Methodology

For two way reinforcements of the footing:

We first bend the bars which are made of expired welding rods. There are six
reinforcement bars that goes both ways having a total of twelve reinforcing bars.

Then we started tying them together, starting from the sides and using it
as a guide in tying the rest using a very thin GI wire.
For the vertical reinforcements of the column:

We measure and marked the GI wire to where it should be bent and cut.

We then cut and bent the GI wires to make the lateral reinforcements of the
column.
Finally we can tie the
lateral reinforcements to
the vertical
reinforcements of the
column.

Final look of the column's


eight vertical reinforcements
and eleven lateral
reinforcements.
Finalizing the reinforcements:

After we finished both


reinforcements, we tied them
together.

Finally, the finished reinforcements of the footing.


For the concrete:
We bend some additional bars which will temporarily support the
reinforcements and will be removed later on.

Final look of the two-way reinforcements of the footing which are uniformly
spaced together with the temporary supports.