Sie sind auf Seite 1von 4

CONTENTS Page No

TITLE i
CERTIFICATE ii
DECLARATION iii
ACKNOWLEDGEMENT iv
SUMMARY v
CONTENTS vi
LIST OF FIGURES Vii
LIST OF TABLES viii
CHAPTER­1 INTRODUCTION ABOUT THE COMPANY 1
1.1 Bus types according to AIS norms 2
1.2 Bus types of TATA marcopolo 2
1.3 Certifications and awards 3
1.3.1 LCV 3
1.3.2 ICV 4
1.3.3 MCV 4
1.4 Models differencing to WB 5
1.5 Models differencing to seats 5
1.6 5Sat production 6
1.7 PPE at work 6
CHAPTER 2 ABOUT THE DEPARTMENTS 7
2.1 Paint shops 7
2.2 Vinyl flooring 11
2.3 Trim shops  11
2.4 Shower test /Leakage test  14
2.5 TATA Pdi 15
2.6 Sub assembly section 16
2.7 Machine shop 16
2.8 Jig sub assembly 17
CHAPTER 3 ASKS PERFORMED 18
Everything explained in Study from Painting to
3.1 Dispatch. Explanation shared in Page no 7 to 17 18
Separation of designs and drawings of G7 project
3.2 as per materials . 18
G7 Front Structure bogie measurements of rear
3.3 side checking as per the structure of bogie 18
Dimension checking in company design of LH
3.4 structure of g7 bogi 20
3.5 Preparation of part numbering 21
CHAPTER 4 REFLECTION NOTES 24
CHAPTER 5 CONCLUSION 26
REFERENCES 27

Das könnte Ihnen auch gefallen