Beruflich Dokumente
Kultur Dokumente
This book contains information obtained from authentic and highly regarded sources. Reasonable efforts have been
made to publish reliable data and information, but the author and publisher cannot assume responsibility for the valid-
ity of all materials or the consequences of their use. The authors and publishers have attempted to trace the copyright
holders of all material reproduced in this publication and apologize to copyright holders if permission to publish in this
form has not been obtained. If any copyright material has not been acknowledged please write and let us know so we may
rectify in any future reprint.
Except as permitted under U.S. Copyright Law, no part of this book may be reprinted, reproduced, transmitted, or uti-
lized in any form by any electronic, mechanical, or other means, now known or hereafter invented, including photocopy-
ing, microfilming, and recording, or in any information storage or retrieval system, without written permission from the
publishers.
For permission to photocopy or use material electronically from this work, please access www.copyright.com (http://
www.copyright.com/) or contact the Copyright Clearance Center, Inc. (CCC), 222 Rosewood Drive, Danvers, MA 01923,
978-750-8400. CCC is a not-for-profit organization that provides licenses and registration for a variety of users. For
organizations that have been granted a photocopy license by the CCC, a separate system of payment has been arranged.
Trademark Notice: Product or corporate names may be trademarks or registered trademarks, and are used only for
identification and explanation without intent to infringe.
Cudney, Elizabeth A.
Implementing lean six sigma throughout the supply chain : the comprehensive and transparent case
study / Elizabeth A. Cudney, Rodney Kestle.
p. cm.
Includes index.
ISBN 978â•‚1â•‚4398â•‚2814â•‚4 (pbk. : alk. paper)
1. Six sigma (Quality control standard)â•‚â•‚Case studies. 2. Business logisticsâ•‚â•‚Quality controlâ•‚â•‚Case
studies. 3. Business logisticsâ•‚â•‚Managementâ•‚â•‚Case studies. I. Kestle, Rodney. II. Title.
HD38.5.C856 2011
658.7â•‚â•‚dc22 2010034679
Elizabeth A. Cudney
Rodney Kestle
Contents
Acknowledgments..................................................................... xi
Authors....................................................................................xiii
1 Introduction......................................................................... 1
How To Use the CD...........................................................................2
CD Instructions............................................................................2
2 Lean Six Sigma Overview..................................................... 5
4 Define Phase...................................................................... 15
Introduction...................................................................................... 15
Midwest Logistics, Lean Six Sigma Core Team......................... 16
Develop Initial Documents.............................................................. 19
Project Charter...........................................................................20
Supplier–Input–Process–Output–Customer (SIPOC)................ 25
Identify Stakeholders and Develop Communication Plan...............28
Communications Strategy List................................................... 32
Perform Initial VOC and Identify CTS............................................. 35
Select the Team and Launch the Project.......................................... 39
Midwest Logistics, Lean Six Sigma Team Additions.................40
Create Responsibility Matrix (RASIC)........................................ 41
Create Project Plan............................................................................ 41
vii
viii ◾ Contents
5 Measure Phase.................................................................... 55
Introduction...................................................................................... 55
Define the Current Process..............................................................56
Process Mapping........................................................................64
Data Collection Plan, Metrics, and Operational Definitions....84
Create a Baseline.......................................................................97
Define the Detailed Voice of the Customer (VOC)....................... 101
Interview Event........................................................................ 101
Brainstorm Needs.................................................................... 104
Affinity Diagrams.................................................................... 105
Translate Needs to CTQ.......................................................... 108
Survey Customers/Stakeholders.............................................. 115
Customer Needs Map.............................................................. 116
Quality Function Deployment (QFD)..................................... 138
Define the Voice of the Process (VOP) and Current
Performance.................................................................................... 139
Benchmarking......................................................................... 141
Check Sheets............................................................................ 141
Plots, Capability, and Statistics................................................ 148
Pareto Charts, Time Series, Histograms.................................. 149
Validate Measurement System........................................................ 159
Define the Cost of Poor Quality (COPQ) and Cost/Benefit......... 164
Moving to the Analyze Phase........................................................ 164
6 Analyze Phase...................................................................167
Introduction.................................................................................... 167
Develop Cause-and-Effect Relationships........................................ 169
Test for Normality Exercise..................................................... 172
Process Analysis and 8 Wastes................................................ 173
5S.............................................................................................. 176
Failure Mode and Effects Analysis.......................................... 177
Contents ◾ ix
We are indebted to the colleagues who we have had the fortune to work
with and learn from. They have challenged our thinking and showed us
what Lean Six Sigma is truly about.
We are extremely thankful to the Productivity Press for all their help
and for making this a remarkable experience for us. In particular, we
would like to thank Michael Sinocchi, senior acquisitions editor, and
Lara Zoble, assistant editor and project coordinator. We are also grateful
to Prudence Board, project editor, for her development edits.
xi
Authors
xiii
xiv ◾ Authors
and 2005 IIE Lean Management Solutions Conferences. She served on the
conference committee for the 2008, 2009, and IIE Annual Conferences.
Beth also recently completed a two-year term as the president of the
IIE Lean Division. She is president of the Rotary Club of Rolla, Missouri.
Beth is a member of the American Society of Engineering Management
(ASEM), American Society of Mechanical Engineers (ASME), American
Society for Quality (ASQ), Institute of Industrial Engineers (IIE), and
Society of Automotive Engineers (SAE). Beth’s major areas of interest are in
quality engineering and Lean enterprise, more specifically Mahalanobis-
Taguchi System, robust design, Lean enterprise, and Six Sigma. She cur-
rently teaches EMgt 266 Quality Philosophies and Methods, EMgt 309
Six Sigma, and EMgt 409 Design for Six Sigma. Beth has published
more than 50 papers, 11 journal papers, and has four additional journal
papers waiting for publication. In addition, her first book, Using Hoshin
Kanri to Improve the Value Stream, was released in March 2009 through
Productivity Press, a division of Taylor and Francis.
Introduction
1
2 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
CD Instructions
◾⊾ Data sets (Excel files): Each data set is named to corre-
spond with a Figure or Table in the book. For example,
the data for Figure€4.4 is named “Data Figure€4.4.”
◾⊾ Training slides (PowerPoint files): These files corre-
spond to the DMAIC methodology used throughout
the book. All figures that are used in the book are
included in these files to provide training documents
to teach the case.
◾⊾ Glossary: This file is a reference guide that also
appears at the end of the book and contains com-
monly used Six Sigma and Lean definitions.
5
6 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Instructor to
Case Study
Train Core
Documents
Fundamentals
All to
Read Case
Students to
Apply Tools All to Compare
with Examples
Case Study
Introduction
11
12 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
CEO
Executive VP
Logistics
VP
Transportation VP Distribution
Regional VP Regional VP
Transportation Distribution
Store Calls
Driver Coordinator Personnel Clerk Area Supervisor Area Supervisor Area Supervisor
Associate
Define Phase
Introduction
15
16 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Joe Thompson
Project
Midwest VP of
Champion
Distribution
Master
Black Belt Jim Pulls
Project Champion
CI Mentor/MBB
Process Owner
Joe Thompson
Joe Thompson
Robert Quincy
Responsible (R)
Team Leader
Anita Smith
Approval (A)
Jim Pulls
Finance
Support (S)
Inform (I)
Consult (C)
Develop Initial Documents
Form Core Team R I A A C
Define Activities and R I A A I
Deliverables for Define
Phase
Responsibility Matrix R I A C I
Project Charter R S A C S
SIPOC R S A C I
Identify Stakeholders & Communication Plan
Stakeholder Analysis R S A C S
Matrix
TPC Analysis R S A C S
Customers/Stakeholders R S A C S
Matrix
Communication Plan R S A C S
Perform Initial VOC and Identify CTS
CTS Summary R S A C S
Select Team and Launch the Project
Team Organization Chart R S A C S
Revise Responsibility R I A C I
Matrix
Items for Resolution (IFR) R S A C S
Form
Establish Ground Rules R S A C S
Create Project Plan
Macro Project Plan R S A C S
100%
20
92% 100%
80%
$ Billions
15 76%
60% 60%
10 9
40%
36% 6
5 4 4
20%
2
0 0%
Midwest SW SE NE NW
Region
Now that the team had agreed on the business case, Anita
organized a team meeting to develop the activities and
deliverables for the Define phase. The team determined
five major activities, which are shown in Figure€4.5.
20 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Project Charter
% of Annual Expense
Account Name Detail Cost Cost (millions)
Transportation Driver 17 $535.5
Cost
Tractor Use 45 $1,417.5
Fuel (for refrigeration) 13 $409.5
Maintenance Preventive Maintenance â•⁄ 2 $63
Cost
Repairs â•⁄ 4 $126
Insurance & License â•⁄ 1 $31.5
Replacement 15 $472.5
Storage Cost Land Rental â•⁄ 2 $63
Security â•⁄ 1 $31.5
◾⊾ Driver
◾⊾ Transportation personnel
◾⊾ Warehouse receiving and shipping personnel
◾⊾ Store receiving personnel
◾⊾ Vendor shipping personnel
Project Overview:
In alignment with the company’s strategic goals, the Logistics
Executive team has jointly set the objective to reduce internal
operating costs by 10%. This has translated to a 3.6% reduction
of operating costs in the Midwest Logistics Region. The Midwest
Logistics Region’s Lean Six Sigma team has examined multiple proj-
ects that may impact the breakthrough goal and has identified opti-
mizing trailer utilization as a high priority.
Problem Statement:
The Midwest Logistics Region needs to reduce operating costs by
3.6% ($324 million). Improving trailer utilization has been identified
as the quickest way to reduce costs within their direct control. The
Lean Six Sigma team needs to analyze the current state of trailer
utilization, and then suggest improvements based on an optimized
process within 4-6 months.
If the Midwest Logistics Region fails to show an opportunity to
reduce operating costs as directed by the company’s strategic plans
within 4-6 months, the region would have to reduce operating costs
by other means, such as labor cutbacks, procurement freezes, and
contract renegotiations. By staying in the current state, the Midwest
Logistics Region would have to choose unfavorable cost cutting
methods which typically impact the productivity of the operation
and may not meet the $324 million goal. If productivity is lost,
shipments may not make it to the market on-time, thus reducing
the total sales of the company. The final impact would be a devalu-
ation of CJMart’s stock due to its inability to meet the 10% profit
increase projection.
Customer/Stakeholders:
Transportation Personnel, Warehouse Receiving Personnel,
Warehouse Shipping Personnel, Drivers, Store Receiving Personnel,
Vendor Shipping Personnel
What is important to these customers – CTS: Up-to-date trailer sta-
tus, optimized trailer dispatch plan, open communication of critical
or jeopardy events, and realistic process time estimates
Scope Statement:
The project is limited to the Midwest region for which Anita Smith
and Joe Thompson are responsible. The Lean Six Sigma team will
examine and recommend changes to the major process steps for
the use of a trailer: dispatch, load, transport, dispatch update, and
unload. The investigation is limited to the two methods of trailer
use: live load/unload and drop’n hook. These methods of use may
occur at a vendor, distribution center, or store.
Project Charter
Potential Risks Probability of Risk Impact of Risk Risk Mitigation Strategy
(H/M/L) (H/M/L)
Lack of Support M H Build Communication Plan
Data not Available L H Retain Risk
Resistance to M H Include in Change Strategy
Change from
Transportation Office
Project Resources: Milestones
Team Leader: Anita Smith Phase Est. Completion Date
Division and Dept.: Midwest Logistics Region Define 2/2
Measure 3/2
Process Owner: Robert Quincy, Sr. Dispatch Manager
Analyze 4/6
Project Champion: Joe Thompson Improve 4/15
Continuous Improvement Mentor/MBB: Jim Pulls Control 4/27
Seek Approval 5/5
Finance: Joe Thompson
Team Members/Support Resources: Midwest Transportation Office
Supplier–Input–Process–Output–
Customer (SIPOC)
The team met again to develop the necessary SIPOC dia-
grams for the processes under consideration. The team
listed numerous process steps:
1. Dispatch plan made for the day of operation.
2. Call made to driver.
3. Dispatch trailer to shipping dock.
4. Driver signs out a tractor.
5. Driver hooks up trailer and moves it to ship-
ping dock.
6. Driver confirms location of trailer with shipping
personnel.
26 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Warehouse
Vendor Store
(Providers of the (Resources required (Top level description (Deliverables (Anyone who receives a deliverable
required resources) by the process) of the activity) from the process) from the process)
Requirements Requirements
Shipping Personnel Packing List, Load Product Trailer Ready to Leave On Driver
Product Transport Schedule (LOS)
Driver Travel Plan, Tractor, Travel Within Transport Trailer Within AOS Driver Coord.
Trailer Legal Limits Trailer Staging Zone
Driver Cell Phone Driver Reports Verbal 30 Minutes Before Driver Coord.
Status Communication Arriving at
Receiving Dock
Driver Coord. Dispatch Plan, Driver Rec. Dock 10 Minutes Before Driver
Phone Receives Location, Trailer Arriving at
Dispatch Status, Next Receiving Dock
Update Assignment
Transportation personnel
◾⊾ Learn a new dispatch planning and execution
process
◾⊾ Why fix what isn’t broke
◾⊾ Lean Six Sigma team doesn’t know my process
Driver (any driver of a CJMart trailer)
◾⊾ Doesn’t want to be watched so closely
◾⊾ Thinks the schedule may become too rigid
◾⊾ Doesn’t want performance data tied to merit
increases
Warehouse and receiving/shipping personnel
◾⊾ Forced to work faster loading or unloading; may
be unsafe and reduce quality
◾⊾ Reduced number of personnel per load or
unload event
◾⊾ Not happy to have transportation pushing ware-
house personnel
30 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Potential Impact or
Stakeholders Who Are They? Concerns
Transportation This includes the • Manage +
Personnel general manager, optimized plan
dispatch manager,
• Clear and timely +
and driver
communication
coordinators for each
transportation office • Able to adapt to –
in the Midwest changing
region. conditions
effecting plan
Driver This includes any • Must champion +
driver moving a optimized plan
CJ-Mart owned
• First point of –
trailer.
contact in field
• Clear and timely –
communication
Warehouse This includes the • Indirect link –
PRIMARY
Transportation Personnel
Source of Examples from
resistance Define causes of resistance our project Rating
Technical Aligning and structuring organization • Learn a new 20
• Habit and inertia dispatch
planning and
• Difficulty in learning new skills execution
• Sunk costs process
• Lack of skills
Political Allocating power and resources • Lean Six 40
• Threat to the old guard from the new guard Sigma team
doesn’t know
• Relationships
my business.
• Power and authority imbalance or self-
preservation
Cultural Articulating the glue or cultural norms • Why fix what 40
• Selective perception works?
Driver
Source of Examples from
resistance Define causes of resistance our project Rating
Technical Aligning and structuring organization â•⁄ 0
• Habit and inertia
• Difficulty in learning new skills
• Sunk costs
• Lack of skills
Political Allocating power and resources • Doesn’t want to 60
• Threat to the old guard from the new be watched so
guard closely
• Relationships
• Power and authority imbalance
or self-preservation
Cultural Articulating the glue or cultural • Forced to work faster 80
norms loading or unloading,
• Selective perception may be unsafe and
reduced quality
• Locked into old “mindset”
• Reduced number of
• Afraid of letting go
personnel per load or
unload event
Figure 4.14â•… TPC analysis for warehouse receiving and shipping personnel.
• Advocate within
Office
Dispatch X O • Project Launch Project
Manager • Invite at All Champ.
Levels
Driver X O • Project Launch Team
Coordinator • Keep Informed Member 1
• Invite to Reviews
Driver X O • Inform of Project Team
Launch Member 1
• Keep Informed
• Town Hall
X = Currentâ•…â•…â•… O = Future
Warehouse
Project Launch
Receiving Keep Informed Team
Manager X O Invite to Reviews Member 3
Town Hall
Project Launch
Shipping Keep Informed Team
Manager
X O Invite to Reviews
Town Hall Member 3
Inform of Project
X O Team
Dock Personnel
Town Hall Member 3
X = Current O = Future
Vendor
Project Launch
Operations Team
X O Inform of Reviews
Manager Town Hall Member 4
Project Launch
Shipping Inform of Reviews Team
Manager X O Member 4
Town Hall
Inform of Project
‘Launch’ Team
Dock Personnel X O Town Hall Member 4
X = Current O = Future
Store
Project Launch
Inform of Monthly
Project
Store Manager X O Meetings and
Leader
Reviews
Town Hall
Inform of Project
Receiving Team
Dock Personnel X O Launch
Member 2
Town Hall
X = Current O = Future
Project Champion
Team Member 1
Team Member 2
Team Member 3
Team Member 4
Team Member 5
Team Member 6
Process Owner
CI Mentor/MBB
Project Leader
Joe Thompson
Joe Thompson
Robert Quincy
Responsible (R)
Anita Smith
Approval (A)
Jim Pulls
Finance
Support (S)
lnform (I)
Consult (C)
Weekly Meeting R S A C S S S S S S S
Monthly Meeting R S A C S S S S S S S
Milestone Review R S A C S S S S S S S
Final Report R S A C S S S S S S S
At the first meeting with the full team, Anita made the
first item of business to establish team member ground
rules, as shown in Figure€ 4.28. This helped the team
meetings run more smoothly and established expecta-
tions for participation and behavior.
The next task for the team was to set a project timeline
and develop a project plan. For the project timeline, the
team laid out the major phases of Lean Six Sigma (Define,
Measure, Analyze, Improve, and Control) into a timeline,
as shown in Figures€4.30 and 4.31. The timeline included
Store
Store
Drivers
Vendor
Vendor
Vendor
Rec. Mgrs.
Warehouse
Warehouse
Warehouse
Warehouse
Driver Coord.
Level of Participation
Shipping Mgr.
General Mgrs.
General Mgrs.
General Mgrs.
Rec. Personnel
Dispatch Mgrs.
Shipping Mgrs.
Transportation
Transportation
Transportation
Dock Personnel
Dock Personnel
Operations Mgr.
Invited (X)
Weekly Meeting X
Monthly Meeting X X
Milestone Review X X X X
Monthly Meeting
Method of
Milestone Report
Agenda & Minutes
Agenda & Minutes
Hardcopy (H)
Communication
Transportation
E
H
H
H
General Mgrs.
Transportation
E
E
E
E
E
Dispatch Mgrs.
Transportation
E
E
E
E
Driver Coord.
E
E
E
E
Drivers
Figure 4.23â•… Communication plan matrix—deliverables.
Warehouse
E
H
H
H
General Mgrs.
Warehouse
E
E
E
E
Rec Mgrs.
Warehouse
E
E
E
E
Shipping Mgrs.
Warehouse
E
E
Dock Personnel
Vendor
E
E
E
Operations Mgr.
Vendor
E
Shipping Mgr.
Vendor
Dock Personnel
Store
E
E
E
E
General Mgrs.
Store
E
E
Rec. Personnel
Define Phase ◾ 43
44 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Customer/Stakeholder Needs
'Accurate information
'Timely information
Transportation 'Standard information
Personnel 'Standard language
'Get inventory to market
when/before it demands
'Accurate assignments
Drivers
'Help 24/7 if plan changes
'Accurate arrival
times
'Easy method to update
Warehouse dispatch
Rec/Ship Personnel
'Correctdock/trailer
assignments
Standard
' trailer pick-up,
window of time
Optimized
Accurate assignments
'
Trailer Dispatch
Accurate arrival times
'
Plan
'Correct dock/trailer
assignments
Accurate information
' Up-to-Date
'Timely information Trailer Status
Standard
' trailer pick-up,
window of time
Accurate assignments
' Optimized
Accurate arrival times
' Trailer Dispatch
Plan
Correct dock/trailer
'
assignments
'Realistic
unload Realistic Process Time
cycle-times Estimates/Expectations
'Get inventory to
Meet Store Customers’
market when/before
Demands
it demands
Joe Thompson
Project
Midwest VP of
Champion
Distribution
Master
Black Belt Jim Pulls
Finance
Jim Pulls
Support (S)
Paul Jones
Anita Smith
Cindy Patch
Dave Leader
Team Leader
Chris Roberts
Robert Quincy
Joe Thompson
Joe Thompson
Inform (1)
Team Member
Simone Fillbert
Mike O’Conner
ClMentor/MBB
Process Owner
Team Member1
Team Member2
Team Member4
Team Member5
Team Member6
Project Champion
Consult (C)
Define Activities 2/2 Measure Activities 3/2 Analyze Activities 4/6 Improve/Control 4/27
• Team Define • Process Flow Measure • Cause and Effect Analyze Activities Improve/
Organization Report Diagrams Report Brainstorming Report • Improvement Control
Activities Due • Survey Execution Due • Cost Benefit Due Plans Report
• Project • Database Data Analysis • Revised Due
Charter Collection Process Flow 5/5
• Stakeholder • CTQs Diagrams Final
Analysis • Control Plan Pres
• SIPOC Recommendations to SVP
50 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Event Dates
Form Core Team Jan 4
Project Launch Meeting Jan 23
Define Review Feb 2–3
Town Hall—Drivers Feb 5
Town Hall—Store Feb 6
Town Hall—Warehouse Feb 7
Town Hall—Vendor Feb 8
Measure Presentation Mar 2–3
Data Analysis Complete Mar 30
Analyze Presentation Apr 6–7
Cause and Effect Analysis Complete Apr 23
Improve/Control Presentation Apr 27–28
Final Report/Presentation May 5–6
11 Develop Method to Control Change Complete 1/19 Items for Resolution Form
12 Prepare Project Plan Complete 1/20 Project Plan
13 Prepare Define Phase Report and Presentation Complete 2/2 Define Phase Report
Measure Phase
Introduction
With the Define phase complete, the Lean Six Sigma team
now had a clear understanding of what was to be done,
how they were going to do it, and who was responsible for
getting it done. The team had also developed a valuable
understanding of the stakeholders and their level of resis-
tance to the change. In addition, there was a communica-
tions plan to ensure that all members and stakeholders had
opportunities to exchange ideas and allow for the voice of
the customer to be heard. Now it was time to move on.
Within the Measure phase, the team must further
define the processes that it is going to study, so that a
plan can be built that covers what data exists within the
process and what data they must collect. Concurrently,
the team will collect the voice of the customer, which is
impacted by the trailer utilization process. Through inter-
views, focus groups, and surveys, the VOC will appear.
Then, once the data has been collected, the voice of
the process (VOP) is defined, which sets the baseline
for the process. To ensure that the data collected is not
biased by the collection instrument or methods, they will
55
56 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
◾⊾ What are the key metrics for the business process?
◾⊾ Are the metrics valid and reliable?
◾⊾ Do we have adequate data on this process?
◾⊾ How will we measure progress?
◾⊾ How will we measure ultimate success?
Warehouse Demand
Dispatch Plan Driver Pool
Warehouse Trailer Inspection
Requests Trailer In-Service
Repair and Maintenance
Tracking Tractor Pool
Store Demand
Replacement
Customer Demand
Trailer Supply Tracking
Depot
Requests
Maintenance Plan
Trailer Use
Warehouse
Requests Driver Tractor
Trailer Inspection Coordination Operation
Driver Trailer Tagging
Requests
Repair and
Depot Maintenance
Requests
Transpo Office 1
Full Full
Empty*
Warehouse
Vendors Depot Stores
Full
Empty
Empty
Transpo Office 2
Full
Full Full
Empty*
Warehouse
Vendors Depot Stores
Empty
Empty
Receive
Request Return to
Depot
Dispatch Pickup
Driver Trailer
Trailer Empty
Trailer Full
Store
Live Unload
Request By Ware Ware Vendor Vendor Driver Driver Driver Ware Depot Driver Driver Ware Depot
Dispatch 13:59 € € € € € € € € € € € €
Driver D1 D2 D3 D4 D6 D1 D3 D8 D8 D1 D3 D8 D8
Trailer 12004 987 7789 6745 0 12004 13288 13456 789 12004 13288 13456 789
Pickup Dock 23 34 L1 13 0 3 10 L2 21 5 10 L2 21
Mode A Full Full Empty Empty No Empty Full Empty Empty Empty Full Empty Empty
Trailer
Mode B Live Drop Drop Drop None Drop Drop Drop Drop Drop Drop Drop Drop
Mode C Origin Origin Origin Connect Return Return Return D-W-D D-W-D Return Return D-W-D D-W-D
Mode D Long Long Long Long Long Long Long D-W-D D-W-D Long Long D-W-D D-W-D
From W W D S S S V D W S V D W
To S S V V D D W W D D W W D
ETL 6/2/2008 € € € € € € € € € € € €
14:00
Depart 6/2/2008 € € € € € € € € € € € €
14:05
ETA 6/2/2008 6/3/2008 6/2/2008 6/3/2008 6/3/2008 6/3/2008 6/3/2008 6/2/2008 € 6/3/2008 6/3/2008 6/2/2008 €
19:00 7:00 18:00 8:00 7:00 8:00 7:00 19:30 8:00 7:00 19:30
Call In 6/2/2008 € € € € € € € € € € € €
18:10
(D = Depot, S = Store, V = Vendor, W = Warehouse) (Mode A = Trailer Condition, Mode B = Trailer State at Dest., Mode C = Leg of trip, Mode D = Type of Transit)
Measure Phase ◾ 63
Process Mapping
The team now had some basic facts and access to and
understanding of the Driver’s Board and the Trailer Plan log.
Instead of trying to use these items to piece together the
process, they decided to interview some relevant stakehold-
ers and reference any standard operating procedures that
were being used to help them build the process maps. The
interviews and research culminated in a written process,
which then was converted to process maps. Their work
appears in the following sections. The team listed the steps
for each process and then drew process flow diagrams.
Wait No
Wait
No
Wait
Wait
No
Is Request full trailer to
trailer Yes be taken to final End
full? destination
Request trailer to be
delivered to depot, empty Note status in the system
Depot personnel
print daily Move trailer to
maintenance garage for service
No
plan
Wait
Yes
Once work is
complete, move
trailer to check-in
Depot personnel review
maintenance plan and Identified trailer Trailer
identify a list of trailers for Yes
in the yard? P/M?
P/M or decommissioning
No
Move decommissioned
trailer to salvage Note status in the system End
pickup lot.
End
Yes A1
To
Yes warehouse?
C1
Yes
No To
vendor?
D1
No
C2
A1
C1
Yes
No
From
warehouse?
Does vendor also
need an empty?
D1
No
Yes
Yes Update plan log – change
trailer condition to
“Empty” plus note
From pickup and trailer #
vendor?
No A2
A2
Standard
Yes empty delivery No
or full pickup?
D1 D2
B1
Driver communicates
Wait Driver Coord. updates
trailer number to E1
trailer plan log with ETA
coordinator
Wait for
driver
call in
C1 No
Wait
No A2
C2
To
depot? Driver Coord.
communicates trailer
Dispatch number, pickup and
designated Wait
destination docks and
Yes (D-W-D) driver requests ETL and
departure time
C1
Yes
Authorization
Yes
Special request approved?
within means?
No
C1
No
E1
End
G1
Drop’n
hook?
H1 Driver transports
Yes trailer to the
F1
destination’s staging
zone
Driver secures load
Destination
Driver picks-up vendor?
Driver updates
shipping docs and
Driver Coord. with
confirms they are
Driver transports location
complete
trailer back to
No
depot staging
Driver zone Driver updates
communicates Driver Coord. with
trailer number and the arrival time
departure time (dock time)
Driver
communicates Driver transports
trailer number and tractor back to
H2 depot staging End
departure time
zone
Assume empty
Driver No J1
trailer to depot
ready for
dispatch
Empty trailer
to warehouse?
Driver communicates
Driver secures Travel to Driver communicates
trailer number to
trailer at depot depot yard ETA to coordinator
coordinator
J1
No
Driver communicates Driver transports Driver communicates
Driver secures
departure time to trailer to the depot destination dock time
trailer
coordinator check-in to coordinator
End
Up-to-date trailer status • Trailer Status • Trailer Plan Log • Histograms • All trailers logged within • Extracted from database
• Trailer Status Error • Audit of Trailer • Pareto charts the Trailer Plan Log within last 12 months.
Rate Status Report • Basic statistics • Audit random 5% for • Call site “given” to confirm
errors. traller# & presence
• Hypothesis tests
Optimized trailer dispatch • %Trailer Utilization • Trailer Plan Log • Histograms • All trailers logged within • Extracted from database
plan • Daily Shipments • Pareto charts the Trailer Plan Log within last 12 months
• % Empty • Basic statistics
• AOS% & LOS% • Hypothesis tests
• Mean Dispatch
• Mean Dev. from
target: Dispatch.
Arrival and Depart
Open comrnunication of • % responded by • Survey • Pareto analysis • 5 Stakeholder groups • Needs survey by email
critical or Jeopardy events question
Realistic Process time • Mean Dispatch • Traller Plan Log • Histograms • All requests logged • Extracted from database
estimates—expectations Time • Study • Pareto charts within the Trailer Plan within last 12 months.
• Live Unload Log • Team member to perform
• Basic statistics
Process Time • 3 trucks by 10 stores by study at 10 stores within
• Hypothesis tests
3 times each store region
Meet store customers’ • Zero Inventory • Store Databases • Histograms • All stores within region • Extracted from database
demands items per store • Point of storage • Pareto charts within last 12 months.
86 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Documented standard • Existlng SOP% • Audit • Pareto charts • All trailer utilization • Team member to audit
process • Knowledge of • Survey • Basic statistics processes • Needs survey by email
Exlsting SOP% • Hypothesis tests • 5 Stakeholder groups
CTS Metric
Up-to-Date Trailer Trailer Status—Data is the logged “real-time” location of a
Status trailer. Qualitative measure and nominal data type.
Trailer Status Error Rate—A calculated percentage of the
incorrect trailer status tally by the total trailers audited.
Quantitative, continuous measure, and ratio data.
Optimized Trailer % Trailer Utilization—A percentage of total trailer hours
Dispatch Plan used per day by total trailer hours available per day.
Quantitative, continuous measure, and ratio data.
Daily Shipments—Total shipments per day. Quantitative,
discrete measure, and ratio data.
% Empty—Calculated percentage of empty shipments by
total shipments within one day. Quantitative, continuous
measure, and ratio data.
Arrive On Schedule%—A calculated percentage of
shipments that arrive on time by total shipments per day.
Quantitative, continuous measure, and ratio data.
Leave On Schedule%—A calculated percentage of
shipments that leave on time by total shipments per day.
Quantitative, continuous measure, and ratio data.
Dispatch Mean—A calculated average of dispatch time in
minutes by day. Quantitative, continuous measure, and
ratio data.
Dispatch Deviation Mean—A calculated average of
dispatch time deviations from a set target (30 minutes) in
minutes. Negative is early and positive is late. Quantitative,
continuous measure, and ratio data.
Arrival Deviation Mean—A calculated average of arrival
time deviations from ETA target in minutes. Negative is early
and positive is late. Quantitative, continuous measure, and
ratio data.
Departure Deviation Mean—A calculated average of
departure time deviations from ETL target in minutes.
Negative is early and positive is late. Quantitative, continuous
measure, and ratio data.
CTS Metric
Open communication % responded by question—Percentage of the number of
of critical or jeopardy positive responses relative to survey question by total
events responses. Quantitative, continuous measure, and ratio data.
Realistic process Live Unload process time—Total time to unload a trailer at
time estimates/ a store. Quantitative, continuous measure, and ratio data.
expectations Dispatch Mean—A calculated average of dispatch time in
minutes by day. Quantitative, continuous measure, and ratio
data.
Meet store Zero-inventory items per store—A daily total of
customers’ demands merchandise that is at a zero quantity divided by the total
number of stores. Quantitative, continuous measure, and
ratio data.
POS Empty Shelf per store—A daily total of survey results
from customers who are reporting that they did not purchase
an item due to an empty shelf per store. Quantitative,
continuous measure, and ratio data.
Documented Existing SOP%—A percentage of formal SOPs in place by
standard process total SOPs possible. Quantitative, continuous measure, and
ratio data.
% Knowledge of Existing SOP—Percentage of the number
of positive responses relative to survey question by total
responses. Quantitative, continuous measure, and ratio data.
Operational Destnitions
Destning the Measure
Trailer Status—Data is the logged “real-time” location of a
trailer. Qualitative measure and nominal data type.
Purpose
To document where trailers are at a snapshot in time. This
data will be used for an audit to generate the Trailer Status
Error metric.
Operational Destnitions
Destning the Measure
Trailer Status Error Rate—A calculated percentage of the
incorrect trailer status tally by the total trailers audited.
Quantitative, continuous measure, and ratio data.
Purpose
Used to determine the accuracy of the current reporting
method for Trailer Accounting.
Operational Destnitions
Destning the Measure
% Trailer Utilization—A percentage of total trailer hours
used per day by total trailer hours available per day.
Quantitative, continuous measure, and ratio data.
Purpose
To document the use of trailer resources.
Operational Destnitions
Destning the Measure
Daily Shipments—Total shipments per day. Quantitative,
discrete measure, and ratio data.
Purpose
To document trend of shipments by day within 12 months.
Operational Destnitions
Destning the Measure
% Empty—Calculated percentage of empty shipments by
total shipments within one day. Quantitative, continuous
measure, and ratio data.
Purpose
The goal is to examine the impact of using backhauls to
improve trailer utilization.
Operational Destnitions
Destning the Measure
Arrive On Schedule%—A calculated percentage of
shipments that arrive on time by total shipments per day.
Quantitative, continuous measure, and ratio data.
Purpose
To document how well the delivery of shipments meet the
goal of arriving as planned.
Operational Destnitions
Destning the Measure
Leave On Schedule%—A calculated percentage of
shipments that leave on time by total shipments per day.
Quantitative, continuous measure, and ratio data.
Purpose
To document how well the delivery of shipments meet the
goal of leaving as planned.
Operational Destnitions
Destning the Measure
Dispatch Mean—A calculated average of dispatch time in
minutes by day. Quantitative, continuous measure, and
ratio data.
Purpose
To document the daily average dispatch time for trending
and goal analysis.
Operational Destnitions
Destning the Measure
Dispatch Deviation Mean—A calculated average of
dispatch time deviations from a set target (30 minutes) in
minutes.Negative is early and positive is late. Quantitative,
continuous measure, and ratio data.
Purpose
To document the deviation from a set target of 30 minutes.
Operational Destnitions
Destning the Measure
Arrival Deviation Mean—A calculated average of arrival
time deviations from ETA target in minutes. Negative is
early and positive is late. Quantitative, continuous measure,
and ratio data.
Purpose
To document the deviation from the target estimated time of
arrival (ETA).
Operational Destnitions
Destning the Measure
Departure Deviation Mean—A calculated average of
departure time deviations from ETL target in minutes.
Negative is early and positive is late. Quantitative,
continuous measure, and ratio data.
Purpose
To document the deviation from the target estimated time of
departure, abbreviated as ETL.
Operational Destnitions
Destning the Measure
% responded by question—Percentage of the number of
positive responses relative to survey question by total
responses. Quantitative, continuous measure, and
ratio data.
Purpose
To convert survey data into quantitative data relative to
each question’s subject.
Operational Destnitions
Destning the Measure
Live Unload process time—Total time to unload a trailer at a
store. Quantitative, continuous measure, and ratio data.
Purpose
To establish a target time for unloading.
Operational Destnitions
Destning the Measure
Zero-inventory items per store—A daily total of merchandise
that is at a zero quantity divided by the total number of
stores. Quantitative, continuous measure, and ratio data.
Purpose
To document missed potential sales due to no product on
the shelf from the process’ voice.
Operational Destnitions
Destning the Measure
POS Empty Shelf per store—A daily total of survey results
from customers who are reporting that they did not
purchase an item due to an empty shelf per store.
Quantitative, continuous measure, and ratio data.
Purpose
To document missed potential sales due to no product on
the shelf from the customer’s voice.
Operational Destnitions
Destning the Measure
Existing SOP%—A percentage of formal SOPs in place by
total SOPs possible. Quantitative, continuous measure, and
ratio data.
Purpose
To document the relative amount of SOPs formally in place.
Operational Destnitions
Destning the Measure
% Knowledge of Existing SOP—Percentage of the number
of positive responses relative to survey question by total
responses. Quantitative, continuous measure, and
ratio data.
Purpose
To convert survey data into quantitative data relative to the
knowledge of an SOP.
Create a Baseline
Metric Baseline
Trailer Status Not applicable. This metric is used in real time to drive the Trailer
Status Error Rate.
Trailer Status Trailer Status Error Rate€= 3.99%. 5% audit revealed 25 trailers
Error Rate incorrectly logged in the Trailer Plan Log.
%Trailer Mean€= 19.938%; StdDev€= 3.543; Max€= 28.964; Min€= 11.905;
Utilization UCL€= 22.26; LCL€= 17.61. Distribution is not normal. Trend is
seasonal and follows Daily Shipments.
Daily Mean€= 19,064; StdDev€= 3,351; Max€= 26,889; Min€= 11,751;
Shipments UCL€= 20,468; LCL€= 17,660. Distribution is not normal. Trend is
seasonal.
%Empty Mean€= 47.41%; StdDev€= 1.438; Max€= 49.977; Min€= 43.314;
UCL€= 50.617; LCL€= 47.094. Distribution is not normal. Trend
shows special cause in the last few weeks of the year.
AOS% Mean€= 97.73%; StdDev€= 1.851; Max€= 100; Min€= 93.202;
UCL€= 102.088; LCL€= 93.373. Distribution is not normal.
LOS% Mean€= 97.833%; StdDev€= 1.563; Max€= 100; Min€= 95.005;
UCL€= 102.83; LCL€= 92.83. Distribution is not normal.
Dispatch Mean Mean€= 18.439; StdDev€= 3.909; Max€= 29.469; Min€= 12.110;
UCL€= 27.34; LCL€= 9.54. Distribution is not normal.
Dispatch Mean€= –11.561; StdDev€= 3.909; Max€= –0.531; Min€= –17.89;
Deviation Mean UCL€= –2.66; LCL€= –20.46. Distribution is not normal.
Arrival Mean€= –28.993; StdDev€= 12.502; Max€= 7.047; Min€= –45.484;
Deviation Mean UCL€= –11.20; LCL€= –46.79. Distribution is not normal.
Departure Mean€= –34.638; StdDev€= 11.441; Max€= –6.497; Min€= –55.329;
Deviation Mean UCL€= –11.03; LCL€= –58.24. Distribution is not normal.
% responded Transportation: Driver Coord.
by question Q1 “Within the last month, how often did drivers show up late at the
Topic: “Open destination dock without calling to alert you before their arrival?”
communication 75% 1–10 times, 5% 11–20 times, 2% more than 20, 18% Never
of critical or
Q2 “Within the last month, how often did you notify a requestor of a
jeopardy events”
late delivery or pickup before the trailer made it to the dock?”
14% 1–10 times, 0% 11–20 times, 0% more than 20, 86% Never
Metric Baseline
% responded Drivers: Driver
by question Q3 “Within the last month, how often did you show up late at the
Topic: “Open destination dock without calling to alert a Driver Coordinator before
communication your arrival?”
of critical or 62% 1–10 times, 3% 11–20 times, 4% more than 20, 31% Never
jeopardy events” Late
Q4 “Within the last month, how many times have you called a
business critical resource and could not make contact within
1 hour?”
62% 1–5 times, 5% 6–10 times, 1% more than 10, 32% Never
% responded Store Personnel: Store Manager, Receiving Dock
by question Q5 “Within the last month, how often did a trailer show up late at
Topic: “Open the destination dock without anybody calling to alert you before its
communication arrival?”
of critical or 26% 1–5 times, 73% 6–10 times, 0% more than 10, 1% Never Late
jeopardy events”
Q6 “Within the last month, how many times were you placed on
hold waiting for a driver coordinator?”
48% 1–5 times, 3% 6–10 times, 1% more than 10, 15% Never, 33%
N/A
% responded Vendor: Operations Manager, Shipping Dock
by question Q7 “Within the last month, how often did a trailer show up late at
Topic: “Open the destination dock without anybody calling to alert you before its
communication arrival?”
of critical or 36% 1–5 times, 1% 6–10 times, 1% more than 10, 62% Never Late
jeopardy events”
Q8 “Within the last month, how many times were you placed on
hold waiting for a driver coordinator?”
29% 1–5 times, 0% 6–10 times, 0% more than 10, 41% Never, 30%
N/A
Metric Baseline
% responded by Warehouse: Managers, Shipping and Receiving Dock
question Q9 “Within the last month, how often did a trailer show up late at the
Topic: “Open destination dock without anybody calling to alert you before its arrival?”
communication of 33% 1–5 times, 1% 6–10 times, 0% more than 10, 66% Never Late
critical or jeopardy
events” Q10 “Within the last month, how many times were you placed on hold
waiting for a driver coordinator?”
32% 1–5 times, 52% 6–10 times, 1% more than 10, 11% Never, 4% N/A
Live Unload Mean€= 63.422; StdDev€= 10.876; Max€= 85.0; Min€= 45.0; UCL€= 102.67;
Process Time LCL€= 24.18. Distribution is not normal.
Zero-inventory Mean€= 16.372; StdDev€= 11.558; Max€= 49.4; Min€= 8.7; UCL€= 22.49;
items per store LCL€= 10.26. Distribution is not normal.
POS Empty Shelf Mean€= 2.5214; StdDev€= 0.6841; Max€= 4.0; Min€= 1.9; UCL€= 4.383;
survey per store LCL€= 0.66. Distribution is not normal.
(2 weeks)
Interview Event
◾⊾ Drivers
◾⊾ Store personnel: general managers and receiving
personnel
◾⊾ Vendors: operational managers
◾⊾ Warehouse personnel: general managers, shipping
and receiving personnel
Focus groups in the form of town hall meetings were held for
the customer/stakeholder groups:
Brainstorm Needs
Drivers:
◾⊾ Prompt replies from driver coordinators
◾⊾ Dispatch correctly, right place, dock, and time
◾⊾ Resources for emergency changes in travel plan
◾⊾ No hold time when calling driver coordinators
◾⊾ Correct contact information for destination site
◾⊾ Quick turnaround when live unloading
◾⊾ Realistic leave-on-schedule and arrive-on-sched-
ule times
Vendor—operational managers:
◾⊾ Easy method to request a pickup
◾⊾ Scheduling that does not conflict with normal
dock hours
◾⊾ Provide an empty when a pickup request is made
◾⊾ Trailers that are safe and secure
Measure Phase ◾ 105
Affinity Diagrams
Fast
Dispatch Requests
Communication
Standard Operating
Process
Early Warning
Process
• Notification of late
or jeopardy shipments
Open Scheduling
Service Requests
Communications Constraints
Safety
• Trailers must be
safe and secure
Shipping Driver
On Time Service Documents Responsibilities
Achievable
Targets
• Time-to-unload goal
must be attainable and
promote safety
Translate Needs
Dispatch Requests
Customer Comment Key Issue Customer Need CTQ
Eliminate
Deliver or Can’t waste Zero
requestor
pickup time calling callbacks due
callbacks due
requests are requestor to incomplete
to incomplete
complete back information
information
Driver supply
Sometimes must be Daily driver
Dispatch
driver supply available utility rate
goal time
is less than within must be at
reasonable
demand established least 105%
dispatch goal Delivery of
No set empty or
Establish
dispatch goal pickup of full is
dispatch goal
less than 60
minutes*
Translate Needs
Fast Communication
Customer Comment Key Issue Customer Need CTQ
Need up to Driver to
Contact to be
Timely contact
date driver made 30
feedback coordinator
and trailer minutes
from drivers when entering
status before docking
staging zone
Contact to be
Driver to
made when
contact
change is
coordinator
more than 1
when travel
hour past AOS
plan changes
time
Establish staff
No hold time loading Maximum load
when calling standards is 20 calls per
driver based on hour per
coordinator Driver historical coordinator
coordinator demand
staff
Prompt capability Driver
replies from coordinators Calls to be
driver use team routed to first
coordinator service available
approach
Translate Needs
Accurate Information
Customer Comment Key Issue Customer Need CTQ
Correct Coordinator
Requestor must have
contact Requestor
contact requestor
information profile
information confirm
for database not
must contact info
destination kept current
be current during request
site
event
Coordinator to
Incorrect
Right place, send request
information Accurate
dock, and verification
logged during request details
time back to
request
requestor
Translate Needs
Live Unloading
Customer Comment Key Issue Customer Need CTQ
Reduce trailer Share,
idle time compare, and Live unload
Quick turn- which best practice
agree on live
around improves documented
unload best
trailer practice in SOP
utilization
Repeatable &
reproducible Live unload
process time process
for unloading should be 1
during a live hour, +/– .25
unload hour
Translate Needs
Standard Operating Process
Customer Comment Key Issue Customer Need CTQ
Standard
operating Formal SOPs
Establish procedures for for all
any missing Gain control processes that
any process
procedures of process impact trailer
that impacts
trailer utilization
utilization
Translate Needs
Achievable Targets
Customer Comment Key Issue Customer Need CTQ
Base tolerance
Established for 8 hour
Realistic
AOS/LOS transport:
LOS
tolerance AOS + 2 hours
LOS + 1
Achievable Review Evaluate route
Realistic time schedule estimators if
AOS estimates estimators if LOS or AOS
LOS/AOS is drop below
Time to missed corporate goal
unload must
be attainable Established Unload
and promote best practice process goal
safety unloading goal 1 hour
Translate Needs
Change in Plan
Customer Comment Key Issue Customer Need CTQ
Translate Needs
Shipping Documents
Customer Comment Key Issue Customer Need CTQ
Shipping to
Correct Shipment sign off on
Shipment verification packing list as
packing list documents method items are
need to be loaded
complete and
accurate
Driver must Driver to audit
provide and verify
Document
correct shipping
verification
paperwork documents
method
before leaving
Driver must dock
provide
complete
paperwork
Translate Needs
Open Communication
Customer Comment Key Issue Customer Need CTQ
Easy to get Access to
Schedule
schedule schedule via
updates upon
updates PC or by
request
phone call
Establish open
Process for lines of
communication Feedback
feedback to PC-based
to Logistics process
Logistics suggestion
that has
portal
accountability
Easy method
Request
to request Multiple trailers either
pickup request by PC or
methods phone
Translate Needs
Early Warning Process
Customer Comment Key Issue Customer Need CTQ
Contact to be
Notification made when
Proactive
of late or Late delivery any change
customer
jeopardy notification adds more
communication
shipments than 1 hour to
AOS time
Translate Needs
Scheduling Constraints
Customer Comment Key Issue Customer Need CTQ
Requestor Coordinator
profile may Know requestor must
No conflict not be profile before reference the
with normal referenced when scheduling requestor
dock hours scheduling delivery or profile before
delivery or pickup dispatching
pickup driver
Schedule Coordinator
delivery or should schedule
pickup that delivery or
promotes pickup that will
good trailer not impact
utilization AOS/LOS
Translate Needs
Service Requests
Customer Comment Key Issue Customer Need CTQ
Requestor Coordinator
profile may not Know requestor must
Provide an profile before
be referenced reference the
empty when scheduling
when requestor
a pickup is delivery or
scheduling profile before
made pickup
delivery or dispatching
pickup driver
Translate Needs
Safety
Customer Comment Key Issue Customer Need CTQ
Establish trailer
Trailer must Provide safe specifications Inspection and
be safe and work that promote P/M program
secure environment safe work for all trailers
environment
All trailers to
be inspected
Inspect and when returned
clearly identify to depot
trailer’s status
Green tag all
trailers that
pass inspection
Translate Needs
On Time Service/On Time Deliveries
Customer Comment Key Issue Customer Need CTQ
Trailers need
to arrive on Deliveries Trailer AOS is
time need to arrive greater than
on schedule 90%
Arrive on
schedule
Meet Pickups need Trailer LOS is
(AOS)
customer to leave on greater than
Leave on demands schedule 98%
schedule
(LOS) Delivery of
Drivers need to empty or
Provide an pickup of
deliver empty
empty trailer full trailers
or pickup full
within an is less than 60
trailers on time
agreed time minutes
request
Translate Needs
Driver Responsibilities
Customer Comment Key Issue Customer Need CTQ
Survey Customers/Stakeholders
Now that the VOC of the customer had been heard and
translated into a language that the team understood, the
team needed to measure the VOC using a survey. The goal
was to transfer the comments into quantitative data and
define a process that can be repeated to verify change.
The survey questions were built off the customer needs,
which came from the customer comments. Five surveys
were built to address each specific focus group. Some
questions were common and spanned all five surveys.
Some topics spanned multiple surveys, but the questions
were asked specific to the respondent’s role. The pur-
pose of developing the surveys in this manner was to
provide all views of the same fact that was in question.
The team had identified 32 customer needs and wanted
to know the most important customer needs to focus
on. So, they asked the customers within the survey to
choose the 10 most important customer needs and then
rank the top 3 of those 10. Some of the team members
116 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Now that that team had gathered the customer needs from
the customer survey, they needed to organize the informa-
tion and rank the needs. Jim Pulls reminded them to use
a weighting scale of 9-3-1, when ranking the needs. The
team gave a 9 if the survey group gave a number one rat-
ing, a 3 for number two rating, and a 1 for a number three
rating of importance. The weights were then totaled for
each need. The survey data for the ranked customer needs
is shown in Figure€5.69 (Data Figure€5.69). For the Customer
Needs map, the items were weighted, sorted in a descend-
ing order, and a percentage was noted for ranking.
Measure Phase ◾ 117
Transportation Questions
Audience: Driver Coordinator
1. Within the last month, how often did you call a requestor back due to incomplete
information?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
2. Within the last week, how often did you have more requests than drivers?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
3. Do you feel there needs to be a set goal for dispatch time (from request to dock)?
a) Yes b) No c) Not sure d) Does not apply
4. Within the last month, how often did drivers forget to call when entering the
staging zone and just called once they were at their destination dock?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
5. Within the last month, how often did drivers show up late at the destination dock
without calling to alert you before their arrival?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
6. Within the last month, how often did you provide incorrect contact information to
drivers?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
7. Within the last month, how often did you log the incorrect request information?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
8. Within the last year, how often have you found that your suppliers and your
customers are not following the standard procedures?
a) 1–10 times b) 11–20 times c) More than 20 d) Always follow
9. Do you know the operating procedures that affect you?
a) Yes b) No c) Not sure d) Does not apply
10. Is there a formal training process for operating procedures?
a) Yes b) No c) Not sure d) Does not apply
11. Within the last month, how often has a driver called you requesting help for which
you then had to forward them on to the correct resource?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
Transportation Questions
Audience: Driver Coordinator
12. Within the last month, how often did you provide schedule updates when
somebody called requesting them?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
13. Within the last month, how often did you notify a requestor of a late delivery or
pickup before the trailer made it to the dock?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
14. Within the last month, how often have you dispatched a delivery or pickup that
became late because the requestor’s docks were closed?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
15. Within the last month, how often did you forget to send an empty trailer when a
vendor requested a pickup?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
16. Within the last year, have you had any reports of trailers which were considered
to be an unsafe working environment?
a) Yes b) No c) Not sure d) Does not apply
17. Choose the top 10 customer needs relative to trailer utilization by placing an “X”
on the line next to the item (mark only 10 items):
_____ Eliminate requestor callbacks due to incomplete information
_____ Driver supply must be available within established dispatch goal
_____ Establish dispatch goal
_____ Driver to contact Driver Coordinator when entering staging zone
_____ Driver to contact Driver Coordinator when travel plan changes
_____ E
stablish staff (Driver Coordinator) loading standards based on historical
demand
_____ Driver Coordinators use team service approach to help cover call load
_____ Requestor contact information must be current
_____ Accurate request details
_____ Share, compare, and agree on Live Unload best practice
_____ R
epeatable and reproducible process time for unloading during a Live
Unload
Transportation Questions
Audience: Driver Coordinator
_____ Standard Operating Procedures for any process that impacts trailer utilization
_____ Train those affected by trailer utilization Standard Operating Procedures
_____ E
stablish Arrive On Schedule (AOS) and Leave On Schedule (LOS)
tolerance
_____ Review schedule estimators if AOS or LOS is missed
_____ Establish unloading goal based on best practice
_____ Business critical resources available for drivers 24/7
_____ Drivers to have a directory of resources with contact information
_____ Establish a shipment verification method
_____ Establish a shipment document verification method
_____ Logistics to provide schedule updates upon request
_____ Logistics to establish a feedback process that has accountability
_____ Logistics to offer multiple trailer delivery or pickup request methods
_____ Driver Coordinator to provide a late delivery notification
_____ D
river Coordinator to review requestor profile before scheduling delivery
or pickup
_____ D
river Coordinator to schedule delivery or pickup that promotes good
trailer utilization
_____ L
ogistics to establish trailer specifications which promote a safe work
environment
_____ Trailer inspection date and status need to be clearly documented on trailer
_____ Deliveries need to arrive on schedule
_____ Pickups need to leave on schedule
_____ Drivers need to secure their own loads
18. Do you understand all of the customer needs listed in question 17? If not please
highlight those that would need explanation.
a) Yes b) No c) Not sure
19. Do you have customer needs that were not listed in question 17? If so please,
write your customer needs on the back of this sheet.
a) Yes b) No c) Not sure
Driver Questions
Audience: Driver
1. Do you feel there needs to be a set goal for dispatch time (from request to dock)?
a) Yes b) No c) Not sure d) Does not apply
2. Within the last month, how often did you forget to call when entering the staging
zone and just called once you were at the destination dock?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
3. Within the last month, how often did you show up late at the destination dock
without calling to alert a Driver Coordinator before your arrival?
a) 1–10 times b) 11–20 times c) More than 20 d) Never
4. Within the last month, how many times were you placed on hold waiting for a
driver coordinator?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
5. Within the last month, how often were you given the incorrect contact information
for the destination site?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
6. Within the last month, how often did you wait more than an hour (time from dock
to drive away) for a live unload process to complete?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
7. Do you know the operating procedures that affect you?
a) Yes b) No c) Not sure d) Does not apply
8. Is there a formal training process for operating procedures?
a) Yes b) No c) Not sure d) Does not apply
9. Within the last month, how many times have you arrived late by more than 2
hours with a delivery?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
10. Within the last month, how many times have you departed late by more than 1
hour with a pickup?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
11. Are there particular routes that you always seem to arrive more than 2 hours late?
a) Yes b) No c) Not sure d) Does not apply
Driver Questions
Audience: Driver
12. Within the last month, how many times have you called a business critical
resource and could not make contact within 1 hour?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
13. Within the last month, how often have you called a Driver Coordinator requesting
help for which you then had to be forwarded on to the correct resource?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
14. Within the last month, how often have you been given a packet of shipping
documents that were incorrect?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
15. Within the last month, how often have you been given a packet of shipping
documents that were incomplete?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
16. Within the last month, how often have arrived at a destination site to find the
docks were closed?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
17. Do you always check and secure your own load before leaving the dock?
a) Yes b) No c) Not my job d) Does not apply
18. Choose the top 10 customer needs relative to trailer utilization by placing an “X”
on the line next to the item (mark only 10 items).
Then rank the top 3 of your chosen 10 with 1 being the most important:
19. Do you understand all of the customer needs listed in question 18? If not please
highlight those that would need explanation.
a) Yes b) No c) Not sure
20. Do you have customer needs that were not listed in question 18? If so please,
write your customer needs on the back of this sheet.
a) Yes b) No c) Not sure
Vendor Questions
Audience: Operations Mgr., Shipping Mgr., Dock Personnel
1. Do you feel there needs to be a set goal for dispatch time (from request to dock)?
a) Yes b) No c) Not sure d) Does not apply
2. Within the last month, how often did a trailer show up late at your dock without
anybody calling to alert you before its arrival?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
3. Within the last month, how many times were you placed on hold waiting for a
driver coordinator?
a) 1–5 times╅╇ b) 6–10 times╅╇ c) More than 10╅╇ d) Never╅╇ e) Does not apply
4. Do you know where to find CJ-Mart operating procedures that affect you?
a) Yes b) No c) Not sure d) Does not apply
5. Do you know of a formal CJ-Mart training process for operating procedures?
a) Yes b) No c) Not sure d) Does not apply
6. Do you have a formal shipment verification method in place that assures the
shipping documents are complete and correct?
a) Yes b) No c) Not sure d) Does not apply
7. Within the last month, how often did you call to request a schedule update for a
trailer arrival time?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
8. What is your preferred method of requesting trailer deliveries or pickups?
a) PC b) Phone c) FAX d) Other
9. Within the last month, how often has a delivery or pickup arrived at your site
when the docks were closed?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
10. Within the last month, how often did you not receive an empty trailer when you
requested a pickup?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
11. Within the last year, have often have you received a trailer you considered to be
an unsafe working environment?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
Vendor Questions
Audience: Operations Mgr., Shipping Mgr., Dock Personnel
12. Within the last year, have you reported your concern of the trailers that you
considered to be an unsafe working environment?
a) Yes b) No c) Not sure d) Does not apply
13. Choose the top 10 customer needs relative to trailer utilization by placing an “X”
on the line next to the item (mark only 10 items).
Then rank the top 3 of your chosen 10 with 1 being the most important:
14. Do you understand all of the customer needs listed in question 13? If not please
highlight those that would need explanation.
a) Yes b) No c) Not sure
15. Do you have customer needs that were not listed in question 13? If so please,
write your customer needs on the back of this sheet.
a) Yes b) No c) Not sure
Warehouse Questions
Audience: Warehouse Mgr., Receiving Mgr., Shipping Mgr., Dock Personnel
1. Do you feel there needs to be a set goal for dispatch time (from request to dock)?
a) Yes b) No c) Not sure d) Does not apply
2. Within the last month, how often did a trailer show up late at your dock without
anybody calling to alert you before its arrival?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
3. Within the last month, how many times were you placed on hold waiting for a
driver coordinator?
a) 1–5 times╅╇ b) 6–10 times╅╇ c) More than 10╅╇ d) Never╅╇ e) Does not apply
Warehouse Questions
Audience: Warehouse Mgr., Receiving Mgr., Shipping Mgr., Dock Personnel
4. Do you know where to find operating procedures that affect you?
a) Yes b) No c) Not sure d) Does not apply
5. Is there a formal training process for operating procedures?
a) Yes b) No c) Not sure d) Does not apply
6. Within the last month, how often did a driver arrive with incorrect shipping
documents?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
7. Within the last month, how often did a driver arrive with incomplete shipping
documents?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
8. Within the last month, how often did you call to request a schedule update for a
trailer arrival time?
a) 1–5 times b) 6–10 times c) More than 10 d) Never
9. What is your preferred method of requesting trailer deliveries or pickups?
a) PC b) Phone c) FAX d) Other
10. Does the driver always check and secure their own load before leaving the dock?
a) Yes b) No c) Not driver’s job d) Does not apply
11. Choose the top 10 customer needs relative to trailer utilization by placing an “X”
on the line next to the item (mark only 10 items).
Then rank the top 3 of your chosen 10 with 1 being the most important:
12. Do you understand all of the customer needs listed in question 11? If not please
highlight those that would need explanation.
a) Yes b) No c) Not sure
13. Do you have customer needs that were not listed in question 11? If so please,
write your customer needs on the back of this sheet.
a) Yes b) No c) Not sure
◾⊾ Audience
−â‹™ Driver Coordinator with at least 1 year of service
−â‹™ 44 of 72 participated in the survey (61% response rate)
◾⊾ Top 3 Needs that Influence Trailer Utilization
−â‹™ Deliveries need to arrive on schedule
−â‹™ Establish a dispatch goal
−â‹™ Establish AOS and LOS tolerance
◾⊾ Interesting Findings
−â‹™ 84% had to call request or back 1–10 times per month
−â‹™ 61% had more requests than drivers 6–10 times per
week
−â‹™ 77% had logged incorrect request info 1–5 times per
month
50
100
40
80
30
Trans-1
Percent
60
20
40
10 20
0 0
Needs Deliveries Pickups Accurate Other
need to need to request
arrive on leave on details
schedule schedule
Trans-1 41 2 1 0
Percent 93.2 4.5 2.3 0.0
Cum % 93.2 97.7 100.0 100.0
50
100
40
80
30
Trans-2
Percent
60
20
40
10 20
0 0
Needs Establish Establish Deliveries Other
dispatch AOS and need to
goal LOS arrive on
tolerance schedule
Trans-2 37 4 3 0
Percent 84.1 9.1 6.8 0.0
Cum % 84.1 93.2 100.0 100.0
50
100
40
80
30
Trans-3
Percent
60
20
40
10 20
0 0
Needs Establish Deliveries Driver Driver to Accurate Driver Other
AOS and need to Coord. contact request supply
LOS arrive on loading Driver details must be
tolerance schedule standards Coord. available
based on when within
historical travel dispatch
demand plan goal
changes
Trans-3 25 5 4 4 3 2 1
Percent 56.8 11.4 9.1 9.1 6.8 4.5 2.3
Cum % 56.8 68.2 77.3 86.4 93.2 97.7 100.0
◾⊾ Audience
−â‹™ Drivers with at least 1 year of service
−â‹™ 325 of 900 participated in the survey (36% response
rate)
◾⊾ Top 3 Needs that Influence Trailer Utilization
−â‹™ Pickups need to leave on schedule
−â‹™ Establish AOS and LOS tolerance
−â‹™ Establish dispatch goal
◾⊾ Interesting Findings
−â‹™ 62% were late arriving and did not alert Driver Coord.
before docking 1–10 times per month
−â‹™ 85% waited more than 1 hour for live unload 6–10 times
per month
−â‹™ 24% were late by more than 2 hours 1–5 times per
month
Figure 5.53
350
100
300
250 80
200 60
Driver-1
Percent
150
40
100
20
50
0 0
Needs Pickups Deliveries Repeatable Establish Other
need to need to and AOS
leave on arrive reproducible and
schedule on process LOS
schedule time for tolerance
a live
unload
Driver-1 189 105 22 6 3
Percent 58.2 32.3 6.8 1.8 0.9
Cum % 58.2 90.5 97.2 99.1 100.0
350
100
300
80
250
200
Driver-2
60
Percent
150
40
100
20
50
0 0
Needs Establish Pickups Establish Other
AOS and need to dispatch
LOS leave on goal
tolerance schedule
350
100
300
250 80
Driver-2
Percent
200 60
150
40
100
20
50
0 0
Needs Establish Coord. Deliveries Establish Other
dispatch to need to AOS and
goal review arrive on LOS
requestor schedule tolerance
profile
before
scheduling
Driver-3 225 45 30 25 0
Percent 69.2 13.8 9.2 7.7 0.0
Cum % 69.2 83.1 92.3 100.0 100.0
◾⊾ Audience
−â‹™ Store Manager and Receiving Dock Personnel with at
least 1 year of service
−â‹™ 422 of 1,260 participated in the survey (33% response
rate)
◾⊾ Top 3 Needs that Influence Trailer Utilization
−â‹™ Deliveries need to be on a schedule
−â‹™ Repeatable and reproducible process time for a live
unload
−â‹™ Review schedule estimators if AOS or LOS is missed
◾⊾ Interesting Findings
−â‹™ 73% reported a trailer was late without anybody con-
tacting them 6–10 times per month
−â‹™ 73% reported a live unload greater than 1 hour 1–5
times per month
Figure 5.57
100
400
80
300
60
Percent
Store-2
200
40
100
20
0 0
Needs Deliveries Repeatable Driver to Other
need to and contact
arrive on reproducible Driver
schedule process Coord.
time for when travel
a live plan
unload changes
Store-1 404 8 6 4
Percent 95.7 1.9 1.4 0.9
Cum % 95.7 97.6 99.1 100.0
100
400
80
300
60
Percent
Store-2
200
40
100
20
0 0
Needs Repeatable Logistics Business Other
and to provide critical
reproducible schedule resources
process time updates available
for a live upon for drivers
unload request 24/7
Store-2 335 51 18 18
Percent 79.4 12.1 4.3 4.3
Cum % 79.4 91.5 95.7 100.0
100
400
80
300
60
Percent
Store-2
200
40
100
20
0 0
Needs Review Driver Logistics Other
schedule Coord. to provide
estimators use team schedule
if AOS or approach updates
LOS is to help upon
missed cover call request
load
Store-3 303 53 46 20
Percent 71.8 12.6 10.9 4.7
Cum % 71.8 84.4 95.3 100.0
◾⊾ Audience
−â‹™ Operations Managers, Shipping Managers, and Dock
Personnel with at least 2 year of service
−â‹™ 278 of 888 participated in the survey (31% response
rate)
◾⊾ Top 3 Needs that Influence Trailer Utilization
−â‹™ Deliveries need to arrive on schedule
−â‹™ Accurate request details
−â‹™ Driver to contact Driver Coordinator when travel plans
change
◾⊾ Interesting Findings
−â‹™ 36% reported a trailer was late without anybody con-
tacting them 1–5 times per month
−â‹™ 52% had trailers arrive at their docks when they were
closed 6–10 times per month
300
100
250
80
200
Percent
60
Vend-1
150
40
100
50 20
0 0
Needs Deliveries Accurate Establish Other
need to request dispatch
arrive on details goal
schedule
Vend-1 265 7 6 0
Percent 95.3 2.5 2.2 0.0
Cum % 95.3 97.8 100.0 100.0
300
100
250
80
200
Percent
Vend-2
60
150
40
100
50 20
0 0
Needs Accurate Driver to Deliveries Establish Other
request contact need to dispatch
details Driver arrive on goal
Coord. schedule
when
travel
plan
changes
Vend-2 201 62 8 7 0
Percent 72.3 22.3 2.9 2.5 0.0
Cum % 72.3 94.6 97.5 100.0 100.0
300
100
250
80
200
60
Percent
Vend-3
150
40
100
50 20
0 0
Needs Driver to Logistics Accurate Other
contact to provide request
Driver schedule details
Coord. updates
when upon
travel request
plan
changes
Vend-3 189 66 23 0
Percent 68.0 23.7 8.3 0.0
Cum % 68.0 91.7 100.0 100.0
◾⊾ Audience
−â‹™ Warehouse Managers, Receiving Managers, Shipping
Managers, and Dock Personnel with at least 1 year of
service
−â‹™ 413 of 1,122 participated in the survey (36% response
rate)
◾⊾ Top 3 Needs that Influence Trailer Utilization
−â‹™ Deliveries need to arrive on schedule
−â‹™ SOPs for any process that impacts trailer utilization
−â‹™ Driver supply must be available within established dis-
patch goal
◾⊾ Interesting Findings
−â‹™ 97% feel there needs to be an established dispatch
goal
−â‹™ 75% had trailers arrive with incorrect shipping docu-
ments 1–5 times per month
100
400
80
300
60
Percent
Ware-1
200
40
100 20
0 0
Needs Deliveries Driver Establish Other
need to supply AOS and
arrive on must be LOS
schedule available tolerance
within
dispatch
goal
Ware-1 400 8 3 2
Percent 96.9 1.9 0.7 0.5
Cum % 96.9 98.8 99.5 100.0
100
400
80
300
60
Percent
Ware-2
200
40
100
20
0 0
Needs SOPs Review Business Driver Other
for any schedule critical Coord. to
process estimators resources schedule
that if AOS or available delivery
impacts LOS is for or pickup
trailer missed drivers that
utilization 24/7 promotes
good
trailer use
Ware-2 312 65 13 10 13
Percent 75.5 15.7 3.1 2.4 3.1
Cum % 75.5 91.3 94.4 96.9 100.0
100
400
80
300
60
Percent
Ware-3
200
40
100
20
0 0
Needs Driver Review SOPs Logistics to Driver Other
supply schedule for any provide Coord.
must be estimators process schedule to
available if AOS or that updates provide a
within LOS is impacts upon late
dispatch missed trailer request delivery
goal utilization notification
Now that the process and the VOC had been defined, it
was time to investigate the voice of the process (VOP)
and its current performance. The team decided from the
beginning of this phase to build a VOP matrix before
Legend
Strong Relationship 9
Moderate Relationship 3
Weak Relationship 1
Strong Positive Correlation
Positive Correlation
Negative Correlation
Strong Negative Correlation
Objective Is To Minimize
Objective Is To Maximize
x Objective Is To Hit Target
Column # 1 2 3 4 5 6 7 8 9 10 11
Direction of Improvement:
Minimize ( ), Maximize ( ), or Target (x)
Technical Requirements
(a.k.a. "Hows")
Customer Requirements
standard
hour transport
LOS or AOS is below
Row #
Weight / Importance
Track AOS Metric
Track LOS Metric
Deliver or pickup of trailer
AOS - base tolerance for 8
hour transport
utilization processes
AOS
(a.k.a. "Whats")
1 36.0 Deliveries need to arrive on schedule
2 9.0 Pickups need to leave on schedule
3 4.0 Establish a dispatch goal
4 4.0 Establish AOS and LOS tolerance
5 3.0 Accurate request details
6 3.0 Repeatable and reproducible process time for live unload
7 3.0 SOP for any process that impacts trailer utilization
140 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Benchmarking
Check Sheets
Up-to-date trailer • Incorrect logging of trailer Calculated percentage of the incorrect trailer status tally by the Trailer Status 0%
status total trailers audited. Trailer status data is extracted from Trailer Error Rate
Plan Log in real-time during the audit. A random list of 5% of the
trailers will be used to choose the trailers to audit.
Optimized trailer • Daily shipments Calculated percentage of total trailer hours used per day by total % Trailer Not defined
dispatch plan trailer hours available per day. The data source is the Trailer Utilization
• Trailer total available
Plan Log.
• Vendor Requests Total shipments per day. The data source is the Trailer Plan Log. Daily Shipments Not defined
• Warehouse Requests
• Backhaul quantity Calculated percentage of empty shipments by total shipments %Empty Not defined
within one day. The data source is the Trailer Plan Log.
Optimized trailer • Route estimate (ETA) Calculated percentage of shipments that arrive on time by total AOS% 100%
dispatch plan shipments per day. The data source is the Trailer Plan Log,
• LOS%
which, when queried will produce the total daily shipments and
• Timing of the driver’s call the total late AOS shipments by day (AOS has no tolerance,
and the logging ETA is goal). 1-(late shipments/total will produce the AOS%).
• Driver Coordinator’s Calculated percentage of shipments that leave on time by total LOS% 100%
decision shipments per day. The data source is the Trailer Plan Log,
which, when queried will produce the total daily shipments and
the total late LOS shipments by day (LOS has no tolerance. ETL
142 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
• Driver availability Calculated average of dispatch time in minutes by day. The data Dispatch Mean Not defined
source is the Trailer Plan Log, which, when queried will produce
• Coordinator’s work load
the dispatch time (Dispatch time minus Request time) which will
then be averaged by day.
Optimized trailer • Unofficial target of Calculated average of dispatch time deviations from a set target Dispatch Not defined
dispatch plan 30 minutes (30 minutes) in minutes. Negative is early and positive is late. Deviation Mean
The data source is the Trailer Plan Log, which, when queried will
• Same as dispatch mean
produce the deviation between the set target of 30 minutes and
dispatch time, averaged by day.
• Same as AOS% Calculated average of arrival time deviations from ETA target in Arrival Deviation Not defined
minutes. Negative is early and positive is late. The data source is Mean
the Trailer Plan Log, which, when queried will produce the
deviation between ETA and Arrival time, averaged by day.
• Same as LOS% Calculated average of departure time deviations from ETL target Departure Not
in minutes. Negative is early and positive is late. The data Deviation Mean defined.
source is the Trailer Plan Log, which, when queried will produce
the deviation between ETL and Departure time, averaged
by day.
Realistic process time • Best practice Total time to unload a trailer at a store. Three fully loaded Live Unload 60 minutes
estimates and • Equipment
trailers will be delivered to 10 stores where the trailers will be Process Time
expectations unloaded 3 different times. A stop watch will start when the door
• Load type
144 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
is opened by the driver and will stop when the trailer has been
emptied.
Meet store customers’ • Unpredicted demand Daily total of merchandise that is at a zero inventory divided by Zero Inventory
demands the total number of stores. The data source is from all stores’ Items per Store
• Change Vendor supply
inventory at midnight each day.
Meet store customers’ • Unpredicted demand Daily total of survey results from customers who are reporting POS Inventory
demands change that they did not purchase an item due to an empty shelf per Items per Store
store. The data source is from all stores POS survey and
• Vendor supply
downloaded daily at midnight. The total is then divided by the
total number of stores.
Documented standard • Defined need Percentage of formal SOPs in place divided by total SOPs Existing SOP% 100%
process possible. SOP audit of processes outlined by Six Sigma team
• Resources not available
relative to the process maps built for the Measure phase. Check
sheet method used to tally if a formal SOP was published and
distributed to those affected.
• Weak training Percentage of the number of positive responses (yes) relative to Knowledge of 100% yes
survey question by total responses. The survey question will be Existing SOP’%
• No training log
presented to the stakeholder groups, percent responded will be
• No audit calculated overall and broken down by rating group.
“Do you know the store operating procedures that affect you?”
Jazy Clothing 0% empty Jazy always prides itself on providing demanded product
shelves 100% of the time. No customer leaves the store without their
intended purchase. The company must find that the holding
cost of the clothing and accessories must be less than the
lost business, plus their market research must be strong to
forecast demand that well. The clothing is moderately priced,
so mark-up is not used as a single method to cover holding
cost. Also, the company has been profitable for the last
12 years.
Bmart Smallest trailer Bmart operates its supply chain efficiently by budgeting for a
fleet per store base demand, while outsourcing for large demand trends.
Doing this keeps operating cost low and efficiencies high
during medium demand periods. Relative efficiencies remain
high due to the contracted trailers and drivers, while
operating costs rise marginally due to the outsourcing.
Big Brownie 0% lost Big Brownie tracks all resources via satellite communications
equipment and knows the status, location, and operation of all assets
24/7. Technology has recently allowed this application at a
reasonable cost. If power is disconnected from the
transponder, the associated database remembers where the
equipment last sent a signal.
Yoda Best practice Developers and users of lean practices show that Lean
for lean works if applied correctly in an embracing environment. Not
a benchmark for a metric, but a benchmark for
implementation.
◾⊾ Trends
−â‹™ Seasonal trends for both %Utilization and Daily
Shipments
−â‹™ LOS%, no trend evident from graph
−â‹™ AOL%, rates drop at the end of the year
−â‹™ Mean dispatch time increases at the end of the year
◾⊾ Distribution and Outliers
−â‹™ Non-normal distribution typical
−â‹™ Outliers due to seasonal trend
◾⊾ Relationship Between
−â‹™ Daily shipments and %Trailer Utilization normal
−â‹™ Daily shipments and Late AOS or Mean dispatch time
show a relationship after 22,000 shipments
22000
20000
18000
16000
14000
12000
10000
1 36 72 108 144 180 216 252 288 324 360
Days
25
%Utilization
20
15
10
1 36 72 108 144 180 216 252 288 324 360
Index
100
99
98
97
LOS%
96
95
94
93
1 36 72 108 144 180 216 252 288 324 360
Days
100
99
98
97
AOS%
96
95
94
93
1 36 72 108 144 180 216 252 288 324 360
Days
30
25
Mean Dispatch Time
20
15
10
1 36 72 108 144 180 216 252 288 324 360
Index
20000
18000
16000
14000 Histogram of Daily Shipments
12000 80
10000 70
60
Frequency
50
40
30
20
10
0
12000 14000 16000 18000 20000 22000 24000 26000
Daily Shipments
Percentage
97
96
95
94
93
LOS% AOS%
Histogram of LOS% Histogram of AOS%
70 70
60 60
50 50
Frequency
Frequency
40 40
30 30
20 20
10 10
0 0
95.2 96.0 96.8 97.6 98.4 99.2 100.0 94 95 96 97 98 99 100
LOS% AOS%
1500
Shipments
1000
500
0
Late LOS Shipments Late AOS Shipments
50
40
40
30
30
20 20
10 10
0 0
0 200 400 600 800 1000 1200 0 300 600 900 1200 1500 1800
Late LOS Shipments Late AOS Shipments
25
20
10
40
Frequency
30
20
10
0
12 15 18 21 24 27
Mean Dispatch Time
Median
25
%Utilization
20
15
10
10000 12000 14000 16000 18000 20000 22000 24000 26000 28000
Daily Shipments
25
Mean Dispatch Time
20
15
10
10000 12000 14000 16000 18000 20000 22000 24000 26000 28000
Daily Shipments
1500
Late AOS Shipments
1000
500
0
10000 12000 14000 16000 18000 20000 22000 24000 26000 28000
Daily Shipments
25
Mean Dispatch Time
20
15
10
0 500 1000 1500 2000
Late AOS Shipments
â•⁄ 2 SD 5 5 5 5 5 5 5
â•⁄ 3 SV 7 7 7 7 7 7 7
â•⁄ 4 DV 7 7 7 7 7 7 7
â•⁄ 5 VW 5 5 5 5 5 5 5
â•⁄ 6 WS 7 7 7 7 7 7 7
â•⁄ 7 SD 5 5 5 5 5 5 5
â•⁄ 8 SV 7 7 5 7 5 7 6
â•⁄ 9 DV 7 7 7 7 6 7 7
10 VW 5 5 5 5 5 5 5
SCORING REPORT
DATE: 3/10/2008
BUSINESS: Transportation
Attribute Legend
1 pass
2 fail
Figure 5.93
162 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
+/- 10 min Trial 1 Trial 2 Trial 3 Trial 1 Trial 2 Trial 3 Trial 1 Trial 2 Trial 3
â•⁄ 1 60 71 73 77 61 62 48 65 78 56
â•⁄ 2 60 64 77 63 52 58 55 66 56 77
â•⁄ 3 60 72 72 68 56 45 48 56 53 75
â•⁄ 4 60 61 61 76 64 49 50 54 78 77
â•⁄ 5 60 59 62 75 58 55 54 81 58 78
â•⁄ 6 60 12 71 64 46 57 46 81 84 82
â•⁄ 7 60 65 73 65 55 54 48 57 70 62
â•⁄ 8 60 57 60 69 62 45 48 80 82 61
â•⁄ 9 60 70 69 69 54 51 48 85 62 73
10 60 62 75 59 54 47 47 76 61 76
Process Tolerance = 20
Study Var % Study Var % Tolerance
Source StdDev (SD) (6 * SD) (%SV) (SV/Toler)
Total Gauge R&R 11.7836 70.7018 98.55 353.51
Repeatability 7.5802 45.4814 63.40 227.41
Reproducibility 9.0219 54.1312 75.45 270.66
Part-To-Part 2.0266 12.1593 16.95 60.80
Total Variation 11.9566 71.7398 100.00 358.70
Number of Distinct Categories = 1
% Tolerance
200 60
0 40
Gauge R&R Repeat Reprod Part-To-Part 1 2 3 4 5 6 7 8 9 10
Truck
R Chart by Store
A B C Unload Time by Store
UCL = 33.04
Sample Range
30 80
15 60
R = 32.83
0 LCL = 0 40
A B C
Store
Xbar Chart by Store
A B C Store * Truck Interaction
??
Sample Mean
75 UCL = 76.55 75 A
Average
B
65 65 C
?? = 63.42
55 55
LCL = 30.29 1 2 3 4 5 6 7 8 9 10
Truck
1. Creation of SOPs and 1. Trailer Log Database 1. Missed sale due to 1. Late shipments cause 1. Damaged corporate
training of the query for the AOS% zero shelf inventory potential down time image, “best price, if
material and LOS% 2. Lost customer due to or create the need to it is on the shelf”?
2. Weekly team 2. Time and materials lack of faith that what redirect personnel 2. Internal corporate
meetings with Driver associated with they want will be on until the shipment conflict may build
Coordinators to driver’s the shelf arrives resistance to future
review current communication of 2. Late shipments may cooperation
performance leave time and arrival increase risk of
3. Trailer quantity held to time to Driver personnel injury due
meet highest level of Coordinator to a need to catch up
demand 3. Time and materials while unloading or
associated with stocking the late
4. Driver quantity held to items
meet highest level of Driver Coordinator’s
demand creation, logging, and
communication of
5. Trailer maintenance ETL and ETA to
driver
Figure 5.96
Measure Phase ◾ 165
Chapter 6
Analyze Phase
Introduction
167
168 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Develop Cause-and-Effect
Relationships
Inputs Outputs
Lead-time
Dispatch time Inventory
Trailer Utilization Process
Accident
Damaged
Repair/maint
Poor quality
Desire to cover
Static trailer
max demand
quantity
within 24 hrs
Cust.
demand Seasonal
variation goods
Vendor &
% Trailer
Shipment ware
utilization
variation demand
variation
variation Reduce
holding
Limited costs
inventory
space at
ware and
store
Reduce
obsolete
prod. loss
Median
Metric Baseline
%Trailer Utilization Mean = 19.938%; StdDev = 3.543; Max = 28.964;
Min = 11.905; UCL = 22.26; LCL = 17.61. Distribution is
not normal. Trend is seasonal and follows Daily
Shipments.
Daily Shipments Mean = 19,064; StdDev = 3,351; Max = 26,889;
Min = 11,751; UCL = 20,468; LCL = 17,660. Distribution is
not normal. Trend is seasonal.
%Empty Mean = 47.41%; StdDev = 1.438%; Max = 49.977%;
Min = 43.314%; UCL = 50.617%; LCL = 47.094%.
Distribution is not normal. Trend shows special cause in
the last few weeks of the year.
AOS% Mean = 97.73%; StdDev = 1.851%; Max = 100%;
Min = 93.202%; UCL = 102.088%; LCL = 93.373%.
Distribution is not normal.
LOS% Mean = 97.833%; StdDev = 1.563%; Max = 100%;
Min = 95.005%; UCL = 102.83%; LCL = 92.83%.
Distribution is not normal.
Dispatch Mean Mean = 18.439; StdDev = 3.909; Max = 29.469;
Min = 12.110; UCL = 27.34; LCL = 9.54. Distribution is not
normal.
Dispatch Deviation Mean Mean = –11.561; StdDev = 3.909; Max = –0.531;
Min = –17.89; UCL = –2.66; LCL = –20.46. Distribution is
not normal.
Arrival Deviation Mean Mean = –28.993; StdDev = 12.502; Max = 7.047;
Min = –45.484; UCL = –11.20; LCL = –46.79. Distribution
is not normal.
Departure Deviation Mean = –34.638; StdDev = 11.441; Max = –6.497;
Mean Min = –55.329; UCL = –11.03; LCL = –58.24. Distribution
is not normal.
Live Unload Process Mean = 63.422; StdDev = 10.876; Max = 85.0; Min = 45.0;
Time UCL = 102.67; LCL = 24.18. Distribution is not normal.
Metric Baseline
Zero-inventory items per Mean = 16.372; StdDev = 11.558; Max = 49.4; Min = 8.7;
store UCL = 22.49; LCL = 10.26. Distribution is not normal.
POS Empty Shelf survey Mean = 2.5214; StdDev = 0.6841; Max = 4.0; Min = 1.9;
per store (2 weeks) UCL = 4.383; LCL = 0.66. Distribution is not normal.
5S
5S
Sustain
Standardize
Shine
Straighten
Sort
5S Evaluation Sheet
Office Store Dock
5S Evaluation Sheet
Office Store Dock
Are cleaning operations assigned and Are cleaning operations assigned and
visually managed? visually managed?
Are cleaning supplies easily available and Are cleaning supplies easily available and
stored in a marked area? stored in a marked area?
Mar Apr
Office Y N Y N
Mar Apr
Office Y N Y N
Mar Apr
Store Dock Y N Y N
Mar Apr
Store Dock Y N Y N
Potential Responsibility
S Cause(s)/ O D R and
Process Potential Potential Effects E Mechanism(s) C Current Process E P Recommended Completion
Function Failure Mode of Failure V of Failure C Controls T N Action(s) Date
The In what ways What is the effect How can the What are the What are the Who is
highest does the of each failure failure occur? existing controls actions for responsible for
value process mode on the Describe in and procedures reducing the the
process potentially outputs and/or terms of (inspection and occurrence, or recommended
steps from fail to meet customer something that test) that either improving action?
the C&E the process requirements? can be prevent failure detection, or for What is the
matrix. requirements The customer corrected or mode from identifying the
184 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
causes.
Live Lasts too Miss scheduled 3 No best 10 none 10 300 Define a best Store and
Unload long departure time practice used; practice that Lean Six
Process improper includes Sigma Team
equipment equipment list
used; no room with
to put unloaded specifications
product
Dispatch Incorrect Delayed pickup 6 Incorrect â•⁄ 4 none 10 240 Define a best Transportation
Process logging of or delivery of request input; practice that and Lean Six
request trailer illegible request instructs how to Sigma Team
information input; typo make a request
and control
input with a
standard form;
implement a
confirmation
process
%Utilization 25
20
15
10
10000 12000 14000 16000 18000 20000 22000 24000 26000 28000
Daily Shipments
99
98
Pearson correlation of daily 97
shipments and AOS% = –0.466
AOS%
P-Value = 0.000 96
95
94
Scatterplot of AOS% vs Daily Shipments Code 22 = 1
100 12000 14000 16000 18000 20000 22000 24000 26000 28000
99 Daily Shipments
98
97
AOS%
96
95
94
93
22000 23000 24000 25000 26000 27000
Daily Shipments
99
98
Pearson correlation of
%Utilization and AOS% = –0.461 97
AOS%
P-Value = 0.000 96
95
94
Scatterplot of AOS% vs %Utilization Code 22 = 1
100
15 20 25 30
99
%Utilization
98
97
AOS%
96
95
94
93
22 23 24 25 26 27 28 29
%Utilization
25
Pearson correlation of zero-
inventory items per store and
20
%Utilization = 0.768
%Utilization
P-Value = 0.000
15
%Utilization
24
190 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
23
22
10 20 30 40 50
Zero-Inventory Items per Store
Figure 6.18â•… Correlation analysis of zero inventory items and %trailer utilization.
Scatterplot of %Utilization vs Mean Dispatch Time
30
25
Pearson correlation of
mean dispatch time and 20
%Utilization = 0.355
%Utilization
P-Value = 0.000
15
27
26
25
%Utilization
24
23
22
10 15 20 25 30
Mean Dispatch Time
Figure 6.19â•… Correlation analysis of mean dispatch time and %trailer utilization.
Analyze Phase ◾ 191
192 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
25
Pearson correlation of
%Empty and %Utilization = 0.299 20
P-Value = 0.000
%Utilization
15
Scatterplot of %Utilization vs %Empty Code 22 = 1
29
25
%Utilization
24
23
22
46.5 47.0 47.5 48.0 48.5 49.0 49.5 50.0
%Empty
25
Pearson correlation of
Ware Request and
%Utilization = 0.971 20
P-value = 0.000
%Utilization
15
Scatterplot of %Utilization vs Ware Request Code 22 = 1
29
25
%Utilization
24
194 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
23
22
10000 10500 11000 11500 12000 12500 13000 13500
Ware Request
25
Pearson correlation of
Vendor Request and
%Utilization = 0.329
20
P-Value = 0.000
%Utilization
15
Scatterplot of %Utilization vs Vendor Request Code 22 = 1
29
%Utilization
24
23
22
0 500 1000 1500 2000
Vendor Request
Regression Analysis
Hypothesis Test
50 0.0
Percent
Residual
10 –1.5
1
0.1 –3.0
–3.0 –1.5 0.0 1.5 3.0 15 20 25 30
Residual Fitted Value
Residual
Frequency
12 –1.5
0 –3.0
–3.00 –2.25 –1.50 –0.75 0.00 0.75 1.50 2.25 1 50 100 150 200 250 300 350
Residual Observation Order
Source DF SS MS F P
Regression 3 4339.5 1446.5 2308.54 0.000
Residual Error 361 226.2 0.6
Total 364 4565.7
Source DF Seq SS
Zero-inventory items per store 1 2693.5
Ware Request 1 1643.9
Mean Dispatch time 1 2.1
Boxplot of AOS%
100
99
98
AOS%
97
96
95
94
93
0 1
Code 22
Two-Sample T-Test and CI: AOS%, Code 22
Two-sample Test for AOS%
Code
22 N Mean StdDev SE Mean
0 292 98.10 1.58 0.092
1 73 96.27 2.14 0.25
Process Capability
40 #
#
30 #
#
20
10
10
Code 22
Two-Sample T-Test and CI: Zero-inventory items per store, Code 22
Two-sample Test for Zero-inventory items per store
Code
22 N Mean StdDev SE Mean
0 292 11.45 3.92 0.23
1 73 36.1 11.0 1.3
30
20
15
10
0 1
Code 22
Two-Sample T-Test and CI: Mean Dispatch time, Code 22
Two-sample Test for Mean Dispatch time
Code
22 N Mean StdDev SE Mean
0 292 17.93 3.35 0.20
1 73 20.49 5.16 0.60
25
UCL = 22.28
20 X = 19.94
LCL = 17.60
15
10
1 37 73 109 145 181 217 253 289 325 361
Observation
16
Moving Range
12
8
4 UCL = 3.40
MR = 1.32
0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
Individual Value
12000
10000 UCL = 10096
X = 8958
8000 LCL = 7821
6000
1 37 73 109 145 181 217 253 289 325 361
Observation
6000
Moving Range
4500
3000
1500 UCL = 1397
MR = 428
0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
100
98 X = 97.730
96
94 LCL = 93.373
1 37 73 109 145 181 217 253 289 325 361
Observation
6.0
UCL = 5.353
Moving Range
4.5
3.0
1.5 MR = 1.638
0.0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
100
98 X = 97.83
96
94
LCL = 92.83
1 37 73 109 145 181 217 253 289 325 361
Observation
4.5
3.0
1.5 MR = 1.881
0.0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
25
20
X = 18.44
15
10 LCL = 9.54
1 37 73 109 145 181 217 253 289 325 361
Observation
16 1
1 1 11
1 11 1
Moving Range
1 1
12 1 1 1
UCL = 10.93
8
4 MR = 3.35
0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
40
30
20 UCL = 22.49
X = 16.37
10 LCL = 10.26
1 37 73 109 145 181 217 253 289 325 361
Observation
40
Moving Range
30
20
10 UCL = 7.51
MR = 2.30
0 LCL = 0
1 37 73 109 145 181 217 253 289 325 361
Observation
Improve Phase
Introduction
207
208 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
25
%Utilization
20
15
10
1 36 72 108 144 180 216 252 288 324 360
Index
Initial Cost
Recommendation Details ($millions)
30% Reduction of Trailers Trailer net Loss or Gain $44.45
Reduce Dispatch Time Implement 5S $0.06
Control Live Unload Time New equipment $15.00
Implement 5S
Formalize and Train SOPs Training materials $22.00
Training wages
Implement log and control system
$81.51
0 1 2 3 4 5 6 7 8 9 10 11 12 (Months)
$6.54
$14.24
$81.51 $82.23
Wait
Wait
Request empty
trailer to be
No Is Request full trailer delivered, once dock
trailer Yes to be taken to final Wait has been cleared. End
full? destination Request direct
Request to Driver to D-W-D driver
Coordinatior
216 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
No
Move decommissioned
Note status in the
trailer to salvage End
system
pickup lot
C1
Yes
To
218 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Yes vendor?
D1
No
C2
From Does
warehouse? vendor
also need
an empty?
D1
No
Yes
Yes Update plan log-
change trailer
condition to “Empty”
From plus note pickup and
trailer #
vendor?
No A2
Driver Coord.
Request checks driver Any Dispatch ready
from No drivers Yes
board for driver driver
driver? availability ready?
Driver Coord.
communicates travel Driver
plan, pickup and destination Driver Coord. updates
Yes communicates trailer plan log with
docks, ETL and ETA Wait trailer number trailer number and
Requests: Trailer number and departure departure time
and departure time time
from driver
Wait
D1 D2
To
depot?
Refer
requestor to End
D–W–D driver
Yes
Long No
Haul?
Yes
C1
Yes
Authorization
Yes
approved?
Special request
within means?
No
C1
No
Close request by
Offer them the placing current time in
Explain to requestor End
Dispatch Mgr contact destination docked
that you can’t help field and type “VOID”
information
in notes column
Once approval for the pilot was given, the team put
together a training plan to go along with the pilot plan
that had been created earlier. Similar to the communica-
tion RASICs, the training action plan documented who
Improve Phase ◾ 223
Assume, empty
“D–W–D” No J1
trailer to depot
Driver ready
for dispatch
Warehouse requestor
communicates
Yes destination dock
Requests:
ETA from driver
Driver documents
Driver secures Travel to Driver communicates
request and ETA in
trailer at depot depot yard ETA to requestor
driver log
J1
Warehouse requestor
Driver documents
communicates Driver communicates
request and ETL
pickup dock, requests ETL to requestor
in driver log
ETL from driver
Driver communicates
Driver secures Driver goes to the
departure time to
trailer pickup dock
requestor
Driver documents
Driver transports
departure time and
trailer to the
closes request in
depot check-in
driver log
End
Figure 7.15
CTS Factors Operational Definition Metric Target
Open Vendor: Op Mgrs., Shipping Dock % responded
communication Q7 “Within the last month, how often did a trailer by question Q7 100% Never Late
of critical or show up late at the destination dock without
jeopardy events anybody calling to alert you before its arrival?”
Q8 “Within the last month, how many times were Q8 100% Never
you placed on hold waiting for a driver
coordinator?”
Warehouse: Mgrs., Shipping & Rec. Dock
Q9 “Within the last month, how often did a trailer Q9 100% Never Late
show up late at the destination dock without
anybody calling to alert you before its arrival?”
Q10 “Within the last month, how many times Q10 100% Never
were you placed on hold waiting for a driver
coordinator?”
Up-to-date trailer Incorrect Calculated percentage of the incorrect trailer Trailer Status 0%
status logging of status tally by the total trailers audited. Trailer Error Rate
trailer status data is extracted from Trailer Plan Log in
real-time during the audit. A random list of 5% of
the trailers will be used to choose the trailers to
audit.
Finance
Support (S)
Jim Pulls
Thompson
Paul Jones
Anita Smith
Cindy Patch
Dave Leader
Chris Roberts
Inform (I)
Robert Quincy
Joe Thompson
Simone Fillbert
Mike O’Conner
Project Leader
Process Owner
Cl Mentor/MBB
Team Member 1
Team Member 2
Team Member 3
Team Member 4
Team Member 5
Team Member 6
Project Champion
Consult (C)
Training Plan R S A I S S S S S S
Training Materials R A S I
â•… Drivers S R S S
â•… Transportation S R S S
â•… Warehouse S R S S
â•… Store S R S S
â•… Vendor S R S
Training Schedule R S A I S S S S S S S
â•… Driver Training Leader S R S S
â•… Transportation Training Leader S R S S
â•… Warehouse Training Leader S R S S
â•… Store Training Leader S R S S
â•… Vendor Training Leader S R S
Pilot Support Plan R A S C B S S S S S
Improve Phase ◾ 229
Vendor
Store-2
Store-1
Transpo-2
Transpo-1
Level of
Invited (X)
Participation
Warehouse-2
Warehouse-1
Pilot Overview
Transportation
X
X
General Mgrs.
Transportation
X
X
Dispatch Mgrs.
Transportation
X
X
Driver Coord.
X
Driver
Warehouse
X
General Mgrs.
Rec. Mgrs.
Warehouse
X
X
Shipping Mgrs.
Warehouse
X
X
X
Dock Personnel
Vendor
X
X
Operations Mgr.
X Vendor
X
Shipping Mgr.
Vendor
X
Dock Personnel
Store
X
General Mgrs.
Store
X
X
Rec. Personnel
230 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
Chapter 8
Control Phase
Introduction
231
232 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
30
28
26
24
Data
22
99
98
Data
97
96
Two-Sample T-Test and CI:
AOS%, Pilot AOS% 95
Two-sample Test for AOS% vs Pilot AOS%
94
N Mean StdDev SE Mean AOS% Pilot AOS%
AOS% 30 97.72 1.61 0.29
Pilot AOS% 30 97.22 1.89 0.34
PC
Mean
Dispatch
Time
No defined
> Target
core
No standard Redundant Skills
Forms
drivers
available No accoutability
No backup
Material People
Figure 8.4â•… Cause-and-effect diagram for mean dispatch time greater than target.
Control Phase ◾ 237
Process Capability/DPMO
The In what ways What is the effect of each How can the failure What are the existing controls
highest might the failure mode on the occur? Describe in and procedures (inspection
value process outputs and/or customer terms of something that and test) that either prevent
process potentially fail requirements? The can be corrected or the failure mode from
steps to meet the customer could be the next controlled. Be specific. occurring or detect the failure
from the requirements operation, subsequent Try to identify the should it occur? Should
C&E and or design operations, another causes that directly include an SOP number.
matrix. intent? division, or the end user. impact the failure
mode, i.e., root causes.
Live Last too long Miss scheduled departure 3 No best practice used; 10 none 10 300
Unload time improper equipment
Process used; no room to put
unloaded product
Dispatch Incorrect Delayed pickup or delivery 6 Incorrect request input; â•⁄ 4 none 10 240
Process logging of of trailer illegible request input;
request typo
238 ◾ Implementing Lean Six Sigma Throughout the Supply Chain
information
Last too long Delayed pickup or delivery 6 No driver available; â•⁄ 6 none 10 360
of trailer workload too large;
poor organization
Responsibility S O D R
Process Potential Failure Potential Effects Recommended and Completion E C E P
Function Mode of Failure Action(s) Date Actions Taken V C T N
The In what ways What is the effect of What are the actions Who is List the completed
highest might the process each failure mode for reducing the responsible for actions that are
value potentially fail to on the outputs and/ occurrence or the recalculated RPN,
process meet the process or customer improving detection, recommended Include the
steps from requirements and requirements? The or for identifying the action? implementation
the C&E or design intent? custumer could be root cause if it is date for any
matrix the next operation, unknown? Should changes.
another division, or have action only on
the end user. high RPNs or easy
What are the new severity?
What is the new process
capability?
Are the detection limits
improved?
Recoankpute RPN after
actions are complete
fixes.
Live Last too long Miss scheduled Define best practices Store and Lean Implemented 5S, 3 5 1 15
Unload departure time that reduce Six Sigma team standard work, and
Process equipment list dashboard for Live
specifications Unload Time
Dispatch Incorrect logging Delayed pickup or Define a best Transportation Implemented 5S, 6 5 1 30
Process of request trailer practice that instructs and Lean Six standard work, and
infomation how to make a Sigma team dashboard for Mean
request and control Dispatch Time
input with a standard
form. Implement a
confirmation process.
Last too long Delayed pickup or Use 5S and 8Wastes Transportaion Implemented 5S, 6 5 1 30
delivery of trailer to anlayze the and Lean Six standard work, and
process and create a Sigma Team dashboard for Mean
list of Dispatch Time
recommendations
Defects Discovered
DPMO = × 1, 000, 000
Total Opportunities
48 54 60 66 72
Observed Performance Exp. Within Performance Exp. Overall Performance
PPM < LSL 0.00 PPM < LSL 294.87 PPM < LSL 3444.39
PPM > USL 0.00 PPM > USL 86.34 PPM > USL 1570.77
PPM Total 0.00 PPM Total 381.22 PPM Total 5015.16
Individual Value
20
15 X = 14.94
10
LCL = 5.98
5
1 6 11 16 21 26 31 36 41 46
Observation
UCL = 11.00
10.0
Moving Range
7.5
5.0
MR = 3.37
2.5
0.0 LCL = 0
1 6 11 16 21 26 31 36 41 46
Observation
Standard work was the Lean tool that helped the team
document the live-unload process so that each store
could repeat it with minimal variability in process time.
Live-unload time was noted as idle time; therefore, the
Control Phase ◾ 243
Individual Value
70 UCL = 70.15
60 X = 59.33
50 LCL = 48.51
1 5 9 13 17 21 25 29 33 37 41 45
Observation
20
Moving Range
15
UCL = 13.29
10
5 MR = 4.07
0 LCL = 0
1 5 9 13 17 21 25 29 33 37 41 45
Observation
2
3
Forklift
parking
44
office
Receiving
Staging lsle 1
1
Staging lsle 2 5–43
Staging lsle 3
Now that the team had completed the project and had
found success, they prepared to close out the work. Robert
Quincy agreed to support the new process changes for
the Midwest region, because he was the process spon-
sor. The team had done a great job of documenting the
new procedures, control documents, and training pro-
grams. So, all that was left was to meet to discuss lessons
learned during the project. Many members had input
about the tools used and the effectiveness of each. Jim
Pulls reminded the group that, typically, not all tools are
used for a Lean Six Sigma project, because some tools
overlap and others were designed for particular appli-
cations. In this project, the team not only completed a
Lean Six Sigma project, but they had also generated a case
study that will be used to train other company employ-
ees. With that said, Jim tasked the team to use a few
Control Phase ◾ 245
extra tools with the idea that the results were to be used
for educational purposes. Jim Pulls congratulated the
team for completing two jobs at once! Then he stopped
and calmly asked Anita to continue with the lessons
learned.
Chapter 9
Conclusions
247
Lean Six Sigma Glossary
249
250 ◾ Lean Six Sigma Glossary