Beruflich Dokumente
Kultur Dokumente
com/in/faatihr
CURRICULUM VITAE
Name : Faatih Rabbaaniy
Education : Bachelor Degree of Ocean Engineering
Date of Birth : April 8th 1995
Gender : Male
Religion : Islam
Home Address : Desa Jetis RT 02/RW 01 No. 6 Kec. Dagangan Kab. Madiun 63172
Current Address : Jl. Asempayung Gang BPM, No 16, Kec. Sukolilo, Kota Surabaya 60111
Phone Number : +62 81 554 121 312 (W.A/LINE) / +62 85 850 520 244 (TELP, SMS)
ABOUT ME
A humble person who had the dedication, hard work, and easy going.
RECENT EDUCATION
I’ve been studied at Institut Teknologi Sepuluh Nopember, with majoring concentration of Ocean Engineering.
Basically, Ocean Engineering is learning about structure or construction on sea and hydrodynamics. With the main
course on structure, basic construction, soil mechanics, fluid mechanics, also basic of naval, and etc. (GPA: 3.18/4)
Undergraduate Thesis : Reassessment Strength of Piles at Port PT. Terminal Petikemas Surabaya Due to The
Development of Port Facilities.
ORGANIZATION EXPERIENCE
2013 : Member of water sport (Swimming Division)
TECHNICAL EXPERIENCE
2013 : - Equipment committee for graduation ceremony 107 Teknik Kelautan ITS
- Equipment committee of short course BEM FTK 2016 “Perkembangan Teknologi LNG untuk Daya Dukung
Bangsa Sebagai Poros Maritim Dunia”
PROJECT EXPERIENCE
1. Analysis of Port and Intake Channel PLTU PT. PLN (Persero) Pembangkit Sumatra Bagian Utara Sektor Belawan
Medan.
This project is about structure analysis of port. my job desk is to analyze, to create structure model by CAD
and global analysis software. At this case the port is will be developed, which is the port will have 16 tons of
additional pipes with 10 tons of pipes support at the dock. Currently the piles had much of corrosion. Furthermore,
the analysis is to knows the estimation of strength piles at this current condition with and without that additional
pipes using global analysis. The result, the dock of port is unable to handle about 16 tons of additional pipes with
10 tons of pipes support. Based on the result, we obtained some solutions that’s the additional pipes are possible
to be place on intake channel beside dock facilities. next, we do analyze the intake channel using local analysis
software to make sure that the structure of intake channel is strong enough to handle the additional pipes and
pipes support.
2. Analysis Structure of Berthing Dolphin at Jetty Port HDC PT. Pertamina (Persero) RU II Dumai
At this case the dock of port structure berthing dolphin at jetty port HDC PT. Pertamina RU II Dumai is collapse
because of failure the structure at some piles. The assessment is to recalculate the actual strength of piles and to
knows the reason why the piles has failure structure.