Reasons & Requirements (1)
Why change?
• Capacity: Less than 50% of our lambdas are in use!
• Upgrade towards 40/100G only with new h/w
• Current equipment is approaching end of life (from 2006)
(investments into old h/w not usefull)
Most important
• Operational inflexibilities very annoying
– as lambdas has
to be changed
– as more native lambda services are provided/added
– as transponders are dedicated/configured for each connection
Page 3
Reasons & Requirements (2)
Add flexibility
• Transparent lambdas between any core nodes (no OEO)
• Protected lambdas
• Easy and quick channel setup
– rapid service delivery
–
flexible use of transponders
– ability to reroute lambdas
easily in case of
serious link problems
• Optical switching facilities at fiber junctions
• Sub-Lambda switching facilities (OTN) (due to 10/100)
Page 4
Reasons & Requirements (3)
Page 5
Reasons & Requirements (4)
Seite 6
Results
• Call for tender (non open, 2 stages): November 2011
– After stage one, reduction to „some serious“ participants
• Acceptance of tender: 10. May 2012
• Winner
– ECI Telecom, http://www.ecitele.com
– Israelien company, founded 1961
– about 2500 employes
– New player in „NREN environment“
• Contract & order for migration: 14. May 2012
Seite 8
Results: Fiber set-up
• High Capacity
– 88 Lambdas per Fiber
– Bandwidth up to 100 Gbit/s per Lambda
• Switching Functions
– Optional: 1Tbit/s Switching-Fabric per Node
– Currently: Usage as ODU Cross-Connect
– Future: In addition usage as MPLS- and Ethernet-Switch
Seite 9
Capacities in Generations of WiN
Bandwidth in Core of WiN (Wissenschaftsnetzes):
Seite 10
Results: Fiber set-up
Amplifier
• Raman amplifiers compensate excessive attenuation on
long spans
• New: Mixture of Raman, EDFA
• Requires additional maintenance procedures
Redundancy
• Customer connection: Redundant fiber with two Core Nodes
(nearly all customers, 77% had not even 1 second interruption in 2011)
• Further extension of redundant fiber connectivity
Seite 11
Results: ROADM
• High Capacity
– 88 Lambdas per Fiber
– Bandwidth up to 100 Gbit/s per Lambda
• Switching Functions
– Optional: 1Tbit/s Switching-Fabric per Node
– Currently: Usage as ODU Cross-Connect
– Future: In addition usage as MPLS- and Ethernet-Switch
Seite 12
Results: ROADM
ROADM functionality
• Colourless: Flexible A/D on any available Lambda
• Directionless: Flexible mapping on any required Direction
(But still uni-directional use of each part of fiber pair)
• Contentionless: Blocking-free switching of same colours, requires add. WSS
(Not that important for DFN, partially possible, not 100%)
• Flexgrid/Super Channels: Not required for DFN use cases during life time of gear
Seite 13
ROADM: Optical Architecture
Page 14
ROADM: L1 Service Cards
Client:
Multi service 40G 10G LAN,
XFP OTN
Mapper
XFP
RZ-DQPSK CMB40 STM64/OC192,
XFP
QPSK
FC8/10, Line
Muxponder OTU-2/2e XFP OTU-3e
OTN
Mapper
Line Line
OTU-3e OTU-3e
OTN
Mapper
Transponder/ QPSK QPSK
TR100
Muxponder 100G Line
100GbE
Line
OTU4
Page 15
ECI: ROADM/Service-Cards
North
West East
Client
page 16
Results: Switching
• High Capacity
– 88 Lambdas per Fiber
– Bandwidth up to 100 Gbit/s per Lambda
• Switching Functions
– Optional: 1Tbit/s Switching-Fabric per Node
– Currently: Usage as ODU Cross-Connect
– Future: In addition usage as MPLS- and Ethernet-Switch
Seite 17
Optical Transport Network (OTN)
DUI GOE
DOR
KAS
• OTN-Backbone (yellow) FZJ WUP
MAR
LEI DRE
STB
KEH FHM
Node to Fabric STU
GAR
– All interfaces use OTH-framing BAS
Seite 20
Switching: L1 Fabric Cards
XFP
Multi service 5 x XFPs
10G LAN, XFP
OTN
Mapper
1Tbps
10G client line FIO10_5 STM64/OC192, XFP
ODU-XC
FC8/10, XFP
Interface OTU-2/2e XFP
OTN
Mapper
40G RZ-DQPSK QPSK
1Tbps
FIO40 ODU-XC
line card Line
OTU-3e
OTN
Page 21
ECI: ROADM/Fabric-Cards
North
West East
Client
page 22
Universal Switch Fabric
STM1 / 4 / 16 /
Scalable to 4Tbit and future FC1 / 2 / 4 / GbE 40G
OTN OTN
16Tbit switching capacity (in
multi-shelf Architecture) 100GbE 100G
OTN OTN
1GbE 100G
Each line card is configured to Packet Packet
work towards the fabric in either Packet
OTN mode or data mode Switching
Page 24
Status of Implementation
Planning
Implementation Location
Location-
Infrastructure
Infrastructure
Training
of DFN-
Employes
05 06 07 08 09 10 11 12
Seite 25
Conclusion: Seen from Customer
• Increase of Bandwidth
– 100Gbit/s-Connections for VPN-service and DFNInternet (IP)
• Reduction of Cost
– Components for 1Gbit/s- and 10Gbit/s-Connections much cheaper
Page 26
Questions ...?
?
? ?
Seite 27
ROADM – classical
• coloured
– For each „colour“ a specific port
per Add/Drop-Block
• Directed
– Exactly one outgoing direction erreichbar
per Add/Drop-Block
Add/
T
/
Drop
R
T
/
North
DWDM-
Knoten
Add/ Add/
Drop Drop
West East
T T T T
/ / / /
R X
R R R
Seite 28
ROADM – „modern“
• Colourless
– each „colour“ at any Add/Drop-Port
• Directionless
– each Ausgangsrichtung erreichbar at
any Add/Drop-Port
DWDM-
Knoten
Add/Drop
T T T T T
/ / / / /
R R R R R
Seite 29
Gigabit AoC / Client-Card
Seite 30
10G Transponder / Fabric Card
2xXFP FC8/10,STM-64/OC-
2xXFP OTU2/2e/2f colored uplinks
192/10GBE/OTU2/2e B&W or
colored I/Fs
1GbE 100GbE
L1 service cards L2/3 L2/3
TR10 AoC10 Packet
Switching
L2/3 Data cards 10GbE
L2/3
2 slots for 100G Photonic layer 4 slots for 1Tbps Photonic layer
fabric cards universal fabric
1GbE
cards L2/3
22 universal slots TR100 Mux100
3rd Restoration
Path
Main Path
E
A 1st Restoration F C
Path
G
2ndRestoration
Path
Restoration by ROADM.
H Switch time 1sec
S R
P O
A L A C
I D
T M
Seite 33
Deutsches
Forschungsnetz
Bereitstellung Glasfaserstrecken
KIE
Glasfaserpaar
,(Bestand, DKR GRE
ROS
nicht parallel) AWI DES
HAM
Glasfaserpaar
(vorhanden) EWE
FFO SLU
Glasfaserpaar BRE TUB
(parallel, beauftragt) ENS ZEU
HAN
BIE POT HUB
Glasfaserpaar MUE ZIB
BRA MAG ADH
(parallel, Übergabe PAD
erfolgt) DUI GOE
BOC
Glasfaserpaar DOR
(parallel, Fertigstellung KAS
FZJ LEI DRE
bis Ende Oktober) WUP
BIR MAR JEN
AAC CHE
GIE
BON FRA ILM
WUE BAY
GSI
GAR
BAS
Seite 35
Stand Installation der Technik
KIE
Glasfaserpaar
,(Bestand, DKR GRE
nicht parallel) AWI DES ROS
HAM
Glasfaserpaar
(vorhanden) EWE
FFO SLU
Glasfaserpaar BRE TUB
(parallel, beauftragt) ENS HAN ZEU
BIE POT HUB
Kernnetzknoten MUE ZIB
(bereits aufgebaut) BRA MAG ADH
PAD
DUI GOE
Kernnetzknoten BOC
(geplant KW42) DOR
KAS
Kernnetzknoten FZJ LEI DRE
WUP
(geplant KW43) MAR
AAC BIR JEN CHE
Kernnetzknoten GIE
BON FRA ILM
(geplant KW44)
WUE BAY
Kernnetzknoten GSI
(geplant KW45)
SAA KAI HEI ERL
REG
FZK STU
STB
KEH FHM
GAR
BAS
Seite 36
Beteiligte Einrichtungen
• DFN Geschäftsstellen in Berlin und Stuttgart
• ECI Telecom
– beschäftigt zusätzlich Montagefirma für Aufbau DWDM-Technik (7 Teams)
– zusätzlich 6 eigene Teams für die Inbetriebnahme
• Glasfaserprovider
– stellen parallele Faserstrecken bereit und Stellflächen/DC-Versorgung an
ILA-Standorten
– insgesamt 10 Firmen
• Dimension Data
– Installationen an Kernnetzknoten (koordiniert zusätzlich Montagefirmen für
Schrankaufbau und Installation von Vorverkabelungen)
– Ersatzteillogistik (Zentrallager plus 10 regionale Depots)
• Fibre-Spooler/Cable Guides
– „saubere“ Führung von Glasfaserkabeln
• Passivgehäuse „Artemis“
– Aufnahme von passiven Modulen
(bspw. optische Splitter)
• Apollo 9624
– 1-4 Geräte je Standort
– Aufnahme der aktiven Komponenten
(Verstärker, ROADM, Line-/Fabric-Karten)
Seite 38
Installation am Standort JEN
• KNK Universität Jena (JEN)
– drei Kernnetzfasern
– zehn 10G-Verbindungen
– drei ECI OPT9624 Chassis
• Stellflächen
– Aufbau in nur einem Datenschrank,
Bestückung von Vorder- und Rückseite
– bisher wurden 3 Stellflächen genutzt
• Spannungsversorgung
– komplett redundant bzgl. Equipment und
Versorgungszweig
– kann zukünftig überwacht werden
Seite 39
Installation am Standort JEN
• Separates Chassis für ODU-XC
– drei 5-Port 10G-Karten
– je 2-3 OTU2 Trunks zu anderen XCs
Seite 40