Actor: Sam Gates Role: NASA Control Room Production: Apollo 13 Date: 18/01/19
Suitability for role: Ability to interpret Audition notes: Availability (dates):
character: Sam was able to fit into the Doesn’t understand Is available for recording role well, although his tone He struggled to interpret the character dates. of voice came across as if character, and struggled to Un-enthusiastic in role he was depressed which show emotion/concern pulled him away from the when needed, character