TSF AREA

MAIN GATE

POWER
CHECK

GEN.
POST

MAIN OFFICE
RAW MATERIAL
STORAGE AREA
PARKING
AREA

OFFICE OFFICE

STORE
MASJID
OPEN STORAGE YARD OPEN STORAGE YARD
STORE (Prayer
Room)

STORE

OFFICE

CS CUTTING AREA CS CUTTING AREA


WALK WAY

(Open Area) (Open Area)

TOILET
CS FITUP AREA CS FITUP AREA
GENERATOR

PAINTING YARD (Shaded) (Shaded)


AREA

CS FITUP AREA CS FITUP AREA


(Shaded) (Shaded)
RT SOURCE RT Performance
WELDING AREA

Area
(Open Area)

(Open Area)
WQT AREA
WALK WAY

GRE BONDING &


CUREING AREA
LAMMINATION

(Shaded)

(Shaded)
AREA
GRE

PWHT AREA
BLASTING YARD

GRE CUTTING AREA GRE GRE SPOOL AREA


(Open Area) GRE SHAVEING AREA FABRICATED
GRE MATERIAL (Open Area) SPOOLS
(Open Area)
(Open Area)
HYDROTESTING
CS SPOOL AREA
AREA
EMERGENCY EVACUATION MAP

MAIN OFFICE

TOILET OFFICE OFFICE OFFICE

OFFICE

STORE OFFICE OFFICE

PANTRY

MEETING
ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE OFFICE

OFFICE OFFICE

FIRST AID BOX

FIRE EXTINGUISHER

ELECTRICAL
PANAL/ DB
WQT AREA FABRICATED SPOOLS STOREGE AREA

10000
GRE SHAVEING AREA

4
0
0
0
64
00
PIPING FABRICATION AREA GRE BONDING AND CUREING AREA

4000

WALK WAY WALK WAY

GRE
CUTTING AREA

1000
0
00
64
PIPING FABRICATION AREA GRE LAMINATION AND CUREING AREA
MATERIAL

15600

AL-HASSAN FABRICATION SHOP


CS FABRICATION AND WELDING AREA
8.0 MTR 11.5 MTR 6.5 MTR 2.0 MTR 6.5 MTR

GRE FABRICATION AREA


13.0 MTR

CS FIT/UP AREA CS FIT/UP AREA

8.0 MTR
WELDING AREA WQT AREA
(SHADE AREA) (SHADE AREA)
(OPEN AREA) (OPEN AREA)

CS FIT/UP AREA CS FIT/UP AREA


(SHADE AREA) (SHADE AREA)

8.0 MTR
WALK WAY
10.0 MTR

GENERATOR AREA
(OPEN AREA)

8.0 MTR 11.5 MTR

CS CUTTING AREA 14.0 MTR


CS CUTTING AREA
(OPEN AREA)

6.5 MTR 2.0 MTR 6.5 MTR

Das könnte Ihnen auch gefallen