‫ﺷرﮐت آذرﺧش اﻧﺗﻘﺎل ﻧﯾرو‬

SUBSTATION:‫ﺧراﺳﺎن‬ ‫ﻓوﻻد‬ TEST SHEET :

TYPE:IMBD&TB 420 CURRENT


RATED VOLTAGE: 420 KV
TRANSFORMER
Visual Checking
N
Description Results
o
1 Bay T1 T2 Neyshabur 1
R 132300307 180048/20 132300201
2 Serial No. S 132300303 132300304 132300204
T 132300306 132300310 132300203
3 Loss off sf6(signal) --- ‫ ﭼﮏ ﺷد‬A‫ﻓﺎز‬ ‫ﭼﮏ ﺷد‬

4 GEN-Lock out(signal) --- ‫ ﭼﮏ ﺷد‬A‫ﻓﺎز‬ ‫ﭼﮏ ﺷد‬


Checking the porcelain for
5
any damages
‫ﺳﺎﻟم‬ ‫ﺳﺎﻟم‬ ‫ﺳﺎﻟم‬

Checking the Oil Level


6 ‫ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل‬
gauge
Controlling the HV
7
connections
‫ﭼﮏ ﺷد‬ ‫ﭼﮏ ﺷد‬ ‫ﭼﮏ ﺷد‬
Checking the earth
8 connections: Tank/Into ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬
box support

9 Tightening the screws ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬

10 Cleaning ‫ﺷد‬ ‫ﺷد‬ ‫ﺷد‬

11 Painting ‫ﺧوب‬ ‫ﺧوب‬ ‫ﺧوب‬

12 Date 97.08.23 97.08.22 97.08.23

REMARKS:
…………………………………………………………………………………………………

…………………………………………………………………………………………………

TEST BY: Saeed khadem CHECKED BY:


‫ﺷرﮐت آذرﺧش اﻧﺗﻘﺎل ﻧﯾرو‬

SUBSTATION:‫ﺧراﺳﺎن‬ ‫ﻓوﻻد‬ TEST SHEET :

TYPE:IMBD CURRENT
RATED VOLTAGE: 420 KV
TRANSFORMER
Visual Checking
N
Description Results
o
1 Bay T3 T4 Neyshabur 2
R 132300301 132300311 132300202
2 Serial No. S 132300302 132300309 132300205
T 132300308 132300305 132300208
3 Loss off sf6(signal) --- --- ---

4 GEN-Lock out(signal) --- --- ---


Checking the porcelain for
5
any damages
‫ﺳﺎﻟم‬ ‫ﺳﺎﻟم‬ ‫ﺳﺎﻟم‬
Checking the Oil Level
6 ‫ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل ﻧرﻣﺎ ل‬
gauge
Controlling the HV
7 connections
‫ﭼﮏ ﺷد‬ ‫ﭼﮏ ﺷد‬ ‫ﭼﮏ ﺷد‬
Checking the earth
8 connections: Tank/Into ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬
box support

9 Tightening the screws ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬ ‫آﭼﺎرﮐﺷﯽ ﺷد‬

10 Cleaning ‫ﺷد‬ ‫ﺷد‬ ‫ﺷد‬

11 Painting ‫ﺧوب‬ ‫ﺧوب‬ ‫ﺧوب‬

12 Date 97.08.23 97.08.23 97.08.23

REMARKS:
…………………………………………………………………………………………………

…………………………………………………………………………………………………

TEST BY: Saeed khadem CHECKED BY: