Objectives
Click here for guidelines on appraisals Guidelines to fill out the form
Objective Progress
Assessment of the performance of the daily work according to the average breakdown Jan-June 2018, crusher = ......% Ballmill = .....%,
job profile Production Throughtput 2018 increase ....% than 2017, Out of spec
product 2018 = ......%
SUS: SUS
1. Zero fatality, Total Injury Rate ≤3, Lost time Injury Rate of ≤ 1, January - June progress
or 25% less than previous year at site. 1. Zero fatality = 0, Total Injury Rate = 0, Lost Time Injury Rate = 1
2. Full compliance to applicable Life Saving Rules. 2. 66% comply to applicable LSR
3. Full compliance with PPE and safety induction standards for 3. 88% comply to PPE
Omya employees, contractors and site visitors. 4. e-IMS report rate = 13 report / month
4. Incorporate Behavior Based Safety Culture in all plants and 5. Costumer complaint reduces by 60% as compared to previous year
quarries including active reporting of work observations and near in cooperation with SCM
miss accidents (min 2 per month). 6. 100% Update and maintain plants related compliance disclosure
5. Reduce number of valid customer complaints by 20% as by respective plant manager
compared to previous year in cooperation with SCM. 7. 100% comply with corporate policies, handbooks and OECs
6. Update and maintain plants/quarries related compliance
disclosure by respective plant/quarry manager.
7. Comply with corporate policies, handbooks and OECs.
100% implementation of POM practices 96% implementation of POM practices
100% implementation of preventive maintenance level 2 100% implementation of preventive maintenance level 2
100% implementation of critical spare parts risk assessment 100% implementation of critical spare parts risk assessment
Improve circuit Reliability Factor NOT/(NOT+RS) to reach 96% in Ballmill
BM and CR circuit by solve 3 top problem in each circuit. 1. Cleaning system dust collector (100%)
2. Blocking material due to condensation problem (cancelled by HOP)
Ballmill 3. Jammed diverter (100%)
1. Cleaning System Dust Collector
2. Eliminating blocking material due to condensation problem Crusher
3. jammed diverter 1. Cleaning system dust collector (100%)
2. Blocking in hammer mill (100%)
Crusher 3. Normalize BMFS#2 capacity (100%)
1. Cleaning System Dust Collector
2. Blocking in Hamermill (overload)
3. Normalize BMFS#2 capacity by eliminating sticky material
Overall achieve 2% reduction in production costs in CIT program, 0 CIT project for improvement
minimum 1 CIT projects for improvement
Implement standard downtime reporting 100%
Implement standard maintenance reporting In Progress
MTBF circuit analysis 100%
5S follow up by monthly New warehouse for slow moving sparepart (100%)
Sort out maintenance document (100%)
Cleaning spider net at main building (100%)
Re-arrange room at front office (100%)
Competencies
Click here for guidelines on competencies Guidelines to fill out the form
English Course
SMK3 Auditor
Final Assessment
Important: Don't forget to click on the button related to your level (i.e. 'Finalized') after having entered your comments.
Log :