No Sub Catchment CN C1 Ct Ha Km2 m Km 1 Bagbagan 341.89 3.42 60.0 0.75 1.80 5022.28 5.0 2 Cibereko 202.93 2.03 60.0 0.75 1.80 3689.00 3.7 3 Curug Pondok 61.62 0.62 45.0 0.75 1.80 1651.00 1.7 4 Terjun Taraje 57.50 0.58 45.0 0.75 1.80 1478.00 1.5 5 Ciharus Tengah Kiri 183.80 1.84 70.0 0.75 1.80 2918.00 2.9 6 Ciharus Hilir Kanan 89.70 0.90 75.0 0.75 1.80 1115.00 1.1 7 Ciharus Hilir Kiri 129.58 1.30 75.0 0.75 1.80 771.00 0.8 8 DAS Ciharus 1067.02 10.67 60.0 0.75 1.80 5396.60 5.4 9 DAS Citanduy Hulu 32195.54 321.96 60.0 0.75 1.80 39897.97 39.9
39897.974648 Equation parameters
Pe = Excess Precipitation P = Accumulated rainfall S = Potential maximum retention S = (25,400 – 254 * CN) / CN Ia = Initial abstraction = 0.2 * S CN = Curve Number CNcomposite = sum (Ai * CNi) / sum Ai CN = 30 (very permeable) CN = 100 (impervious cover) 1. Lag time (tL): time from the center of rain Lc Time Lag S = Potential maximum tL = C1Ct (LLc)0.3 Initial Abstraction (mm) where Km (jam) retention tL = Time [hrs]; 1.7 2.6 169.3 33.9 C1 = 0.75 for SI unit; 1.0 for English unit; Ct = Coefficient which is a function of watersh 1.2 2.1 169.3 33.9 steeper slope, Ct is smaller); 0.6 1.3 310.4 62.1 L = length of the main channel [mi, km]; Lc = point nearest to the watershed centroid 0.5 1.2 310.4 62.1 1.0 1.8 108.9 21.8 0.4 1.0 84.7 16.9 0.3 0.8 84.7 16.9 1.8 2.7 169.3 33.9 13.3 8.9 169.3 33.9 e (tL): time from the center of rainfall – excess to the UH peak = C1Ct (LLc)0.3 rs]; r SI unit; 1.0 for English unit; ent which is a function of watershed slope and shape, 1.8~2.2 (for e, Ct is smaller); the main channel [mi, km]; Lc = length along the main channel to the st to the watershed centroid