Sie sind auf Seite 1von 18

Grand total transmission network :

GRAND TOTAL (KM) = 8867.10

PROVINCE-WISE TRANSMISSION BREAKUP

Province-Wise Breakup Transmission System as on 30-09-2018

BALOCHISTAN

Sr Dia Meter in MainLine LoopLine


Section
#. Inches (KM) (KM)

1 PIRKOH - SUI 24 70.50 -

2 LOTI - PESHBOGI 18 11.25 -

3 SUI - MULTAN 24 19.31 -

4 SUI - MULTAN 30 - 19.31

SUB TOTAL BALOCHISTAN 101.06 19.31

TOTAL BALOCHISTAN 120.

Sr Dia Meter in
Section MainLine (KM) LoopLine (KM)
#. Inches

1 SUI-MULTAN 24 14.29 -

2 SUI-MULTAN 30 - 14.29

3 SUI-MULTAN 16 0.26 -

4 GUDDU TPS 4 2.41 -


Sr Dia Meter in MainLine LoopLine
Section
#. Inches (KM) (KM)

5 GUDDU BARRAGE 24 1.81 -

6 GUDDU CROSSING 36 - 1.81

7 SAWAN - QADIRPUR 24 131.00 -

8 SAWAN - CUSTODY TRANSDER POINT - SV1 24 2.85 -

9 SAWAN CUSTODY TRANSFER POINT - U/S OF SV1 42 - 2.73

10 SV1 - SV2 LINE 42 - 25.12

11 SV2 - SV4 SEGMENT 42 - 55.33

12 SV4 - SV5 42 - 20.92

13 SV5 - QV1 SEGMENT 42 - 29.40

14 KAND KOT LINE 16 52.23 -

15 QADIRPUR LINE 30 53.13 -

16 QADIRPUR LINE 36 - 53.14

17 QADIRPUR LINE (LNG PHASE-II) 42 - 53.14

18 ENGRO FERTILIZER LINE 20 37.80 -

19 ENGRO ENERGY LINE 16 3.30 -

20 MARI DCPF - GENCO-II DEHYDRATION UNIT LINE 12 4.50 -

21 MARI DCPF - GENCO-II DEHYDRATION UNIT LINE 10 5.50 -


Sr Dia Meter in MainLine LoopLine
Section
#. Inches (KM) (KM)

SUB TOTAL SINDH 309.08 255.88

TOTAL SINDH 564.96

Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

1 SUI - MULTAN 18 - 256.82

2 SUI - MULTAN 24 288.06 -

3 SUI - MULTAN 30 - 313.78

4 SUI - MULTAN 36 - 213.68

5 SUI - MULTAN 16 1.85 -

6 K1 - MP-37.88 20 - 20.68

7 SHER SHAH X-ING 36 - 2.20

8 AC1X - AV7 (RYK) 36 - 26.96

9 AC1X - AC2 (RLNG LINE) 36 - 44.62

10 AC2 - AV9 (RLNG LINE) 36 - 18.52

11 AV9 - AV10 (RLNG LINE) 36 - 20.78

12 AV10 - A4 (RLNG LINE) 36 - 30.1

13 A4 - AC4 (RLNG LINE) 36 - 29.51


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

14 AC4-AV15 (RLNG LINE) 36 - 25.348

15 AV15 - AV-20 (RLNG LINE) 36 - 5.74

16 AV20 - AV 21 (RLNG LINE) 36 - 38.09

17 AV21 - AV 22 (RLNG LINE) 36 - 27.79

18 AV22 - AC6 (RLNG LINE) 36 - 27.35

19 AC6 - AV29 (RLNG LINE) 36 - 23.16

20 AV29 - N2 (RLNG LINE) 24 - 68.16

21 N2 - SAHIWAL (RLNG LINE) 24 - 77.296

22 SAHIWAL - OKARA CANTT. (RLNG LINE) 30 - 24.250

23 OKARA CANTT. - AKHTARABAD (RLNG LINE) 30 - 42.450

24 AKHTARABAD - PHOOLNAGAR (RLNG LINE) 30 - 42.64

25 AV17 - AV 20 36 - 3.50

26 AV21 - AV 22 36 - 27.79

27 SUTLEJ CROSSING - 1 12 1.61 3.22

28 SUTLEJ CROSSING - 2 36 - 2.04

29 KHANPUR LINE 6 22.81 -

30 A5 - BAHAWALPUR 8 48.18 -
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

31 AV22 - KOT ADDU 16 69.65 -

32 AV22 - KOT ADDU 20 - 38.01

33 MP 37.33 V/A - CMS KAPCO 16 - 8.70

34 KOT ADDU - CHOWK SARWAR SHAHEED 8 26 -

35 D. G. KHAN LINE 8 72.06 -

36 DHODAK - KOT ADDU 16 77.79 -

37 TPS MUZAFFARGARH LINE 16 4.57 -

38 QADIRPUR - AC-1X LINE 30 17.11 -

39 QADIRPUR - AC-1X LINE 36 - 16.88

40 QADIRPUR - AC-1X LINE (LNG PHASE-II) 42 - 17.13

41 AHMEDPUR EAST 6 18.34 -

42 KHAN GARH 8 22.20 -

43 MULTAN - FERTILIZER LINE 10 1.430 -

44 JAHANIAN LINE 8 30.49 -

45 MULTAN - SIDHNAI 18 - 46.7

46 MULTAN - SIDHNAI 24 22.46 22.46

47 MULTAN - SIDHNAI 30 - 46.70


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

48 MULTAN - SIDHNAI 36 - 48.38

49 AV29 - SAHIWAL 36 - 145.46

50 KASHMORE - SHAHWALI LINE 12 20 -

51 SHAHWALI - ROJHAN LINE (FIRST SEGMENT) 12 4.0 -

52 SHAHWALI-ROJHAN LINE (MP 14.92 TO MP 27.792) 12 21.0 -

53 HAROONABAD LINE 8 20 -

54 SMS KHANGARH - KALLARWALI 8 30 -

55 SMS KALLARWALI - CHOWK PERMIT 8 27.61 -

56 SIDHNAI - FAISALABAD 18 - 163.58

57 SIDHNAI - FAISALABAD 24 - 50.24

58 SIDHNAI - FAISALABAD 30 - 53.29

59 SIDHNAI - FAISALABAD 36 - 26.42

60 SIDHNAI X-ING - AC-7 36 - 33.26

61 AC7 - HAVELI BAHADUR SHAH 30 37.30 -

62 DARKHANA-SINDHELIANWALI LINE 8 17.40 -

63 T.T. SING - JHANG 8 30.28 -

64 DIJKOT-SAMUNDARY LINE 8 22.33 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

65 SAHIWAL - LAHORE 18 142.93 -

66 SAHIWAL - AKHTARABAD 24 - 66.69

67 SUNDER INDUSTRIAL STATE LINE 16 4.34 -

68 AC8 - SMSII (OLD) 16 - 5.90

69 AC8 - A11 20 - 0.66

70 WAPDA OFFTAKE FSD 12 2.42 -

71 CHAK JHUMRA LINE 6 12.04 -

72 FSD - MALIKWAL 12 19.34 -

73 FSD - MALIKWAL 16 - 158.67

74 FSD - MALIKWAL 30 - 90.82

75 CV12A - KHATHIALA SHAKHAN LINE 12 28.23 -

76 KATHIALA SHEIKHAN - MANDI BAHAUDDIN LINE 12 9.1 -

77 MANDI BAHAUDDIN - LALAMUSA LINE 12 47.17 -

78 MALAKWAL - JHELUM CROSSING 16 - 5.42

79 CHENAB CROSSING CHINIOT 18 1.13 -

80 CHENAB CROSSING CHINIOT 30 2.32 -

81 KOT MOMIN - JOHARABAD (1) 8 72.41 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

82 KOT MOMIN - JOHARABAD (2) 6 38.36 -

83 JOHARABAD - CHASHMA 8 82.21 -

84 PIPLAN LINE 8 17.05 -

85 SARGODHA LINE 6 20.92 -

86 SARGODHA LINE 16 20.92 -

87 CV3 (JHOKE MORE)-M3 INDUSTRIAL ESTATE LINE 8 15.68 -

88 FSD - SHAHDARA 16 57.48 119.25

89 NEW BV3 - MP 28.33 (RLNG LINE) 16 - 25.10

90 FSD - SHAHDARA 24 - 55.03

91 BC1 - FAROOQ ABAD 8 22.96 -

92 SHAHDARA - LAHORE 16 2.51 2.99

93 RAVI CROSSING (1) 16 0.58 -

94 RAVI CROSSING (2) 10 - 0.58

95 SHAHDARA - WAPDA LAHORE 10 3.41 -

96 KHURRIANWALA - JARANWALA 8 - 22.53

97 DAWOOD HERCULES LINE 12 5.87 -

98 SHEIKHUPURA - GUJRANWALA (1) 10 59.44 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

99 SHEIKHUPURA - GUJRANWALA (2) 16 - 44.57

100 MP 59.91 - B3 LINE 24 - 22.83

101 MP 59.91- TATLAYALI V/A (RLNG LINE) 16 - 44.57

102 MP 59.91- BHIKHI POWER PLANT (QATPL) 30 - 16.17

103 B2 - MP 50.70 (QATPL LINE) 30 - 1.45

104 MP 59.91 - NANDIPUR POWER PLANT 24 76.4 -

105 "TATLAYALI V/A - MP 27.186 ON NANDIPUR POWER PLANT PIPELINE" 24 - 8.20

106 B3-RAVI D/S LINE 24 - 3.15

107 KOTLI - RAHWALI (BV13) 18 30.76 -

108 HAFIZABAD LINE 8 43.00 -

109 SHAHDARA - GUJRANWALA - RAHWALI 10 73.4 -

110 RAHWALI - GUJRAT 8 35.46 -

111 RAHWALI - SIALKOT 8 13.97 13.97

112 SIALKOT OFF-TAKE V/A TO PASROOR OFF-TAKE V/A 16 - 32.83

113 RAHWALI-SIALKOT OFFTAKE 18 - 1.48

114 PASROOR - DHAMTAL - NAROWAL 8 40.55 -

115 SIALKOT O/T - WAZIRABAD 18 - 19.82


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

116 SAHIWAL - LAHORE 16 - 76.67

117 BSL U/S - BALLOKI POWER PLANT 30 7.5 -

118 PHOOL NAGAR - U/S HEAD BALLOKI 18 - 10.38

119 D/S HEAD BALLOKI TO MP-59.9 18 - 52.34

120 PHOOL NAGAR - DAWOOD HERCULES 16 62.38 -

121 PHOOLNAGAR - DAWOOD HERCULES 24 - 65.47

122 U/S V/A HEAD BALLOKI TO D/S V/A HEAD BALLOKI (RLNG LINE) 24 - 3.10

123 ORIENT POWER PLANT LINE 10 1.88 -

124 SAPPHIRE POWER PLANT LINE 10 0.22 -

125 HALMORE POWER LINE 12 3.40 -

126 SAIF POWER PLANT SAHIWAL 12 0.34 -

127 GUJRAT - JHELUM 8 54.27 -

128 SARAI ALAMGIR - MIRPUR 8 18.5 -

129 RENALA-SATGARAH 8 12.35 -

130 MALIKWAL - HARANPUR - DANDOT 12 1.18 -

131 MALIKWAL - HARANPUR - DANDOT 16 - 20.00

132 CC1 - C4 30 - 29.09


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

133 C4 - CHAKWAL CEMENT 10 24.00 -

134 HARANPUR - GHARIBWAL 8 13.02 -

135 DANDOT - GALI JAGIR - WAH 10 87.7 -

136 DANDOT - GALI JAGIR - WAH 16 - 153.51

137 DANDOT - GALI JAGIR - WAH 30 - 64.22

138 DAKHNI - MEYAL - DHULIAN 16 50.44 -

139 CV13a - CC1 16 - 3.58

140 RATANA LINE 10 2.49 -

141 SIL CROSSING 10 - 1.46

142 DHURNAL LINE (1) 8 0.54 -

143 DHURNAL LINE (2) 10 11.08 -

144 DHULIAN - DAUDKHEL 8 85.2 4.04

145 FC1 - MP13.20 24 - 21.25

FC1-C6 PIPELINE FROM MID POINT VALVE ASSEBMLY TO END POINT C6


146 24 - 18.901
GALI JAGIR

147 FC1-PINDIGHEB LINE 24 - 10.1

148 MEYAL V/A - END POINT SMS PINDIGHEB 24 - 12.5

149 KHUSHAL GARH BRIDGE-DAKHNI END POINT V/A 24 - 11.4


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

150 POINT A V/A - SMS DHURNAL 3 0.24 -

151 GALI JAGIR - MORGAH (1) 10 21.43696 -

152 GALI JAGIR - MORGAH (2) 6 9.50 -

153 GALI-RANIAL 16 - 35.57

154 WAH - ISLAMABAD 6 12.06 -

155 WAH - HATTAR 16 - 6.17

156 WAH - HATTAR 10 9.93 -

157 ADHI - RAWAT 10 47.70 -

158 RAWAT - MURREE 12 57.25 -

159 BHANGALI LINE 8 5.82 -

160 MISSA KASWAL - MANDRA 8 20.60 -

161 WAH - NOWSHERA (1) 10 50.41 -

162 WAH - NOWSHERA (2) 16 - 52.60

163 INDUS CROSSING 24 - 1.12

164 TAXILA LINE 4 4.43 -

165 SANJWAL LINE 6 6.67 -

166 KOHAT LINE 8 11.58 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

167 SHAKARDARA - DAUDKHEL 10 40.11 -

MPCL (KALABAGH-1) - MID POINT V/A, MP 11.29 ON SHAKARDARA


168 8 1.00 -
DAUDKHEL PIPELINE

169 SHAKARDARA END POINT - F3 10 1.55 -

170 SADQAL - NAUGAZI LINE 16 19.02 -

171 DASKA - PASROOR LINE 8 24.86 -

172 DASKA-SAMBRIAL LINE 8 11.6 -

173 FAUJI KABIR WALA LINE 8 5.86 -

174 OKARA - DIPALPUR LINE 8 16.83 -

175 ROUSCH POWER PLANT LINE 16 4.70 -

176 PINDORI - BHANGALI LINE 8 15.83 -

177 CV24-PINDORI (FIRST SEGMENT) 10 26.33 -

178 KM 26.33 - KM 30.80 (CV24 - PINDORI PIPELINE) 10 4.47 -

179 MIANWALI LINE 8 17.80 -

180 DI-KHAN BHAKAR LINE 8 19.69 -

181 MIAN CHUNNUN - HASILPUR 12 83.85 -

182 HASILPUR - CHISHTIAN LINE 8 30.98 -

183 AV-40 - DIJKOT - TANDLIANWALA 8 39.79 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

184 AV-40 - BHAWANA LINE 8 37.14 -

185 SUKHO - RAWAT 16 36.24 -

186 DIPALPUR - BASIRPUR 8 22.64 -

187 MANGA - PACKAGES LINE( RENTED POWER ) 8 36.65 -

188 RODHO - KOT QAISRANI LINE 12 14.50 -

SAHIWAL -PHOOLNAGAR LOOP LINE FROM AKHTARABAD V/A to N-6


189 24 - 20.95
Pattoki V/A

190 N-6 - PHOOL NAGAR O/T 24 - 21.69

191 SHAHPUR-HUSSAIN SHAH LINE 8 22.22 -

192 HUSSAIN SHAH-SAHIWAL TOWN LINE 8 13.52 -

193 SAHIWAL TOWN-SILLANWALI LINE 8 26.71 -

194 RANDHAWA OFF-TAKE TO BADIANA 8 8.50 -

195 KOTLI RAI ABU BAKAR LINE 8 7.05 -

SUB TOTAL PUNJAB 3227.73 3605.19

TOTAL PUNJAB 6832.92

Sr MainLine
Section Dia Meter in Inches LoopLine (KM)
#. (KM)

1 HATTAR-HARIPUR 10 18.12 -
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

2 HATTAR OFFTAKE 6 0.39 -

3 HARIPUR-MANSEHRA 8 70.53 -

4 HARIPUR OFFTAKE 8 1.53 -

5 WAH-NOWSHERA(1) 10 25.13 -

6 WAH-NOWSHERA(2) 16 - 23.68

7 WAH - HATTAR 16 - 13.62

8 HATTAR - SARAI SALEH 16 - 19

9 HATTAR - HAVELLIAN 16 - 15.00

10 HAVILLINA - ABBOTTABAD 16 - 27.5

11 C10 - ISMAILKOT 16 - 14.64

12 KOHAT LINE 8 19.20 -

13 KOHAT - NOWSHERA 24 85.52 -

14 KOHAT - GHORAZAI LINE 24 - 23.49

15 EPF TOLANJ - GHORAZAI VALVE ASSEMBLY 8 3.50 -

16 MANZALAI - KOHAT LINE 24 39.01 -

17 JARMA - HANGO LINE 8 36.00 -

18 MUNJOWAL - BANNU 8 36.50 -


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

19 NOWSHERA-ISMAILKOT(1) 8 11.97 -

20 NOWSHERA-ISMAILKOT(2) 6 - 11.97

21 ISMAILKOT-TURNAB(1) 8 - 20.85

22 ISMAILKOT-TURNAB(2) 6 20.86 -

23 ISMAILKOT-TURNAB(3) 16 - 21.24

24 SHAKARDARA - DAUDKHEL 10 3.00 -

25 KHARAPPA - SHAKARDARA 8 25.50 -

26 KHARAPPA - MANJOWAL 12 84.42 -

27 NARI PANOOS LINE 8 2.98 -

28 MAKORI - KHARAPPA * 10 8.75 -

29 MUNJOWAL - PEZU 8 53.29 -

30 PEZU - D. I. Khan 8 47.02 -

31 PEZU - TANK 8 31.51 -

32 DI- KHAN BHAKAR 8 18.80 -

33 NOWSHERA-MDN-T.BAI-S/KOT 8 57.99 -

34 NOWSHERA-CHARSADDA 8 23.59 -

35 NOWSHERA - MARDAN 12 - 19.76


Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

36 MARDAN - PALAI 12 - 56.00

37 THANA - SWAT 12 - 31.27

38 NOWSHERA - MARDAN 16 - 2.16

39 CHARSADDA-TURANG ZAI LINE 6 10.36 -

40 TANGI LINE 6 13.87 -

41 CHARSADHA - KHAZANA LINE 8 22.64 -

42 CHARSADHA - KHAZANA - DOLATPURA 6 0.34 -

43 JAHANGIRA - SWABI - TOPI 8 40.29 -

44 JAHANGIRA - SWABI - TOPI 8 - 38.24

45 JAHANGIRA OFF-TAKE - KABUL X-ING D/S 16 - 2.52

46 KABUL X-ING JAHANGIRA 16 0.30 -

47 SAKHAKOT - SWAT 8 68.06 -

48 CHAKDARA-TALASH LINE 8 31.60 -

49 GURGURI - KOHAAT LINE 10 78.00 -

SUB TOTAL KPK 990.56 340.94

TOTAL KPK 1331.50

AZAD KASHMIR
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches

1 SARAI ALAMGIR - MIRPUR 8 17.35 -

SUB TOTAL AZAD KASHMIR 17.35 -

TOTAL AZAD KASHMIR 17.35

GRAND TOTAL (KM) = 8867.10