Sie sind auf Seite 1von 4

JSW STEEL LTD

DOLVI

10 MTPA PHASE-II EXPANSION PROJECT

SPECIFICATION NO.
JSWDOLVI-08004-WTS-0001

FOR

SLUICE GATES FOR INTAKE WATER PUMP


HOUSE

APRIL 2018
JSWDOLVI-08004-WTS-0001

TABLE OF CONTENTS

Pages

TECHNICAL SPECIFICATION

ANNEX-1 - DATA FOR SLUICE GATES .. 2

- i -
JSWDOLVI-08004-WTS-0001

ANNEX-1 – DATA SHEET OF SLUICE GATES

Sr. No. Parameters Description

Sluice gate - Thimble mounted with


1 Type headstock, Rising spindle type,
confirming to IS: 13349 -1992

2 Tag No. SG-1 and SG-2

3 Design Standard IS : 13349 -1992

4 Design temperature (Deg. C) 50 deg. C

5 Location Intake water channel

6 Quantity (No.) 2

7 Liquid handled Raw Water

Flow rate of water in open


8 6400
channel, m3/hr

9 Velocity through Gate, m/sec. 8.7 M/sec *

10 Operation Manually operated with gear arrangement

11 Gate Sealing Water-tight

12 Size ( Width x Height ), mm 1600 x 1600


Water head acting on Gate
13 Seating
face
Top level of where gate
14 + 11.0
headstock will be installed, m

15 Bottom level of channel, m + 1.55

14 Max water level, m + 10.7

15 Min water level, m + 3.5

Distance between centre line


16 0.95 M
*
of Gate to bottom, m

1
JSWDOLVI-08004-WTS-0001

Annex-1 – data sheet of sluice gates (cont’d)

17 Mounting Thimble Mounted


18 Bottom Closure type Conventional
Centre line of spindle to face
19 As per IS:13349 -1992
of wall
D Material of Construction :
Gate Frame, Door, Guide
1 strip, Head stock, Guide C.I. IS 210 FG 200
Bracket
2 Spindle SS AISI 410

3 Seating faces (Frame & Door) Naval Brass IS : 292 Gr. 2

4 Lift Nut LTB IS: 318 Gr. LTB-2

5 Fasteners SS AISI 304

6 Extension Spindle SS AISI 410

7 Head Stock (Geared) C.I. IS 210 FG 200


Gear Box (Encl. - Worm
8 C.I. IS 210 FG 200
Gear)
9 Guide Bracket C.I. IS 210 FG 200

10 Hand wheel M.S.

E Weight of Gate *
F Painting : As per JSW Painting spec
G Inspection & Testing: Shall be as per approved QAP
Notes :
1 (*) marks are to be filled by the vendor.
Minimum 150 mm foundation height to be considered where headstock
2
shall be installed
All surface forming joints and bearings shall be machined and painted
3 joists and bearings shall be machined and painted with anti-corrosive
paint.
4 Lifting lugs shall be provided on gate to facilitate maintenance

Das könnte Ihnen auch gefallen