Sie sind auf Seite 1von 10

voith.

com

Bringing Untapped Hydropower to Reality


Whitepaper | 2018

Voith Mini Hydro Solutions


1 Reducing Interfaces by Turnkey Solutions
2 Customized Solutions for Standard Applications
3 Water-to-Wire and Beyond: Voith as Your Partner

The Hidden Potential of Mini Hydro


There are many new and lasting trends generally provides a huge advantage only 36 % has yet to be developed.
in the energy market, including renew- over other renewables such as: long But the success and future scalability,
able projects with smaller production lifetime of equipment, favorable base- especially of Mini Hydro, is not definite.
sites that are closer to the consumer. load characteristics and better predict-
Energy conversion by utilizing remaining ability. These advantages give additional Smaller hydropower sites often face the
potential and offsetting part of the local value to grid operators who struggle challenges of project lead times and
consumption and electrification of rural with the integration of smaller, fluctuat- initial investment costs due to required
areas by renewable projects go hand ing renewables. The graphs below show water construction works. So the ques-
in hand with the environment or larger hydropower’s share of more than 60 % tion is: how do we tap into the potential
wind, solar or hydropower projects with within the renewable energy mix. Small which is clearly there? This paper shall
a local footprint and close participation and Mini Hydro contribute 7 % to that give a first answer – the Voith Mini
of the communities. The potential is mix. A remarkable number which still Hydro approach.
still great, even for hydropower which has potential to grow considering that

Global share of renewable energy Global installed SHP* capacity


Voith Hydro at a glance
Bioenergy 5 % Geothermal power 1 % Since nearly 150 years Voith Hydro is a
Solar power Remaining Installed global leader in Small Hydro providing
11 % 64 % 36 % water-to-wire solutions from a few
hundred Kilowatts up to 30 MW.
Wind
power
22 % • 4 500 employees
Small Large • 25 locations
hydropower hydropower • 4 competence centers for
7 % 54 %
Small Hydro in Austria, Spain,
Source: World Small Hydropower Development Report 2016, World Bank, ICSHP
India and Japan
* SHP = Small Hydropower

1 | 10
Whitepaper | 2018

Voith Mini Hydro – A Comprehensive Product Line

The first principle is simple:


reducing interfaces in the
project.

The complexity of larger hydropower


projects is reduced by standardization
of the entire concept. The product is
not just the turbine or the generator –
the key is the right plant solution with
the integrated and standardized com-
ponents as part of it. The hydropower
business is much more complex as one The Mini Hydro site “Alte Bleiche” in Heidenheim, Germany
might think. Solar and wind power
plants have relatively constant boundar- generator unit is fully submerged into
ies, the integration of a hydropower the existing water channel with an inte- Mini Hydro key facts
plant into the project site has often grated trash rack and gate system. This Complete water-to-wire solutions
much more parameters to deal with. provides fish friendliness, maintains the designed and manufactured by Voith
Therefore the first principle is to reduce waterway’s flood capacity and com- Small Hydro Competence Center
the interfaces within the plant itself bines it with a high performance power Kössler in Austria.
and have a fully integrated solution as a plant which is 100 % oil-free.
whole. • Turbine-generator units from 50 to
Voith and its project partners provided 1 200 kW
The Voith Mini Hydro product line is planning, design, manufacturing and • Head range from 2 to 200 m
designed and driven by this principle. supply of all plant components and su- • Flow range from 0.3 to 15 m³/s
The StreamDiver is an outstanding pervised the construction. An outstand- • Compact, integrated auxiliary systems
example of it. The picture above shows ing example of the first key principle: • Standard low voltage protection &
the Mini Hydro site “Alte Bleiche” in reducing interfaces in both, the design control system
Heidenheim, Germany. The turbine- and the execution.

Mini Hydro application range

1 000 Small Hydro


Mini Hydro
5 MW 10 MW 15 MW 30 MW
StreamDiver
2 MW Tubular
100
1 MW eQ Solutions
Discharge [m3/s]

500 kW
300 kW
10
100 kW
eQ Kaplan
50 kW
eQ Francis
1
eQ Pelton

0.1
1 10 100 1 000
Head [m]

2 | 10
Whitepaper | 2018

Mini Hydro Products

The second principle is finding the link between the application and the solution.
In many aspects Mini Hydro requires smart and innovative concepts to find the best
solution for a specific site and save time and cost on all aspects of the project.

eQ Solutions
The eQ Solutions comprises simplified, highly standardized turbine-generator units and its auxiliary systems. The system is
pre-assembled which allows fast and easy erection at site. With integrated controls and actuators, it provides a compact and
reliable water-to-wire system.

Kaplan Francis Pelton

2 to 10 m Up to 150 m Up to 200 m

2 to 20 m3/s 0.5 to 3 m3/s Up to 1 m3/s


Up to 1 200 kW
Up to 1 000 kW Up to 1 200 kW

Design features Design features Design features


• Vertical double-regulated Kaplan • Vertical or horizontal Francis unit • Vertical or horizontal Pelton

• High efficient hydraulic design • Compact and pre-assembled design with 1- to 6-nozzles
• Short erection time due to pre- • Medium head up to 125 m • Inner-regulated nozzles with

assembled parts • Runner diameter from 400 to hydraulic actuator


• Compact design to optimize 790 mm • Compact set with integrated

civil structure • Optimized inlet and draft-tube generator


• Directly coupled generator or parts • Encased in concrete or free-

speed increaser option • High-quality milled runner in-house standing


• Maintenance-friendly due to in Austria • Jet deflector as option

modular design • Automation (see page 5) • Automation (see page 5)

• Runner diameter from 0.8 to 2 m

• Automation (see page 5)

3 | 10
Whitepaper | 2018

StreamDiver Tubular Turbine

The StreamDiver provides an industry-wide unique design The Voith Tubular Turbine is designed to provide clean power
which allows a simplification of the entire power house design. from industrial water applications (e.g. sewage or drinking
Lubrication and cooling water systems are not required, water treatment plants). Its focus is flexible integration, easy
actuation systems for control and start-up are reduced to access and the use of standardized, off-the-shelf componets.
a minimum. A flexible and modular integration into the civil
infrastructure, ease of installation and maintenance allow cost
savings throughout the project phase.

Up to 8 m Up to 20 m

Up to 14 m3/s Up to 4 m3/s

Up to 850 kW Up to 250 kW

Design features Design features


• High-efficient propeller turbine • Fixed runner or runner regulation for variable flow

• Direct-driven permanent magnet generator • Cost-efficient off-the-shelf generator

• River-water lubricated bearing design • Higher head through serial arrangement

• Completely oil- and grease-free operation • Higher flow through parallel arrangement

• Maintenance-friendly design for easy and fast • Tubular design with high setting and easy access

service in the workshop • Special application in drinking or sewage water

• Modular design for sites with high flow treatment plants


(parallel generation of multiple units) • Automation (see page 5)

• Runner regulation or variable speed as option

for flow regulation


• Flexible integration and solution for low head

run-of-river or energy recovery projects


• Automation (see page 5)

4 | 10
Whitepaper | 2018

Automation system Intelligent Hydropower – Made by Voith

150 years of experience combined with


in-depth digital expertise − Voith brings
intelligence into the digital hydropower
plant.

Step 1: Open up data − securely in the cloud

Step 2: Visualize processes − detect variances

Step 3: Analyze intelligently and extend service life

1,000 h remaining
Step 4: Run simulations and maintain proactively

Step 5: Derive actions − maximize revenue

The Mini Hydro automation system yields as a standardized Hydropower is already highly automated; now Voith is making
low-voltage platform for all Mini Hydro products. The design it intelligent. We know the data that is important for hydro-
concept minimizes complexity by focusing on mandatory power plant operators to achieve greater efficiency, flexibility
systems only. Additional functionality and systems can be and security – today and in the future.
added as options to account for local grid codes or customer
preferences. Together with our customers we are making available a pool
of technical and system-related data for the power plant and
its infrastructure securely in the cloud, visualize and analyze it,
• Low voltage circuit breaker assembly
and develop self-learning models for well-substantiated and
• Protection and synchronization
forward-looking decisions. Thanks to the intelligent hydro-
• Central plant control (common control functions)
power plant, we are making the plants of our customers fit for
• Automatic voltage regulator (AVR)
the requirements of tomorrow.
• Alarm and remote monitoring system
• House supply for support systems (motors and actuators)
• Uninterruptible power supply (UPS)
• Fully assembled stand-alone container system (option)
• Island operation system (option)

5 | 10
Whitepaper | 2018

Mini Hydro Applications


Run-of-river Low head hydropower Sewage Water Treatment
Energy recovery Plant
Single unit installation, Type S, fixed blades

The most common application is the As a special type of run-of-river, low Using non-utilized potential in existing
use of water resources in rivers with head hydropower has a tremendous power plants or industrial applications
natural or man-made head and to turbi- potential on waterways around the such as drinking or sewage water treat-
nate a portion of this water. Depending world. More than 85 % of the existing ment plants has become more and
on the head and flow range Kaplan, dams are not electrified yet and the more popular. It benefits from existing
Francis, Pelton or Crossflow technolo- majority of them have low heads. infrastructure or missing interfaces with
gies are applicable. natural flows which results in less
It is a question of an economic and requirements and plant components
An important factor is the compact and ecological solution which makes these (e.g. fish protection).
flexible integration, to account for cost sites bankable. Voith’s answer to it is
reductions on the civil and erection side. the StreamDiver. If it is for tubular or open-channel flows,
For many cases Voith eQ Solutions will the Tubular Turbine, StreamDiver or
be the most suitable choice. eQ Solutions (Francis or Pelton for high-
er heads) cover a wide range of possi-
ble applications.

Key requirements Key requirements Key requirements


• Cost-efficient concepts & products • Low impact to civil structure • Flexible integration into existing

• Compact, pre-assembled parts to • Environmental-friendly solution infrastructure (network, civil)


shorten erection time • Keep waterway management • Compliant with safety or usage

• High performance and flexible capabilities requirements (e.g. drinking water


hydraulics treatment)
• Cost-efficient solution

6 | 10
Whitepaper | 2018

Mini Hydro Reference Examples


Brukfors, Sweden Babino Polje, Montenegro

Run-of-river – modernization of existing power house Run-of-river – high head application


(Usage of residual flow)

Mini Hydro technology: StreamDiver Mini Hydro technology: Pelton eQ Solution


Plant output: 250 kW Plant output: 2 258 kW
Head: 4.7 m Head: 186 m and 174 m
Flow: 6 m³/s Flow: 1 m³/s and 0.4 m³/s
Units: 1 Units: 2

Commissioning: March 2015 Commissioning: May 2017

Voith scope and features Voith scope and features


• Water-to-wire supply • Supply of complete set of mechanical equipment
• Fixed-speed, non-regulated StreamDiver • Turbine-generator units with auxiliaries

• Cold climate operation (submerged power house) • 3 and 6-nozzle vertical Pelton

• Fish-friendly power house concept • Pelton turbine without jet deflector

• Turbine inlet valve and hydraulic power unit

• Distribution pipe and drainage pipe

Customer benefits Customer benefits


• Oil-free, environment friendly solution in sensitive region • Cost-efficient design
• Fast delivery in 8 months • Short delivery times

• Full integration into existing automation infrastructure • Significant reduction of civil foundation cost by

• Low maintenance solution housing design


• High quality and performance

7 | 10
Whitepaper | 2018

Egasaki, Japan

The Tokyo Electric


Generation Co., Ltd.

Energy recovery – drinking water treatment plant

Mini Hydro technology: Tubular Turbine project


Plant output: 80 kW
Head: 14 m
Flow: 0.7 m³/s
Units: 2 (serial arrangement)

Commissioning: 2003

Voith scope and features


• Complete electromechanical equipment

• Tubular Turbine-generator units

• Connection integration in existing system

• Propeller units (non-regulated) in serial arrangement

• Low voltage protection and control equipment

Customer benefits
• Offset own load by 80 kW
• Integrated pipe system, easy to access

• Standardized, off-the-shelf components

• Short delivery and project execution time

8 | 10
Whitepaper | 2018

Water-to-Wire and Beyond: Voith as your Partner

The second driving principle was the link between the application and the solution.
The third factor now refers to the first one – reducing the interfaces. Projects on the
lower end of the output scale hardly pencil off if the setup is not right from the start.
Early involvement, transparent planning and a partner approach is key to bring more
projects to realization.

Project Project Project


Construction Operation
identification feasibility design

Solution development Planning support Training


Finding the best solution for a € € During the
€ design phase
€ of You are interested
€ €
site is not straight forward. No your project the interfaces in further training on
€ € €
matter if you are a project owner to the equipment supplier plant operation or
or a project engineer. Voith and are crucial. Voith’s project other special topics
its partners will support you by design office will manage around hydropower.
developing a comprehensive or assist you with these Ask us!
solution which considers your interfaces. €
€ €
site-specific requirements.

€ € €

Early project Financing support W2W OEM Service


Pre-feasibility check You have a profitable project, We deliver what we’ve We know our products
You identified a site and want but you are interested in further promised. Voith can provide and how to service them.
to know whether this can be a equity? Voith can support you a comprehensive package We can provide service
profitable opportunity? We can finding equity and other financ- from the hydropower resource packages which suits
assist you or bring you in touch ing options. up the grid connection point. your requirements and
with the persons who do! save operational costs,
downtime and risks.

9 | 10
VH 3416, en, vvk, 2018-01. Dimensions and illustrations without obligation. Subject to modifications.
Whitepaper | 2018

The importance of Hydropower About the company Editor


Renewable energy is undoubtedly the For 150 years, Voith technologies have
Philipp Daus
most sustainable answer to the rise in been inspiring its customers, business
energy demand. Hydropower plays a partners and employees all over the Global Product Manager
Product Line Mini Hydro
key role in sustainable and environmen- world. Founded in 1867, Voith today
Voith Hydro GmbH
tally friendly power generation and is the has around 19  000 employees and Alexanderstr. 11
leading renewable source of electricity earns 4.3 billion euros in sales. It has 89522 Heidenheim, Germany
Philipp.Daus@Voith.com
generation globally. Worldwide it makes locations in more than 60 countries and
Tel. +49 7321 37-9040
an indispensable contribution to a stable is one of the largest family-owned
power supply which supports economic companies in Europe. As a technology
and social development in both indus- leader, Voith sets standards in the
trialized countries and in high-growth energy, oil & gas, paper, raw materials
regions. Since the early days of hydro- and transport & automotive markets. Stay tuned and keep track of exciting
power Voith has been and continues to news on Mini Hydro @ Voith in 2018:
be a leading supplier and innovator of Visit our Website:
hydropower technology. www.voith.com/minihydro

Voith Hydro Holding GmbH & Co. KG


Alexanderstr. 11
89522 Heidenheim, Germany

10 | 10