Cogeneration Schematic
Peak boiler
Exhaust gas
Fuel gas
Heat exchanger
Heat
Buffer consumer
Electrical
energy
Cogeneration & Trigeneration Proven Solution Our Competence
Cogeneration (or combined heat & In a number of countries such as Clarke Energy has comprehensive
power) and trigeneration can also be Australia, there are many large, experience of the generation of
used in remote areas. Cogeneration sparsely-populated areas which electrical and thermal power from
is the simultaneous production of cannot be economically serviced by gas in a variety of remote locations.
electricity and thermal energy from a the main electricity grids. Most notably our Australian
single fuel source, whereas operations have installed hundreds
trigeneration adds the production of The Clarke Energy pre-engineered of MW of generation capability in
cold water. A reciprocating gas high ambient temperature ‘cookie remote, arid locations.
engine is used to drive a generator cutter’ power station model has been
to produce electricity; the waste designed for remote-area power The GE Jenbacher gas engine is
heat from the engine exhaust can plants and are designed to operate known for having the highest levels
also be recovered and provided on natural gas, coal gas, flare gas, of electrical efficiency on the market.
directly to the customer or used in a biogas or landfill gas to economically When coupled with a contractual
boiler to produce steam. This meet the needs of remote operations. maintenance agreement with Clarke
enables the supply of electricity and Energy, it will give peace of mind to
steam or heat to customers. The model features a modular the customer that they will achieve
Additionally the waste heat can be design which facilitates the earliest the highest levels availability and
used to drive an absorption chiller. possible power generation given hence consistent returns from their
This results in the production of cold work can start immediately upon biogas plant.
water for use on-site. award, saving critical design time at
the front end of the project. The
proven model also allows the steady
augmentation to coincide with the
electrical load development of the
supplied operation. This means that
generation can begin with as little as
500kW and then grow this output to
tens of megawatts as the
operational load comes on line.