Sie sind auf Seite 1von 1

PT.

PLN ( PERSERO ) UNIT INDUK PEMBANGUNAN II


Unit Pelaksana Konstruksi Jaringan Sumatera 2
Pekerjaan Pembangunan Jaringan Transmisi 150 kV Dumai - Kawasan Industri Dumai
30,8 KMR, 2 CCT, ACSR 1 x 240/40 mm2
Kontrak : 210.PJ.PLN 2017/DAN.02.02/UIP II/2017, Tertanggal 14 Agustus 2017

CERTIFICATE OF TOWER GROUNDING RESISTANCE


FORM - 4
DOC NO : TOWER SURVEY NO : TYPE OF TOWER SOIL CLASS / CONDITION REFF DRAWING NO :
TOWER SCHEDULE NO :

Step 1 : Standart / Basic Earthing Step 3 : If over maximum Ohm in step 2 INDICATION OF LEGS

D C HIGHER TOWER NUMBER

PG D C Additional
OK Clamp Earthing
D C
NOT OK OK
Earthing A B NOT OK
Counterpoise A B

Step 2 : If over maximum Ohm in step 1 Step 4 : If over maximum Ohm in step 3 A B
D C

OK D C PG Clamp LOWER TOWER NUMBER

NOT OK OK
NOT OK
A B
A B

Note : 1. Earthing for tower more than 1.5 kM from substation - Maximum Resistance : 10 Ohm
2. Earthing for tower within 1.5 kM from substation - Maximum Resistance : 3 Ohm
Tower earthing including excavation reinstatement, compression jointing and connection to tower (Gantry) Refer Drawing

Item Description Qty Unit Item Description Qty Unit

Counterpoise cable, buried at 450mm depth


Earthing angle comprising 2 set of galvanized steel,
4.1 4.1 in rock and 750mm depth in soil, including
lead wire, including all clamp.
parallel groove clamp.

EARTH RESISTANCE MEASUREMENT TOWER ONLY TOWER CONNECTED TO COUNTERPOISE CABLE

LOCATION LEG A LEG B LEG C LEG D LEG A LEG B LEG C LEG D


MEASUREMENT RESULT
DATE
DRY
SOIL
MEDIUM
CONDITION
WET
NAME AND SIGN OF INSPECTOR

REMARKS : PT. PLN (Persero) PT. PLN (Persero) CONTRACTOR


PT. HORAS
UPK Jaringan Sumatera 2 PLN JMK - UMK IV
BANGUN PERSADA

NAME : NAME : NAME :


DATE : DATE : DATE :