land equ.

documently work
soil test lab test
field test
Measurement Of Plot
Bench Marks
Under Drainage line or Pipelines
Ground Water (Water Table)
Slope Calculation
Water Supply
Electricity Supply
centre line and marking
sub structure
EXCAVATION
Site clearance
Measurement for cutting and filling
levelling marking
Dumping location
backfilling
compaction
levelling
pcc
compaction
levelling
at
bar bending
cleanning of bar
cutting of bar
bending of bar with bending wire
footing
formwork for footing
lubrication of formwork
cutting of formwork in proper size
placing of formwork
reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreing

panja used
vibraction process
curing
border of sand for storage of water
deshuttring
Foundation
foemwork
lubrication of formwork
cutting of formwork in proper size
placing of formwork
bar bending
cleanning of bar
cutting of bar
bending of bar with bending wire
Reinforcement Placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreing
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
Padestal / Lift wall
foemwork
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreing
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
tie beam
Excavation and Levelling
compaction
PCC for Tiebeam
formwork for tie beam
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreing
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
Column Up to Lintel
formwork of column up tp lintel
lubrication of formwork
cutting of formwork in proper size
placing of formwork
bar bending
cutting
reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreing
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
backfilling
compaction
super structure
Plinth Beam
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Bar Bending
cutting
Placing Reinforcement
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
pcc
att
Curing
border of sand for storage of water
Deshuttring
Column for ground floor
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
bar bending
cutting bars
Reinforcement
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
Deshuttring
Slab for ground floor
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Placing Reinforcement
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
Curing
border of sand for storage of water
Deshuttring
Staircase
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
Brick Work for ground floor
door and window frame fitting for ground floor
chajja for window at ground floor
formwork
lubrication of formwork
cutting of formwork in proper size
placing of formwork
reinforcemet placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
cooping
outer plaster for ground floor
inner plaster for ground floor
prepare cement admixture
flooring for ground floor
levelling of ground floor for flooring work
plumbing work for ground floor
electric work for ground floor
jari work carried out
paint work for ground floor
furniture for ground floor
Starter for 1st floor column
1st Floor Column
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
Deshuttring
1st Floor Slab
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
Placing Reinforcement
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
Curing
border of sand for storage of water
Deshuttring
Staircase for 1st floor to terrace
Form Work
lubrication of formwork
cutting of formwork in proper size
placing of formwork
reinforcement placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
Concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
Brick Work for 1st floor
door and window frame fitting for 1st floor
chajja for window at 1st floor
formwork
lubrication of formwork
cutting of formwork in proper size
placing of formwork
reinforcemet placing
placing of vertical bar
placing of horizontal bars
bending of bars
placing of cover
concreting
prepare admixture
panja used
vibraction process
curing
border of sand for storage of water
deshuttring
cooping
outer plaster for 1st floor
inner plaster for 1st floor
prepare cement admixture
perafeet wall
outer plaster for perafeet wall
inner plaster for perafeet wall
china mosic at terrace
flooring for 1st floor
levelling of 1st floor for flooring work
plumbing work for 1st floor
electric work for 1st floor
jari work carried out
paint work for 1st floor
furniture for 1st floor
pop work at groung floor and 1st floor
coumpand wall
main gate fixed in coumpand wall
outer plaster of coumpand wall
inner plaster of coumpand wall
paint work of outer part of bunglow