NOTES:-
TP TECH PECIFIC
STRUCTURAL CONSULTANTS
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE SPECIFIED.
JOINT Morth No:-RW/NH-34054/1/2014-S&R(B)
2. M25 CONCRETE MIX FOR ALL. Category=II(17)
ROOF LVL. 3. THE ENGINEER-IN-CHARGE MAY GET THE CONCRETE MIX Office: Plot No.-307, Sector-79, Mohali
Mob. No.- +91-8968012763
DESIGNED BUT CEMENT CONTENT SHOULD NOT BE LESS
THAN E-mail: techpecific@gmail.com
300 Kg/Cum FOR M25 MIX.
4. P.C.C UNDER FOOTING IS 1:4:8 .
5. MINIMUM CLEAR COVER TO THE REINFORCEMENT IS TO BE
PROVIDED AS FOLLOWS:
FOUNDATION 50mm NOTE-
COLUMNS 40mm A.S.P- AS PER SITE
BEAMS 25mm N.F.L- NORMAL FLOOR
SLAB 20mm LEVEL
P.L -PLINTH LEVEL
6. REINFORCEMENT BARS TO BE USED SHALL BE TMT BARS
(THERMO MECHANICALLY TWISTED BARS) OF GRADE 500D

CONFORMING TO IS 1786 .
DETAILS AS PER 7. IS 456-2000 , IS 13920 SHALL BE REFERRED FOR DETAILING OF
DUCTILE DETAILS REINFORCEMENT AND TO MEET DUCTILITY REQUIREMENTS.
8 (a) LAP SPLICES TO BE PROVIDED ONLY IN THE
CENTRAL HALF OF THE MEMBER LENGTH AND
NOT MORE 50% OF THE BARS SHALL BE SPLICED
all over lap in

AT ONE SECTION.
middle half

(b) HOOPS/STIRRUPS SHALL BE PROVIDED OVER THE


ENTIRE SPLICE LENGTH AT THE SPACING NOT
EXCEEDING 150mm. a
H

9. HOOKS FOR TIES/STIRRUPS = 13.5D

COLUMN

N.F.L
600
SECTION A-A

COLUMN DETAIL
COL DIA OF COL. LENGTH OF
150 150 NO. (D) COLUMN (L) CLIENT-
P1 600 mm 11 m
150
2000

PEDESTAL
REINFORCEMENT
SCHEDULE PROJECT-
BAR
D

DESCRIPTION SHAPE
Ld Ld NO.
536

b DRAWING TITLE-
100

P.C.C 1:4:8

100 LxB 100 DRAWING NO-


ASB D
FOUNDATION LXB Ast
DUCTILE DETAILING OF 3000 x 3000 650 SHEET NO. REVISION-
COLUMN & FOUNDATION AS PER IS13920 R0