FORMWORK SYSTEM
FORMWORK SIZE
Formwork Standard(mm)
Width Length
600 900 1200 1500 1800
550 900 1200 1500 1800
500 900 1200 1500 1800
450 900 1200 1500 1800
400 900 1200 1500 1800
350 900 1200 1500 1800
300 900 1200 1500 1800
250 900 1200 1500 1800
200 900 1200 1500 1800
Special ones also can order.
FORMWORK SIZE
Standard Length
Standard Length
Shorten Duration
Efficiency
Wood Formwork (the left) Wood&Steel Formwork (the right )
Low-level High-level
FORMWORK ADVANTAGE
Save Materials
Improve Quality
Verticality
Wood Formwork (the left) Wood&Steel Formwork (the right )
Better Worse
FORMWORK ADVANTAGE
Cut Costs
Composite Cost
Wood Formwork (the left) Wood&Steel Formwork (the right )
High Low
FORMWORK ADVANTAGE
Order Management
Order Management
Wood Formwork (the left) Wood&Steel Formwork (the right )
Disorder In order
FORMWORK ADVANTAGE
Repetitive Forms
Repetitive Time
Wood Formwork (the left) Wood&Steel Formwork (the right )
5-6times Hundreds of times for steel frame
COMPARISION TABLE
Labors Need more skilled workers Need less workers (do not need lots of skilled
workers ,just one or two is enough)
Construction Period Seven days for one floor Three days for one floor
Value About 28 RMB per square meter About 292 RMB per square meter
(excluding accessories) (excluding accessories)
Costs for every time 11.7RMB per square meter 7.6RMB per square meter
Equipment and Steel Shotcrete Need more and the rent costs are Need less and the rent costs are 2.2RMB per
Support 6.5RMB per square meter square meter
Work Salary 150-300RMB for every skilled workers 100-200RMB for every labors
Efficiency 15-20 Square meters (a worker for one 45-50 Square meters (a worker for one day)
day)
Salary Costs 20RMB per square meter 6.7RMB per square meter
Composite Costs 38.2RMB per square meter 16.5RMB per square meter
30-50RBM per square 210-300RBM per square meter 1200-1500RBM per square
meter (cheap but low (higher price but higher meter
numbers of uses) numbers of uses) (expensive and high numbers of
uses)
GOOD COST PERFORMANCE