Revision Philosophy
All revisions for review will be issued at R01, with subsequent R02, R03, etc as required.
All revisions approved for issue or design will be issued at A01, with subsequent A02, A03, etc as required.
Documents approved for Construction will be issued at C01, C02 , and C03 respectively.
Documents or drawings revised as “As built” will be issued as Z01, Z02 Z03 etc.
Narrative sections revised from previous approved issues are to be noted in the table below and/or highlighted in the RH margin (using the
appropriate revision status) thus: | A02
Previous revision highlighting to be removed at subsequent issues.
Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the affected areas and by the use of a triangle containing the
revision status.
Revision History
New item
Wall Estimated item value
OCDA
Rev. letter
S/C
thickness
Item Total quantity Pipe
Card
store mm/in
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.
Full
Dec
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 2 7 5 0 0 M T R 3 2 3 • 9 7 • 5 D O U B. R A N D O M
D
D
Made by Date Equipment : OPUKUSHI AG PIPELINE Rev letter Rev letter Rev letter Rev letter
Michael Shoge 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-2011
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
5 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001
New item
Wall Estimated item value
OCDA
Rev. letter
S/C
thickness
Item Total quantity Pipe
Card
store mm/in
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.
Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 1 7 5 5 0 M T R 2 1 9 • 1 7 • 1 D O U B. R A N D O M
D
D
Made by Date Equipment : OGBOTOBO AG PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-2011
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
8 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linelpipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001
9 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 DATASHEET FOR CARBON STEEL LINEPIPES
This document is controlled electronically and is uncontrolled when printed
Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:
New item
Wall Estimated item value
OCDA
Rev. letter
S/C
thickness
store
Card Item Total quantity mm/in Pipe
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.
Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 1 7 2 0 0 M T R 3 2 3 • 9 7 • 5 D O U B. R A N D O M
D
D
Made by Date Equipment : BENISEDE AG PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-11 A01
Checked by Date Plant: SSAGS PROJECT Date
Michael Shoge 21-Dec-11 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-11
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
11 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for Carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001
12 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 DATASHEET FOR CARBON STEEL LINEPIPES
This document is controlled electronically and is uncontrolled when printed
Requisition for Contr. Job No.:
LINE PIPE FOR TRANSMISSION SYSTEMS MESC No.:
New item
Wall Estimated item value
OCDA
Rev. letter
S/C
thickness
store Card Item Total quantity mm/in Pipe
Unit mm Length of Pipe** Quantity change
No. required sched. MESC No.
Dec
Full
Full Fraction
• • £ ±
D ± 1 J T.
R02 0 1 2 7 7 0 0 M T R 4 0 6 • 4 1 0 • 5 D O U B. R A N D O M
D
R02 0 2 7 0 0 0 M T R 4 0 6 • 4 1 2 • 4 D O U B. R A N D O M ± 1 J T.
D
R02 0 3 5 0 0 M T R 4 0 6 • 4 1 4 • 7 D O U B. R A N D O M ± 1 J T.
D
D
Made by Date Equipment : TUNU CPF EXPORT PIPELINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-11 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-11 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-11
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
14 of 17
SSG-TPEF-GEN-LA-2105-00001-A01 Datasheet for carbon Steel Linepipe
This document is controlled electronically and is uncontrolled when printed
SSG-TPEF-GEN-LA-2105-00001
15 of 17
New item
Estimated item value
OCDA
From Outside diameteter Wall
S/C
Quantity change
letter
Item Total quantity Pipe
Card
Rev.
store Unit mm/in thickness mm Length of Pipe**
No. required sched. MESC No.
Dec
Full
Full • Fraction • £ ±
D
R02 0 1 1 1 0 0 0 M T R 2 7 3 • 0 1 5 • 6 D O U B. R A N D O M ± 1 J T.
Made by Date Equipment : DODO NORTH NAG LINE Rev letter Rev letter Rev letter Rev letter
D. Anabraba 21-Dec-2011 A01
Checked by Date Plant: SSAGS PROJECT Date Date
Michael Shoge 21-Dec-2011 21-Dec-11
Appr by Date Consignee: SPDC Signature Signature Signature Signature
Michael Shoge 21-Dec-2011
Eng. By Sheet No. 2 Cont'd on sheet No.
Principal Req. No.
DEP 31.38.81.94-Gen., sheet 2/2, 02/2002
17 of 17
SSG-TPEF-GEN-LA-2105-00001-A01
This document is controlled electronically and is uncontrolled when printed Datasheet for carbon Steel Linepipe