ork Progress Monitoring Sheet

Date of Date of
Submission date
Name of the Consultant Package No. S.N Road/Bidge Name Length/Span (KM) commencement Submission of
of Draft Report
of preparation Final Report
29-Dec-2016 27-Jan-2016
BEAM-Civil Tech-AEC BB-159-DSD-072/73-07
2073-09-14 2073-10-14
1.00 Katha Nadipul,Kailali (After Replacement) 2 x 30m PSC 2073-12-25 2074-02-10
2.00 Gajjar Khola,Kanchanpur (After Replacement) 1 x 15m RCC 2073-12-29 2074-02-10
3.00 Maleria Nala 1,Kanchanpur (After Replacement) 1 x 25m RCC 2074-01-05 2074-02-23
4.00 Maleria Nala-2,Kanchanpur (After Replacement) 1 x 25m RCC 2073-12-31 2074-02-24
5.00 Tumrani Bridge,Kanchanpur (After Replacement) 1 x 10m RCC Slab 2074-01-05 2074-02-23
6.00 Pathariya Bridge,Kanchanpur (After Replacement) 2 x 35m PSC 2074-01-25
7.00 Sisa Khola(Chatyanghat), Solukhumbu 1 x20m RCC
8.00 Solu Khola, Solukhumbu 2 x 15m RCC
9.00 Kinja Khola, Solukhumbu 1 x 35m PSC
10.00 Jhanjh River Bridge,Rautahat (After Replacement)