BALOCHISTAN
Sr Dia Meter in
Section MainLine (KM) LoopLine (KM)
#. Inches
1 SUI-MULTAN 24 14.29 -
2 SUI-MULTAN 30 - 14.29
3 SUI-MULTAN 16 0.26 -
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches
6 K1 - MP-37.88 20 - 20.68
25 AV17 - AV 20 36 - 3.50
26 AV21 - AV 22 36 - 27.79
30 A5 - BAHAWALPUR 8 48.18 -
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches
53 HAROONABAD LINE 8 20 -
122 U/S V/A HEAD BALLOKI TO D/S V/A HEAD BALLOKI (RLNG LINE) 24 - 3.10
Sr MainLine
Section Dia Meter in Inches LoopLine (KM)
#. (KM)
1 HATTAR-HARIPUR 10 18.12 -
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches
3 HARIPUR-MANSEHRA 8 70.53 -
5 WAH-NOWSHERA(1) 10 25.13 -
6 WAH-NOWSHERA(2) 16 - 23.68
19 NOWSHERA-ISMAILKOT(1) 8 11.97 -
20 NOWSHERA-ISMAILKOT(2) 6 - 11.97
21 ISMAILKOT-TURNAB(1) 8 - 20.85
22 ISMAILKOT-TURNAB(2) 6 20.86 -
23 ISMAILKOT-TURNAB(3) 16 - 21.24
33 NOWSHERA-MDN-T.BAI-S/KOT 8 57.99 -
34 NOWSHERA-CHARSADDA 8 23.59 -
AZAD KASHMIR
Dia
Sr Meter MainLine LoopLine
Section
#. in (KM) (KM)
Inches