LOAD BREAK SWITCH

OPERATING INSTRUCTION MANUAL

ESWARI
Excellence in Protection

ECO - FRIENDLY AS STANDARD


LOAD BREAK SWITCH

Arc Quenching Pin Top Fixed Contact


(P.No : BMRAQP702) (P.No : BBTFC701)

Top Fixed Contact Cover Insulator


(P.No : BPPCPTFCC704) (P.No : BEI200)

Rubber Stopper
Bolt
(P.No : BMRSB1201)

Center Shaft
(P.No : BMRCS501)

Top Enclosure
(P.No : BPPCPTE8208)

Moving Arm
(P.No : BNMA2000)

Bottom Enclosure
(P.No : BPPCPBE8207)

Fuse Trip Clamp Earth Shaft


(P.No : BMFTC1002) (P.No : BMRES1101)

Manual Tripping
Alu. Bus Bar (P.No : BMSTPB603)
(P.No : BABB1001)

Tripping Rod
(P.No : BMRTR601)
Tripping Lever
(P.No : BMSTL401)

Control Unit Center Shaft Earth On/Off Holding Pipe


(P.No : BMRCUCS301)
(P.No : BMSOHP1105)

Main Spring
(P.No : BMMS903)
LOAD BREAK SWITCH
STEP 1 :
Load break switch is packed in wooden crates , as in condition of LBS in
Off condition and Earth Switch in ON Condition. Before LBS is fixed to the panel ,
first earth switch has to be opened .

STEP 2 :
To Operate Load Break Switch, Insert and rotate the operating Handle as shown in the figure.

STEP 3 :
To CHARGE Switch Operate the Handle to the Counter‐Clockwise Direction as shown in the
figure. The Operating Handle can be removed at charged condition only.

Do’s
* Rotate operating handle in clockwise direction for switching ON LBS.
* Rotating operating handle in anti‐clockwise direction for “CHARGING” LBS.
LBS can be tripped only if LBS in charged condition.
* Insert operating handle earth in earth rod for
making earth switch ON or OFF.

Do not’s
* Do not remove operating handle from the switch until LBS is in charged
condition (i.e) LBS should be in both “ON” and in “CHARGED” condition.
* Do not operate main switch when earth switch is on “ON” condition.
To defeat , mechanical interlock is provided.

ECO - FRIENDLY AS STANDARD


LOAD BREAK SWITCH
STEP 4 :

TRIPPING :
To Trip the Load Break Switch, Push the Tripping Lever as shown in the figure (Using Coil
also, LBS can be tripped).

STEP 5 :
EARTH ON / OFF :
To Operate Earth Switch, Insert Earth Handle into the Slot as shown in the figure.

ECO - FRIENDLY AS STANDARD


ESWARI
Excellence in Protection

Corporate Office
Unit I Fusegear Division
#64, Industrial Estate, Perungudi,
Chennai 600096, India
Tel: 91-44-42152122, 42152123

Unit II Switchgear Division


#102A, Industrial Estate, Perungudi,
Chennai 600096, India

Unit III Switchboard Division


#29-31, Industrial Estate, Kakkalur,
Tiruvellore Distriect , India

E‐ mail : info@eswari.in
Website : www.eswari.in

Overseas Branches
Eswari Electricals Pvt, Ltd. Eswari Electricals (Kenya) Pvt, Ltd.
#54A, Pambankada Lane, P.O. Box No. 159‐00623,
Wellawatte, Colombo ‐ 06. Nairobi , Kenya.
Srilanka.