECHANICAL TANKS PIPES STRUCTURES
PIPING WORKS MH/SM MH/SM MH/SM
PAINTING WORK PARAMETER REMARKS

PAINTING WORKS
Manual (Brush) 0.194 0.194 0.194
Spray 0.100 0.120 0.130

NOTE:
INCLUSION EXCLUSION
1. Checking and hauling from stockpile area. 1. Surface preparation works.
2. Checking dry film thickness of applied coating. 2. Artistic and sign painting works.
3. Setting-up and clearing of blasted eqpt.,protective barriers & scaffs. 3. Scaffolding

Page 30 of 90
4. Painting equipment.

Page 31 of 90
MECHANICAL
PIPE COLD INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/LM MH/LM
MECHANICAL INSULATION WORKS PARAMETER REMARKS

PIPING INSULATION WITH CLADDING


Small Bore 1/2" - 2" 2.00 4.00
Large Bore 2 1/2" - 6" 3.00 4.50
Large Bore 8" - 16" 5.00 8.00
Large Bore 18" - 30" 8.00 12.00
Large Bore 32" - 36" 12.00 18.00

NOTE:
Include valve insulation works if insulation of valve correspond to a very small labor portion of total piping insulation manhours.
Include elbow cladding if elbow cladding correspond to a very small labor portion of total pipe cladding manhours.

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs.
3. Batching and mixing of castable mat'ls.
4. Setting-up and clearing of metal forming machines.
5. Site fabricating of claddding sheets into pre-formed sections.
6. Setting-up and clearing of scaffolds.

MECHANICAL
PIPE COLD INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/EA MH/EA
MECHANICAL INSULATION WORKS PARAMETER REMARKS
VALVE INSULATION WITH CLADDING
SCREWED OR WELDED CONNECTION
Small Bore 1/2" - 2" 6.00 8.00
Large Bore 2 1/2" - 6" 10.00 12.00
Large Bore 8" - 16" 16.00 21.00

Page 32 of 90
NOTE:

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls. 3. Valve box.
4. Setting-up and clearing of scaffolds.

Page 33 of 90
MECHANICAL
PIPE COLD INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/EA MH/EA
MECHANICAL INSULATION WORKS PARAMETER REMARKS
VALVE INSULATION WITH CLADDING
FLANGED CONNECTION
Small Bore 1/2" - 2" 12.00 15.00
Large Bore 2 1/2" - 6" 18.00 22.00
Large Bore 8" - 16" 30.00 40.00
Large Bore 18" - 30" 60.00 50.00
Large Bore 32" - 36" 90.00 120.00

NOTE:

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls. 3. Valve box.
4. Setting-up and clearing of scaffolds.

MECHANICAL
PIPE COLD INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/SM MH/SM
MECHANICAL INSULATION WORKS PARAMETER REMARKS
EQUIPMENT INSULATION WITH
CLADDING
Vertical Vessel/Stack 7.50 9.00
Horizontal Vessel 6.00 8.00
Heat Exchanger 8.00 9.50
Tank 5.50 7.50
Pump 8.50 10.00

NOTE:

Page 34 of 90
INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls.
4. Setting-up and clearing of scaffolds.

Page 35 of 90
MECHANICAL
PIPE HOT INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/LM MH/LM
MECHANICAL INSULATION WORKS PARAMETER REMARKS

PIPING INSULATION WITH CLADDING


Small Bore 1/2" - 2" 1.50 3.00
Large Bore 2 1/2" - 6" 2.50 4.00
Large Bore 8" - 16" 4.00 7.50
Large Bore 18" - 30" 7.50 10.00
Large Bore 32" - 36" 10.00 15.00

NOTE:
Include valve insulation works if insulation of valve correspond to a very small labor portion of total piping insulation manhours.
Include elbow cladding if elbow cladding correspond to a very small labor portion of total pipe cladding manhours.

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs.
3. Batching and mixing of castable mat'ls.
4. Setting-up and clearing of metal forming machines.
5. Site fabricating of claddding sheets into pre-formed sections.
6. Setting-up and clearing of scaffolds.

MECHANICAL
PIPE HOT INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/EA MH/EA
MECHANICAL INSULATION WORKS PARAMETER REMARKS
VALVE INSULATION WITH CLADDING
SCREWED OR WELDED CONNECTION
Small Bore 1/2" - 2" 5.00 7.00
Large Bore 2 1/2" - 6" 8.00 11.00
Large Bore 8" - 16" 13.00 19.00

Page 36 of 90
NOTE:

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls. 3. Valve box.
4. Setting-up and clearing of scaffolds.

Page 37 of 90
MECHANICAL
PIPE HOT INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/EA MH/EA
MECHANICAL INSULATION WORKS PARAMETER REMARKS
VALVE INSULATION WITH CLADDING
FLANGED CONNECTION
Small Bore 1/2" - 2" 8.00 10.00
Large Bore 2 1/2" - 6" 12.00 15.00
Large Bore 8" - 16" 20.00 25.00
Large Bore 18" - 30" 45.00 56.00
Large Bore 32" - 36" 65.00 80.00

NOTE:

INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls. 3. Valve box.
4. Setting-up and clearing of scaffolds.

MECHANICAL
PIPE HOT INSULATION
DESCRIPTION SIZE
RANGE
MECHANICAL 25mm ~ 50mm 80mm ~ 100mm
PIPING WORKS MH/SM MH/SM
MECHANICAL INSULATION WORKS PARAMETER REMARKS
EQUIPMENT INSULATION WITH
CLADDING
Vertical Vessel/Stack 6.00 8.00
Horizontal Vessel 5.00 7.50
Heat Exchanger 5.50 8.00
Tank 4.50 6.50
Pump 7.50 9.00

NOTE:

Page 38 of 90
INCLUSION EXCLUSION
1. Material uncrating, sorting, checking & hauling from storage area. 1. Surface preparation, painting works.
2. Fitting-up & placing of mesh wires or wire lath to anchor studs. 2. Anchor studs.
3. Batching and mixing of castable mat'ls.
4. Setting-up and clearing of scaffolds.

Page 39 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

FIRE PROTECTION UNIT PARAMETER


SPRINKLER SYSTEM & ACCESSORIES
Sprinkler Heads, Pendants & Uprights MH/EA 1.00
Fire Hydrants MH/EA 16.00
Fire Hose Cabinets MH/EA 12.00
Rotary Mounted Fire Nozzle MH/EA 6.00
Post Indicator Valve MH/EA 20.00
Fire House Reel MH/EA 15.00
Fire Monitor MH/EA 20.00
Fire Extinguisher Portable MH/EA 1.00
Fire Extinguisher Wheel Type MH/EA 2.00
Fire Extinguisher Cabinet MH/EA 2.00

NOTE:INCLUSION EXCLUSION
1. Receiving, off-loading, handling, hauling and installing fixing 1. Scaffolding, piping and power wiring,
and testing of units. support installation.
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

PLUMBING WORKS (INCLUDING ROUGH-IN) UNIT PARAMETER

PLUMBING EQUIPMENT, FIXTURES AND TRIMS


Water Closet & Appurtenances MH/EA 16.00
Urinals, Wall Hung or Floor Mounted MH/EA 10.50
Lavatories, Wall Hung or Floor Mounted MH/EA 14.00
Wash-up Sinks, Wall Hung or Floor Mounted MH/EA 9.60
Dispensers, All type MH/EA 4.00
Drinking Fountain, Floor Mounted MH/EA 8.00
Bathtubs Recessed Type MH/EA 10.00
Bathtubs and Shower, C.I. MH/EA 12.00
Shower Including Stall MH/EA 16.00
Shower Head Only MH/EA 3.00
Shower Drain MH/EA 4.00
Shower Stall, Slate MH/EA 16.00
Water Cooler MH/EA 12.00
Hot Water Heater 45~65 Gal MH/EA 8.00

Page 40 of 90
Water Closet Partition MH/EA 12.00
Urinal Partition MH/EA 12.00
Floor Drain up to 4" dia. MH/EA 12.00
Floor/Wall Cleanout up to 4" dia. MH/EA 8.00
Grease Trap, Single C.I. MH/EA 5.00
Kitchen Gas Range MH/EA 4.00
Kitchen Sink, Single MH/EA 8.00
Kitchen Sink, Double MH/EA 12.00
Laundry Tubs MH/EA 6.00
Slop Sink MH/EA 8.00
Emergency Shower And Eyewash Fountain MH/EA 6.00
Hand Dryer MH/EA 1.00
Soap Dispenser MH/EA 2.00
Soap Holder MH/EA 2.00
Bidet MH/EA 12.00

INCLUSION
1. Receiving, off-loading, handling, uncrating, handling, hauling and installing fixing EXCLUSION
of items, including rough-ins. 1. Scaffolding, piping and power wiring.

Page 41 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

HEATING VENTILATION AND AIR CONDITIONING UNIT PARAMETER

PACKAGED RECIPROCATING WATER CHILLERS W/ AIR-COOLED CONDENSERS


Capacity 10 ~ 25 Tons MH/EA 32.00
Capacity 30 ~ 50 Tons MH/EA 40.00
Capacity 60 ~ 80 Tons MH/EA 48.00
Capacity 100 ~ 125 Tons MH/EA 56.00

PACKAGED RECIPROCATING HERMETIC WATER CHILLERS W/ WATER-COOLED CONDENSERS


Capacity 10 ~ 25 Tons MH/EA 32.00
Capacity 30 ~ 50 Tons MH/EA 40.00
Capacity 60 ~ 80 Tons MH/EA 48.00
Capacity 100 ~ 125 Tons MH/EA 54.00
Capacity 150 ~ 200 Tons MH/EA 60.00

PACKAGED HERMETIC CENTRIFUGAL WATER CHILLERS W/ WATER-COOLED CONDENSERS


Capacity 100 ~ 200 Tons MH/EA 56.00
Capacity 250 ~ 500 Tons MH/EA 64.00
Capacity 600 ~ 800 Tons MH/EA 80.00
Capacity 1000 ~ 1500 Tons MH/EA 96.00

NOTE:
Manhours are based on receiving package type units delivered to jobsite and include off-loading from carrier, moving within 50 feet of final location
site, uncrating, setting, aligning, starting, checking, grouting and installation of box-in type anchor bolts.

Manhours do not include installation of water supply and return piping, instruments within the water piping, or electrical power wiring.

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

COOLING TOWERS UNIT PARAMETER

COOLING TOWERS FOR RECIPROCATING & CENTRIFUGAL CHILLERS

Page 42 of 90
Capacity 20 ~ 50 Tons MH/EA 55.00
Capacity 60 ~ 100 Tons MH/EA 96.00
Capacity 200 ~ 400 Tons MH/EA 330.00
Capacity 600 ~ 800 Tons MH/EA 630.00
Capacity 840 ~ 1000 Tons MH/EA 780.00

NOTE:
Manhours are based on receiving prefabricated units, knocked down and delivered to jobsite and include off-loading from carrier, moving within 50 feet
of final location site, field assembling, erecting, aligning, and anchoring at ground elevation.

Manhours do not include installation of catch basin, supporting steel, grillage, water treatment system, condenser water piping, motor starters
or power wiring.

Page 43 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

PUMPS UNIT PARAMETER

PACKAGED RECIPROCATING WATER CHILLERS W/ AIR-COOLED CONDENSERS


Capacity 100 ~ 500 Tons MH/EA 40.00
Capacity 750 ~ 1500 Tons MH/EA 60.00
Capacity 1800 ~ 3000 Tons MH/EA 80.00
Capacity 3750 ~ 5500 Tons MH/EA 96.00

HEAT PUMPS
Capacity 0.75 ~ 1.0 Tons MH/EA 10.00

NOTE:
Manhours include job handling, hauling, rigging, setting, aligning of pump and motor including grouting, aand installation of box-in type anchor bolts.
Manhours do not include installation of piping, instrumentation and electrical motor starter and hook-up.

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

AIR COOLED CONDENSING UNITS UNIT PARAMETER

AIR COOLED CONDENSING UNITS


Capacity 3 Tons MH/EA 10.00
Capacity 4 Tons MH/EA 12.00
Capacity 5 Tons MH/EA 16.00

AIR HANDLING UNITS UNIT PARAMETER


AIR HANDLING UNITS - SINGLE ZONE
Capacity 1,000 CFM MH/EA 16.00

Page 44 of 90
Capacity 2,500 CFM MH/EA 18.00
Capacity 6,000 CFM MH/EA 20.00
Capacity 14,000 CFM MH/EA 22.00
Capacity 24,000 CFM MH/EA 40.00
Capacity 30,000 CFM MH/EA 50.00

AIR HANDLING UNITS - MULTI ZONE


Capacity 4,000 CFM MH/EA 18.00
Capacity 6,000 CFM MH/EA 20.00
Capacity 10,000 CFM MH/EA 22.00
Capacity 15,000 CFM MH/EA 30.00
Capacity 22,000 CFM MH/EA 40.00
Capacity 30,000 CFM MH/EA 60.00

NOTE:
Manhours include receiving at jobsite, off-loading from carrier, moving within 50 feet of final location site, uncrating, setting and aligning.

Manhours do not include installation of ductwork, water or steam piping, motor starters or power wiring, and scaffolding.

Page 45 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

FAN COIL UNITS UNIT PARAMETER

FAN COIL UNITS, FREE STANDING


Capacity 200 ~ 1,200 Tons MH/EA 8.00
Capacity 4,000 ~ 6,000 Tons MH/EA 18.00
Capacity 8,000 ~ 12,000 Tons MH/EA 40.00

NOTE:
Manhours include receiving at jobsite, off-loading from carrier, moving within 50 feet of final location site, uncrating, setting and aligning inside
of buliding at grade.

Manhours do not include installation of ductwork, water or steam piping, motor starters or power wiring.

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

PACKAGED TYPE BOILERS UNIT PARAMETER

PACKAGE TYPE BOILERS - ELECTRIC FIRED, STEEL


Output 60 ~ 150 MBH MH/EA 25.00
Output 500 MBH MH/EA 75.00
Output 1,000 MBH MH/EA 90.00
Output 2,000 ~ 3,000 MBH MH/EA 140.00
Output 7,000 MBH MH/EA 350.00

PACKAGE TYPE BOILERS - GAS FIRED, CAST IRON


Output 50 ~ 150 MBH MH/EA 30.00
Output 200 ~ 500 MBH MH/EA 60.00
Output 600 ~ 1,500 MBH MH/EA 100.00
Output 1,600 ~ 3,000 MBH MH/EA 150.00
Output 7,000 MBH MH/EA 400.00

PACKAGE TYPE BOILERS - OIL FIRED, CAST IRON

Page 46 of 90
Output 50 ~ 150 MBH MH/EA 36.00
Output 200 ~ 500 MBH MH/EA 70.00
Output 600 ~ 1,500 MBH MH/EA 115.00
Output 1,600 ~ 3,000 MBH MH/EA 160.00
Output 7,000 MBH MH/EA 400.00

PACKAGE TYPE BOILERS - GAS OR OIL FIRED, STOTCH MARINE


Output 1,300 ~ 4,200 MBH MH/EA 120.00
Output 5,000 ~ 7,000 MBH MH/EA 160.00
Output 8,000 ~ 24,000 MBH MH/EA 200.00

NOTE:
Manhours include receiving at jobsite, off-loading from carrier, moving within 50 feet of final location, skidding, rolling, jacking, setting, aligning on
pre-installed foundation, boilout, startup, final adjustment and testing, grouting and installation of box-in type anchor bolts.

Manhours do not include installation of gas, steam, water, or other piping, or installation of motor starter and power wiring.

Page 47 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

UNIT HEATERS UNIT PARAMETER

UNIT HEATERS - SUSPENDED TYPE, ALUMINIZED HEAT EXCHANGER, GAS FIRED


Output 40 ~ 154 MBH MH/EA 10.00
Output 200 ~ 310 MBH MH/EA 20.00

PREFABRICATED STORAGE TANKS UNIT PARAMETER


COMPRESSION TANKS
Capacity 15 ~ 200 GAL MH/EA 6.00

HOT WATER STORAGE TANKS


Capacity 60 ~ 600 GAL MH/EA 8.00
Capacity 700 ~ 800 GAL MH/EA 15.00
Capacity 2,000 GAL MH/EA 20.00

UNDERGROUND STORAGE TANKS


Capacity 550 ~ 1,000 GAL MH/EA 10.00
Capacity 2,000 ~ 6,000 GAL MH/EA 20.00
Capacity 8,000 ~ 12,000 GAL MH/EA 30.00
Capacity 15,000 ~ 20,000 GAL MH/EA 40.00

NOTE:
Manhours include receiving at jobsite, off-loading from carrier, moving within 50 feet of final location, rigging, picking, setting and aligning.

Manhours do not include fabrication of tank, steam, condensate, or water piping, insulation, or instrumentation, and civil works.

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

PACKAGED/WINDOW TYPE AIR CONDITIONER UNITS UNIT PARAMETER

Page 48 of 90
PACKAGE/SPLIT TYPE AIR CONDITIONER UNITS
Capacity 3.00 ~ 3.75 Tons MH/EA 20.00
Capacity 10 ~ 15 Tons MH/EA 40.00
Capacity 20 ~ 30 Tons MH/EA 60.00
Capacity 40 ~ 50 Tons MH/EA 80.00

WINDOW TYPE AIR CONDITIONER UNITS


Capacity 1 ~ 2 Tons MH/EA 2.00

NOTE:
Manhours include off-loading from carrier, moving within 50 feet of final location site, uncrating, setting and aligning of unit on a
preinstalled concrete slab along the exterior structure wall and suspending the air handler from the ceiling up to 15 feet high.

Manhours do not include installation of concrete slab, connecting piping, refrigerant charge, or scaffolding.

Page 49 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

ROOF VENTILATORS UNIT PARAMETER

ROOF VENTILATORS - ROTARY SYPHON TYPE


6" to 18" ø 185 ~ 150 CFM MH/EA 4.00
20" to 24" ø 1,080 ~ 1,530 CFM MH/EA 6.00
30" to 42" ø 2,500 ~ 4,500 CFM MH/EA 8.00

ROOF VENTILATORS - SPINNER TYPE


6" to 18" ø 180 ~ 1,700 CFM MH/EA 4.00
20" to 24" ø 2,100 ~ 3,100 CFM MH/EA 6.00
30" to 36" ø 4,500 ~ 5,500 CFM MH/EA 8.00

ROOF VENTILATORS - STAIONARY GRAVITY SYPHON TYPE


6" to 18" ø 185 ~ 150 CFM MH/EA 4.00
20" to 24" ø 1,080 ~ 1,530 CFM MH/EA 6.00
30" to 42" ø 2,500 ~ 4,500 CFM MH/EA 8.00

ROOF VENTILATORS - ROTATING CHIMNEY CAP TYPE


3" to 10" ø MH/EA 4.00

ROOF VENTILATORS - RELIEF HOOD TYPE (INTAKE / EXHAUST)


500 ~ 1,500 CFM MH/EA 5.00
3,000 ~ 8,000 CFM MH/EA 12.00
10,000 ~ 20,000 CFM MH/EA 24.00
25,000 ~ 30,000 CFM MH/EA 40.00
40,000 ~ 50,000 CFM MH/EA 60.00

NOTE:
Manhours include receiving and off-loading at jobsite, rigging, pickling, setting and aligning.

Manhours do not include cutting openings in roof, placement of curb caps and flashing, or electrical power hook-up and scaffolding.

Page 50 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

FANS AND BLOWERS UNIT PARAMETER

CEILING FAN (Direct Drive)


95 ~ 3,000 CFM MH/EA 4.00

PADDLE BLADE FAN (Direct Drive)


36" 4,000 CFM MH/EA 6.00
52" 7,000 CFM MH/EA 8.00

ROOF FAN (Direct Drive)


420 ~ 2,150 CFM MH/EA 8.00

ROOF FAN (Belt Drive)


1,660 ~ 8,750 CFM MH/EA 10.00
12,500 CFM MH/EA 16.00
21,600 CFM MH/EA 24.00

UTILITY SET FAN (Direct Drive)


150 ~ 2,400 CFM MH/EA 6.00
3,300 CFM MH/EA 8.00

UTILITY SET FAN (Belt Drive)


800 ~ 6,700 CFM MH/EA 8.00
11,000 ~ 13,000 CFM MH/EA 16.00
15,000 ~ 20,000 CFM MH/EA 32.00

IN-LINE CENTRIFUGAL FAN (Belt Drive)


3,800 ~ 15,600 CFM MH/EA 15.00
23,000 CFM MH/EA 35.00
28,000 CFM MH/EA 60.00

PROPELLER FAN (Belt Drive)


12" ~ 36" 1,000 ~ 7,000 CFM MH/EA 4.00
42" ~ 48" 16,000 CFM MH/EA 6.00

Page 51 of 90
AIRFOIL CENTRIFUGAL FAN (Belt Drive)
12,420 ~ 40,980 CFM MH/EA 15.00
60,920 ~ 90,160 CFM MH/EA 30.00
110,300 ~ 134,960 CFM MH/EA 50.00

NOTE:
Manhours include receiving and off-loading at jobsite, moving within 50 feet of final location, rigging, pickling, setting and aligning
in an existing opening and adjustment.

Manhours do not include preparations of openings, installation of inlet vane control, out dampers, motor and drives, or electrical power hook-up.

Page 52 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

GRILLS/DIFFUSERS/REGISTERS/LOUVERS/DAMPERS/ACCESS UNIT PARAMETER

CEILING DIFFUSERS (Round Shapes) Step Down Adjustable


6" to 18" ø 225 ~ 400 CFM MH/EA 1.44
10" to 14" ø 600 ~ 1,200 CFM MH/EA 1.56
16" to 20" ø 1,250 ~ 2,100 CFM MH/EA 1.80
24" to 38" ø 2,500 ~ 5,000 CFM MH/EA 2.28

CEILING DIFFUSERS (Square Shapes) With Equalizing Grid & Damper


6" to 18" 225 ~ 400 CFM MH/EA 0.89
10" to 14" 600 ~ 1,200 CFM MH/EA 1.01
16" to 20" 1,250 ~ 2,100 CFM MH/EA 1.19

VOULUME DAMPERS
6" to 18" MH/EA 0.18
10" to 14" MH/EA 0.21
16" to 20" MH/EA 0.25
24" to 30" MH/EA 0.29
38" MH/EA 0.33

CEILING GRILLS
6" x 4" through 10" x 10" MH/EA 0.84
12" x 4" through 12" x 12" MH/EA 0.96
14" x 6" through 14" x 14" MH/EA 1.08

SIDE - WALL SUPPLY GRILLS


8" x 4" through 12" x 8" MH/EA 0.42
14" x 4" through 18" x 6" MH/EA 0.48
20" x 5" through 24" x 12" MH/EA 0.58
30" x 6" through 36" x 12" MH/EA 0.66
48" x 24" through 48" x 36" MH/EA 0.72

RETURN AIR GRILLES


11" x 6" through 18" x 18" MH/EA 0.52
24" x 10" through 30" x 24" MH/EA 0.65
36" x 12" through 36" x 30" MH/EA 0.71

Page 53 of 90
48" x 24" through 48" x 36" MH/EA 0.78

HUMIDIFIERS UNIT PARAMETER


HUMIDIFIERS
Air Flow Ca2,150 L/S MH/EA 72.00

NOTE:
Manhours include handling, hoisting into place, setting, aligning into position and make-up of connections for diffusers and above type accessories.

Manhours do not include fabrication or placement of duct or fittings, or scaffolding.

Page 54 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

DUCTWORKS UNIT PARAMETER

FIELD ERECTION DUCTS (Rectangular Steel Sheet Metal)


Gauge 24 MH/SM 2.29
Gauge 22 MH/SM 2.55
Gauge 20 MH/SM 2.93
Gauge 18 MH/SM 3.56

FIELD ERECTION DUCTS (Rectangular Aluminum Sheet Metal)


Gauge 22 MH/SM 2.80
Gauge 20 MH/SM 3.06
Gauge 18 MH/SM 3.56
Gauge 16 MH/SM 4.45

FIELD ERECTION DUCTS (Circular Steel Sheet Metal)


Gauge 22 4 ~ 10" ø MH/LM 0.93
Gauge 20 12 ~ 20" ø MH/LM 2.17
Gauge 18 21 ~ 30" ø MH/LM 3.72
Gauge 16 31 ~ 40" ø MH/LM 6.21
Gauge 14 41" ø MH/LM 8.85

NOTE:
Manhours include handling,rigging, hoisting into position, aligning and fastening into place including installation of duct fittings.

Manhours do not include fabrication works, insulation, fixing of supports and testing.

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

SOUND ATTENUATORS UNIT PARAMETER

Page 55 of 90
SOUND ATTENUATORS
Air Flow Ca1,700 L/S MH/EA 12.00
Air Flow Ca20,500 L/S MH/EA 16.00
Air Flow Ca21,500 L/S MH/EA 18.00

NOTE:
Manhours include handling, hoisting into place, setting and aligning into position and make-up of connections for the above type accessories.

Manhours do not include fabrication works.

Page 56 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

TESTING/ADJUSTING AND BALANCING UNIT PARAMETER

AIR BALANCING & SYSTEM TESTING


Air Handlers - Water Side MH/EA 8.00
Air Handlers - Air Side MH/EA 3.00
Chiller Equipment MH/EA 5.00
Wall Grilles and Registers MH/EA 0.50
Ceiling Air Diffusers MH/EA 0.80
Roof Exhausters MH/EA 1.00
Blowers to 5,000 CFM MH/EA 2.00
Blowers 5,000 to 30,000 CFM MH/EA 3.50
Induction & Fan Coil Units - Floor Mounted MH/EA 2.00
Induction & Fan Coil Units - Ceiling Mounted MH/EA 3.00
Smoke Stack Combustion Test MH/EA 3.00

TEST & ADJUST CONTROLS


Thermostat - Two Position MH/EA 0.50
Thermostat - Modulating MH/EA 0.90
Humidistat - Two Position MH/EA 0.90
Humidistat - Modulating MH/EA 1.40
Automatic Pump Down MH/EA 1.50
Motor Control MH/EA 1.00
Back - Pressure Control MH/EA 1.30
Water Solenoid Valve MH/EA 0.40
Water Regulationg Valve MH/EA 0.80
Expansion Valve MH/EA 0.90

NOTE:
Manhours include all operations to balance and test the systems in accordance with procedures which, in most cases
have been adapted from the Associated Air Balance Council.
Manhours include checking all terminals for tightness, testing for cycle in all positions, and making necessary adjustments.

Manhours do not include installation of systems and controls.

Page 57 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

POWER GENERATION, 600 MW CAPACITY COAL FIRED UNIT PARAMETER

BOILERS (PRESSURE PARTS)


STEAM DRUM (WITHOUT INTERNALS) MH/MT 18.00
SUPPLY DRUM MH/MT 30.00
FURNACE WALLS MH/MT 95.00
SUPER HEATERS MH/MT 90.00
REHEATERS MH/MT 56.00
ECONOMIZERS MH/MT 105.00
HEADERS MH/MT 75.00
BOILER ACCESSORIES
SUPPORT AND HANGER ROD MH/MT 65.00
BUCKSTAYS & CASINGS MH/MT 45.00
BOILER FITINGS MH/MT 150.00
PURGE WATER COOLER MH/MT 80.00
DCC MH/MT 45.00
MILL INERT SYSTEM MH/MT 300.00
BOILER WATER CIRCULATING PUMP MH/MT 80.00
FORCED DRAFT FAN MH/MT 60.00
PRIMARY AIR AND MILL SEAL AIR FAN MH/MT 60.00
IGNITOR BOOSTER FAN AND FRAME SCANNER FAN MH/MT 60.00
SEAL AIR FAN MH/MT 60.00
SOOT BLOWERS MH/MT 30.00
ELEVATOR FOR BOILER MH/MT 120.00
CHEMICAL DOSING EQUIPMENT MH/MT 90.00
CHAIN BLOCK MH/MT 45.00
BLOWDOWN TANK MH/MT 37.00
LIGHT OIL PIPING MH/MT 210.00
ACCUMULATOR MH/MT 80.00
LIFTING UNIT MH/MT 60.00
GAGE AND CONTROL EQUIPMENT MH/MT 60.00
MOTORS MH/MT 45.00
FLUE GAS DUCT MH/MT 90.00
BOILER WATER PUMP MH/MT 80.00
INDUCED DRAFT FAN MH/MT 60.00
IGNITOR BOOSTER FAN MH/MT 60.00

Page 58 of 90
ELECTROSTATIC PRECIPITATOR MH/MT 110.00
SMALL COMPRESSOR MH/MT 58.00
BLOWER AND DRIVER MH/MT 50.00
DRYER MH/MT 31.00
SILENCER MH/MT 42.00
AGITATOR AND MIXER MH/MT 110.00
BOILER STEEL STRUCTURE ERECTION
BOILER STEEL STRUCTURES MH/MT 40.00
HIGH TENSION BOLTS FOR BOILER STRUCTURE MH/MT 90.00
GRATING FOR BOILER STRUCTURE MH/MT 60.00
HANDRAIL FOR BOILER STRUCTURE MH/MT 65.00
SUPPORT FOR COAL BUNKER MH/MT 50.00
HIGH TENSION BOLTS FOR COAL BUNKER MH/MT 90.00
GRATING FOR BOILER COAL BUNKER MH/MT 60.00
HANDRAIL FOR COAL BUNKER MH/MT 65.00
PLATFORM & LADDER MH/MT 60.00

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

POWER GENERATION, 600 MW CAPACITY COAL FIRED UNIT PARAMETER

BOILER PIPINGS
MAIN STREAM PIPE MH/MT 75.00
REHEAT STEAM PIPE MH/MT 95.00
HP / LP BYPASS STAEM PIPE MH/MT 95.00
HP FEEDWATER PIPE MH/MT 110.00
MILLING PLANT
COAL GATE MH/MT 60.00
COAL FEEDER MH/MT 60.00
COAL CHUTES MH/MT 90.00
COAL MILLS MH/MT 99.00
MILL OUTLET VALVES MH/MT 70.00
MILL AROUND PIPING & VALVE MH/MT 120.00
PULVERIZED COAL PIPE MH/MT 120.00
SPRAGE HOPPER MH/MT 90.00

MECHANICAL BALANCE OF PLANTS


CONDENSER MH/MT 95.00

Page 59 of 90
CONDENSER CLEANING SYSTEM MH/MT 45.00
DEAERATOR MH/MT 35.00
LP HEATER MH/MT 30.00
ELECTRICAL PROTECTION UNIT MH/MT 100.00
VACUUM PUMP MH/MT 60.00
GLAND CONDENSER AND FAN MH/MT 90.00
CONDENSATE TRANSFER FAN MH/MT 60.00
CONDENSATE WATER FAN MH/MT 60.00
BOILER FEED WATER PUMP MH/MT 45.00
HEATER DRAIN RECOVERY PUMP MH/MT 80.00
ESP PIT PUMP MH/MT 80.00
BEARING COOLING WATER PUMP MH/MT 60.00
SEA WATER BOOSTER PUMP MH/MT 60.00
SEA WATER PIT PUMP MH/MT 80.00
BFP SOUND INSULATION COVER MH/MT 120.00
CHEMICAL DOSING EQUIPMENT MH/MT 60.00
OVERHEAD CRANE FOR T/G HOUSE MH/MT 60.00
HEATER DRAIN TANK MH/MT 60.00
CONDENSATE STORAGE TANK MH/MT 75.00
N2 SEAL SYSTEM MH/MT 60.00
VACCUM PURGE UNIT MH/MT 100.00
CIRCULATING WATER PIPE MH/MT 120.00
N2 GAS GENERATING SYSTEM MH/MT 120.00
EMERGENCY D/G MH/MT 60.00
COOLING WATER CHILLER MH/MT 45.00
INSTRUMENT AIR COMPRESSOR MH/MT 60.00
SERVICE AIR COMPRESSOR MH/MT 60.00
CHLORINATION INJECTION MH/MT 60.00
LIGHT OIL PIPING MH/MT 210.00
LIGHT OIL PUMP MH/MT 80.00
LIGHT OIL IGNITION PUMP MH/MT 80.00
LIGHT OIL STRAINER MH/MT 80.00
CIRCULATING WATER PUMP MH/MT 45.00
INTAKE EQUIPMENT MH/MT 50.00
SCREEN CLEANING SYSTEM MH/MT 80.00
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

POWER GENERATION, 600 MW CAPACITY COAL FIRED UNIT PARAMETER

Page 60 of 90
CATHODIC PROTECTION FOR INTAKE MH/MT 240.00
CATHODIC PROTECTION UNIT MH/MT 240.00
CATHODIC PROTECTION FOR DEMI TANK & CW MH/MT 240.00
CIRCULATING WATER PIPE MH/MT 120.00
STACK FOR ELEVATOR MH/MT 75.00
MACHINE SHOP MH/MT 60.00
FIRE FIGHTING SYSTEM MH/MT 200.00
FIRE PUMP MH/MT 80.00
LIGHT OIL UNLOADING EQUIPMENT MH/MT 60.00

MECHANICAL BALANCE OF PLANTS


LIGHT OIL TANK MH/MT 75.00
LIGHT OIL STAND MH/MT 60.00
CRANE (C.W.P. GANTRY) MH/MT 60.00
CRANE (MACHINE SHOP) MH/MT 60.00
HOIST (WAREHOUSE CYLINDER HOUSE) MH/MT 60.00
OILY WATER PIT PUMP MH/MT 80.00
DEMI. P. EFFLUENT PUMP MH/MT 90.00
HEAVY O.S.T. PIT PUMP MH/MT 80.00
COAL YARD PIT PUMP MH/MT 80.00
POTABLE WATER PLANT MH/MT 100.00
POTABLE WATER TANK MH/MT 110.00
POTABLE WATER HEADTANK MH/MT 85.00
POTABLE WATER SUPPLY PUMP MH/MT 60.00
POTABLE WATER SERVICE PUMP MH/MT 80.00
GENERAL TRANS. PIT PUMP MH/MT 80.00
GENERAL WASTE WATER PUMP MH/MT 80.00
RAW WASTE WATER PUMP MH/MT 80.00
WASTE WATER TREATMENT EQUIPMENT MH/MT 90.00
SERVICE WATER PUMP MH/MT 80.00
SERVICE WATER PUMP ASH MH/MT 80.00
SERVICE WATER HEAD TANK MH/MT 60.00
SERVICE WATER TANK MH/MT 110.00
B.C.W. SERVICE TANK MH/MT 85.00
DEMI. WATER TRANSFER PUMP MH/MT 60.00
DEMI. WATER TANK MH/MT 85.00
RAW WATER STORAGE TANK MH/MT 60.00
WATER TREATMENT PLANT MH/MT 120.00
RAW WATER SUBMERSIBLE PUMP MH/MT 80.00

Page 61 of 90
RAW WATER SUPPLY PUMP MH/MT 80.00
RAW WATER PUMP MH/MT 80.00
DEMI. WATER PUMP MH/MT 80.00
AUXILLIARY EQUIPMENT MH/MT 65.00
OVERHEAD CRANE MH/MT 60.00

BREECHING, CHIMNEYS, STACKS, AND DUCTS


AIR DUCT MH/MT 90.00
FLUE GAS DUCT MH/MT 90.00
HOT & COLD AIR DUCT MH/MT 90.00

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

POWER GENERATION, 600 MW CAPACITY COAL FIRED UNIT PARAMETER


FUEL HANDLING SYSTEM
COAL BUNKER (INCLUDING 10T LINING) MH/MT 60.00
ASH HANDLING SYSTEM MH/MT 85.00
COAL HANDLING SYSTEM MH/MT 75.00
BELT CONVEYOR MH/MT 110.00

FURNACES
BURNER WIND BOX MH/MT 90.00
OIL FIRING EQUIPMENT (IGNITORS) MH/MT 90.00

FUEL FIRED HEATERS


GAS FIRED HEATERS MH/MT 40.00
GAS AIR HEATERS MH/MT 45.00

MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

POWER GENERATION, 600 MW CAPACITY COAL FIRED UNIT PARAMETER

Page 62 of 90
TURBINE GENERATOR
HP TURBINE MH/MT 80.00
LP TURBINE MH/MT 80.00
CONTROL AND TURBINE ATTACHMENT MH/MT 60.00
TOOL MH/MT 80.00
OIL COOLER MH/MT 40.00
GENERATOR MH/MT 30.00
ACCESSORY MOTOR MH/MT 40.00
TRANSFORMER MH/MT 25.00
MAIN STEAM PIPE MH/MT 100.00
HP FEEDWATER PIPE MH/MT 147.00
FEEDWATER PIPE MH/MT 147.00
CONDENSATE WATER PIPE MH/MT 200.00
HOUSE WATER PIPE MH/MT 300.00
REHEAT STEAM PIPE MH/MT 94.00
ENGINE GENERATOR MH/MT 45.00
STEAM TURBINE MH/MT 70.00

Page 63 of 90
MECHANICAL

MAIN WORK AND ACTIVITY DESCRIPTION

HEAT GENERATION UNIT PARAMETER

BELT CONVEYORS PULLEYS AND DRUMS


12" ~ 24" MH/EA 6.00
30" ~ 42" MH/EA 8.00
48" MH/EA 10.00

BELT CONVEYORS ROLLERS, THROUGH TYPE


12" ~ 24" MH/EA 5.00
30" ~ 42" MH/EA 6.00
48" MH/EA 7.00

BELT CONVEYORS ROLLERS, STRAIGHT TYPE


12" ~ 24" MH/EA 3.00
30" ~ 42" MH/EA 4.00
48" MH/EA 5.00

CONVEYORS BELTINGS
12" ~ 16" 2PLY MH/LM 0.40
18" ~ 24" 2PLY MH/LM 0.50
30" ~ 42" 2PLY MH/LM 0.60
48" 2PLY MH/LM 0.70

SPEED REDUCERS W/ INDIRECT DRIVE ASSEMBLY/ELECTRIC MOTOR


3~5 MH/EA 9.00
25 ~ 100 MH/EA 21.00
125 ~ 400 MH/EA 81.00

NOTE:
INCLUSION:
1. Material uncrating, sorting, checking, cleaning and hauling from laydown area.
2. Setting up, mounting, greasing and aligning of bearings and take-up units to pulley and drum shaft.
3. Conveyor belt laying, pulling, assembling, aligning & levelling of speed reducers w/ indirect drives or motors.
4. Setting & assembly of drive pulleys & chain sprocket to shafts of motor & fitting-up & tensioning of drive belts & chains & placing rive guards & idlers.

Page 64 of 90
EXCLUSION:
1. Any repairs as may required to rehabilitate damaged hardwares.
2. Conveyor belt splicing and vulcanizaing works.
3. Footings, foundations, steel structurals, carpentry, tinsmithry and electrical works.
4. Mechanical Tests and Machining works.

Page 65 of 90
DESCRIPTION

REMARKS

ding, piping and power wiring,

DESCRIPTION

REMARKS

Page 66 of 90
ding, piping and power wiring.

Page 67 of 90
DESCRIPTION

REMARKS

LED CONDENSERS

ED CONDENSERS

from carrier, moving within 50 feet of final location

water piping, or electrical power wiring.

DESCRIPTION

REMARKS

Page 68 of 90
include off-loading from carrier, moving within 50 feet

ystem, condenser water piping, motor starters

Page 69 of 90
DESCRIPTION

REMARKS

grouting, aand installation of box-in type anchor bolts.

DESCRIPTION

REMARKS

REMARKS

Page 70 of 90
ocation site, uncrating, setting and aligning.

r wiring, and scaffolding.

Page 71 of 90
DESCRIPTION

REMARKS

ocation site, uncrating, setting and aligning inside

DESCRIPTION

REMARKS

Page 72 of 90
ocation, skidding, rolling, jacking, setting, aligning on
of box-in type anchor bolts.

or starter and power wiring.

Page 73 of 90
DESCRIPTION

REMARKS

REMARKS

ocation, rigging, picking, setting and aligning.

nstrumentation, and civil works.

DESCRIPTION

REMARKS

Page 74 of 90
ng, setting and aligning of unit on a
the ceiling up to 15 feet high.

Page 75 of 90
DESCRIPTION

REMARKS

ical power hook-up and scaffolding.

Page 76 of 90
DESCRIPTION

REMARKS

Page 77 of 90
igging, pickling, setting and aligning

s, motor and drives, or electrical power hook-up.

Page 78 of 90
DESCRIPTION

REMARKS

Page 79 of 90
REMARKS

onnections for diffusers and above type accessories.

Page 80 of 90
DESCRIPTION

REMARKS

uding installation of duct fittings.

DESCRIPTION

REMARKS

Page 81 of 90
of connections for the above type accessories.

Page 82 of 90
DESCRIPTION

REMARKS

which, in most cases

ing necessary adjustments.

Page 83 of 90
DESCRIPTION

REMARKS

Page 84 of 90
DESCRIPTION

REMARKS

Page 85 of 90
DESCRIPTION

REMARKS

Page 86 of 90
Page 87 of 90
DESCRIPTION

REMARKS

DESCRIPTION

REMARKS

Page 88 of 90
Page 89 of 90
DESCRIPTION

REMARKS

t drives or motors.
oning of drive belts & chains & placing rive guards & idlers.

Page 90 of 90