Sie sind auf Seite 1von 17

ADDITIONAL AGREEMENT/APPROVAL RECORD

Party Ref Ind Name Sign Date

Revision Philosophy
All revisions for review will be issued at R01, with subsequent R02, R03, etc as required.

All revisions approved for issue or design will be issued at A01, with subsequent A02, A03, etc as required.

Documents approved for Construction will be issued at C01, C02 , and C03 respectively.

Documents or drawings revised as “As built” will be issued as Z01, Z02 Z03 etc.

Narrative sections revised from previous approved issues are to be noted in the table below and/or highlighted in the RH margin (using the
appropriate revision status) thus: | A02
Previous revision highlighting to be removed at subsequent issues.

Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by the use of a triangle containing the
revision status.

Revision History

Revision No. Date of issue Reason for change

SSG-TPEF-GEN-LA-2105-00001-A01 2 of 17 Datasheet for Carbon Steel Linepipe

This document is controlled electronically and is uncontrolled when printed


SSG-TPEF-GEN-LA-2105-00001

DATASHEET 3: OPUKUSHI AG LINEPIPES

SSG-TPEF-GEN-LA-2105-00001-A01 3 of 17 DATASHEET FOR CARBON STEEL LINEPIPES

This document is controlled electronically and is uncontrolled when printed


Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:

MATERIAL SPECIFICATION* MEDIUM DATA*

Carbon steel in accordance with ISO 3183


Material grade: ISO 3183 L360M Medium: ASSOCIATED GAS
Seamless/ERW/SAW/spiral/ SEAMLESS Service: SWEET

Additional requirements in accordance with PL2/


NACE required in accordance with MR-01-75: NO
HIC test required: NO
HIC test for information: NO

Contents: H2S/CO2/H20 0 / 0.0271 / 0.0756 (mole fraction)

LOCATION AND CONSTRUCTION DATA* DESIGN DATA*

Special construction/welding technniques: NO Design in accordance with: ANSI B31.8


Land/sub-marine line Swamp Pipeline
Design Pressure 20 barg
Special inspection required, as specified in: YES Minimum Design Temperature 0 0C
- ISO 3183 and amended by DEP 31.40.20.37 Maximum Design Temperature (Below Ground) 50 0C
- Linepipe Specification SSG-TPEF-GEN-RA-7880-00001 Maximum Design Temperature (Above Ground) 80 0C
Operating Temperature 37 0C
Test Pressure 63.9 barg

INFORMATION TO BE SUBMITTED WITH THE TENDER ENGINEERING DOCUMENTS REQUIRED

- Illustrations and technical documentation Manufacturing procedure specification: YES


- Manufacturing and test proecdure
- List of documents to be produced by manufacturer Material certificates in line with SSG-TPEF-GEN-RA-7880-00001
- Sub-vendor list

REMARKS REMARKS ON REVISIONS

*Complete and delete as applicable


**Indicate random, double random or other length
Made by Date: EQUIPMENT: OPUKUSHI AG PIPELINE
Rev letter A01
D. Anabraba 21-Dec-2011
Checked by Date: PLANT: SSAGS PROJECT
Date 21-Dec-11
Michael Shoge 21-Dec-2011
Appr. by Date: CONSIGNEE: SPDC Signature

Michael Shoge 21-Dec-2011 Sheet No. 1 cont'd on sheet No. 2


Eng. by : Equipment No.
Principal : Req. No.
DEP 31.38.81.94-Gen., sheet 1/2, 02/2002
4 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Pipeline
This document is controlled electronically and is uncontrolled when printed
Data Requistion sheet for Cont. Job No:
LINE PIPE FOR TRANSMISSION SYSTEMS - cont. sheet MESC No:
Abbreviated description

New item
Wall Estimated item value
OCDA

From Outside diameteter

Rev. letter

S/C
thickness
Item Total quantity Pipe
Card
store mm/in
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.

Full

Dec
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 2 7 5 0 0 M T R 3 2 3 • 9 7 • 5 D O U B. R A N D O M
D

D
Made by Date Equipment : OPUKUSHI AG PIPELINE Rev letter Rev letter Rev letter Rev letter
Michael Shoge 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-2011
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
5 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001

DATASHEET 2: OGBOTOBO AG LINEPIPES

SSG-TPEF-GEN-LA-2105-00001 6 OF 17 DATASHEET FOR CARBON STEEL LINEPIPES


Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:

MATERIAL SPECIFICATION* MEDIUM DATA*

Carbon steel in accordance with ISO 3183


Material grade: ISO 3183 L360M Medium: ASSOCIATED GAS
Seamless/ERW/SAW/spiral/ SEAMLESS Service: SWEET

Additional requirements in accordance with PL2/


NACE required in accordance with MR-01-75: NO
HIC test required: NO
HIC test for information: NO

Contents: H2S/CO2/H20 0 / 0.0271 / 0.0756 (mole fraction)

LOCATION AND CONSTRUCTION DATA* DESIGN DATA*

Special construction/welding technniques: NO Design in accordance with: ANSI B31.8


Land/sub-marine line Swamp Pipeline
Design Pressure 20 barg
Special inspection required, as specified in: YES Minimum Design Temperature 0 0C
- ISO 3183 and amended by DEP 31.40.20.37 Maximum Design Temperature (Below Ground) 50 0C
- Linepipe Specification SSG-TPEF-GEN-RA-7880-00001 Maximum Design Temperature (Above Ground) 80 0C
Operating Temperature 37 0C
Test Pressure 63.9 barg

INFORMATION TO BE SUBMITTED WITH THE TENDER ENGINEERING DOCUMENTS REQUIRED

- Illustrations and technical documentation Manufacturing procedure specification: YES


- Manufacturing and test proecdure
- List of documents to be produced by manufacturer Material certificates in line with SSG-TPEF-GEN-RA-7880-00001
- Sub-vendor list

REMARKS REMARKS ON REVISIONS

*Complete and delete as applicable


**Indicate random, double random or other length
Made by Date: EQUIPMENT: OPUKUSHI AG PIPELINE
Rev letter A01
D. Anabraba 21-Dec-2011
Checked by Date: PLANT: SSAGS PROJECT
Date 21-Dec-2011
Michael Shoge 21-Dec-2011
Appr. by Date: CONSIGNEE: SPDC Signature

Michael Shoge 21-Dec-2011 Sheet No. 1 cont'd on sheet No. 2


Eng. by : Equipment No.
7 of 17
Principal : Req. No.
DEP 31.38.81.94-Gen., sheet 1/2, 02/2002 Datasheet for Carbon Steel Linepipe
SSG-TPEF-GEN-LA-2105-00001-A01
This document is controlled electronically and is uncontrolled when printed
Data Requistion sheet for Cont. Job No:
LINE PIPE FOR TRANSMISSION SYSTEMS - cont. sheet MESC No:
Abbreviated description

New item
Wall Estimated item value
OCDA

From Outside diameteter

Rev. letter

S/C
thickness
Item Total quantity Pipe
Card
store mm/in
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.

Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 1 7 5 5 0 M T R 2 1 9 • 1 7 • 1 D O U B. R A N D O M
D

D
Made by Date Equipment : OGBOTOBO AG PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-2011
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
8 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linelpipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001

DATASHEET 1: BENISEDE AG LINEPIPES

9 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 DATASHEET FOR CARBON STEEL LINEPIPES
This document is controlled electronically and is uncontrolled when printed
Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:

MATERIAL SPECIFICATION* MEDIUM DATA*

Carbon steel in accordance with ISO 3183


Material grade: ISO 3183 L360M Medium: ASSOCIATED GAS
Seamless/ERW/SAW/spiral/ SEAMLESS Service: SWEET

Additional requirements in accordance with PL2/


NACE required in accordance with MR-01-75: NO
HIC test required: NO
HIC test for information: NO

Contents: H2S/CO2/H20 0 / 0.0167 / 0.0756 (mole fraction)

LOCATION AND CONSTRUCTION DATA* DESIGN DATA*

Special construction/welding technniques: NO Design in accordance with: ANSI B31.8


Land/sub-marine line Swamp Pipeline
Design Pressure 20 barg
Special inspection required, as specified in: YES Minimum Design Temperature 0 0C
- ISO 3183 and amended by DEP 31.40.20.37 Maximum Design Temperature (Below Ground) 50 0C
- Linepipe Specification SSG-TPEF-GEN-RA-7880-00001 Maximum Design Temperature (Above Ground) 80 0C
Operating Temperature 37 0C
Test Pressure 63.9 barg

INFORMATION TO BE SUBMITTED WITH THE TENDER ENGINEERING DOCUMENTS REQUIRED

- Illustrations and technical documentation Manufacturing procedure specification: YES


- Manufacturing and test proecdure
- List of documents to be produced by manufacturer Material certificates in line with SSG-TPEF-GEN-RA-7880-00001
- Sub-vendor list

REMARKS REMARKS ON REVISIONS

*Complete and delete as applicable


**Indicate random, double random or other length
Made by Date: EQUIPMENT: OPUKUSHI AG PIPELINE
Rev letter A01
D. Anabraba 21-Dec-2011
Checked by Date: PLANT: SSAGS PROJECT
Date 21-Dec-2011
Michael Shoge 21-Dec-2011
Appr. by Date: CONSIGNEE: SPDC Signature
Michael Shoge 21-Dec-2011 Sheet No. 1 cont'd on sheet No. 2
Eng. by : Equipment No.
Principal : Req. No.
DEP 31.38.81.94-Gen., sheet 1/2, 02/2002
10 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
Data Requistion sheet for Cont. Job No:
LINE PIPE FOR TRANSMISSION SYSTEMS - cont. sheet MESC No:
Abbreviated description

New item
Wall Estimated item value
OCDA

From Outside diameteter

Rev. letter

S/C
thickness
store
Card Item Total quantity mm/in Pipe
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.

Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 1 7 2 0 0 M T R 3 2 3 • 9 7 • 5 D O U B. R A N D O M
D

D
Made by Date Equipment : BENISEDE AG PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-11 A01
Checked by Date Plant: SSAGS PROJECT Date
Michael Shoge 21-Dec-11 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-11
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
11 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001

DATASHEET 4: TUNU CPF EXPORT LINEPIPES

12 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 DATASHEET FOR CARBON STEEL LINEPIPES
This document is controlled electronically and is uncontrolled when printed
Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:

MATERIAL SPECIFICATION* MEDIUM DATA*

Carbon steel in accordance with ISO 3183


Material grade: ISO 3183 L450M Medium: DRY NATURAL GAS
Seamless/ERW/SAW/spiral/ SEAMLESS Service: SOUR

Additional requirements in accordance with PL2/


NACE required in accordance with MR-01-75: YES
HIC test required: YES
HIC test for information: NO
- HIC tests shall be in accordance with ISO 3183 annex H.4.3
- Samples shall be in accorance with ISO 3183 annex H.7.2.2 Contents:
- Test methods shall be in line with ISO 3183 annex H.7.3.1 H2S 4ppm by volume
CO2 4% by volume
H20 7 lb/MMscf

LOCATION AND CONSTRUCTION DATA* DESIGN DATA*

Special construction/welding technniques: NO Design in accordance with: ANSI B31.8


Land/sub-marine line Swamp/Offshore Pipeline
Design Pressure 150 barg
Special inspection required, as specified in: YES Minimum Design Temperature -10 0C
- ISO 3183 and amended by DEP 31.40.20.37 Maximum Design Temperature (Below Ground) 50 0C
- Linepipe Specification SSG-TPEF-GEN-RA-7880-00005 Maximum Design Temperature (Above Ground) 80 0C
Operating Temperature 27 0C
Test Pressure 187 barg

INFORMATION TO BE SUBMITTED WITH THE TENDER ENGINEERING DOCUMENTS REQUIRED

- Illustrations and technical documentation Manufacturing procedure specification: YES


- Manufacturing and test proecdure
- List of documents to be produced by manufacturer Material certificates in line with SSG-TPEF-GEN-RA-7880-00005
- Sub-vendor list

REMARKS REMARKS ON REVISIONS

*Complete and delete as applicable


**Indicate random, double random or other length
Made by Date: EQUIPMENT: OPUKUSHI AG PIPELINE
Rev letter A01
D. Anabraba 21-Dec-2011
Checked by Date: PLANT: SSAGS PROJECT
Date 21-Dec-2011
Michael Shoge 21-Dec-2011
Appr. by Date: CONSIGNEE: SPDC Signature

Michael Shoge 21-Dec-2011 Sheet No. 1 cont'd on sheet No. 2


Eng. by : Equipment No.
Principal : Req. No.
DEP 31.38.81.94-Gen., sheet 1/2, 02/2002 13 of 17
This document is controlled electronically and is uncontrolled when printed
Data Requistion sheet for Cont. Job No:
LINE PIPE FOR TRANSMISSION SYSTEMS - cont. sheet MESC No:
Abbreviated description

New item
Wall Estimated item value
OCDA

From Outside diameteter

Rev. letter

S/C
thickness
store Card Item Total quantity mm/in Pipe
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.

Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 2 7 7 0 0 M T R 4 0 6 • 4 1 0 • 5 D O U B. R A N D O M
D
R02 0 2 7 0 0 0 M T R 4 0 6 • 4 1 2 • 4 D O U B. R A N D O M ± 1 J T.
D
R02 0 3 5 0 0 M T R 4 0 6 • 4 1 4 • 7 D O U B. R A N D O M ± 1 J T.
D

D
Made by Date Equipment : TUNU CPF EXPORT PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-11 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-11 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-11
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
14 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001

DATASHEET 4: DODO NORTH MFD TO TUNU CPF

15 of 17

This document is controlled electronically and is uncontrolled when printed


Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:

MATERIAL SPECIFICATION* MEDIUM DATA*

Carbon steel in accordance with ISO 3183


Material grade: ISO 3183 L450M Medium: NATURAL GAS
Seamless/ERW/SAW/spiral/ SEAMLESS Service: SOUR

Additional requirements in accordance with PL2/


NACE required in accordance with MR-01-75: YES
HIC test required: YES
HIC test for information: NO
- HIC tests shall be in accordance with ISO 3183 annex H.4.3
- Samples shall be in accorance with ISO 3183 annex H.7.2.2 Contents:
- Test methods shall be in line with ISO 3183 annex H.7.3.1 CO2 0.00678 Mol Fraction

LOCATION AND CONSTRUCTION DATA* DESIGN DATA*

Special construction/welding technniques: NO Design in accordance with: ANSI B31.8


Land/sub-marine line Swamp Pipeline
Design Pressure 150 barg
Special inspection required, as specified in: YES Minimum Design Temperature (-45) 0C
- ISO 3183 and amended by DEP 31.40.20.37 Maximum Design Temperature 110 0C
- Linepipe Specification SSG-TPEF-GEN-RA-7880-00005 Operating Temperature 98 0C
Test Pressure 187.5 barg

INFORMATION TO BE SUBMITTED WITH THE TENDER ENGINEERING DOCUMENTS REQUIRED

- Illustrations and technical documentation Manufacturing procedure specification: YES


- Manufacturing and test proecdure
- List of documents to be produced by manufacturer Material certificates in line with SSG-TPEF-GEN-RA-7880-00005
- Sub-vendor list

REMARKS REMARKS ON REVISIONS

*Complete and delete as applicable


**Indicate random, double random or other length
Made by Date: EQUIPMENT: OPUKUSHI AG PIPELINE
Rev letter A01
D. Anabraba 21-Dec-2011
Checked by Date: PLANT: SSAGS PROJECT
Date 21-Dec-2011
Michael Shoge 21-Dec-2011
Appr. by Date: CONSIGNEE: SPDC Signature

Michael Shoge 21-Dec-2011 Sheet No. 1 cont'd on sheet No. 2


Eng. by : Equipment No.
Principal : Req. No.
DEP 31.38.81.94-Gen., sheet 1/2, 02/2002

SSG-TPEF-GEN-LA-2105-00001-A01 16 of 17 Datasheet for carbon Steel Linepipe

This document is controlled electronically and is uncontrolled when printed


Data Requistion sheet for Cont. Job No:
LINE PIPE FOR TRANSMISSION SYSTEMS - cont. sheet MESC No:
Abbreviated description

New item
Estimated item value
OCDA
From Outside diameteter Wall

S/C
Quantity change

letter
Item Total quantity Pipe
Card
Rev.
store Unit mm/in thickness mm Length of Pipe**
No. required sched. MESC No.

Dec
Full
Full • Fraction • £ ±

D
R02 0 1 1 1 0 0 0 M T R 2 7 3 • 0 1 5 • 6 D O U B. R A N D O M ± 1 J T.

Made by Date Equipment : DODO NORTH NAG LINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002

17 of 17
SSG-TPEF-GEN-LA-2105-00001-A01
This document is controlled electronically and is uncontrolled when printed Datasheet for carbon Steel Linepipe

Das könnte Ihnen auch gefallen