Sie sind auf Seite 1von 2

MAGNETIC PARTICLE INSPECTION REPORT

CLIENT : REPORT NO :
PROJECT : CONTRACT /JOB :
LOCATION : TEST DATE :
SPECIFICATION: ACCEPTANCE CRITERIA: PROCEDURE NO :

SPECIMENT DATA
MATERIAL: SURFACE CONDITION:

TESTING TEMPERATURE: DWG NO.:

REQUEST FOR INSPECTION (RFI) NO.:

MPI DATA
EQUIPMENT USED: SERIAL NUMBER: CALIBRATION:

CURRENT: ILLUMINATION: SENSITIVITY:

CONTRAST PAINT: BATCH NO:

MAGNETIC (POWDER / INK): BATCH NO:

INSPECTION METHODS: DRY WET CONTINUOS RESIDUAL

RESULT :
WELD DIAMETER RESULT
Spool No. / Line No. JOINT No. REMARKS
ID (Inch) Accept Reject

REMARKS:

TECHNICIANS VERIFIED BY: SUBCONTRACTOR: CONTRACTOR: COMPANY:


(SITE SUPERVISOR)

NAME:
QUALIFICATION: NAME: NAME: NAME: NAME:
DATE: DATE : DATE : DATE : DATE :

1 TNDT-FRM-NDT-007 / Rev: 2
SKETCH/ PHOTOGRAPH
INSPECTION REPORT

CLIENT : REPORT NO :
PROJECT : CONTRACT /JOB :
LOCATION : TEST DATE :
SPECIFICATION: ACCEPTANCE CRITERIA: PROCEDURE NO :

SKETCH/ PHOTOGRAPH:

2 TNDT-FRM-NDT-007 / Rev: 2

Das könnte Ihnen auch gefallen