Saudi Aramco 9597-1 (08/06) Page 1 of 2

NONMATERIAL REQUIREMENTS A
REV. ______________________
DATE: ______________________
06/06/2016
FOR
RECTIFIERS/BATTERY CHARGERS DEVELOPMENT NO.

PER 17-SAMSS-514
ITEM/TAG NUMBERS:_________________________________________________________________ REQUISITION/PURCHASE ORDER NO.
LINE ITEM 001 SKAD-01904-MR-037

COPIES AS INDICATED IN COLUMN 1 MUST BE FURNISHED WITH BIDDER'S QUOTATION.


COPIES AS INDICATED IN COLUMN 2 MUST BE FURNISHED ON DATES AS INDICATED. (DATES
CALCULATED BY BUYER AS PART OF WRITTEN PURCHASE ORDER ARE BASED ON SUCCESSFUL BIDDER'S QUOTE
AND INCLUDE PROVISIONS FOR MAILING TIME.)
BIDDER PROMISES THAT IN THE EVENT A PURCHASE ORDER IS AWARDED TO HIM, HE WILL SUBMIT REQUESTED
COPIES AS STATED IN COLUMN 2 WITHIN NUMBER OF CALENDAR WEEKS AS INDICATED IN COLUMN 5 AFTER
HIS RECEIPT OF PURCHASE ORDER.

SEE THE ATTACHMENT TO THIS SHEET FOR EXPLANATION OF PRIORITY CODES.

1 2 3 4 5 6

SUBMITTAL OF
NOTE: BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH
COPIES REQUIRED

REQUIRED DRAWINGS,
HIS QUOTATION. MANUALS, ETC.
HARD COPIES
SOFT COPY

PRIORITY
NO. OF DUE
DESCRIPTION CALENDAR DATES
WEEKS

601 PRELIMINARY DRAWINGS FOR REVIEW AND APPROVAL BY BUYER


1. COMPOSITE ENGINEERING MATERIAL PROCUREMENT, MANUFACTURING
3 AND TESTING SCHEDULE 1 4 WEEKS
3 2. POWER AND CONTROLS SCHEMATIC DRAWINGS 1 4 WEEKS
3. DIMENTIONAL OUTLINE DRAWINGS-PLAN ELEVATION, AND CABLE
3 ENTRANCE DETAILS 1 4 WEEKS
3 4. FOUNDATION LOADING AND FOOTING DRAWINGS 1 4 WEEKS
3 5. EQUIPMENT SPECIFICATIONS AND DATA SHEETS 1 4 WEEKS

602 CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC.


5 1. POWER AND CONTROLS SCHEMATIC DRAWINGS 6 WEEKS
5 2. WIRE AND CABLE TERMINATION AND INTERCONNECTION DIAGRAMS 6 WEEKS
WITH TERMINAL IDENTIFICATION NUMBERS
5 3. DIMENSIONAL OUTLINE DRAWING-PLAN, ELEVATION AND CABLE 6 WEEKS
ENTRANCE DETAILS
5 4. FOUNDATION LOADING AND FOOTING DRAWINGS 6 WEEKS
5 5. NAMEPLATE DATA, EQUIPMENT SPACIFICATIONS, AND DATA SHEETS 6 WEEKS
5 6. CERTIFIED TEST REPORTS 6 WEEKS
5 7. RECOMMENDED SPARE PARTS LIST 6 WEEKS
5 8. BILL OF MATERIALS INCLUDING CATALOG DATA OF ALL MAJOR PARTS AND 6 WEEKS
COMPONENTS
5 9. PRICED LIST OF SPECIAL TOOLS OR DEVICES REQUIRED FOR MAINTENANCE 6 WEEKS

603 OPERATIONS/MAINTENANCE MANUALS & INSTALLATION INTRUCTIONS


6 1. INSTALLATION INSTRUCTIONS 2 WKS (PTD)
6 2. COMMISSIONING INSTRUCTIONS 2 WKS (PTD)
6 3. MAINTENANCE AND SERVICE INSTRUCTIONS WITH CALIBRATION 2 WKS (PTD)
AND TROUBLESHOOTING GUIDE

**PTD - PRIOR TO DELIVERY


NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA BIDDER'S SIGNATURE:
SUBMITTED.
(B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG
IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN.
(C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED,"
THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED," COMPANY:_______________________________________
THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT BIDDER'S REF. NO.:__________________________________
CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS.
DATE:_____________________________________________
(D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL
REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER.
(E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED.

Save Data... Print Copyright©Saudi Aramco 2009. All rights reserved.


Saudi Aramco 9597-1 (08/06) Page 2 of 2

CERTIFIED DRAWINGS, LITERATURE AND PHOTOGRAPHS:

NOTES

GENERAL: 1. The applicable nonmaterial requirement form reference number 601.1 (etc.) must be shown on each
document.
2. All drawings and manuals (etc.) must be written in the English language. Unless stated otherwise in the
material description or specification of this Quotation Request/Purchase Order, it is preferred that all
dimensions and weights must be in the "Le System Internationale D'Unites" (S.I.) metric systems of units.
The pound, foot, and second system may be used as an alternative for equipment designed to a nonmetric
specification.
3. The drawings and literature (etc.) should not be bound in books or hard covers since they will be incorporated
in Plant Record Books.

601 PRELIMINARY DRAWINGS AND DATA FOR REVIEW

In the event that a purchase order is awarded, Buyer's approval of these drawings is required prior to fabrication
of the units covered by such order.

602 CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC.

ALL PRINTS OF FINAL DRAWINGS must be marked or certified to indicate:


1. That the drawings are final and that all dimensions and material specifications are identical to those of
the material or equipment being supplied by Vendor;
2. That no further changes must be made either by Vendor or by Buyer;
3. That all revisions requested previously by buyer are included.

603 OPERATIONS, MAINTENANCE MANUALS, INSTALLATION INSTRUCTIONS, TEST CERTIFICATES,


ETC.

All drawings, documents, manuals, lists or other literature must be clearly marked with Buyer's Purchase Order
Number and item number, and manufacturer's serial numbers pertaining to the material or equipment being
furnished.

SHOPS OR MAINTENANCE MANUALS must include:


a. Dimensions of mating surfaces;
b. Tolerances applied to dimensions;
c. Clearance between moving surfaces;
d. Instructions for maintenance, disassembly, repair, overhaul and assembly;
e. System of trouble detection and remedy.

PRIORITY CODES
1. Required as soon as possible after receipt of purchase order.
2. Required as soon as possible after receipt of buyer's comments on preliminary drawings and specifications
(etc.) catalog information, detailed drawings of sub-vendors and parts data.
3. Required as soon as possible after receipt of all non-material requirements covered by item 602 and
after final inspection and testing.

Copyright©Saudi Aramco 2009. All rights reserved.