Parameter Basin DAS Ciharus

Luas Panjang Sungai


No Sub Catchment CN C1 Ct
Ha Km2 m Km
1 Bagbagan 341.89 3.42 60.0 0.75 1.80 5022.28 5.0
2 Cibereko 202.93 2.03 60.0 0.75 1.80 3689.00 3.7
3 Curug Pondok 61.62 0.62 45.0 0.75 1.80 1651.00 1.7
4 Terjun Taraje 57.50 0.58 45.0 0.75 1.80 1478.00 1.5
5 Ciharus Tengah Kiri 183.80 1.84 70.0 0.75 1.80 2918.00 2.9
6 Ciharus Hilir Kanan 89.70 0.90 75.0 0.75 1.80 1115.00 1.1
7 Ciharus Hilir Kiri 129.58 1.30 75.0 0.75 1.80 771.00 0.8
8 DAS Ciharus 1067.02 10.67 60.0 0.75 1.80 5396.60 5.4
9 DAS Citanduy Hulu 32195.54 321.96 60.0 0.75 1.80 39897.97 39.9

39897.974648 Equation parameters


Pe = Excess Precipitation
P = Accumulated rainfall
S = Potential maximum retention
S = (25,400 – 254 * CN) / CN
Ia = Initial abstraction = 0.2 * S
CN = Curve Number
CNcomposite = sum (Ai * CNi) / sum Ai
CN = 30 (very permeable)
CN = 100 (impervious cover)
1. Lag time (tL): time from the center of rain
Lc Time Lag S = Potential maximum tL = C1Ct (LLc)0.3
Initial Abstraction (mm) where
Km (jam) retention
tL = Time [hrs];
1.7 2.6 169.3 33.9 C1 = 0.75 for SI unit; 1.0 for English unit;
Ct = Coefficient which is a function of watersh
1.2 2.1 169.3 33.9 steeper slope, Ct is smaller);
0.6 1.3 310.4 62.1 L = length of the main channel [mi, km]; Lc =
point nearest to the watershed centroid
0.5 1.2 310.4 62.1
1.0 1.8 108.9 21.8
0.4 1.0 84.7 16.9
0.3 0.8 84.7 16.9
1.8 2.7 169.3 33.9
13.3 8.9 169.3 33.9
e (tL): time from the center of rainfall – excess to the UH peak 
= C1Ct (LLc)0.3
rs];
r SI unit; 1.0 for English unit;
ent which is a function of watershed slope and shape, 1.8~2.2 (for
e, Ct is smaller);
the main channel [mi, km]; Lc = length along the main channel to the
st to the watershed centroid