China Harbour Engineering Co.L.L.C.

CHECK LIST FOR TILING WORKS

SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC


SECTION OF WORK : ARCH LOCATION :

LEVEL : Page 1 of 2

CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
Tiles, Adhesive & grouting materials approved
Preliminary Latest drawings used at site
Checks Method statement, QCP, ITP, Risk Assessment
approved
Mock up is approved
Check for concrete defects prior to screed
Substrate surfaces to be free from dirt, dust, debris,
loose particles prior to installation
Surface wet prior to application of adhesive
Surface Check wall surface vertically
Preparation Check plaster thickness is 12mm
Check for floor drain & MEP fixture location
Check for defects in screed, if any
Check for water proofing application & vertical
termination
MEP SERVICES/ MEP Subcontractor has checked all his boxes and
BUILT-IN ITEMS conduits as per MEP drawings and specs
Tile layout as per finishing schedule / Approved
drawings or as per company approval
SETTING OUT Set out points /tile patterns marked on the desired
(CONTD) locations with reference to datum levels (Substrate
and finish levels)
Check that FD and fixture location is in one tile

FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :

Name: Name: Name:


Sign: Sign: Sign:
Date : Date : Date :
China Harbour Engineering Co.L.L.C.

CHECK LIST FOR TILINGWORKS

SUBCONTRACTOR : HUNAN general contracting L.L.C CONTRACTOR: CHEC


SECTION OF WORK : ARCH LACATION :

LEVEL : Page 2 of 2

CHECKED BY DATE
STAGE ITEM
HGC CHEC DORSCH
Ensure that setting out is such that cut piece of less
SETTING OUT
than half a tile is not to be used
Adhesive prepared as per manufacturer
recommendations / method statement
ADHESIVE Check setting time and ensure stiff adhesive is
PREPARATION discarded
Apply a uniform layer of adhesive layer to the back
of tiles and to the substrate
Check that setting out point has been established
Check that tiles are installed with proper level and
alignment
Check that damaged tiles are not installed

INSTALLATION Check that tiles joint spacing is uniform


Check that cut tiles less than half the tile are not
used
Check that wall tiles are at right angles at corners
Check that floor tiles are laid under the wall tiles at
peripheries
Grouting done with approved grout materials and
GROUTING AND adequate penetration in to joints
CLEANING
Proper cleaning done for the tiled surface
Proper protection done for installed tiles against any
PROTECTION
damages or distortion

FOR S/C QA/QC : FOR CONTRACTOR QA/QC : FOR DORSCH REP :

Name: Name: Name:


Sign: Sign: Sign:
Date : Date : Date :