( No loading and unloading charges allowed for machinery loading and unloading )

(Lead)
charges
for trucks (Lead)
(Lead) (Lead)
and charges for
charges for charges for
tippers for trucks and (Lead) (Lead)
trucks and trucks and
Cement/ tippers per charges for charges
tippers for tippers for
cu.meter for trucks and for trucks
Earth / Sand Rubble/Size Steel/
Sl No. Distance PCC slabs/ tippers per and
/Gravel / stones/ Cut RCC Shahabad cu.meter for tippers for
Murrum/ Stones/ poles/ slabs/ CC &
water/ 1000 Bricks /
Lime/ Coarse AC & GI
Laterite litres 1000 nos
Surki/ per aggregate sheets/
blocks/
cu.meter per cu.meter Packed
Wood/ cum
materials
/tonne

1 2 3 4 5 6 7 8
1 Lead up to 1 km 1 30.00 28.90 18.00 42.40 17.80 48.10
2 Lead up to 2 km 2 42.00 40.40 25.30 59.40 24.90 67.30
3 Lead up to 3 km 3 56.00 56.00 35.00 82.40 33.20 89.80
4 Lead up to 4 km 4 68.00 68.00 42.50 100.00 40.30 109.00
5 Lead up to 5 km 5 80.00 80.00 50.00 117.70 47.40 128.30
6 for Every km beyond 5 km up to 30 km 30 12.00 12.00 7.50 17.60 7.10 19.20
7 for Every km beyond 30 km 10000 10.00 10.00 6.30 14.70 5.90 16.00

Rubble/ size
Earth / Sand stone/ cut
/Gravel stone/ Bricks
Cement in Steel in
Sl No. Description of item Murrum/ / Coarse Rs/1000
Rs/Tonne Rs/Tonne
Surki/ Rs / aggregate, Nos.
cum Lime in
Rs/cum

1 Loading 15.20 30.30 50.10 60.00 41.70


2 Unloading 7.60 15.15 50.10 60.00 41.70
A Name of the Work: :- Construction of Office building for District Live Stock
Development Association at Visakhapatnam in Visakhapatnam District

B Sources and Leads


Material Quarry Lead in KM
1 Cement
2 Steel
3 Sand for concrete Gosatani River 35.00
4 Sand for mortar, plastering Gosatani River 35.00
5 Sand for filling Gosatani River 35.00
6 Second Class Bricks Thummapala 45.00
7 Fly ash bricks 290 x 225 x 140 Local 10.00
8 Fly ash bricks 290 x 100 x 140 Local 10.00
9 Fly ash bricks 225 x 100 x 60 Local 10.00
10 40mm HBG Metal Machine crushed Mamidipalem 51.00
11 20mm HBG Metal Machine crushed Mamidipalem 51.00
12 12mm HBG Metal Machine crushed Mamidipalem 51.00
13 10mm HBG Metal Machine crushed Mamidipalem 51.00
14 6mm HBG Metal Machine crushed Mamidipalem 51.00
15 Rough Stone OTG Mamidipalem 51.00
16 Rough Stone HBG Mamidipalem 51.00
16 Gravel Local 10.00
17 Shahabad stone slabs Local 10.00
18 Kadapa stone slabs
19 Granite

C Cement & Steel Rates April, 2014


1 Cement 4000.00
2 Fe - 500 46500.00
3 Fe 415 46000.00
4 Mild Steel 41000.00
5 Structural Steel 45000.00
6 MS Flats 46000.00

D Allowances
1 Add for MA @ 40% 0.40
2 Overheads&Contractors Profit @14% 0.14
Common SoR 2012-13 Page-5

COMMON SoR 2013-2014


Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
1 Common burnt clay bricks (23x11x7cm) 13 BMT-A.01 3707.00 1000 Nos.
Flyash cement / lime solid blocks (50 Kgs/
2
sq.cm) 290mmx225mmx140mm 13 BMT-A-10 19.00 1 No.
Flyash cement / lime solid blocks (50 Kgs/
3
sq.cm) 290mmx100mmx140mm 14 BMT-A-13 10.00 1 No.
Flyash cement / lime solid blocks (50 Kgs/
4
sq.cm) 225mmx100mmx60mm 14 BMT-A-14 5.00 1 No.

Polished Shahabad / Tandur stone slabs


5
15mm to 18mm thick 14 BMT-B-05 1544.00 1 Sqm
Polished black Kadapa slabs minimum of
6
15mm thick (0.457m x 0.457m) 15 BMT-B-06 1287.00 1 Sqm
High Polished Granite 16 to 18 mm thick up
7 to 8'-00 (2.43 M) other than black and
regular colours 15 BMT-B-10 2392.00 1 Sqm
High Polished Granite 16 to 18 mm thick up
8
to 8'-00 (2.43 M) black. 15 BMT-B-11 2033.00 1 Sqm
Granite stone tiles 8mm thick (mirror
9
polished of all shades) 15 BMT-B.16 933.00 1 Sqm

10 Ceramic Tiles Non-skid variety 7.3 m thick of


all shades 15 BMT-C.01 447.00 1 Sqm
11 Edge Cut - Rectified Ceramic tiles 8mm thick
15 BMT-C.02 538.00 1 Sqm
12 Glazed plain coloured tiles of any size 5 to
7mm thick 15 BMT-C.07 397.00 1 Sqm
13 Vitrified tiles of size not less than 598mm x
598mm , 8mm thickness regular finish and
normal colours 16 BMT-C.16 607.00 1 Sqm

14 Chequrred terrazo tiles 30mm thick, dark


shade (0.305m x 0.305m) 19 BMT-D.04 266.00 1 Sqm

15 Medium teak wood scantilings up to 2m 20 BMT - E.01 63567.00 1 cum


16 Medium teak wood scantilings 2 to 3m 20 BMT - E.02 70630.00 1 cum
17
Best teak wood scantilings up to 2m 20 BMT - E.05 109477.00 1 cum
18
Best teak wood scantilings 2 to 3m 20 BMT - E.06 116540.00 1 cum
19 Sal wood scantlings any length 20 BMT - E.15 48543.00 1 cum
20 6mm thick corrugated AC sheets 20 BMT-E.17 207.00 1 sqm
21 Plain or Corrugated Galvanized iron sheets
as per IS 277(0.1mm to 0.8 mm thickness) 20 BMT-E.20 56.00 1 Kg

22 Cost of MS Tube 21 BMT-F.04 57.00 1 Kg


23 Cost of stainless steel pipes 202 grade 21 BMT-F.05 187.00 1 Kg
24 Cost of stainless steel pipes 304 grade 21 BMT-F.06 309.00 1 Kg
25 Rabbit wire mesh (chicken mesh) 22 BMT-F.28 16.00 1 Sqm
26
Rolling Shutter (80x1.25mm) 22 BMT-F.29 2500.00 1 Sqm
27 Collapsable steel shutters 22 BMT-F.30 2187.00 1 Sqm

28 Brass tower bolt 150mm long 23 BMT-G.02 148.00 1 No.


29 200mm long brass towerbolts 23 BMT-G.03 198.00 1 No.
30
Al. tower bolt 150mm long 23 BMT-G.08 92.00 1 No.
Common SoR 2012-13 Page-6

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
31 Al. tower bolt 300mm long 23 BMT-G.11 159.00 1 No.
32
MS powder coated tower bolt 150mm long 23 BMT-G.15 35.00 1 No.
33 MS powder coated tower bolt 200mm long 23 BMT-G.16 50.00 1 No.
34 Brass Butt hinges 150mm long 24 BMT-G.22 219.00 1 No.
35 Al. Butt hinges 150mm long 24 BMT-G.26 132.00 1 No.
36
MS powder coated Butt hinges 150mm long 24 BMT-G.30 40.00 1 No.
37 Al. handle 125mm long 24 BMT-G.33 101.00 1 No.
38 Al. handle 150mm long 24 BMT-G.34 112.00 1 No.
39 MS powder coated handle 125mm long 24 BMT-G.35 31.00 1 No.
40 MS powder coated handle 150mm long 24 BMT-G.36 46.00 1 No.
41 Brass aldrop 300mm long 24 BMT-G.37 891.00 1 No.
42 Brass aldrop 450mm long 24 BMT-G.39 2442.00 1 No.
43
Al. aldrop 250mm long 24 BMT-G.41 314.00 1 No.
44 Al. aldrop 300mm long 24 BMT-G.42 341.00 1 No.
45 MS powder coated aldrop 250mm long 24 BMT-G.44 137.00 1 No.
46 MS powder coated aldrop 300mm long 24 BMT-G.45 164.00 1 No.
47 Brass door stopper 24 BMT-G.46 179.00 1 No.
48 MS powder coated door stopper 24 BMT-G.53 46.00 1 No.
49 Heavy duty Al.door stopper 24 BMT-G.57 50.00 1 No.
50 Brass fancy handle 150mm long 24 BMT-G.58 303.00 1 No.
51
Brass fancy handle 450mm long 25 BMT-G.62 1482.00 1 No.
52
Friction stay hinges for windows 25 BMT-G.71 97.00 1 No.
53 Cost of hydraulic floor springs 25 BMT-G.77 3198.00 1 No.

54 Impervious Water proof compound 26 BMT-H.01 24.00 0.50 Kg


55 HI-BOND Wall Putty Super Fine or Acrylic
based ready to use surface (white / off
white) -Wall strong WC/ Zoritek WC or
Equivalent. 26 BMT-H.91 15.00 1 Kg

56 5mm thick plain glass 33 BMT-I.02 521.00 1 sqm


57
12mm thick plain float glass 33 BMT-I.06 1099.00 1 sqm
58 Cost of 12mm thick tinted glass 34 BMT-I.12 1443.00 1 sqm
59 Pin headed glass 4mm thick 34 BMT-I.13 309.00 1 sqm
60 5mm thick ground glass 34 BMT-I.16 697.00 1 sqm

61 Red oxide Primer Paint Grade-I 34 BMT-J.03 121.00 1 Ltr


62 Zinc Chromate Yellow Oxide Iron Primer
paint 34 BMT-J.04 175.00 1 Ltr
63 Ready made primer for Wood 34 BMT-J.05 135.00 1 Ltr
64 Putty for wood work 34 BMT-J.07 135.00 1 Kg
65
Spirit 34 BMT-J.10 95.00 1 Ltr
Common SoR 2012-13 Page-7

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
66 Linseed Oil 34 BMT-J.11 54.00 1 Ltr
67
Thinner for Melamine polish 34 BMT-J.12 125.00 1 Ltr
68 French Polish 34 BMT-J.14 177.00 1 Ltr.
69 Melamine Polish 34 BMT-J.16 299.00 1 Ltr.
70 Acrylic based Oil bound Washable
Distemper having VOC content less than 50
grams/litre 34 BMT-J.21 81.00 1 Kg
71 Acrylic Emulsion paint having VOC content
less than 50 grams/litre 35 BMT-J.25 183.00 1 Ltr
72 Water proof cement paint 35 BMT-J.26 1106.00 25 Kgs
73
Paint grade white lime for wash 35 BMT-J.27 515.00 25 Kgs
74 Synthetic enamel paint Grade - II having
VOC content less than 50 grams/litre 35 BMT-J.31 175.00 1 Ltr
75 Deco orient base 35 BMT-J-42 631.00 25 Kgs

76 12mm thick prelaminated paticle board (both


sides laminated) 37 BMT-K.81 806.00 1 sqm

77 12.5mm Gypboard Tiles 595mm x 595mm 39 BMT-M.01 255.00 1 sqm


78 Gypsom board plain sheets 12.5mm thick 39 BMT-M.03 232.00 1 sqm
79
GI Ceiling Angle - 25mm x 10mm x 0.5mm 39 BMT-M.04 69.00 1 RM
80 GI Ceiling section - 51.5mm x 26mm x
10.5mm x 0.55mm thick 39 BMT-M.05 79.00 1 RM
81 Intermediate channel - 45mm x 15mm x
15mm x 0.9mm 39 BMT-M.06 78.00 1 RM
82 Perimeter channel - 20mm x 27mm x 30mm
(web) of 0.55mm thick 39 BMT-M.07 69.00 1 RM
83 GI Angle - Precoated - 25mm x 25mm
x0.7mm 39 BMT-M.08 38.00 1 RM
84 GI pre coated - T section - 3600mm long -
24mm x 38mm x 0.7mm thick 39 BMT-M.10 50.00 1 RM
85 Hotdipped GI Angle - Precoated - Grid -
19mmx19mmX0.7mm 39 BMT-M..11 37.00 1 RM
86 Polyster painted GI - T section - 1200mm - BMT-M.12 &
24x32mm and 24x25mm (sub-cross Tee) 39 13 44.50 1 RM
87 Polyster painted GI-T Section - 300mm -
24mm x 27mm 39 BMT-M.14 43.00 1 RM
88 Aluminium angle - 24mmx 24mm 39 BMT-M.15 24.00 1 RM
89 Anodised Aluminium T section - 24mm x
24.5mm x 2.4mm 39 BMT-M.16 32.00 1 RM
90
Connecting Clips 39 BMT-M.17 2.00 1 No.
91
Rawl Plug 39 BMT-M.18 2.00 1 No.
92 6mm Nylon Rawl Plug 39 BMT-M.19 3.00 1 No.
93 Soffit Cleats 40 BMT-M.20 2.00 1 No.
94 Drywall screws - 25mm 40 BMT-M.21 2.00 1 No.
95 Jointing Compound 40 BMT-M.22 27.00 1 Kg.
96 Jointing Paper tape 40 BMT-M.23 5.00 1 RM
97 Drywall top coat 40 BMT-M.24 133.00 1 Ltr
98 Universal Holding Clips 40 BMT-M.25 3.00 1 No.
99
GI Rod - 4mm dia - Connecting Rod 40 BMT-M.26 11.00 1 RM
Common SoR 2012-13 Page-8

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
100 GI rod-prestraightened 2.0mm dia. -
Connecting rod 40 BMT-M.27 9.00 1 RM
101 15mm Mineral Fiber sheet 600 x 600 40 BMT-M.29 479.00 1 sqm
102 12mm Mineral Fiber sheet 600 x 600 40 BMT-M.31 317.00 1 sqm
103 12mm Thermocole sheet 41 BMT-M.37 24.00 1 sqm
104 Bison LAM aluminium glazed partions 46 BMT-M.77 3207.00 1 sqm
105 13mm Mineral Fiber sheet 600 x 600
Mineral Fibre Ceiling Tile of 0.595 mm x 40 BMT-M.82 344.00 1 sqm
106 0.595 mm of 15 mm thick Fissura Fine
Model 48 BMT-M.86 444.00 1 sqm

107 30 mm thick flush shutter 56 BMT-N-16 771.00 1 sqm


108
35 mm thick flush shutter 56 BMT-N-17 844.00 1 sqm
109 Cup Board frames & shutters using
BISONLAM 59 BMT-N.32 3218.00 1 sqm
110 Scientific Door with metal door frame (single
leaf door) 68 BMT-N.66 8889.00 1 sqm
111 Scientific Door with metal door frame
(double leaf door) 68 BMT-N.67 9482.00 1 sqm
112 Pre painted steel windows

Windows with guard bars


i) Double shutters with central mullion 76 BMT - P.10 5775.00 1 sqm
ii) Centre fixed both side openable shutters 77 BMT - P.14 5145.00 1 sqm
113 Pre painted steel Ventilators
a) Top hung 77 BMT-P.17 5985.00 1 sqm
b) Fixed louvered 77 BMT-P.20 4095.00 1 sqm

114 Pre painted steel Windows with fly mesh


i) Double shutters with central mullion 79 BMT - P.29 6930.00 1 sqm
ii) Centre fixed both side openable
shutters(5'x4') 79 BMT - P.31 6300.00 1 sqm
iii) Centre fixed both side openable
shutters(6'x4') 79 BMT - P.32 5513.00 1 sqm
115 Pre painted steel Window with two Sliding
Shutters 88 BMT-P.82 5490.00 1 sqm
116 Pre painted steel three shutter Sliding
Windows 89 BMT-P.83 5800.00 1 sqm
117
Pre painted steel Structural Glazing 94 BMT - Q.01 6300.00 1 sqm
118 Top Hung shutters in Structural Glazing 95 BMT - Q.02 5093.00 1 sqm
119 Curtain glazing made of pre painted steel
a) Fixed Glazing 2'-0" x 2'-0" (609.6x609.6mm) BMT -
and 2'-0" x 3'-0" (609.6x914.4mm) 95 Q.03&04 5198.00 1 sqm
b) Fixed Glazing 3'-0" x 3'-0" (914.4x914.4mm),
3'-0" x 4'-0" (914.4x1219.2mm) BMT -
95 Q.05&06 4410.00 1 sqm
120 Dismantling
a)
Stone masonry in cement mortar 97 BMT-S.01 306.00 1 cum
b) Flat stone in roof or floors including lifting : 97 BMT-S.03 106.00 10 sqm
c) Pan tiled or Mangalore tiled roof with out
roof timbers : 97 BMT-S.04 96.00 10 sqm
d) Wrought and framed timber in roofs or floors 97 BMT-S.06 160.00 1 cum
Common SoR 2012-13 Page-9

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
e) Old lime mortar plaster 97 BMT-S.07 33.00 10 sqm
f)
Old cement mortar plaster 97 BMT-S.08 37.00 10 sqm
g) Kadapa slabs or shahabad stone slabs on
sand bed 97 BMT-S.11 53.00 10 sqm
h) Clean removal of lime plaster from walls and
raking out joints 20mm deep or from
terraced roof and raking out joints 100 mm
deep 97 BMT-S.14 34.00 10 sqm
i) Clean removal of cement plaster from walls
and raking out joint 200 mm deep 97 BMT-S.15 36.00 10 sqm

121 Expansion joint filler board for buildings,


columns, beams and slabs 25 mm thick 98 BMT-U.05 376.00 1 sqm

122 Rounding the edges of Kadapa / Shahabad


stone slab of any thickness including
polishing the same 99 BMM-V.09 80.00 1 RM
123 Half rounding the edges of Marble / Granite
slabs of all thicknesses and polishing the
same 99 BMM-V.10 245.00 1 RM
124 Full rounding the edges of Marble / Granite
slabs of all thicknesses and polishing the
same 99 BMM-V.11 317.00 1 RM
125 Machine cutting charges for Marble / Granite
slabs up to 50mm thickness by mechanical
device 99 BMM-V.12 13.00 1 RM
126 Flat nosing Shahabad/Kadapa slabs of any
thickness 99 BMM-V.13 13.00 1 RM
127 Labour charges for fabricating steel works
like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position 99 BMM-V.14 20.00 1 Kg
128 Labour charges for fixing Iron Doors, Iron
Windows and Window Grills in position 99 BMM-V.15 4.00 1 Kg
129 Labour charges for fabrication of stainless
steel railing works 99 BMM-V.18 101.00 1 Kg
130 Labour charges for glass designing
work( Etching work) 99 BMM-V.20 737.00 1 sqm
131 Labour charges for fixing flush door shutters
to the existing door frame 99 BMM-V.23 295.00 1 sqm
132 Labour charges for fixing glass 99 BMM-V.24 221.00 1 sqm

133 Powder coated Al. sections 100 BMS-W-01 300.00 1 Kg


134 Rubber beading 100 BMS-W-06 2.00 1 RM
135 Chloropyriphos Lindane Emulsifiable
concentrate of 20% 100 BMS-W-09 213.00 1 Ltr
136 Aluminium composite cladding 4mm thick
with skin material thickness of 0.25mm 100 BMS-W.13 2350.00 1 sqm
137 Aluminium composite cladding 4mm thick
with skin material thickness of 0.50mm 100 BMS-W.14 2636.00 1 sqm
138 Cement Jally 50mm thick 101 BMS-W.17 375.00 1 Sqm
139
24 gauge aluminium sheet 101 BMS-W.18 282.00 1 sqm
140 G.I scam bolts & nuts 104 BMS-W.62 5.00 1 No.
141 8mm dia GI 'j' bolts & nuts 104 BMS-W.64 9.00 1 No.
142 GI washers 104 BMS-W.65 1.00 1 No.
Common SoR 2012-13 Page-10

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
143 Limpet washers (for scam & ‘J’ bolts) 104 BMS-W.66 0.30 1 No.
144
Bitumen washers 104 BMS-W.67 0.25 1 No.
128 White cement 104 BMS-W.68 27.00 1 Kg

129 Power Saw cutter - Hand Operated - Hire


Charges 104 BMC-X.02 117.00 1 hour
130 Power Drill - Hand Operated - Hire Charges 104 BMC-X.03 108.00 1 hour

Reference Material
Labour
131 Hire charges for Access Scaffolding to SSR hire Unit
charges
page charges
A) Brick Masonry / Stone Maasonry
a) 1st floor 107 8.99 54.34 1 Sqm
b)
2nd floor 8.99 77.01 1 Sqm
c) 3rd floor 8.99 99.69 1 Sqm
d) 4th floor 8.99 122.36 1 Sqm

B) Plastering to walls
a)
1st floor 108 0.90 5.43 1 Sqm
b)
2nd floor 0.90 7.70 1 Sqm
c) 3rd floor 0.90 9.97 1 Sqm
d) 4th floor 0.90 12.24 1 Sqm
Common SoR 2012-13 Page-11

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
132 Hire charges for Stage Scaffolding

Ceiling Plastering
a) 1st floor 108 2.11 11.08 1 Sqm
b) 2nd floor 2.11 15.57 1 Sqm
c) 3rd floor 2.11 20.05 1 Sqm
d) 4th floor 2.11 24.54 1 Sqm

133 HIRE CHARGES FOR CENTERING&SCAFFOLDING-centering using Steel scaffolding pipes , jack props ,
wallers , Foot plates , brackets , steel centering plates etc.,
Reference Material
Labour
to SSR hire Unit
charges
charges
2nd 3rd
1st Floor 4th Floor
Floor Floor
a) 1
Footings, Bed blocks, Steps 106 137.00 415.00 456.50 498.00 539.50
b) Pedestals 1
109.00 660.00
c) Plinth beams 1
1158.00 1000.00

134 HIRE CHARGES FOR CENTERING & SCAFFOLDING -Unsupported height of 3.66M - Casurina Ballies ,
Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc.,
Reference Material
Labour
to SSR hire Unit
charges
charges
2nd 3rd
1st Floor 4th Floor
Floor Floor
a) Lintels 111 680.00 834.00 917.00 1001.00 1084.00 1

b) 134.00 128.00 141.00 154.00 166.00 1


Sunshades of any width
c) 205.00 1171.00 1288.00 1405.00 1522.00 1
Columns
d) Beams 1201.00 982.00 1080.00 1178.00 1227.00 1

e) RCC roof slabs upto 150 mm depth 136.00 111.00 122.00 133.00 144.00 1

f) RCC slabs upto 150-300 mm depth 140.00 114.00 125.00 137.00 148.00 1

g) RCC walls , water tank walls 348.00 426.00 469.00 511.00 554.00 1

135 PVC Clamps 138 BMW-G.106 18.00 1 Each

LABOUR CHARGES

SKILLED
136 Bar bender 303 I-1 370.00 1 Each
137 Blacksmith 303 I-2 350.00 1 Each
138 Blaster 303 I-3 400.00 1 Each
139 Carpenter 303 I-4 350.00 1 Each
140
Work Inspector(Non technical) 303 I -10 335.00 1 Each
141 Mason / Brick layer 303 I -11 350.00 1 Each
142 Operator concrete mixer 303 I -16 350.00 1 Each
143 Operator Jackhammer / Pneumatic
tamper(skilled) 303 I - 23 350.00 1 Each
144
Painter 304 I - 35 400.00 1 Each
Common SoR 2012-13 Page-12

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
145 Plumber / Pipe fitter 304 I - 36 400.00 1 Each

SEMI SKILLED
145 Sprayer(semi skilled) 304 II - 1 320.00 1 Each
146 Carpenter 304 II - 4 320.00 1 Each
147 Mason / Brick layer 305 II - 35 320.00 1 Each
148 Painter 305 II - 37 320.00 1 Each
149 Plumber / Pipe fitter 304 II - 9 320.00 1 Each

UN SKILLED
Man Mazdoor / Woman Mazdoor
150 305 / 306 III - 3, 4 280.00 1 Each

Cost of Materials :
151 Binding wire 308 3 70.00 1 Kg
152 Detonator electric 309 21 13.00 1 No.
153 Sand (un-screened for concrete items) 309 27(a) 385.00 1 Cum
154 Sand un-screened for filling 309 27(b) 285.00 1 Cum
155 Sand(screened for mortar, plastering items) 309 28 505.00 1 Cum
156 Gravel / Quarry spall 322 M - 008 120.00 1 Cum
157 Aggregates 6mm nominal size (HBG) 324 M - 050 700.00 1 Cum
158
Aggregates 10mm nominal size (HBG) 324 M - 051 890.00 1 Cum
159 Aggregates 13.20 / 12.50mm nominal size
(HBG) 324 M - 052 1045.00 1 Cum
160 Aggregates 20mm nominal size (HBG) 324 M - 053 1300.00 1 Cum
161 Aggregates 40mm nominal size (HBG) 325 M - 054 805.00 1 Cum
162 Gelatin 80% 327 M - 104 73.00 1 Kg
163 Water 331 M - 189 100.00 1 KL
164 PH ITEMS
PVC pipes 110mm dia.(4.00Kgs/sq.cm) 59 Table18 139.00 1 RM
Common SoR 2012-13 Page-13

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
165 Hire &
Crew
Machinery Charges Fuel
charges
charges
a) Air compressor 7 cmm ( diesel) 354 3 916.00 1 hour 167.20
b) Batching plant 0.50 cum 354 9 234.40 1 hour 269.50
c) Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 354 16 128.90 1 hour 174.20
d) Jack hammer 355 40 20.50 1 hour 261.30
e) Needle vibrator 40mm( petrol) 355 41 26.80 1 hour 125.40
f)
Shovel 0.50 cum 75hp 355 52 1474.40 1 hour 187.20
g) Lift charges of materials(Winch 35HP-
Electric) 356 67 318.90 1 hour 209.00

166 Seigniorage charges


i) Coarse aggregate , stone 358 50.00 1 cum
ii) Earth , Gravel 359 22.00 1 cum
ii) Sand for mortar & filling 359 40.00 1 cum
iv) Bricks 359 38.50 1000 Nos.
v) Polished Shahabad/Tandur stone slbs 359 7.00 1 sqm
vi)
Black Kadapa slabs 359 4.00 1 sqm
vii)
Granite 359 32.73 1 sqm

167 Rough Stone (OTG) 1 160.00 1 cum


(Part II)
168 Rough Stone (HBG) Roads & 12 245.00 1 cum
169 Drilling 20mm dia. Holes with pneumatic Bridges
compressor 142 140.00 1 RM

Non SSR items


1 Chemical admixture 50.00 1 cum
2 Glass strips in Granolithic concrete flooring 5.00 1 sqm
3 Stainless steel base Plate 75mm dia.(in SS
railing) 75.00 1 No.
4
Anchor bars in SS railing 25.00 1 No.
5 Bonding anchor bars in SS railing 10.00 1 No.
6 Teak wood beading 12mm x 12mm 20.00 1 RM
7 250mm long brass butt hinges 250.00 1 No.
8 Z holdfasts 300 x 40 x 5mm 18.00 1 No.
9 Rubber bush 20.00 1 No.
10 1.20mm thick PVC sheet 150.00 1 sqm
11 Fevicol & labour charges for fixing PVC
sheet for flush shutter 50.00 1 sqm
12 Al. round handles 150mm dia. 100.00 1 No.
13 Labour charges including cost of nails,
making holes to wall and in aluminium sheet
for expansion joint 15.00 1 No.
14 Expansion joint treatment with poly sulphide
compound 400.00 1 RM
Common SoR 2012-13 Page-14

Reference
Sl. S.No./ Item
Items to SoR Rate Unit
No Code No.
page
15 Al. lock with handle 50.00 1 No.
Common SoR 2012-13 Page-15

Unit

Cum

Cum

Cum

Unit

Cum

Sqm

Cum

Cum

Sqm

Sqm

Sqm
WS & SA Comon SoR-2012-13 Page-16

DATA (SoR 2012-13)


WATER SUPPLY AND SANITARY ITEMS
SSR
Sl.
ITEM Page Item code Rate Labour Unit
No.
No.
1 Supply, laying, jointing 101.60 mm dia
SWG pipe
a) up to 1524mm (5') depth 113 BMW-A.01 390.00 1 RM
b) up to 914.40mm (3') depth 113 BMW-A.02 262.00 1 RM
2 Supply, laying, jointing 152.40mm dia
SWG pipe

a) up to 1524mm (5') depth 113 BMW-A.03 526.00 1 RM

b) up to 914.40mm (3') depth 113 BMW-A.04 407.00 1 RM

3 Labour charges for laying , jointing ,


testing SWG pipes up to 914.40mm (3')
depth 113 BMW-A.05 113.00 1 RM
4 Labour charges for laying , jointing ,
testing SWG pipes up to 1524mm (5')
depth 113 BMW-A.06 154.00 1 RM
5
Supply of 203.20mm (8") dia SWG pipe 114 BMW-A.17 453.00 1 RM
6
Supply of 254mm (10") dia SWG pipe 114 BMW-A.18 829.00 1 RM
7
Supply of 300mm (12") dia SWG pipe 114 BMW-A.19 1195.00 1 RM
8
150mm x 100mm SWG gully trap 116 BMW-A.72 530.00 1 Each

9 Inspection chamber 3' dia and upto 3'


depth 118 BMW-B.03 4999.00 1 Each
10 Inspection chamber 3' dia - 3' above
upto 5' depth 118 BMW-B.04 7662.00 1 Each
11 Inspection chamber 457.2mm x
457.2mm in brick masonry up to
914.4mm ( 3) depth 118 BMW-B.06 3104.00 1 Each

12
76.20mm (3") CI Nahany trap 1st quality 121 BMW-C.41,42 307.00 50.00 1 Each

13 Orissa pan 580mmx440mm


Hindware/Parry/Neycer - ISI mark 122 BMW-D.04,06 1157.00 320.00 1 Each
14 Brick masonry seat 122 BMW-D.09 278.00 1 Each
15 C.C Squatting plate 123 BMW-D.10 83.00 1 Each
16 S&F EWC Hindustan/
Neycer/Parryware with'S' trap 123 BMW-D.14,15 1582.00 224.00 1 Each
17 S&F Plastic seat and lid for EWC 123 BMW-D.16,17 430.00 65.00 1 Each
18 Flat back Wash hand basin
(HSW/Parryware/Neyser) 1st quality
550mmx400mm-single CP Pillar cock 124&125 BMW-D.24,28 1455.00 320.00 1 Each
19 S&F flat back bowl urinal 440 x 265 x
315 125&126 BMW-D.33,36 759.00 128.00 1 Each
20 S&F flat back bowl urinal 590 x 375 x
390 126 BMW-D.35,36 2530.00 128.00 1 Each
21 S & F vitreous china porcelain sink (600
x 400 x 250) 126 BMW-D.37,39 4048.00 320.00 1 Each
WS & SA Comon SoR-2012-13 Page-17

SSR
Sl.
ITEM Page Item code Rate Labour Unit
No.
No.
22 S & F vitreous china porcelain sink (750
x 450 x 250) 126 BMW-D.38,39 4554.00 320.00 1 Each
23 S&F RCC terrazo sink 126 BMW-D.40,41 646.00 205.00 1 Each

24 Angle stop cock 12.70mm heavy duty


Seiko/Senior/Nice or equivalent 126 BMW-E.05,06 443.00 39.00 1 Each
25 12.70mm NP bib tap heavy duty
Seiko/Senior/Nice or equivalent : 126 BMW-E.07,08 380.00 26.00 1 Each
26 12.70mm NP bib tap heavy duty 126 BMW-E.09,10 241.00 26.00 1 Each
27 S&F 31.75mm brass plumber union 126 BMW-E.11,12 64.00 13.00 1 Each
28 12.7mm dia. NP push cock 127 BMW-E.29 253.00 1 Each

29 GM peet valves
a)
15mm NB 128 BMW-F.21,22 350.00 40.00 1 Each
b)
20mm NB 128 BMW-F.19,20 474.00 40.00 1 Each
c)
25mm NB 128 BMW-F.17,18 698.00 40.00 1 Each
d) 32mm NB 128 BMW-F.23,24 1044.00 40.00 1 Each
e) 40mm NB 128 BMW-F.25,26 1423.00 61.00 1 Each
f) 50mm NB 128 BMW-F.27,28 2055.00 82.00 1 Each
g) 65mm NB 128 BMW-F.29,30 3920.00 102.00 1 Each
h) 80mm NB 128 BMW-F.31,32 5548.00 121.00 1 Each
30 S& F Nominal Bore GI pipe Medium
Grade properties & weight
a)
15mm Nominal bore 130 BMW-F.79,80 173.00 37.00 1 RM
b)
20mm Nominal bore 130 BMW-F.81,82 192.00 37.00 1 RM
c)
25mm Nominal bore 131 BMW-F.83,84 252.00 37.00 1 RM
d)
32mm Nominal bore 131 BMW-F.85,86 354.00 37.00 1 RM
e) 40mm Nominal bore 131 BMW-F.87,88 396.00 40.00 1 RM
f) 50mm Nominal bore 131 BMW-F.89,90 427.00 61.00 1 RM
31 65mm Tata or Zenith make or
equivalent. 131 BMW-F.91 757.00 1 RM
32 S & F 12.70 x 152.00 mm NP shower BMW-
rose heavy 131 F.100,101 174.00 18.00 1 Each

33 Polyetheylene water storage tank with


Double layer 132 BMW-G.01,02 6.00 1.00 1 Lt
34 31.75mm dia. PVC flexible waste pipe,
914.4mm length 132 BMW-G.05 26.00 1 Each
35 Supply & fixing of PVC low level system
parryware, slimline with internal
components & short bend
a)
10ltrs capacity single flush 132 BMW-G.08 1455.00 1 Each
b)
8 lts capacity single flush 133 BMW-G.10 823.00 1 Each
36 Double socket PVC/SWR pipes 4
kgs/sqm
a)
75mm dia. 133 BMW-G.11 255.00 3 RM
WS & SA Comon SoR-2012-13 Page-18

SSR
Sl.
ITEM Page Item code Rate Labour Unit
No.
No.
b) 90mm dia. 133 BMW-G.12 405.00 3 RM
c)
110mm dia. 133 BMW-G.13 484.00 3 RM
37
Pipe clip
a)
75mm dia. 138 BMW-G.104 15.00 1 Each
b)
90mm dia. 138 BMW-G.105 17.00 1 Each
c)
110mm dia. 138 BMW-G.106 18.00 1 Each
38
3" (76.2mm) multi floor trap with jali 139 BMW-G.118 102.00 1 Each
39 4" (101.6mm) multi floor trap with jali 139 BMW-G.119 144.00 1 Each
40 Labour charges for laying, fixing and
commissioning the PVC pipes 140 BMW-G.152 65.00 1 Each

41 Chiselling the brick masonry wall and


repairs as directed by the department 145 BMW-I.07 26.00 1 RM
42 Cost of NP chain and rubber plug 145 BMW-I.18 39.00 7.00 1 Each
43 25.4mm dia & 609.6mm long aluminium
anodized towel rod 145 BMW-I.20,21 153.00 40.00 1 Each
44 S & F NP soap dish heavy type with NP
screws 145 BMW-I.28,29 227.00 11.00 1 Each
45
Teak wood blocks 76.2mm x 101.6mm 146 BMW-I.42,43 24.00 8.00 1 Each
46
Cutting holes in brick masonry 146 BMW-I.46 40.00 1 RM
47 Cutting holes in RCC slab floor &
repairs labour charges only 146 BMW- I.47 61.00 1 No.
48 12.70mm PVC connection with brass
union nut CP coated 146 BMW-I.48,49 95.00 18.00 1 Each
49 Constructing Brick mlasonry support for
G.I pipe with CM 304.8*228.6*228.6mm
size including plastering finishing etc
complete 146 BMW-I.63 68.00 20.00 1 Each
50 CI frame and cover for gully traps 146 BMW-I.65 111.00 32.00 1 Each
51 S&F TV shap mirror with plastic frame
size 609.60mm x 457.20mm 148 BMW-I.105,106 479.00 106.00 1 Each
52 Supplying & fixing stainless steel sink
size 36" x 18" (914.4x457.2mm) 1 mm
thick with accessories 148 BMW-I.119,120 6409.00 461.00 1 Each
53 Supplying & fixing stainless steel sink
size 20" x 18" x 8"
(508x457.2x203.20mm) 1 mm thick with
accessories 148 BMW-I.123,124 4579.00 409.00 1 Each
54 Supplying & fixing white glazed
porcelain channel 4" x 24" (101.6 x
609.6mm) 148 BMW-I.125 462.00 1 Each
55 Chrome plated bib cock cum health
faucet jaquar make queen series 149 BMW-I.141 4071.00 1 Each
56 CPVC Pipes
15.90mm OD pipe - SDR 13.5 158 BMW-I.220 132.00 1 RM
22.20mm OD pipe - SDR 13.5 BMW-I.221 149.00 1 RM
28.60mm OD pipe - SDR 13.5 BMW-I.222 198.00 1 RM
34.90mm OD pipe - SDR 13.5 BMW-I.223 270.00 1 RM
41.30mm OD pipe - SDR 13.5 BMW-I.224 336.00 1 RM
54.00mm OD pipe - SDR 13.5 BMW-I.225 490.00 1 RM
15.90mm OD pipe - SDR 11 158 BMW-I.226 146.00 1 RM
22.20mm OD pipe - SDR 11 159 BMW-I.227 176.00 1 RM
WS & SA Comon SoR-2012-13 Page-19

SSR
Sl.
ITEM Page Item code Rate Labour Unit
No.
No.
28.60mm OD pipe - SDR 11 BMW-I.228 212.00 1 RM
34.90mm OD pipe - SDR 11 BMW-I.229 289.00 1 RM
41.30mm OD pipe - SDR 11 BMW-I.230 358.00 1 RM
54.00mm OD pipe - SDR 11 BMW-I.231 523.00 1 RM

56
16mm to 20mm thick marble slab 15 & 410 BMT-B.14 935.97 1 sqm
57 Socket and Spigot Centrifugally cast 372 Public Health
(Spun) Iron pressure pipes - Clas" LA" items Table-21
a)
80mm dia. 780.00 1 RM
b) 100mm dia. 950.00 1 RM
c) 125mm dia. 1198.00 1 RM
d) 150mm dia. 1452.00 1 RM
e) 200mm dia. 2120.00 1 RM
f) 250mm dia. 2856.00 1 RM

NON SSR ITEMS


1 RCC cover for gully trap 100.00 1 Each
Name of the Work: :- Construction of Office building for District Live Stock Development Association at Visakhapatnam in Visakhapatnam
District
LEAD CHART (COMMON SoR 2013-2014) (Cement & Steel - April, 2014 rates)
Initial
Reference
S.No./ Cost Convey- MA
Sl. to SSR Lead in Loading Unloading
Description Source of Materials Item Code Unit excluding ance Total
No. page KM charges charges
No. seigniorage Charges
number
charges 40%
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
Ordinary Portland Cement 43 / 53 grade
1 1 MT 4000.00 43.95 17.58 4061.53
(including loading charges)
2 Reinforcement steel Fe- 500 1 MT 46500.00 52.63 21.05 46573.68

3 Reinforcement steel Fe- 415 1 MT 46000.00 52.63 21.05 46073.68

4 Mild steel bars 1 MT 41000.00 52.63 21.05 41073.68

5 Structural steel 1 MT 45000.00 52.63 21.05 45073.68

6 MS flats 1 MT 46000.00 52.63 21.05 46073.68


27(a)
7 Sand (un-screened for concrete items) Gosatani River 309 1 Cum 35.00 385.00 350.88 735.88

Sand (screened for mortar, plastering 28


8 Gosatani River 309 35.00 505.00 350.88 855.88
items)
27(b)
9 Sand for filling Gosatani River 309 1 Cum 35.00 285.00 350.88 635.88

10 Common burnt clay bricks (23x11x7cm) Thummapala 13 BMT-A.01 1000 Nos 45.00 3707.00 701.93 36.58 36.58 14.63 4496.72

Flyash cement / lime solid blocks (50 Kgs/


11 Local 13 BMT-A-10 1000 Nos 10.00 19000.00 797.25 188.68 188.68 75.47 20250.08
sq.cm) 290mmx225mmx140mm
Flyash cement / lime solid blocks (50 Kgs/
12 Local 14 BMT-A-13 1000 Nos 10.00 10000.00 354.34 83.86 83.86 33.54 10555.60
sq.cm) 290mmx100mmx140mm

13 Aggregates 40mm nominal size (HBG) Mamidipalem 325 M - 054 1 Cum 51.00 805.00 492.20 1297.20

14 Aggregates 20mm nominal size (HBG) Mamidipalem 324 M - 053 1 Cum 51.00 1300.00 492.20 1792.20

Aggregates 13.20 / 12.50mm nominal


15 Mamidipalem 324 M - 052 1 Cum 51.00 1045.00 492.20 1537.20
size (HBG)
Initial
Reference
S.No./ Cost Convey- MA
Sl. to SSR Lead in Loading Unloading
Description Source of Materials Item Code Unit excluding ance Total
No. page KM charges charges
No. seigniorage Charges
number
charges 40%
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
16 Aggregates 10mm nominal size (HBG) Mamidipalem 324 M - 051 1 Cum 51.00 890.00 492.20 1382.20

17 Aggregates 6mm nominal size (HBG) Mamidipalem 324 M - 050 1 Cum 51.00 700.00 492.20 1192.20

(Part II)
18 Rough Stone (OTG) Mamidipalem Roads & 1 1 Cum 51.00 160.00 492.20 652.20
Bridges
(Part II)
19 Rough Stone (HBG) Mamidipalem Roads & 12 1 Cum 51.00 245.00 492.20 737.20
Bridges

20 HBG Stone Chips 2.36m and below Mamidipalem 74 92 1 Cum 51.00 330.00 492.20 822.20

21 Gravel / Quarry spall Local 322 M - 008 1 Cum 10.00 120.00 96.50 216.50

Polished Shahabad / Tandur stone slabs


22 Local 14 BMT-B-05 10 Sqm 10.00 1544.00 23.64 4.39 2.19 0.88 1575.10
15mm to 18mm thick

Polished black Kadapa slabs minimum of


23 0 15 BMT-B-06 10 Sqm 0.00 1287.00 0.00 3.99 1.99 0.80 1293.78
15mm thick (0.457m x 0.457m)

High Polished Granite 16 to 18 mm thick


24 up to 8'-00 (2.43 M) other than black and 15 BMT-B-10 1 Sqm - 2392.00 - 2392.00
regular colours

High Polished Granite 16 to 18 mm thick


25 15 BMT-B-11 1 Sqm - 2033.00 - 2033.00
up to 8'-00 (2.43 M) black.
CIVIL DATA : Page-22

D A T A ( SoR 2013-14)
Name of the Work: :- Construction of Office building for District Live Stock Development Association at
Visakhapatnam in Visakhapatnam District

CEMENT MORTAR PER CUM CM (1:2) CM (1:3) CM (1:4) CM (1:5) CM (1:6) CM (1:8)
Cost of Sand for mortar & Plastering (
1.05 cum ) 898.67 898.67 898.67 898.67 898.67 898.67

Cost of cement 2924.30 1949.53 1462.15 1169.72 974.77 731.08


Mazdoor ( Unskilled ) for mixing mortar
( 0.20 Nos.) 56.00 56.00 56.00 56.00 56.00 56.00

Add for MA @ 40% 22.40 22.40 22.40 22.40 22.40 22.40


Rate per Cum 3901.37 2926.60 2439.22 2146.79 1951.84 1708.15

20 mm HBG GRADED METAL


Arregates 20mm nominal size 0.60 1792.20 1075.32
Arregates 13.20 / 12.50mm nominal
size 0.15 1537.20 230.58
Arregates 10mm nominal size 0.15 1382.20 207.33
Arregates 6mm nominal size 0.10 1192.20 119.22

Rate per Cum 1632.45

12 mm HBG GRADED METAL


Arregates 13.20 / 12.50mm nominal
size 0.60 1537.20 922.32
Arregates 10mm nominal size 0.20 1382.20 276.44
Arregates 6mm nominal size 0.20 1192.20 238.44

Rate per Cum 1437.20


CIVIL DATA : Page-23

DATA

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
1 Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing
on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental,
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete
for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)

(BLKD-CSTN-2-2)
Ordinary Soil - Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 240 cum
a) Labour
Mazdoor ( Unskilled) 8.32 Nos. 280.00 1 No. 2329.60
Add for MA @ 40% 0.40 2329.60 931.84
b) Machinery
Shovel 0.50cum 75hp 6.00 hours 1474.40 1 Hour 8846.40
Crew charges 6.00 hours 187.20 1 Hour 1123.20
Add MA on crew charges 0.40 1123.20 449.28
13680.32
c&d)
Overheads&Contractors Profit @14% 0.14 13680.32 1915.24
Cost for 240 cum ( a+b+c+d) 15595.56
Rate per cum (a+b+c+d) / 240 64.98
Seigniorage charges 1.00 cum 22.00 1.00 cum 22.00
Rate per 1cum 86.98
Say 87

2 Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T &
P, labour charges etc., and overheads & contractors profit complete for finished item of work.
Rate as per SoR 1 cum 70.18 1 cum 70.18
Overheads&Contractors Profit @14% 0.14 70.18 9.83
80.01
Rate per 1 Cum Say 80

3 Filling with HBG stone chips 2.36m and below in trenches,sides of foundations and basement with initial lead
in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site
and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit
complete for fnished item of work(APSS NO.309&310)

(BLD-CSTN-2-8)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 280.00 1 No. 86.80
Add for MA @ 40% 0.40 86.80 34.72
b)Material :
HBG Stoen Chips 2.36m and below 6.00 cum 822.20 1 cum 4933.20
5054.72
c&d)
Overheads&Contractors Profit @14% 0.14 5054.72 707.66
Rate per 6 cum (a+b+c+d) 5762.38
Rate per 1cum 960.40
Seigniorage charges
Sand 1.00 cum 40.00 1 cum 40.00
1000.40
Say 1000
CIVIL DATA : Page-24

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
4 Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not
exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all
peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for
fnished item of work(APSS NO.309&310)
(BLD-CSTN-2-8)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 280.00 1 No. 86.80
Add for MA @ 40% 0.40 86.80 34.72
b)Material :
Gravel 6.00 cum 216.50 1 cum 1299.00
1420.52
c&d)
Overheads&Contractors Profit @14% 0.14 1420.52 198.87
Rate per 6 cum (a+b+c+d) 1619.39
Rate per 1cum 269.90
Seigniorage charges
Gravel 1.00 cum 22.00 1 cum 22.00
291.90
Say 292

5 Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including
cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P
etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310)

(BLD-CSTN-2-9)
Unit : 1 cum
Taking output = 6 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 280.00 1 No. 86.80
Add for MA @ 40% 0.40 86.80 34.72
121.52
b&c)
Overheads&Contractors Profit @14% 0.14 121.52 17.01
Rate per 6 cum (a+b+c) 138.53
Rate per 1 cum (a+b+c) / 6 23.09
Rate per 1cum Say 23
CIVIL DATA : Page-25

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
6 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under
flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying
concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required
level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

(BLD-CSTN-3-5)
Unit : 1 cum
A.MATERIALS :
Cement 162.00 Kgs 4061.53 1000 Kgs 657.97
Coarse aggregate 40mm 0.90 Cum 1297.20 1 Cum 1167.48
Fine aggregate ( Sand ) 0.45 Cum 735.88 1 Cum 331.15
Water (including curing) 1.20 kl 100.00 1 kl 120.00
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew charges 1.00 hour 174.20 1 hour 174.20
Add MA on crew charges 0.40 174.20 69.68
C.LABOUR :
1st class mason 0.10 Nos. 350.00 1 Each 35.00
Mazdoor (unskilled) 1.39 Nos. 280.00 1 Each 389.20
Add for MA @ 40% 0.40 424.20 169.68
3243.25
Overheads&Contractors Profit @14% 0.14 3243.25 454.06
Rate per 1 cum 3697.31
Seigniorage charges
Coarse aggregate 0.90 Cum 50.00 1 Cum 45.00
Fine aggregate 0.45 Cum 40.00 1 Cum 18.00
3760.31
Say 3760

7 Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under
flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying
concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required
level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

(BLD-CSTN-3-7)
Unit : 1 cum
A.MATERIALS :
Cement 129.60 Kgs 4061.53 1000 Kgs 526.37
Coarse aggregate 40mm 0.90 Cum 1297.20 1 Cum 1167.48
Fine aggregate ( Sand ) 0.45 Cum 735.88 1 Cum 331.15
Water (including curing) 1.20 kl 100.00 1 kl 120.00
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew charges 1.00 hour 174.20 1 hour 174.20
Add MA on crew charges 0.40 174.20 69.68
C.LABOUR :
1st class mason 0.10 Nos. 350.00 1 Each 35.00
Mazdoor (unskilled) 1.39 Nos. 280.00 1 Each 389.20
Add for MA @ 40% 0.40 424.20 169.68
3111.66
Overheads&Contractors Profit @14% 0.14 3111.66 435.63
Rate per 1 cum 3547.29
CIVIL DATA : Page-26

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Seigniorage charges
Coarse aggregate 0.90 Cum 50.00 1 Cum 45.00
Fine aggregate 0.45 Cum 40.00 1 Cum 18.00
3610.29
Say 3610
CIVIL DATA : Page-27

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)

8 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard other than granite
stones carted from approved quarry including cost and conveyance of all materials like cement, screened
sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes
on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar,
construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation
and basement. (APSS No. 601 & 615)

( BLD-CSTN-6-13 )
Unit = 1 cum
A.MATERIALS
Cement 59.40 Kgs 4061.53 1000 Kgs 241.25
Rough stone (OTG) 1.10 Cum 652.20 1 Cum 717.42
Fine aggregate(sand) 0.33 Cum 855.88 1 Cum 282.44
B) LABOUR
1st class mason 1.20 Nos. 350.00 1 Each 420.00
Mazdoor (unskilled) 2.00 Nos. 280.00 1 Each 560.00
Add for MA @ 40% 0.40 980.00 392.00
2613.12
Overheads&Contractors Profit @14% 0.14 2613.12 365.84
Rate per 1cum 2978.95
Seigniorage charges
Rough stones 1.10 Cum 50.00 1 Cum 55.00
Fine aggregate 0.33 Cum 40.00 1 Cum 13.20
3047.15
Say 3047

9 Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement
content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers ,
Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete
but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

(BLD-CSTN-3-14)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
Cement 400.00 Kgs 4061.53 1000 Kgs 1624.61
20mm HBG graded metal 0.80 Cum 1632.45 1 Cum 1305.96
Sand 0.40 Cum 735.88 1 Cum 294.35
B.LABOUR :
1st class Mason 0.133 Nos 350.00 1 Each 46.55
2nd class Mason 0.267 Nos 320.00 1 Each 85.44
Mazdoor (both men&women) 4.60 Nos 280.00 1 Each 1288.00
Add for MA @ 40% 0.40 1419.99 568.00
C.MACHINERY :
Batching plant 0.50 cum 1.333 hours 234.40 1 hour 312.46
Crew charges 1.333 hours 269.50 1 hour 359.24
Needle vibrator 40mm ( petrol ) 1.333 hours 26.80 1 hour 35.72
Crew charges 1.333 hours 125.40 1 hour 167.16
Add MA on crew charges 0.40 526.40 210.56
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 6418.05
CIVIL DATA : Page-28

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
CIVIL DATA : Page-29

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
a Footings
Rate for Design mix M 25 1.00 Cum 6418.05 1 Cum 6418.05
Hire charges of centering and
scaffolding 1.00 Cum 137.00 1 Cum 137.00
Labour charges 1.00 Cum 415.00 1 Cum 415.00
Add for MA @ 40% 0.40 415.00 166.00
7136.05
Overheads&Contractors Profit @14% 0.14 7136.05 999.05
Seigniorage charges
Coarse aggregate 0.80 Cum 50.00 1 Cum 40.00
Fine aggregate 0.40 Cum 40.00 1 Cum 16.00
Rate per 1 cum 8191.10
Say 8191

b Column pedestals
Rate for Design mix M 25 1.00 Cum 6418.05 1 Cum 6418.05
Hire charges of centering and
scaffolding 1.00 Cum 109.00 1 Cum 109.00
Labour charges 1.00 Cum 660.00 1 Cum 660.00
Add for MA @ 40% 0.40 660.00 264.00
7451.05
Overheads&Contractors Profit @14% 0.14 7451.05 1043.15
Seigniorage charges
Coarse aggregate 0.80 Cum 50.00 1 Cum 40.00
Fine aggregate 0.40 Cum 40.00 1 Cum 16.00
Rate per 1 cum 8550.20
Say 8550

c Plinth Beams
Rate for Design mix M 25 1.00 Cum 6418.05 1 Cum 6418.05
Hire charges of centering and
scaffolding 1.00 Cum 1158.00 1 Cum 1158.00
Labour charges 1.00 Cum 1000.00 1 Cum 1000.00
Add for MA @ 40% 0.40 1000.00 400.00
8976.05
Overheads&Contractors Profit @14% 0.14 8976.05 1256.65
Seigniorage charges
Coarse aggregate 0.80 Cum 50.00 1 Cum 40.00
Fine aggregate 0.40 Cum 40.00 1 Cum 16.00
Rate per 1 cum 10288.70
Say 10289
CIVIL DATA : Page-30

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
10 Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement
content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers,
Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit
etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

(BLD-CSTN-3-15)
COLUMNS, LINTELS, WATER TANKS, RCC WALL IN BUILDINGS:
A.MATERIALS :
Cement 400.00 Kgs 4061.53 1000 Kgs 1624.61
20mm HBG graded metal 0.80 Cum 1632.45 1 Cum 1305.96
Sand 0.40 Cum 735.88 1 Cum 294.35
B.LABOUR :
1st class Mason 0.167 Nos 350.00 1 Each 58.45
2nd class Mason 0.167 Nos 320.00 1 Each 53.44
Mazdoor (both men&women) 5.60 Nos 280.00 1 Each 1568.00
Add for MA @ 40% 0.40 1679.89 671.96
C.MACHINERY :
Batching plant 0.50 cum 1.333 hours 234.40 1 hour 312.46
Crew charges 1.333 hours 269.50 1 hour 359.24
Needle vibrator 40mm ( petrol ) 1.333 hours 26.80 1 hour 35.72
Crew charges 1.333 hours 125.40 1 hour 167.16
Add MA on crew charges 0.40 526.40 210.56
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 6781.91

a) COLUMNS :
un supported height up to 3.66 m
Rate for other Floors FF SF TF
Rate as above 6781.91 6781.91 6781.91
Hire charges of centering and
scaffolding 205.00 205.00 205.00
Labour charges 1171.00 1288.00 1405.00
Add for MA @ 40% 468.40 515.20 562.00
Lift charges of materials(Manual) 0.00 167.99 335.98
Add for MA @ 40% 0.00 67.20 134.39
Rate per 1cum 8626.31 9025.30 9424.28
Overheads&Contractors Profit @14% 1207.68 1263.54 1319.40
9833.99 10288.84 10743.68
Seigniorage charges
Coarse aggregate 40.00 40.00 40.00
Fine aggregate 16.00 16.00 16.00
Rate per 1cum 9889.99 10344.84 10799.68
Say 9890 10345 10800
CIVIL DATA : Page-31

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
b) LINTELS :
Rate for other Floors FF SF TF
Rate as above 6781.91 6781.91 6781.91
Hire charges of centering and
scaffolding 680.00 680.00 680.00
Labour charges 834.00 917.00 1001.00
Add for MA @ 40% 333.60 366.80 400.40
Lift charges of materials(Manual) 0.00 167.99 335.98
Add for MA @ 40% 0.00 67.20 134.39
Rate per 1cum 8629.51 8980.90 9333.68
Overheads&Contractors Profit @14% 1208.13 1257.33 1306.72
Seigniorage charges
Coarse aggregate 40.00 40.00 40.00
Fine aggregate 16.00 16.00 16.00
Rate per 1cum 9893.64 10294.23 10696.40
Say 9894 10294 10696

11 Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement
content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers ,
Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as weigh
batching, machine mixing, lifting of concrete manually, laying concrete, curing , overheads & contractors profit
etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

(BLD-CSTN-3-16)
RCC SLABS , BEAMS :
A.MATERIALS :
Cement 400.00 Kgs 4061.53 1000 Kgs 1624.61
20mm HBG graded metal 0.80 Cum 1632.45 1 Cum 1305.96
Sand 0.40 Cum 735.88 1 Cum 294.35
B.LABOUR :
1st class Mason 0.067 Nos 350.00 1 Each 23.45
2nd class Mason 0.133 Nos 320.00 1 Each 42.56
Mazdoor (both men&women) 3.077 Nos 280.00 1 Each 861.56
Add for MA @ 40% 0.40 927.57 371.03
C.MACHINERY :
Batching plant 0.50 cum 0.308 hours 234.40 1 hour 72.20
Crew charges 0.308 hours 269.50 1 hour 83.01
Needle vibrator 40mm ( petrol ) 0.308 hours 26.80 1 hour 8.25
Crew charges 0.308 hours 125.40 1 hour 38.62
Add MA on crew charges 0.40 121.63 48.65
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 4894.25
A) BEAMS :
un supported height up to 3.66 m
Rate for other Floors FF SF TF
Rate as above 4894.25 4894.25 4894.25
Hire charges of centering and
scaffolding 1201.00 1201.00 1201.00
Labour , lift charges for scaffolding 982.00 1080.00 1178.00
Add for MA @ 40% 392.80 432.00 471.20
Lift charges of materials(Manual) 0.00 92.76 185.51
Add for MA @ 40% 0.00 37.10 74.21
Rate per Cum 7470.05 7737.11 8004.17
Overheads&Contractors Profit @14% 1045.81 1083.2 1120.58
CIVIL DATA : Page-32

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Seigniorage charges
Coarse aggregate 40.00 40.00 40.00
Fine aggregate 16.00 16.00 16.00
8571.86 8876.31 9180.75
Say 8572 8876 9181

B) RCC SLABS :
a) Roof Slabs 115mm thick :
un supported height up to 3.66 m
Rate for Design mix M 25 0.115 Cum 4894.25 1 Cum 562.84

Rate for other Floors FF SF TF


Rate as above 562.84 562.84 562.84
Hire charges of centering and
scaffolding 136.00 136.00 136.00
Labour , lift charges for scaffolding 111.00 122.00 133.00
Add for MA @ 40% 44.40 48.80 53.20
Lift charges of materials(Manual) 0.00 10.67 21.33
Add for MA @ 40% 0.00 4.27 8.53
Rate per 1 Sqm 854.24 884.57 914.91
Overheads&Contractors Profit @14% 119.59 123.84 128.09
Seigniorage charges
Coarse aggregate 4.60 4.60 4.60
Fine aggregate 1.84 1.84 1.84
980.27 1014.85 1049.44
Say 980 1015 1049

b) Roof Slabs 125mm thick :


un supported height up to 3.66 m
Rate for Design mix M 25 0.125 Cum 4894.25 1 Cum 611.78

Rate for other Floors FF SF TF


Rate as above 611.78 611.78 611.78
Hire charges of centering and
scaffolding 136.00 136.00 136.00
Labour , lift charges for scaffolding 111.00 122.00 133.00
Add for MA @ 40% 44.40 48.80 53.20
Lift charges of materials(Manual) 0.00 11.59 23.19
Add for MA @ 40% 0.00 4.64 9.28
Rate per 1 Sqm 903.18 934.81 966.45
Overheads&Contractors Profit @14% 126.45 130.87 135.3
Seigniorage charges
Coarse aggregate 5.00 5.00 5.00
Fine aggregate 2.00 2.00 2.00
1036.63 1072.68 1108.75
Say 1037 1073 1109

e) Roof Slabs 200mm thick :


Rate for Design mix M 25 0.20 Cum 4894.25 1 Cum 978.85

for un supported height of 3.66 m


Rate for other Floors FF SF TF
Rate as above 978.85 978.85 978.85
Hire charges of centering and
scaffolding 140.00 140.00 140.00
Labour , lift charges for scaffolding 114.00 125.00 137.00
Add for MA @ 40% 45.60 50.00 54.80
CIVIL DATA : Page-33

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Lift charges of materials(Manual) 0.00 18.55 37.10
Add for MA @ 40% 0.00 7.42 14.84
Rate per 1 Sqm 1278.45 1319.82 1362.59
Overheads&Contractors Profit @14% 178.98 184.78 190.76
Seigniorage charges
Coarse aggregate 8.00 8.00 8.00
Fine aggregate 3.20 3.20 3.20
1468.63 1515.80 1564.55
Say 1469 1516 1565
CIVIL DATA : Page-34

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
12 Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement
content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine
crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers ,
Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick
at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such
as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads &
contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402, 403 & 903)

(BLD-CSTN-3-16)
A.MATERIALS :
Cement 400.00 Kgs 4061.53 1000 Kgs 1624.61
20mm HBG graded metal 0.80 Cum 1632.45 1 Cum 1305.96
Sand 0.40 Cum 735.88 1 Cum 294.35
B.LABOUR :
1st class Mason 0.067 Nos 350.00 1 Each 23.45
2nd class Mason 0.133 Nos 320.00 1 Each 42.56
Mazdoor (both men&women) 3.077 Nos 280.00 1 Each 861.56
Add for MA @ 40% 0.40 927.57 371.03

C.MACHINERY :
Batching plant 0.50 cum 0.308 hours 234.40 1 hour 72.20
Crew charges 0.308 hours 269.50 1 hour 83.01
Add MA on crew charges 0.40 83.01 33.20
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 4831.93

Cost of RCC M 25 design mix 0.0375 cum 4831.93 1 cum 181.20

Rate for other Floors FF SF TF


Rate as above 181.20 181.20 181.20
Hire charges of centering and
scaffolding 80.40 80.40 80.40
Labour , lift charges for scaffolding 76.80 84.60 92.40
Add for MA @ 40% 30.72 33.84 36.96
Lift charges of materials(Manual) 0.00 3.48 6.96
Add for MA @ 40% 0.00 1.39 2.78
Rate per 1 RM 369.12 384.91 400.70
Overheads&Contractors Profit @14% 51.68 53.89 56.1
Seigniorage charges
Coarse aggregate 1.50 1.50 1.50
Fine aggregate(concrete) 0.60 0.60 0.60
Rate per 1 RM 422.90 440.90 458.90
Say 423 441 459
CIVIL DATA : Page-35

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
13 Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid
blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement
mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc.,
complete for finished item of work. (APSS No. 501 & 504).

(BLD-CSTN-5-17)
Unit = 1 Cum
A.MATERIALS
No of blocks required for
1 Cum of Masonry 110 Nos 20250.08 1000 Nos 2227.51
Cement 24.00 Kgs 4061.53 1000 Kgs 97.48
Fine aggregate ( Sand ) 0.10 cu.m. 855.88 1 cu.m. 85.59
B .LABOUR
Mason 1st class 0.24 Nos. 350.00 1 Each 84.00
Mason 2nd class 0.56 Nos. 320.00 1 Each 179.20
Man Mazdoor 1.89 Nos. 280.00 1 Each 529.20
water charges @ 1% 0.01 792.40 7.92
Add for MA @ 40% 0.40 800.32 320.13
Rate for 1 cum. 3531.03

a) Rate for Foundation , Basement , Compound wall


Rate as above 1.00 cum 3531.03 1 cum 3531.03
Overheads&Contractors Profit @14% 0.14 3531.03 494.34
Seigniorage charges
Fine aggregate 0.10 cum 40.00 1 cum 4.00
4029.37
say 4029

b) Superstructure :
Rate for other Floors FF SF TF 4F
Rate as worked out above 3531.03 3531.03 3531.03 3531.03
Hire charges for Access Scaffolding 39.96 39.96 39.96 39.96
Labour charges for scaffolding 241.51 342.27 443.07 543.82
Add for MA @ 40% 96.60 136.91 177.23 217.53
Lift charges ( Page 131 of Std. Data ) 0.00 80.03 160.06 240.10
Add for MA @ 40% 0.00 32.01 64.02 96.04
3909.10 4162.20 4415.36 4668.47
Overheads&Contractors Profit @14% 547.27 582.71 618.15 653.59
Seigniorage charges
Fine aggregate 4.40 4.40 4.40 4.40
Rate for 1 cum. 4460.77 4749.31 5037.91 5326.46
Say 4461 4749 5038 5326
CIVIL DATA : Page-36

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
14 Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using
fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength
of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement
pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials
like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all
materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding
charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost
of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

(BLD-CSTN-5-12)
Unit - 10sqm
A.MATERIALS :
Flyash lime solid blocks 247 Nos. 10555.60 1000 Nos. 2607.23
Cement 36.00 Kgs 4061.53 1000 Kgs 146.22
Fine aggregate ( Sand ) 0.10 cu.m. 855.88 1 cu.m. 85.59
B.LABOUR :
1st class mason 0.60 Nos. 350.00 1 Each 210.00
2nd class mason 0.60 Nos. 320.00 1 Each 192.00
Mazdoor (Unskilled) 2.75 Nos. 280.00 1 Each 770.00
water charges @ 1% 0.01 1172.00 11.72
Add for MA @ 40% 0.40 1183.72 473.49
Rate for 10 sqm 4496.24
Rate for 1 sqm 449.62

Internal walls :
Rate for other Floors FF SF TF 4F
Rate as worked out above 449.62 449.62 449.62 449.62
Hire charges for Access Scaffolding 8.99 8.99 8.99 8.99
Labour charges for scaffolding 54.34 77.01 99.69 122.36
Add for MA @ 40% 21.74 30.80 39.88 48.94
Lift charges ( Page 131 of Std. Data ) 0.00 11.84 23.67 35.51
Add for MA @ 40% 0.00 4.74 9.47 14.20
Rate per 1 sqm 534.69 583.00 631.31 679.63
Overheads&Contractors Profit @14% 74.86 81.62 88.38 95.15
Rate per 1 sqm 609.55 664.62 719.69 774.78
Seigniorage charges
Fine aggregate 4.40 4.40 4.40 4.40
Rate per 1 sqm 613.95 669.02 724.09 779.18
Say 614 669 724 779

15 Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and
10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all
materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and
overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402)

(BLD-CSTN-3-10 & 11)


Unit : 1cum
A.MATERIALS :
HBG 20mm size metal 0.90 Cum 1632.45 1 Cum 1469.21
Sand 0.45 Cum 735.88 1 Cum 331.15
Cement 220.00 Kgs 4061.53 1 MT 893.54
Water ( including for curing ) 1.20 Kl 100.00 1 Kl 120.00
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew Charges 1.00 hour 174.20 1 hour 174.20
Add MA on crew charges 0.40 174.20 69.68
C.LABOUR :
CIVIL DATA : Page-37

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
1st class mason 0.10 Nos. 350.00 1 Each 35.00
Mazdoor (Unskilled) 1.39 Nos. 280.00 1 Each 389.20
Add for MA @ 40% 0.40 424.20 169.68
Rate for 1 Cum 3780.55

Rate for other Floors FF SF TF 4F


Rate as worked out above 3780.55 3780.55 3780.55 3780.55
Hire charges of centering and
scaffolding 137.00 137.00 137.00 137.00
Lift charges for scaffolding 415.00 456.50 498.00 539.50
Add for MA @ 40% 166.00 182.60 199.20 215.80
Lift charges ( Page 131 of Std. Data ) 0.00 42.42 84.84 127.26
Add for MA @ 40% 0.00 16.97 33.94 50.90
Rate per Cum 4498.55 4616.04 4733.52 4851.01
Overheads&Contractors Profit @14% 629.80 646.24 662.69 679.14
Seigniorage charges
Coarse aggregate 45.00 45.00 45.00 45.00
Fine aggregate 18.00 18.00 18.00 18.00
5191.35 5325.28 5459.21 5593.15
say 5191 5325 5459 5593

16 Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine
crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs.
of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel
centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors
profit etc., complete for finished item of work (APSS No. 402 & 403) for steps

(BLD-CSTN-3-11)
Unit : 1cum
A.MATERIALS :
HBG 20mm size metal 0.90 Cum 1632.45 1 Cum 1469.21
Sand 0.45 Cum 735.88 1 Cum 331.15
Cement 350.00 Kgs 4061.53 1000 Kgs 1421.54
Water ( including for curing ) 1.20 Kl 100.00 1 Kl 120.00
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew Charges 1.00 hour 174.20 1 hour 174.20
Needle vibrator 40mm ( petrol ) 1.00 hours 26.80 1 hour 26.80
Crew charges 1.00 hours 125.40 1 hour 125.40
Add MA on crew charges 0.40 299.60 119.84
C.LABOUR :
1st class mason 0.10 Nos. 350.00 1 Each 35.00
Mazdoor (Unskilled) 1.39 Nos. 280.00 1 Each 389.20
Add for MA @ 40% 0.40 424.20 169.68
Rate for 1 Cum 4510.91

Rate for other Floors FF SF TF 4F


Rate as worked out above 4510.91 4510.91 4510.91 4510.91
Hire charges of centering and
scaffolding 137.00 137.00 137.00 137.00
Lift charges for scaffolding 415.00 456.50 498.00 539.50
Add for MA @ 40% 166.00 182.60 199.20 215.80
Lift charges ( Page 131 of Std. Data ) 0.00 42.42 84.84 127.26
Add for MA @ 40% 0.00 16.97 33.94 50.90
Rate per 1 cum 5228.91 5346.39 5463.88 5581.37
Overheads&Contractors Profit @14% 732.05 748.50 764.94 781.39
CIVIL DATA : Page-38

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Seigniorage charges
Coarse aggregate 45.00 45.00 45.00 45.00
Fine aggregate 18.00 18.00 18.00 18.00
6023.95 6157.89 6291.83 6425.76
Say 6024 6158 6292 6426
CIVIL DATA : Page-39

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
17 Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal
(Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of
6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including
cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, laying
concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS
No. 402 & 403) for sill slabs.

(BLD-CSTN-3-13 - A)
A.MATERIALS :
Cement 350.00 Kgs 4061.53 1000 Kgs 1421.54
12mm HBG graded metal 0.90 Cum 1437.20 1 Cum 1293.48
Sand 0.45 Cum 735.88 1 Cum 331.15
B.LABOUR :
1st class Mason 0.133 Nos 350.00 1 Each 46.55
2nd class Mason 0.267 Nos 320.00 1 Each 85.44
Mazdoor (both men&women) 3.60 Nos 280.00 1 Each 1008.00
Add for MA @ 40% 0.40 1139.99 456.00
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew charges 1.00 hour 174.20 1 hour 174.20
Add MA on crew charges 0.40 174.20 69.68
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 5134.93

Cost of RCC(1:2:4) 1.00 cum 5134.93 1 cum 5134.93


Rate per 1sqm 5134.93

Rate for other Floors FF SF TF 4F


Rate as worked out above 5134.93 5134.93 5134.93 5134.93
Hire charges of centering and
scaffolding 137.00 137.00 137.00 137.00
Lift charges for scaffolding 415.00 456.50 498.00 539.50
Add for MA @ 40% 166.00 182.60 199.20 215.80
Lift charges ( Page 131 of Std. Data ) 0.00 114.00 228.00 342.00
Add for MA @ 40% 0.00 45.60 91.20 136.80
Rate per 1Cum 5852.93 6070.63 6288.32 6506.02
Overheads&Contractors Profit @14% 819.41 849.89 880.37 910.84
Seigniorage charges
Coarse aggregate 45.00 45.00 45.00 45.00
Fine aggregate 18.00 18.00 18.00 18.00
Rate per 1Cum 6735.34 6983.51 7231.69 7479.87
Say 6735 6984 7232 7480
CIVIL DATA : Page-40

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
18 Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal
(Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of
6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including
cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, laying
concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS
No. 402 & 403) for platforms and shelves.

(BLD-CSTN-3-13 - C)
A.MATERIALS :
Cement 350.00 Kgs 4061.53 1000 Kgs 1421.54
12mm HBG graded metal 0.90 Cum 1437.20 1 Cum 1293.48
Sand 0.45 Cum 735.88 1 Cum 331.15
B.LABOUR :
1st class Mason 0.067 Nos 350.00 1 Each 23.45
2nd class Mason 0.133 Nos 320.00 1 Each 42.56
Mazdoor (both men&women) 2.50 Nos 280.00 1 Each 700.00
Add for MA @ 40% 0.40 766.01 306.40
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 0.267 hour 128.90 1 hour 34.42
Crew charges 0.267 hour 174.20 1 hour 46.51
Add MA on crew charges 0.40 46.51 18.60
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 4338.11

a) 50mm thick platforms :


Cost of RCC(1:2:4) 0.05 cum 4338.11 1 cum 216.91

Rate for other Floors FF SF TF 4F


Rate as worked out above 216.91 216.91 216.91 216.91
Hire charges of centering and
scaffolding (50% of roof slab) 68.00 68.00 68.00 68.00
Lift charges for scaffolding 55.50 61.00 66.50 72.00
Add for MA @ 40% 22.20 24.40 26.60 28.80
Lift charges ( Page 131 of Std. Data ) 0.00 3.83 7.66 11.49
Add for MA @ 40% 0.00 1.53 3.06 4.60
Rate per 1 sqm 362.61 375.67 388.73 401.79
Overheads&Contractors Profit @14% 50.76 52.59 54.42 56.25
Seigniorage charges
Coarse aggregate 2.25 2.25 2.25 2.25
Fine aggregate 0.90 0.90 0.90 0.90
Rate per 1 sqm 416.52 431.41 446.30 461.19
Say 417 431 446 461

b) 25mm thick shelves :


Cost of RCC(1:2:4) 0.025 cum 4338.11 1 cum 108.45
Rate per 1sqm 108.45

Rate for other Floors FF SF TF 4F


Rate as worked out above 108.45 108.45 108.45 108.45
Hire charges of centering and
scaffolding 68.00 68.00 68.00 68.00
Lift charges for scaffolding 55.50 61.00 66.50 72.00
Add for MA @ 40% 22.20 24.40 26.60 28.80
Lift charges ( Page 131 of Std. Data ) 0.00 1.92 3.83 5.75
Add for MA @ 40% 0.00 0.77 1.53 2.30
Rate per 1 sqm 254.15 264.53 274.91 285.30
Overheads&Contractors Profit @14% 35.58 37.03 38.49 39.94
CIVIL DATA : Page-41

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Seigniorage charges
Coarse aggregate 1.13 1.13 1.13 1.13
Fine aggregate 0.45 0.45 0.45 0.45
Rate per 1 sqm 291.31 303.14 314.98 326.81
Say 291 303 315 327

19 Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters
for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads &
contractors profit complete for finished item of work in all floors.( APSS No.126)

(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392


Unit - 1 MT
a) Material
TMT bars including 5% for overlaps
and wastage 1.05 MT 46573.68 1 MT 48902.36
Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
b) Labour for cutting , bending , shifting to
site , tying and placing in position
Blacksmith / Barbender 10.00 Nos. 350.00 1 Each 3500.00
Mazdoor(Unskilled) 10.00 Nos. 280.00 1 Each 2800.00
Add for MA @ 40% 0.40 6300.00 2520.00
58142.36

Rate for other Floors FF SF TF 4F


Rate as worked out above 58142.36 58142.36 58142.36 58142.36
Lift charges ( Page 131 of Std. Data ) 0.00 630.00 1260.00 1890.00
Add for MA @ 40% 0.00 252.00 504.00 756.00
Rate per MT 58142.36 59024.36 59906.36 60788.36
Overheads&Contractors Profit @14% 8139.93 8263.41 8386.89 8510.37
Rate per 1 MT 66282.29 67287.77 68293.25 69298.73
Say 66282 67288 68293 69299

20 Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete
for finished item of work in all floors.( APSS No.126)

(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392


Unit - 1 MT
a) Material
Mild steel bars including 5% for
overlaps and wastage 1.05 MT 41073.68 1 MT 43127.36
Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
b) Labour for cutting , bending , shifting to
site , tying and placing in position
Blacksmith / Barbender 10.00 Nos. 350.00 1 Each 3500.00
Mazdoor(Unskilled) 10.00 Nos. 280.00 1 Each 2800.00
Add for MA @ 40% 0.40 6300.00 2520.00
52367.36

Rate for other Floors FF SF TF 4F


CIVIL DATA : Page-42

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Rate as worked out above 52367.36 52367.36 52367.36 52367.36
Lift charges ( Page 131 of Std. Data ) 0.00 630.00 1260.00 1890.00
Add for MA @ 40% 0.00 252.00 504.00 756.00
Rate per MT 52367.36 53249.36 54131.36 55013.36
Overheads&Contractors Profit @14% 7331.43 7454.91 7578.39 7701.87
Rate per 1 MT 59698.79 60704.27 61709.75 62715.23
Say 59699 60704 61710 62715
CIVIL DATA : Page-43

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
21 Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and
conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, and all operational, incidental charges on materials and including cost of all labour
charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors
profit complete for finished item of work.(SS 901,903 & 904)

(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement 43.20 Kgs 4061.53 1000 Kgs 175.46
Fine aggregate ( Sand ) 0.15 cu.m. 855.88 1 cu.m. 128.38
B.LABOUR :
1st Class Mason 0.60 Nos. 350.00 1 Each 210.00
Mazdoor (Unskilled) 0.96 Nos. 280.00 1 Each 268.80
Add for MA @ 40% 0.40 478.80 191.52
Rate per 10 Sqm 974.16
Rate per 1 Sqm 97.42

Rate for other Floors FF SF TF 4F


Rate as worked out above 97.42 97.42 97.42 97.42
Hire charges for Access Scaffolding 2.11 2.11 2.11 2.11
Labour charges for scaffolding 11.08 15.57 20.05 24.54
Add for MA @ 40% 4.43 6.23 8.02 9.82
Lift charges ( Page 131 of Std. Data ) 0.00 4.79 9.58 14.36
Add for MA @ 40% 0.00 1.92 3.83 5.74
Rate per 1 Sqm 115.04 128.04 141.01 153.99
Overheads&Contractors Profit @14% 16.11 17.93 19.74 21.56
Seigniorage charges
Fine aggregate 0.60 0.60 0.60 0.60
Rate per 1 Sqm 131.75 146.57 161.35 176.15
Say 132 147 161 176

22 Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all
operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing,
scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

( BLD-CSTN-8-10)
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 8mm thick
Cement 26.40 Kgs 4061.53 1000 Kgs 107.22
Fine aggregate (Sand) 0.11 Cum 855.88 1 Cum 94.15
Top coat in CM(1:4) , 4mm thick
Cement 14.40 Kgs 4061.53 1000 Kgs 58.49
Fine aggregate (Sand) 0.04 Cum 855.88 1 Cum 34.24
B.LABOUR :
1st Class Mason 0.63 Nos. 350.00 1 Each 220.50
2nd Class Mason 1.47 Nos. 320.00 1 Each 470.40
Mazdoor (Unskilled) 3.90 Nos. 280.00 1 Each 1092.00
Add for MA @ 40% 0.40 1782.90 713.16
Rate per 10 Sqm 2790.15
Rate per 1 Sqm 279.02
CIVIL DATA : Page-44

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Walls in superstructure :
Rate for other Floors FF SF TF 4F
Rate as worked out above 279.02 279.02 279.02 279.02
Hire charges for Access Scaffolding 0.90 0.90 0.90 0.90
Labour charges for scaffolding 5.43 7.70 9.97 12.24
Add for MA @ 40% 2.17 3.08 3.99 4.90
Lift charges ( Page 131 of Std. Data ) 0.00 17.83 35.66 53.49
Add for MA @ 40% 0.00 7.13 14.26 21.40
Rate per 1 Sqm 287.52 315.66 343.80 371.95
Overheads&Contractors Profit @14% 40.25 44.19 48.13 52.07
Seigniorage charges
Fine aggregate(0.015 cum) 0.60 0.60 0.60 0.60
328.37 360.45 392.53 424.62
Say 328 360 393 425

23 Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing
mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for
finished item of work .(SS 901,903 & 904)

(BLD-CSTN-8-8)
Unit : 10 sqm
A.MATERIALS :
Cement 60.48 Kgs 4061.53 1000 Kgs 245.64
Fine aggregate (Sand) 0.21 Cum 855.88 1 Cum 179.73
B.LABOUR :
2nd Class Mason 0.94 Nos. 320.00 1 Each 300.80
Mazdoor (Unskilled) 1.60 Nos. 280.00 1 Each 448.00
Add for MA @ 40% 0.40 748.80 299.52
Rate per 10 Sqm 1473.70
Rate per 1 Sqm 147.37

a) for basement :
Rate per 1 Sqm 1.00 sqm 147.37 1 sqm 147.37
Overheads&Contractors Profit @14% 0.14 147.37 20.63
Seigniorage charges
Fine aggregate 0.022 Cum 40.00 1 Cum 0.88
Rate per 1 Sqm 168.88
Say Say 169

24 Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using
screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed
manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is
green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm
including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site,
including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour
charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off
junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS
No. 901 & 903).

(BLD-CSTN-10-25)
Unit : 10 sqm
A.MATERIALS :
Cement 100.80 Kgs 4061.53 1000 Kgs 409.40
Fine aggregate (Sand) 0.21 Cum 855.88 1 Cum 179.73
Impervious Water proof compound 2.00 Kgs 24.00 0.50 Kgs 96.00
B.LABOUR :
1st Class Mason 0.66 Nos. 350.00 1 Each 231.00
2nd Class Mason 1.54 Nos. 320.00 1 Each 492.80
CIVIL DATA : Page-45

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Mazdoor (Unskilled) 3.70 Nos. 280.00 1 Each 1036.00
Add for MA @ 40% 0.40 1759.80 703.92
Rate per 10 Sqm 3148.86
CIVIL DATA : Page-46

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Rate for other Floors FF SF TF 4F
Rate as worked out above 3148.86 3148.86 3148.86 3148.86
Lift charges ( Page 131 of Std. Data ) 0.00 175.98 351.96 527.94
Add for MA @ 40% 0.00 70.39 140.78 211.18
3148.86 3395.23 3641.60 3887.97
Overheads&Contractors Profit @14% 440.84 475.33 509.82 544.32
Seigniorage charges
Fine aggregate 8.40 8.40 8.40 8.40
3598.10 3878.96 4159.82 4440.69
Rate per 1 Sqm 359.81 387.90 415.98 444.07
Say 360 388 416 444

25 Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom
slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand
12mm thick mixed with water proofing compound manufactured by reputed manufacturers as approved by
Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a
floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including
cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including
seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of
wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

(BLD-CSTN-8-2)
A.MATERIALS :
Cement 72.00 Kgs 4061.53 1000 Kgs 292.43
Fine aggregate (Sand) 0.15 Cum 855.88 1 Cum 128.38
Impervious Water proof compound 1.44 Kgs 24.00 0.50 Kgs 69.12
B.LABOUR :
1st Class Mason 0.60 Nos. 350.00 1 Each 210.00
Mazdoor (Unskilled) 0.96 Nos. 280.00 1 Each 268.80
Add for MA @ 40% 0.40 478.80 191.52
Rate per 10 Sqm 1160.25

Rate for other Floors FF SF TF 4F


Rate as worked out above 1160.25 1160.25 1160.25 1160.25
Lift charges ( Page 131 of Std. Data ) 0.00 47.88 95.76 143.64
Add for MA @ 40% 0.00 19.15 38.30 57.46
1160.25 1227.28 1294.32 1361.35
Overheads&Contractors Profit @14% 162.44 171.82 181.20 190.59
Seigniorage charges
Fine aggregate 6.00 6.00 6.00 6.00
Rate per 10 Sqm 1328.69 1405.10 1481.52 1557.94
Rate per 1 Sqm 132.87 140.51 148.15 155.79
Say 133 141 148 156
CIVIL DATA : Page-47

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
26 Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick 0.457m x 0.457m or any
other size as specified set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC
bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and
jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water,
flooring stones etc. complete including seigniorage charges, sales & other taxes on all materials including all
labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges ,
cost of base coat etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 &
701)

(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished shahabad stone 15 to 18mm
thick 11.00 Sqm 1575.10 10 Sqm 1732.61
Cement for CM (1:8) proportion for
base coat 21.60 Kgs 4061.53 1000 Kgs 87.73
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
Cement for pointing 20.00 Kgs 4061.53 1000 Kgs 81.23
Sand for CM(1:8) 0.12 Cum 855.88 1 Cum 102.71
B .LABOUR
Mason 1st class 3.10 Nos 350.00 1 Each 1085.00
Mason 2nd class 1.10 Nos 320.00 1 Each 352.00
Mazdoor(un skilled) 0.86 Nos 280.00 1 Each 240.80
Add water charges 1% 0.01 1677.80 16.78
Add for MA @ 40% 0.40 1694.58 677.83
Rate for 10 sqm 4510.71

Rate for other floors FF SF TF 4F


Rate as worked out above 4510.71 4510.71 4510.71 4510.71
Lift charges ( Page 131 of Std. Data ) 0.00 169.46 338.92 508.37
Add for MA @ 40% 0.00 67.78 135.57 203.35
4510.71 4747.96 4985.20 5222.43
Overheads&Contractors Profit @14% 631.50 664.71 697.93 731.14
Seigniorage charges
Shahabad stone 77.00 77.00 77.00 77.00
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 5224.01 5494.47 5764.93 6035.37
Rate per 1 Sqm 522.40 549.45 576.49 603.54
Say 522 549 576 604

27 Flooring with ceramic tiles 7.30mm thick , 1st quality and of size as approved by Engineer-in-charge, set
over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof
slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like
cement, sand , water and tiles etc., and overheads & contractors profit complete including seigniorage charges
etc., complete for finished item of work. (APSS No.701 & 707)
(BLD-CSTN-9-6)
Unit = 10 sqm.
A. MATERIALS:
Ceramic tiles 7.3mm thick of 1st quality
10.50 Sqm 447.00 1 Sqm 4693.50
Cement for CM(1:8) proportion for base
coat 21.60 Kgs 4061.53 1000 Kgs 87.73
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
White Cement 2.00 Kgs 27.00 1 Kg 54.00
Sand for CM(1:8) 0.12 Cum 855.88 1 Cum 102.71
B .LABOUR
Mason 1st class 0.96 Nos 350.00 1 Each 336.00
Mason 2nd class 2.24 Nos 320.00 1 Each 716.80
CIVIL DATA : Page-48

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Mazdoor(un skilled) 3.30 Nos 280.00 1 Each 924.00
Add water charges 1% 0.01 1976.80 19.77
Add for MA @ 40% 0.40 1996.57 798.63
Rate for 10sqm 7867.16

Rate for other Floors FF SF TF 4F


Rate as worked out above 7867.16 7867.16 7867.16 7867.16
Lift charges ( Page 131 of Std. Data ) 0.00 199.66 399.31 598.97
Add for MA @ 40% 0.00 79.86 159.72 239.59
7867.16 8146.68 8426.19 8705.72
Overheads&Contractors Profit @14% 1101.40 1140.54 1179.67 1218.80
Seigniorage charges
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 8973.36 9292.02 9610.66 9929.32
Rate per 1 Sqm 897.34 929.20 961.07 992.93
Say 897 929 961 993

28 Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of
size not less than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and
design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of
2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid
or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and
jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C.
bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for
mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and
overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

(BLD-CSTN-9-5)
Unit = 10 sqm.
A. MATERIALS:
Vitrified tiles 8mm thick of size not less
than 598mm x 598mm 10.50 Sqm 607.00 1 Sqm 6373.50
Cement for CM(1:8)proportion for base
coat 21.60 Kgs 4061.53 1000 Kgs 87.73
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
White Cement 6.00 Kgs 27.00 1 Kg 162.00
Sand for CM(1:8) 0.12 Cum 855.88 1 Cum 102.71
B .LABOUR
Mason 1st class 0.96 Nos 350.00 1 Each 336.00
Mason 2nd class 2.24 Nos 320.00 1 Each 716.80
Mazdoor(un skilled) 3.30 Nos 280.00 1 Each 924.00
Add water charges 1% 0.01 1976.80 19.77
Add for MA @ 40% 0.40 1996.57 798.63
Rate for 10sqm 9655.16

Rate for other Floors FF SF TF 4F


Rate as worked out above 9655.16 9655.16 9655.16 9655.16
Lift charges ( Page 131 of Std. Data ) 0.00 199.66 399.31 598.97
Add for MA @ 40% 0.00 79.86 159.72 239.59
9655.16 9934.68 10214.19 10493.72
Overheads&Contractors Profit @14% 1351.72 1390.86 1429.99 1469.12
Seigniorage charges
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 11011.68 11330.34 11648.98 11967.64
Rate per 1 Sqm 1101.17 1133.03 1164.90 1196.76
Say 1101 1133 1165 1197
CIVIL DATA : Page-49

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
29 Providing polished shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set
over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat
cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc.
complete including seigniorage charges, sales & other taxes on all materials including all labour charges like
dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift
charges , cost of base coat etc., and overheads & contractors profit complete for finished item of work for
treads and risers. (APSS No.703 & 701)

a) Treads of 0.30m wide :


(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished shahabad stone 15 to 18mm
thick 11.00 Sqm 1575.10 10 Sqm 1732.61
Cement for CM (1:5) proportion for
base coat 34.56 Kgs 4061.53 1000 Kgs 140.37
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
Cement for jointing 20.00 Kgs 4061.53 1000 Kgs 81.23
Sand for CM(1:5) 0.12 Cum 855.88 1 Cum 102.71
B .LABOUR
Mason 1st class 3.10 Nos 350.00 1 Each 1085.00
Mason 2nd class 1.10 Nos 320.00 1 Each 352.00
Mazdoor(un skilled) 0.86 Nos 280.00 1 Each 240.80
Add water charges 1% 0.01 1677.80 16.78
Add for MA @ 40% 0.40 1694.58 677.83
Flat nosing the edges 33.33 RM 13.00 1 RM 433.29
Add for MA @ 40% 0.40 173.32 69.33
Rate for 10sqm 5065.97

Rate for other floors FF SF TF 4F


Rate as worked out above 5065.97 5065.97 5065.97 5065.97
Lift charges ( Page 131 of Std. Data ) 0.00 169.46 338.92 508.37
Add for MA @ 40% 0.00 67.78 135.57 203.35
5065.97 5303.21 5540.46 5777.69
Overheads&Contractors Profit @14% 709.24 742.45 775.66 808.88
Seigniorage charges
Shahabad stone 77.00 77.00 77.00 77.00
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 5857.01 6127.46 6397.92 6668.37
Rate per 1 Sqm 585.70 612.75 639.79 666.84
Say 586 613 640 667

b) Risers of 0.15m height :


(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of shahabad stone slabs 11.00 sqm 1575.10 10 sqm 1732.61
Sand for CM(1:5) base coat 0.12 cum 855.88 1 cum 102.71
Cement for CM(1:5) base coat 34.56 Kgs 4061.53 1000 Kgs 140.37
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
B.LABOUR
Mason 1st class 0.96 Nos. 350.00 1 Each 336.00
Mason 2nd class 2.24 Nos. 320.00 1 Each 716.80
Mazdoor(unskilled) 3.10 Nos. 280.00 1 Each 868.00
Add water charges 1% 0.01 1920.80 19.21
Add for MA @ 40% 0.40 1940.01 776.00
Rate for 10 sqm 4825.72
CIVIL DATA : Page-50

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Risers 15cm height :
Rate for other Floors FF SF TF 4F
Rate as worked out above 4825.72 4825.72 4825.72 4825.72
Lift charges ( Page 131 of Std. Data ) 0.00 194.00 388.00 582.00
Add for MA @ 40% 0.00 77.60 155.20 232.80
4825.72 5097.32 5368.92 5640.52
Overheads&Contractors Profit @14% 675.60 713.63 751.65 789.67
Seigniorage charges
Shahabad stone 77.00 77.00 77.00 77.00
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 5583.12 5892.75 6202.37 6511.99
Rate per 1 Sqm 558.31 589.28 620.24 651.20
Say 558 589 620 651

30 Providing skirting to internal walls to 10 cm height with ceramic tiles 7.30 mm thick length equal to
flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete
including seigniorage charges etc., and overheads & contractors profitcomplete for finished item of work.(APSS
No.701 &707)

(BLD-CSTN-9-18)
Unit = 10 sqm
A.MATERIALS :
Cost of Ceramic tiles 8 mm thick 10.50 sqm 447.00 1 sqm 4693.50
Sand for CM(1:5) base coat 0.12 cum 855.88 1 cum 102.71
Cement for CM(1:5) base coat 34.56 Kgs 4061.53 1000 Kgs 140.37
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
White cement for jointing & pointing 6.00 Kgs 27.00 1 Kg 162.00
B.LABOUR
Mason 1st class 0.77 Nos. 350.00 1 Each 269.50
Mazdoor(unskilled) 0.80 Nos. 280.00 1 Each 224.00
Add water charges 1% 0.01 493.50 4.94
Add for MA @ 40% 0.40 498.44 199.37
Rate per 10 Sqm 5930.41

Rate for other Floors FF SF TF 4F


Rate as worked out above 5930.41 5930.41 5930.41 5930.41
Lift charges ( Page 131 of Std. Data ) 0.00 49.84 99.69 149.53
Add for MA @ 40% 0.00 19.94 39.88 59.81
5930.41 6000.19 6069.98 6139.75
Overheads&Contractors Profit @14% 830.26 840.03 849.80 859.57
Seigniorage charges
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 6765.47 6845.02 6924.58 7004.12
Rate per 1 RM 67.65 68.45 69.25 70.04
Say 68 68 69 70
CIVIL DATA : Page-51

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
31 Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and
normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand
with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc.,and overheads & contractors profit complete including seigniorage charges etc.,
complete for finished item of work.(APSS No.701 &707)

(BLD-CSTN-9-20)
Unit = 10 sqm
Cost of vitrified tiles 8mm thick 10.50 sqm 607.00 1 sqm 6373.50
Sand for CM(1:5) base coat 0.12 cum 855.88 1 cum 102.71
Cement for CM(1:5) base coat 34.56 Kgs 4061.53 1000 Kgs 140.37
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
White cement for jointing & pointing 2.00 Kgs 27.00 1 Kg 54.00

B.LABOUR
Mason 1st class 0.77 Nos. 350.00 1 Each 269.50
Mazdoor(unskilled) 0.80 Nos. 280.00 1 Each 224.00
Add water charges 1% 0.01 493.50 4.94
Add for MA @ 40% 0.40 498.44 199.37
Rate for 10 sqm 7502.41

Rate for other Floors FF SF TF 4F


Rate as worked out above 7502.41 7502.41 7502.41 7502.41
Lift charges ( Page 131 of Std. Data ) 0.00 49.84 99.69 149.53
Add for MA @ 40% 0.00 19.94 39.88 59.81
7502.41 7572.19 7641.98 7711.75
Overheads&Contractors Profit @14% 1050.34 1060.11 1069.88 1079.65
Seigniorage charges
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 8557.55 8637.10 8716.66 8796.20
Rate per 1 RM 85.58 86.37 87.17 87.96
Say 86 86 87 88

32 Providing dadooing to walls with glazed plain coloured wall tiles 1st quality of size of size not less than
300mm x 200mm with bordersas approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick
using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads &
contractors profit complete for finished item of work.

(BLD-CSTN-9-18)
Unit = 10 sqm
A.MATERIALS :
Cost of glazed coloured tiles 10.50 sqm 397.00 1 sqm 4168.50
Sand for CM(1:5) base coat 0.12 cum 855.88 1 cum 102.71
Cement for CM(1:5) base coat 34.56 Kgs 4061.53 1000 Kgs 140.37
Cement for slurry 33.00 Kgs 4061.53 1000 Kgs 134.03
White cement for jointing & pointing 6.00 Kgs 27.00 1 Kg 162.00
B.LABOUR
Mason 1st class 0.77 Nos. 350.00 1 Each 269.50
Mazdoor(unskilled) 0.80 Nos. 280.00 1 Each 224.00
Add water charges 1% 0.01 493.50 4.94
Add for MA @ 40% 0.40 498.44 199.37
Rate for 10 sqm 5405.41
CIVIL DATA : Page-52

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Rate for other Floors FF SF TF 4F
Rate as worked out above 5405.41 5405.41 5405.41 5405.41
Lift charges ( Page 131 of Std. Data ) 0.00 49.84 99.69 149.53
Add for MA @ 40% 0.00 19.94 39.88 59.81
5405.41 5475.19 5544.98 5614.75
Overheads&Contractors Profit @14% 756.76 766.53 776.30 786.07
Seigniorage charges
Fine aggregate 4.80 4.80 4.80 4.80
Rate per 10 Sqm 6166.97 6246.52 6326.08 6405.62
Rate per 1 Sqm 616.70 624.65 632.61 640.56
Say 617 625 633 641

33 Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using 40mm
size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., shuttering, machine mixing, laying concrete, lifting concrete manually , curing
etc., and overheads & contractors profit complete as per drawings but excluding cost of steel and it's fabrication
charges for finished item of work (APSS NO. 402 & 403) for Dummy columns.

(BLDS-CSTN-3-13)
Unit: 1 Cum
A.MATERIALS :
Cement 129.60 Kgs 4061.53 1000 Kgs 526.37
40mm HBG metal 0.90 Cum 1297.20 1 Cum 1167.48
Sand 0.45 Cum 735.88 1 Cum 331.15
B.LABOUR :
1st class Mason 0.167 Nos 350.00 1 Each 58.45
2nd class Mason 0.167 Nos 320.00 1 Each 53.44
Mazdoor (unskilled) 4.70 Nos 280.00 1 Each 1316.00
Add for MA @ 40% 0.40 1427.89 571.16
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8
cum)capacity 1.00 hour 128.90 1 hour 128.90
Crew charges 1.00 hour 174.20 1 hour 174.20
Needle vibrator 40mm ( petrol ) 1.00 hour 26.80 1 hour 26.80
Crew charges 1.00 hour 125.40 1 hour 125.40
Add MA on crew charges 0.40 299.60 119.84
Water(including for curing) 1.20 kl 100.00 1 kl 120.00
Basic cost per 1cum 4719.19

Rate for other Floors SF TF


Rate as above 4719.19 4719.19
Hire charges of centering and
scaffolding 205.00 205.00
Labour , lift charges for scaffolding 1288.00 1405.00
Add for MA @ 40% 515.20 562.00
Lift charges 142.79 285.58
Add for MA @ 40% 57.12 114.23
Rate per 1 cum 6927.30 7291.00
Overheads&Contractors Profit @14% 969.82 1020.74
Seigniorage charges
Coarse aggregate 45.00 45.00
Fine aggregate 18.00 18.00
7960.12 8374.74
Say 7960 8375
CIVIL DATA : Page-53

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
34 Supplying and fixing of stainless steel ( grade 202 ) hand railing as per approved drawing with top rail of
50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2
Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding,
drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the
railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials,
electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc.,
complete for finished item of work.

For a flight length of 4.60 M. 4.60 RM


Cost of 50mm dia SS pipe (1x4.60) 4.60 RM
Cost of 25mm dia SS pipe (26x0.90) 23.40 RM
50.00mm pipe (4.60 x 2.39 Kgs/RM) 10.99 Kgs
25mm pipe (23.40x 0.89 Kgs/RM) 20.83 Kgs
Cost of stainless steel pipes 31.82 Kgs 187.00 1 Kg 5950.34
Labour charges for fabrication 31.82 Kgs 101.00 1 Kg 3213.82
Drilling of 20mm dia hole(13 x 0.10) 1.30 RM 140.00 1 RM 182.00
Base Plate 75mm dia. 13 Nos. 75.00 1 Each 975.00
Add for anchor bars 13 Nos. 25.00 1 No 325.00
Add for bonding 13 Nos. 10.00 1 No 130.00
10776.16
Rate per 1 RM 2342.64
Rate per 1 Sqm 2602.94
Overheads&Contractors Profit @14% 0.14 2602.94 364.41
2967.35
say 2967

35 Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm
pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other
accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on
materials to site, operational & incidental charges including all labour charges for fixing at site etc., and
overheads & contractors profit complete for finished item of work. (APSS No. 1328)

PVC pipe 110mm dia 6.00 RM 139.00 1 RM 834.00


MS Clamps 3 Nos. 18.00 1 Each 54.00
Labour charges for fixing pipes 6.00 RM 65.00 1 RM 390.00
Rate per 6 RM 1278.00
213.00
Overheads&Contractors Profit @14% 0.14 213.00 29.82
Rate per 1 RM 242.82
Say 243

36 White washing two coats with paint grade white lime to ceiling to give an even shade after thouroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials ,
labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete
for finished item of work but excluding conveyance of materials in all floors.
(BLD-CSTN-11-5)
Unit : 10 sqm
A.MATERIALS :
Surya cement 2.00 kgs 515.00 25 kgs 41.20
B.LABOUR :
Painter 1st class 0.063 Nos. 400.00 1 Each 25.20
Painter 2nd class 0.147 Nos. 320.00 1 Each 47.04
Mazdoor(unskilled) 0.32 Nos. 280.00 1 Each 89.60
Sundries including brushes , ladders
etc., @ 1% 1% 161.84 1.62
Add for MA @ 40% 0.40 163.46 65.38
Rate per 10 sqm 270.04
Overheads&Contractors Profit @14% 0.14 270.04 37.81
Rate per 10 sqm 307.85
CIVIL DATA : Page-54

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Rate per 1 sqm 30.78
Say 31

37 Supply & application of one coat deco orient base & two coats of acrylic emulsion paint having VOC
(Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance
of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads &
contractors profit complete for finished item of work in all floors.

(BLD-CSTN-12-2& Amendment in SoR 2011-12)


Unit 10 Sqm.
A. Materials:-
Cost of deco orient base 1.00 Kg 631.00 25 Kg 25.24
Painter 1st class 0.21 Nos. 400.00 1 Each 84.00
Painter 2nd class 0.49 Nos. 320.00 1 Each 156.80
Acrylic emulsion paint 0.80 Ltrs 180.00 1 Ltrs 144.00
Painter 1st class 0.36 Nos. 400.00 1 Each 144.00
Painter 2nd class 0.84 Nos. 320.00 1 Each 268.80
Sundries including brushes , ladders
etc., @ 1% 0.01 653.60 6.54
Add for MA @ 40% 0.40 660.14 264.05
1093.43
Overheads&Contractors Profit @14% 0.14 1093.43 153.08
Rate per 10 sqm 1246.51
Rate per 1 sqm 124.65
Say 125

38 Supply & application of one coat of deco orient base & two coats of acrylic exterior emulsion paint
having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and
conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and
overheads & contractors profit complete for finished item of work in all floors.

Unit 10 Sqm.
A. Materials:-
Cost of deco orient base 1.00 Kg 631.00 25 Kg 25.24
Painter 1st class 0.21 Nos. 400.00 1 Each 84.00
Painter 2nd class 0.49 Nos. 320.00 1 Each 156.80
Acrylic emulsion paint 0.80 Ltrs 183.00 1 Ltrs 146.40
Painter 1st class 0.21 Nos. 400.00 1 Each 84.00
Painter 2nd class 0.49 Nos. 320.00 1 Each 156.80
Mazdoor 1.50 Nos. 280.00 1 Each 420.00
Sundries including brushes , ladders
etc., @ 1% 0.01 901.60 9.02
Add for MA @ 40% 0.40 910.62 364.25
1446.50
Overheads&Contractors Profit @14% 0.14 1446.50 202.51
Rate per 10 sqm 1649.01
Rate per 1 sqm 164.90
Say 165
CIVIL DATA : Page-55

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
39 Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two
coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre
of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour
charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other
taxes on cost of all materials etc.and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in
all floors.

(BLD-CSTN-12-6 & 12-12-195)


Cost of Putty for wood work 1 Kg 135.00 1 Kg 135.00
Primer Coat
Cost of Wood Primer 0.70 Ltr 135.00 1 Ltr 94.50
1st Class Painter 0.21 Nos. 400.00 1 Each 84.00
2nd Class Painter 0.49 Nos. 320.00 1 Each 156.80
2 coats of Enamel painting
Cost of Synthetic Enamel Paint 1.20 Ltr 175.00 1 Ltr 210.00
1st Class Painter 0.36 Nos. 400.00 1 Each 144.00
2nd Class Painter 0.84 Nos. 320.00 1 Each 268.80
Sundries including brushes , ladders
etc., @ 1% 0.01 653.60 6.54
Add for MA @ 40% 0.40 660.14 264.05
1363.69
Overheads&Contractors Profit @14% 0.14 1363.69 190.92
Rate per 10 sqm 1554.61
Rate per 1 sqm 155.46
Say 155

40 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames
of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS
flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements,
stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc.,
overheads & contractors profit complete for finished item of work as per special spn 1105

Rate as per SSR 1.00 sqm 2187.00 1 sqm 2187.00


Overheads&Contractors Profit @14% 0.14 2187.00 306.18
Rate per 1 sqm 2493

41 Supplying and fixing 50mm dia nominal bore Medium Grade properties & weight as per IS 1239 ISI mark MS
Tube for fixing of GI Sheet including cost and conveyance of all materials to work site and all operational,
incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished
item of work in all floors for stair case head room roof.

Cost of MS Tube 5.10 Kgs 57.00 1 Kgs 290.70


Labour charges for fabrication 5.10 Kgs 20.00 1 Kgs 102.00
Labour charges for fixing 5.10 Kgs 4.00 Kgs 20.40
Add for MA @ 40% 0.40 61.20 24.48
Rate per 1 RM 437.58
Overheads&Contractors Profit @14% 0.14 437.58 61.26
498.84
Say 499
CIVIL DATA : Page-56

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
42 Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I
limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint
on over lapping of sheets complete (up to a pitch of 600) and seigniorage charges, etc., complete, excluding the
cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and
contractors profit etc., complete for finished item of work in all floors.

Unit : 10 sqm
A. MATERIALS:
G.I corrugated 0.80 mm thick sheets 103.09 Kgs 56.00 1 Kg 5773.04
G.I scam bolts & nuts 2 x 27 (laps) x 17 47.91 Nos. 5.00 1 No. 239.55
= 884
G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets 43.90 Nos. 9.00 1 No. 395.10
x 3 noswashers
Limpet = 810 nos. with washers
(for scam or
& ‘J’ bolts) 91.82 Nos. 0.30 1 No. 27.55
srews,
884 if washers
+ 810
Bitumen wooden
= 1694battens used. 91.82 Nos. 0.25 1 No. 22.96
Zinc cromate yellow paint 0.14 Ltrs 175.00 1 Ltr 24.50
Ready mixed paint 0.20 Ltrs 175.00 1 Ltr 35.00
B. LABOUR
For roofing
Carpenter II class 0.84 Nos. 320.00 1 No. 268.80
Man mazdoor (beldar) 0.91 Nos. 280.00 1 No. 254.80
For primer painting one coat
Painter 1st class 0.018 Nos. 400.00 1 No. 7.20
Painter 1st class 0.042 Nos. 320.00 1 No. 13.44
Mazdoor (coolie) 0.06 Nos. 280.00 1 No. 16.80
For two coats of painting to over laps
Painter 1st class 0.042 Nos. 400.00 1 No. 16.80
Painter 1st class 0.098 Nos. 320.00 1 No. 31.36
Mazdor (coolie) 0.14 Nos. 280.00 1 No. 39.20
Add for MA @ 40% 0.40 648.40 259.36
Rate per 10 sqm 7425.45
Rate per 1 sqm 742.55
Overheads&Contractors Profit @14% 0.14 742.55 103.96
Rate per 1 sqm 846.50
say 847
43 Providing Plinth protection 1.20m width along with drain constructed with 230 mm thick brick walls using
common burnt clay bricks (23x11x7cm) over 100 mm thick over PCC(1:5:10) bed and plastering with CM (1:5)
12mm thick single coat for brick masonry drain and providing PCC(1:5:10) 100mm thick in between basement of
the building and brick wall and 20mm thick granolithic concrete flooring with CC(1:1:2) prop. up to the edge of
the brick masonry wall using 6mm to 12mm size graded hard granite machine crushed metal laid monolithically
already laid, in alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strips
between the pannels and finishing the top surface to required smoothness and slopes including grooves, thread
lining as directed by the Engineer - in - charge including cost and conveyance of all materials to site,
seigniorage charges, sales & other taxes on all materials and operational & incidental and labour charges like
mixing of cement concrete, laying, curing, overheads & contractor profit etc., complete

P.C.C.(1:5:10) 0.211 cum 3547.29 1 cum 748.48


Masonry in CM(1:6) 0.138 cum 3531.03 1 Cum 487.28
Plastering 12 mm th Single coat in
C.M(1:5) 1.43 sqm 102.79 10 sqm 14.7
Granolithic concrete flooring 1.20 sqm 0.00 10 sqm 0.00
Rate per 1.00 RM (1.20 Sqm) 1250.46
Rate per 1 Sqm 1042.05
Overheads&Contractors Profit @14% 0.14 1042.05 145.89
Seigniorage charges
40mm metal 0.1899 cum 50.00 1 cum 9.50
12mm graded metal 0.0204 cum 50.00 1 cum 1.02
Sand
in PCC 0.084 cum
in brick masonry 0.029 cum
in plastering 0.018 cum
in granolithic concrete 0.009
CIVIL DATA : Page-57

Sl. Amount
Description Quantity Rate (Rs.) Per Unit
No. (Rs.)
Sand 0.140 cum 50.00 1 cum 7.00
Bricks 71 Nos. 38.50 1000 Nos. 2.73
Rate per 1 Sqm 1208.19
Say 1208

44 Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing
mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for
finished item of work.(SS 901,903 & 904)
(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement 43.20 Kgs 4061.53 1000 Kgs 175.46
Fine aggregate ( Sand ) 0.15 cu.m. 855.88 1 cu.m. 128.38
B.LABOUR :
1st Class Mason 0.60 Nos. 350.00 1 Each 210.00
Mazdoor (Unskilled) 0.96 Nos. 320.00 1 Each 307.20
Add for MA @ 20% 0.40 517.20 206.88
Rate per 10 Sqm 1027.92
Rate per 1 Sqm 102.79

a) for basement :
Rate per 1 Sqm 1.00 sqm 0.00 1 sqm 0.00
Overheads&Contractors Profit @14% 0.14 0.00 0.00
Seigniorage charges
Fine aggregate 540.541 Cum 40.00 1 Cum 21621.64
Rate per 1 Sqm 21621.64
Say 21622
30

JOINERY DATA
COMMON SoR 2013-2014

a) Labour charges for wrought and put up (BLD-CSTN-13-1)


1st class carpenter 5.31 Nos. 350.00 1 Each 1858.50
2nd class carpenter 12.39 Nos. 320.00 1 Each 3964.80
Man Mazdoor 8.80 Nos. 280.00 1 Each 2464.00
Labour charges per 1 cum 8287.30

b) Labour charges for aluminium doors ( S.No.11 of Page No. 396 of SoR 2011-12 )
1st class carpenter 0.099 Nos. 350.00 Each 34.65
2nd class carpenter 0.198 Nos. 320.00 Each 63.36
Power Saw Cutter -Hand Operated
-Operator 0.099 Nos. 350.00 Each 34.65
Power Drill -Hand Operated -Operator 0.099 Nos. 350.00 Each 34.65
Mazdoor(Unskilled) 0.297 Nos. 280.00 Each 83.16
Non-technical work inspector 0.099 Nos. 335.00 Each 33.17
Add for MA @ 40% 0.40 283.64 113.45
Machinery
Power Saw Cutter -Hand Operated
-Hire charges (BMC-X.02) 0.793 Hrs 117.00 1 Hour 92.78
Power Drill -Hand Operated -Hire
charges (BMC-X.03) 0.793 Hrs 108.00 1 Hour 85.64
575.51
Power charges for Motors 1% 0.01 575.51 5.76
Labour charges per 1 sqm 581.27
31

1 Supply and fixing of two shutter main door cum fixed window as per approved drawing with best teak
wood frame of section 150mm x 100 mm with fixed fan light of 500mm at top and fixed panels of 600mm width
at sides fixed with 12mm thick Tinted - Bronze/Green glass using 12mm x 12mm teak wood beading and fixing
ornamental grill made of 25mm x 5mm MS flats as per the approved drawing in fan light portion and fixed
panels and 1st class teak wood top and middle rails & styles of section 120mm x 35mm, bottom rail of size
150mm x 35mm and 12mm thick plain float glass for shutter with ornamental etching including cost and

conveyance to site of teak wood frame, shutters, glass including supply and fixing 6 nos MS Zhold fasts of
size 300 mm x 40 mm x 5mm including cost of ISI marked brass fixtures of 8 Nos butt hinges(IS:205) 250mm
long , 1 No. aldrop (IS:2681) 450mm long, 3 Nos tower bolts- 10mm (IS:204) of 200 mm long , 2 Nos 450 mm
long fancy handles, 2 Nos door stoppers including fixing the fixtures to door with required number of screws,
bolt and nuts including labour charges for fixing the frame in position, fixing the shutters to the frame etc.,
including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of not less than 40 mm) (3000mmX2600mm)

Quantity analysis Size : 3.00m x 2.60m 7.80 sqm


2x3.00 + 2x2.60+2x2.10
= 15.40 RM x 0.15 x 0.10 0.2310 Cum
Best teak wood frame up to 2m long for
outer frame 3X0.50+4X0.60
= 3.90 RM x 0.15 x 0.10 0.0585 Cum
Shutter styles 2 x 2 x 2.10
= 8.40 RM x 0.12 x 0.035 0.0353 Cum
Top and middle rail 2 x 2 x 0.90
= 3.60 RM x 0.12 x 0.035 0.0151 Cum
Bottom rail 2 x 0.90
= 1.80 RM x 0.15 x 0.035 0.0095 Cum
0.1184 Cum
12 mm thick tinted glass 3.00x0.50+2x0.60x2.10 4.02 Sqm
12 mm thick plain float glass 2x0.90x2.10 3.78 Sqm
Teak wood beading
Fan light portion 2x2(0.60+0.50)+2x2(0.90+0.50) 10.00 RM
Side fixed panels 2x6(0.60+0.70) 15.60 RM
Shutter portion 2x2(0.90+2.10) 12.00 RM
37.60 RM
Cost analysis
Cost of best TW frame 2 m to 3m
length 0.2310 Cum 116540.00 1 Cum 26920.74
Cost of best TW frame up to 2 m length 0.1184 Cum 109477.00 1 Cum 12962.08
Cost of 12mm thick tinted glass 4.02 Sqm 1443.00 1 Sqm 5800.86
Cost of 12mm thick plain float glass 3.78 Sqm 1099.00 1 Sqm 4154.22
Cost of teak wood beading 37.60 RM 20.00 1 RM 752.00
Cost of 250mm long brass butt hinges 8 Nos 250.00 Each 2000.00
Cost of 450mm long brass fancy
handles 2 Nos 1482.00 Each 2964.00
Cost of 450mm long brass heavy duty
aldrop 1 No 2442.00 Each 2442.00
Cost of 200mm long brass tower bolts 3 Nos 198.00 Each 594.00
Cost of brass door stoppers 2 Nos 179.00 Each 358.00
Cost of Z hold fasts 6 Nos 18.00 Each 108.00
Cost of MS Ornamental Grill 4.02 Sqm 1664.02 1 Sqm 6689.35
Labour charges 0.3494 Cum 8287.30 1 Cum 2895.58
Add for MA @ 40% 0.40 2895.58 1158.23
Labour charges for fixing glass 3.78 Sqm 221.00 1 Sqm 835.38
Add for MA @ 40% 0.40 835.38 334.15
Labour charges for glass designing
work( Etching work) 3.78 Sqm 737.00 1 Sqm 2785.86
Add for MA @ 40% 0.40 2785.86 1114.34
Add for screws and nails 13.13
32

Rate for 7.80 Sqm 74881.93


Rate for 1 Sqm 9600.25
Overheads&Contractors Profit @14% 0.14 9600.25 1344.03
10944.28
Say 10944

2 Supply and fixing of ornamental grill made of 25mm x 5mm MS flats for fixing in fan light portion and side
fixed panels for door cum window as per the approved drawing including cutting the flat to required length,
welding, painting with red oxide single coat including cost and conveyance of all materials, labour charges etc.,
complete for finished otem of work.

for grill of size 535mm x 435mm 0.2327 Sqm


MS flats: 4(0.535+0.435)+4x0.1+2x0.38 5.04 RM 1 Kg/Rm 5.04 Kgs
Cost of MS flats 5.04 Kgs 46073.68 1000 Kgs 232.21
Labour charges for fabrication 5.04 Kgs 20.00 1 Kg 100.80
labour charges for fixing in position 5.04 Kgs 4.00 1 Kg 20.16
Add for MA @ 40% 0.40 60.48 24.19
Painting with red oxide 0.2327 Sqm 425.19 10 Sqm 9.90
Rate per 0.2327 Sqm 387.26
Rate per 1 Sqm 1664.02

Painting with Red oxide


Cost of red oxide 0.70 Ltr 121.00 1 Ltr 84.70
Painter 1st class 0.21 Nos. 400.00 1 Each 84.00
Painter 2st class 0.49 Nos. 320.00 1 Each 156.80
Sundries including brushes , ladders
etc., @ 1% 0.01 240.80 2.41
Add for MA @ 40% 0.40 243.21 97.28
425.19
33

3 Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65
mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x 12mm
Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick
double shutters with bond wood solid block board type core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-
1991 (Part-I) both sides commercial ply with internal lipping on all sides,

including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS
Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 6 Nos.
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x
10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber bushes
including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for
fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in
flooring for a depth of not less than 10 mm) (1200mm x 2600mm)

(BLD-CSTN-13-16)
Size : 1.20m x 2.60m 3.12 sqm
Quantity analysis
Outer frame - Vertical 2 x 2.61
= 5.22 x 0.10 x 0.065 0.03393 cum
Outer frame - Horizontal 2 x 1.20 + 0.50
= 2.90 x 0.10 x 0.065 0.01885 cum
0.05278 cum

4 mm thick pin headed glass 2 x 1.20 x 0.30 0.72 sqm


Teak wood beading 2 x 2 (1.20+2 x 0.30) 7.20 RM
30 mm thick flush shutter 2 x 0.55 x 2.05 2.255 sqm
10 mm MS square bars 2 x 1.20 x 0.785 1.884 Kgs

Cost analysis
Cost of medium TW frame 2 m to 3m
length 0.03393 cum 70630.00 1 cum 2396.48
Cost of medium TW frame up to 2 m
length 0.01885 cum 63567.00 1 cum 1198.24
Cost of 4 mm thick pin headed glass 0.72 sqm 309.00 1 sqm 222.48
Cost of TW beading 7.20 RM 20.00 1 rm 144.00
Cost of 30 mm thick flush shutter 2.255 sqm 771.00 1 sqm 1738.61
Cost of MS Z hold fasts 6 Nos. 18.00 Each 108.00
Cost of MS poder coated tower bolt
200mm long 2 Nos. 50.00 Each 100.00
Cost of MS powder coated butt hinges
150mm long 6 Nos. 40.00 Each 240.00
Cost of MS powder coated aldrop
300mm long 1 No. 164.00 Each 164.00
Cost of MS powder coated handle
150mm long 2 Nos. 46.00 Each 92.00

Cost of MS powder coated door stopper 2 Nos. 46.00 Each 92.00


Cost of rubber bush 2 Nos. 20.00 Each 40.00
Cost of 10mm MS square bars 1.884 Kgs 45073.68 1000 Kgs 84.92
Labour charges for frame work 0.0528 cum 8287.30 1 cum 437.40
Add for MA @ 40% 0.40 437.40 174.96
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter 2.255 sqm 295.00 1 sqm 665.23
Add for MA @ 40% 0.40 665.23 266.09
Add for nails & screws etc. 4.78
Rate for 3.12 sqm 8169.18
Overheads&Contractors Profit @14% 0.14 8169.18 1143.68
34

9312.86
Rate for 1 sqm 2984.89
Say 2985
35

4 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI
marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and

fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt
(IS:204) of 200 mm x 10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No.
rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour
charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors
profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm)

(BLD-CSTN-13-16)
Size : 1.00m x 2.10m 2.10 sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 1.00
= 1.00 x 0.10 x 0.065 0.00650 cum
0.03393 cum

30 mm thick flush shutter 0.90 x 2.05 1.845 sqm

Cost analysis
Cost of medium TW frame 2 m to 3m
length 0.02743 cum 70630.00 1 cum 1937.38
Cost of medium TW frame up to 2 m
length 0.00650 cum 63567.00 1 cum 413.19
Cost of 30 mm thick flush shutter 1.845 sqm 771.00 1 sqm 1422.50
Cost of MS Z hold fasts 6 Nos. 18.00 Each 108.00
Cost of MS powder coated tower bolt
200mm long 1 No. 50.00 Each 50.00
Cost of MS powder coated butt hinges
150mm long 3 Nos. 40.00 Each 120.00
Cost of MS powder coated aldrop
300mm long 1 No. 164.00 Each 164.00
Cost of MS powder coated handle
150mm long 2 Nos. 46.00 Each 92.00

Cost of MS powder coated door stopper 1 No. 46.00 Each 46.00


Cost of rubber bush 1 No. 20.00 Each 20.00
Labour charges for frame work 0.0339 cum 8287.30 1 cum 281.19
Add for MA @ 40% 0.40 281.19 112.48
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter 1.845 sqm 295.00 1 sqm 544.28
Add for MA @ 40% 0.40 544.28 217.71
Add for nails & screws etc. 5.11
Rate for 2.10 sqm 5533.82
Overheads&Contractors Profit @14% 0.14 5533.82 774.73
6308.55
Rate for 1 sqm 3004.07
Say 3004
36

5 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI
marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and
fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked MS powder coated fixtures
3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long,

1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush
including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour
charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors
profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be
embedded in flooring for deth of not less than 10mm) ( 750mm x 2100mm )

(BLD-CSTN-13-16)
Quantity analysis Size : 0.75m x 2.10m 1.575 sqm
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 0.75
= 0.75 x 0.10 x 0.065 0.00488 cum
0.03231 cum

30 mm thick flush shutter 0.65 x 2.05 1.333 sqm

Cost analysis
Cost of medium TW frame 2 m to 3m
length 0.02743 cum 70630.00 1 cum 1937.38
Cost of medium TW frame up to 2 m
length 0.00488 cum 63567.00 1 cum 310.21
Cost of 30 mm thick flush shutter 1.333 sqm 771.00 1 sqm 1027.74
Cost of MS Z hold fasts 6 Nos. 18.00 Each 108.00
Cost of MS powder coated tower bolt
150mm long 1 No. 35.00 Each 35.00
Cost of MS powder coated Butt hinges
150mm long 3 Nos. 40.00 Each 120.00
Cost of MS powder coated aldrop
250mm long 1 No. 137.00 Each 137.00
Cost of MS powder coated handle
125mm long 1 No. 31.00 Each 31.00
Cost of rubber bush 1 No. 20.00 Each 20.00
Cost of 1.20mm thick PVC sheet 1.333 sqm 150.00 1 sqm 199.95
cost of Fevicol & labour charges for
fixing PVC sheet 1.333 sqm 50.00 1 sqm 66.65
Labour charges for frame work 0.03231 cum 8287.30 1 cum 267.76
Add for MA @ 40% 0.40 267.76 107.11
Labour charges for fixing flush door
shutter to the frame , fixing the fixtures
to the shutter 1.333 sqm 295.00 1 sqm 393.24
Add for MA @ 40% 0.40 393.24 157.29
Add for nails & screws etc. 5.82
Rate for 1.68 sqm 4924.15
Overheads&Contractors Profit @14% 0.14 4924.15 689.38
5613.53
Rate for 1 sqm 3564.14
Say 3564
37

16 Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with
fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm , 3.18 mm
thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick
and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium sections 25mm microns
thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan light
portion, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick
prelaminated particle board ( One side choice colour and other side balancing white lamnation ) in the
bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double
action hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for
doors including cost of cutting floors as required , embedding in floors

and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete( Weight
Capacity up to 130 Kgs ) as approved by Engineer-in-Charge including supply and fixing ISI marked powder
coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles
(IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing
door , fixing the door with required No. of screws etc., including overheads & contractors profit complete for
finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948 – 1961) and
as approved by the Engineer) (1500mmx2600mm)

(BLD-CSTN-13-31)
Quantity analysis Size : 1.50m x 2.60m 3.90 sqm
Outer frame (101.60 x 44.45, 3.18mm
thick) 2 x 1.50 + 2 x 2.60 8.20 RM

Mullions (101.60 x 44.45, 3.18mm thick) 1 x 0.50 0.50 RM


8.70 RM
= 8.70 RM @ 2.404 Kgs / RM 20.915 Kgs.
Shutters, styles and rails(47.62mm x
44.45mm , 3.18 mm thick) 4 x 2.10 + 2 x 2 x 0.90 11.40 RM
= 11.40 RM @1.501 Kgs/ RM 17.111 Kgs.
Bottom rails (114.30 x 44.45. 3.18mm
thick) 2 x 0.75 1.80 RM
= 1.50 RM @ 2.646 Kgs / RM 3.969 Kgs.
2 x 2 x 2(0.75+0.50) +
2 x 2 x 2(0.75+1.20) +
Glazing clips 2 x 2 x 2(0.75+0.90) 38.80 RM
= 38.80 RM @ 0.101 Kgs /RM 3.919 Kgs.
45.914 Kgs.
5mm thick plain glass 2 x 0.75 x 0.50 0.75 sqm.
5mm thick ground glass 2 x 0.75 x 1.20 1.80 sqm.
12mm thick prelaminated paticle board 2 x 0.75 x 0.90 1.35 sqm.
Rubber beading 2 x 2(0.75+0.50)+2 x 2(0.75+1.20) 12.80 RM
Cost analysis
A.Material :
Cost of powder coated Al. sections 45.91 Kgs. 300.00 1 Kgs. 13774.20
Cost of 5mm thick plain glass 0.75 sqm. 521.00 1 sqm. 390.75
5mm thick ground glass 1.80 sqm. 697.00 1 sqm. 1254.60
12mm thick prelaminated paticle board 1.35 sqm. 806.00 1 sqm. 1088.10
Cost of rubber beading 12.80 RM 2.00 1 RM 25.60
Cost of floor springs 2 Nos. 3198.00 Each 6396.00
Cost of Al. tower bolts 300mm 4 Nos. 159.00 Each 636.00
Cost of Al. round handles 150mm dia. 4 Nos. 100.00 Each 400.00
Cost of Al. aldrops 300mm 2 Nos. 341.00 Each 682.00
B.Labour charges 3.90 sqm. 581.27 1 sqm. 2266.95
Add for Screws, Nails, Nuts, Bolts etc., LS 13.39
Rate per 3.90 Sqm: 26927.59
Overheads&Contractors Profit @14% 0.14 26927.59 3769.86
30697.45
Rate per 1 Sqm: 7871.14
38

Say Say 7871

17 Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS
513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns
thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed
glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion
sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh
shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions
fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and
panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber
gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws,
including 10mm Square guard bars with 6” (152.4mm) pitch including overheads and contractor profit etc.,
complete for finished item of work

a Centre fixed both side openable shutter window : 1800mm x1800mm 3.24 sqm
Window portion 2.34 Sqm 5513.00 1 Sqm 12900.42
Fan light portion 0.90 Sqm 5198.00 1 Sqm 4678.20
Rate per 3.24sqm 17578.62
Rate per 1 sqm 5425.50
Overheads&Contractors Profit @14% 0.14 5425.50 759.57
Rate per 1 sqm 6185.07
Say 6185

b Centre fixed both side openable shutter window : 1500mm x1800mm 2.70 sqm
Window portion 1.95 Sqm 6300.00 1 Sqm 12285.00
Fan light portion 0.75 Sqm 5198.00 1 Sqm 3898.50
Rate per 2.70sqm 16183.50
Rate per 1 sqm 5993.89
Overheads&Contractors Profit @14% 0.14 5993.89 839.14
Rate per 1 sqm 6833.03
Say 6833

e Centre fixed both side openable shutter window 1800mmx1300mm : 2.34 sqm
Window portion 2.34 Sqm 5513.00 1 Sqm 12900.42
Rate per 1 sqm 5513.00
Overheads&Contractors Profit @14% 0.14 5513.00 771.82
Rate per 1 sqm 6284.82
Say 6285

f Centre fixed both side openable shutter window 1500mmx1300mm : 1.95 sqm
Window portion 1.95 Sqm 6300.00 1 Sqm 12285.00
Rate per 1 sqm 6300.00
Overheads&Contractors Profit @14% 0.14 6300.00 882.00
Rate per 1 sqm 7182.00
Say 7182
39

18 Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre -
painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120
GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16
microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm
section and for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading should be 18 x
25 mm and section for louvered ventilation of 33 x 56 mm Box section and the windows panelled with 5 mm
thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gasket
(EPDM) and the sections cut to length mitre joined with corner brocket centre mullions fixed using mullion cap
and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of
CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall
by means of self expanding screws including 10 mm square guard bars with 6" pitch including overheads &
contractors profit etc., complete for finished item of work.

B) VENTILATORS :
a Top Hung of any size 1.00 Sqm 5985.00 1 Sqm 5985.00
Overheads&Contractors Profit @14% 0.14 5985.00 837.90
Rate for 1 Sqm 6822.90
Say 6823

b Fixed louvered of any size 1.00 Sqm 4095.00 1 Sqm 4095.00


Overheads&Contractors Profit @14% 0.14 4095.00 573.30
Rate for 1 Sqm 4668.30
Say 4668

19 Providing and fixing RAJSHRI or equivalent false ceiling consisting of 600mmX600mm, Solid PVC insulation
panels having wall thickness of 1mm thick plain PVC rigid foam sheet and EPS as defined in of desired
thickness depending on nsulation required shall be insert in a frame work made using anodized aluminium Tee
section of sizes 1”X1” (25X25mm, 19 auge or 1mm thick) in square pattern of grid sizes of 2’X2’
(600X600mm). The aluminium framework is supported from the ceiling with the help of G.I. hook and G.I.
wire/6mm.M.S. rods of required sizes to maintain proper level etc. the aluminium framework is supported on
side wall with the use of aluminium 1”X1” (25X25mm) angles, complete as per direction inclusive of
conveyance of all materials accessories, labour charges, and erection at site including overheads &
contractors profit etc., complete finished item of work.

Rate as per SSR (BMT-M.81 1.00 Sqm 1260.00 1.00 Sqm 1260.00
Overheads&Contractors Profit @14% 0.14 1260.00 176.40
Rate for 1 Sqm 1436.40
Say 1436
WS & SA DATA 2013-14 Page-40

DATA FOR WATER SUPPLY AND SANITARY ITEMS


Sl.No Description Qty Unit Rate per Unit Amount
1 Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127
with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in
any soil (except rock requiring blasting) and refilling with watering and tamping to the required
slope including cost and conveyance of all materials to site and all labour charges , overheads &
contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318)

a) 101.60mm dia upto 914.40mm (3')


depth
Rate as per SSR 1.00 RM 262.00 1 RM 262.00
Overheads&Contractors Profit @14% 0.14 262.00 36.68
Rate per 1 RM 298.68
say 299

b) 152.40mm dia upto 914.40mm (3')


depth
Rate as per SSR 1.00 RM 407.00 1 RM 407.00
Overheads&Contractors Profit @14% 0.14 407.00 56.98
463.98
Rate per 1 RM say 464

2 Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar
1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock)
and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and
conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement
mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for
finished item of work as per Standard specification.

Rate as per SSR 1 No. 4999.00 Each 4999.00


Overheads&Contractors Profit @14% 0.14 4999.00 699.86
5698.86
Rate per Each say 5699

3 Constructing 904.0 mm (3’0”) dia brick masonry inspection chamber as per IS - 4111: Part-
1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved
source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar
1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames
including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock)
and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and
conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement
mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for
finished item of work as per Standard specification.

Rate as per SSR 1 No. 7662.00 Each 7662.00


Overheads&Contractors Profit @14% 0.14 7662.00 1072.68
8734.68
Rate per Each say 8735
WS & SA DATA 2013-14 Page-41

Sl.No Description Qty Unit Rate per Unit Amount


4 Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 &
4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber
and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as
approved including cost and conveyance of all materials to site, labour charges, overheads &
contractors profit etc., complete for finished item of work.

Rate as per SSR 1 No. 530.00 1 Each 530.00


Deduct cost of CI frame and cover 1 No. 111.00 1 No. -111.00
Add for RCC Cover 1 No. 100.00 1 No. 100.00
519.00
Overheads&Contractors Profit @14% 0.14 519.00 72.66
591.66
Rate per Each say 592

5 Supplying and fixing of 3" (76.2mm) multi floor trap with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with standard
practice for all floors including cost and conveyance of all materials to site, labour charges ,
overheads & contractors profit etc., complete for finished item of work.

Rate as per SSR 1 No. 102.00 1 Each 102.00


Overheads&Contractors Profit @14% 0.14 102.00 14.28
116.28
Rate per Each say 116

6 Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as per site requirements with standard
practice for all floors including cost and conveyance of all materials to site, labour charges ,
overheads & contractors profit etc., complete for finished item of work.

Rate as per SSR 1 No. 144.00 1 Each 144.00


Overheads&Contractors Profit @14% 0.14 144.00 20.16
164.16
Rate per Each say 164
WS & SA DATA 2013-14 Page-42

Sl.No Description Qty Unit Rate per Unit Amount


7 Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality
ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer
with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single
flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of
teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by
Engineer-in-charge, angle stop cock 12.70mm dia. first quality Indian make heavy duty
Seiko/Senior/Nice or equivalent, 12.70mm PVC connection with brass union nuts CP coated ,
31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4)
150mm alround well above the joint to stop leakage at the joint etc., complete including cost and
conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges,
overheads & contractors profit etc., complete for finished item of work.

Cost of Orissa pan 1 No. 1157.00 1 Each 1157.00


Add MA on labour charges for fixing
Orissa pan 0.40 320.00 128.00
Cost of Brick masonry seat 1 No. 278.00 1 Each 278.00
Cost of C C squatting plate 1 No. 83.00 1 Each 83.00
Cost of slim line PVC flush tank 10 Ltrs.
capacity single flush 1 No. 1455.00 1 Each 1455.00
Angle stop cock 12.70mm 1 No. 443.00 1 Each 443.00
Add MA on labour charges for fixing
angle stop cock 0.40 39.00 15.60
12.70mm PVC connection with brass
union nuts 1 No. 95.00 1 Each 95.00
Add MA on labour charges for fixing
PVC connection with brass union nuts 0.40 18.00 7.20
31.75mm brass plumber union 1 No. 64.00 1 Each 64.00
Add MA on labour charges for fixing
31.75mm brass plumber union 0.40 13.00 5.20
Teak wood blocks 76.2mm x 101.6mm 2 Nos. 24.00 1 Each 48.00
Add MA on labour charges for fixing
Teak wood blocks 0.40 8.00 3.20
3782.20
Overheads&Contractors Profit @14% 0.14 3782.20 529.51
4311.71
Rate per Each 4312
WS & SA DATA 2013-14 Page-43

Sl.No Description Qty Unit Rate per Unit Amount


8 Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of
Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian
make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-
1996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal
components and fixed using required size of nails and screws, angle stop cock 12.70mm dia. first
quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 12mm PVC connections with brass
union nuts CP coated including cost and conveyance of all materials to site, overheads &
contractors profit etc., complete for finished item of work for all floors.

Cost of EWC with 'S' trap 1 No 1582.00 1 Each 1582.00


Add MA on labour charges for fixing
EWC 0.40 224.00 89.60
Supply and fixing of 10 lts. Capacity
lowdown PVC flushing tank 1 No 1455.00 1 Each 1455.00
Plastic seat and lid for European Water
Closet and rubber buffers 1 No 430.00 1 Each 430.00
Add MA on labour charges for fixing
Plastic seat and lid for EWC and rubber
buffers 0.40 65.00 26.00
Angle stop cock 12.70mm 1 No. 443.00 1 Each 443.00
Add MA on labour charges for fixing
angle stop cock 0.40 39.00 15.60
12.70mm dia PVC connection with
brass union nuts 1 No 95.00 1 Each 95.00
Add MA on labour charges for fixing
PVC connection with brass union nuts 0.40 18.00 7.20
Cost of 76.2 x 101.60 mm teakwood
blocks 2 Nos 24.00 1 Each 48.00
Add MA on labour charges for fixing
Teak wood blocks 0.40 8.00 3.20
4194.60
Overheads&Contractors Profit @14% 0.14 4194.60 587.24
4781.84
Rate per Each 4782

9 Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent
complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with
brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty
Seiko/Senior/Nice or equivalent, 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm
dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all
materials to site, labour charges , overheads & contractors profit for finished item of work

Cost of Wash hand basin 1 No. 1455.00 1 Each 1455.00


Add MA on labour charges for fixing
Wash hand basin 0.40 320.00 128.00
Angle stop cock 12.70mm 1 No. 443.00 1 Each 443.00
Add MA on labour charges for fixing
angle stop cock 0.40 39.00 15.60
12.70mm PVC connection with brass
union nuts 1 No. 95.00 1 Each 95.00
Add MA on labour charges for fixing
PVC connection with brass union nuts 0.40 18.00 7.20
Deduct cost of NP chain and rubber
plug 1 No. 39.00 1 Each -39.00
WS & SA DATA 2013-14 Page-44

Sl.No Description Qty Unit Rate per Unit Amount


31.75mm dia. PVC flexible waste pipe 1 No. 26.00 1 Each 26.00
2130.80
Overheads&Contractors Profit @14% 0.14 2130.80 298.31
2429.11
Rate per Each say 2429

10 Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc.,
complete including cost and conveyance of all materials, labour charges for fixing , overheads &
contractors profit for finished item of work in all floors

Cost of NP soap dish 1 No. 227.00 1 Each 227.00


Add for MA @ 40% 0.40 11.00 4.40
231.40
Overheads&Contractors Profit @14% 0.14 231.40 32.40
263.80
Rate per Each say 264

11 Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm ,
plywood back with NP screws 1st quality including cost and conveyance of all materials, labour
charges , overheads & contractors profit for finished item of work in all floors.

Rate as per SSR 1 No. 479.00 Each 479.00


Add for MA @ 40% 0.40 106.00 42.40
521.40
Overheads&Contractors Profit @14% 0.14 521.40 73.00
594.40
Rate per Each say 594

12 Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with
brackets and aluminium screws including cost and conveyance of all materials, labour charges ,
overheads & contractors profit for finished item of work.

Rate as per SSR 1 No. 153.00 Each 153.00


Add for MA @ 40% 0.40 40.00 16.00
169.00
Overheads&Contractors Profit @14% 0.14 169.00 23.66
192.66
Rate per Each say 193

13 Supplying and fixing 12.70mm dia NP push cock as approved by the Engineer-In-Charge
including cost and conveyance of all materials, labour charges , overheads & contractors profit
complete for finished item of work in all floors.

Rate as per SSR 1 No. 253.00 Each 253.00


Overheads&Contractors Profit @14% 0.14 253.00 35.42
288.42
Rate per Each say 288

14 Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty as
approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges
, overheads & contractors profit complete for finished item of work in all floors.

Rate as per SSR 1 No. 241.00 Each 241.00


Add for MA @ 40% 0.40 26.00 10.40
251.40
Overheads&Contractors Profit @14% 0.14 251.40 35.20
286.60
Rate per Each say 287
WS & SA DATA 2013-14 Page-45

Sl.No Description Qty Unit Rate per Unit Amount


15 Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4
Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double
junctions as per site requirement, fixing with PVC clamps if necessary with required number of
Bombay nails including cost and conveyance of all materials to site, labour charges, overheads &
contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 &
1326)

a) 75mm dia
Data for 6 RM
Cost of 75mm dia pipe 6.00 RM 255.00 3 RM 510.00
Cost of PVC clamps 3 Nos. 15.00 Each 45.00
Labour charges 6.00 RM 65.00 1 RM 390.00
945.00
Rate per 1 RM 157.50
Overheads&Contractors Profit @14% 0.14 157.50 22.05
179.55
say 180

b) 90mm dia
Data for 6 RM
Cost of 90mm dia pipe 6.00 RM 405.00 3 RM 810.00
Cost of PVC clamps 3 Nos. 17.00 Each 51.00
Labour charges 6 RM 65.00 1 RM 390.00
1251.00
Rate per 1 RM 208.50
Overheads&Contractors Profit @14% 0.14 208.50 29.19
237.69
say 238

c) 110mm dia
Data for 6 RM
Cost of 110mm dia pipe 6.00 RM 484.00 3 RM 968.00
Cost of PVC clamps 3 Nos. 18.00 Each 54.00
Labour charges 6 RM 65.00 1 RM 390.00
1412.00
Rate per 1 RM 235.33
Overheads&Contractors Profit @14% 0.14 235.33 32.95
268.28
say 268

16 Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark in
ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the walls & floors to the original surface and
fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour
charges , overheads & contractors profit complete for finished item of work.

a) 15mm Nominal bore


Rate as per SSR 1.00 RM 173.00 1 RM 173.00
Add for MA @ 40% 0.40 37.00 14.80
187.80
Overheads&Contractors Profit @14% 0.14 187.80 26.29
214.09
Rate per 1 RM say 214

b) 20mm Nominal bore


Rate as per SSR 1.00 RM 192.00 1 RM 192.00
Add for MA @ 40% 0.40 37.00 14.80
WS & SA DATA 2013-14 Page-46

Sl.No Description Qty Unit Rate per Unit Amount


206.80
Overheads&Contractors Profit @14% 0.14 206.80 28.95
235.75
Rate per 1 RM say 236

c) 25mm Nominal bore


Rate as per SSR 1.00 RM 252.00 1 RM 252.00
Add for MA @ 40% 0.40 37.00 14.80
266.80
Overheads&Contractors Profit @14% 0.14 266.80 37.35
304.15
Rate per 1 RM say 304

d) 32mm Nominal bore


Rate as per SSR 1.00 RM 354.00 1 RM 354.00
Add for MA @ 40% 0.40 37.00 14.80
368.80
Overheads&Contractors Profit @14% 0.14 368.80 51.63
420.43
Rate per 1 RM say 420

e) 40mm Nominal bore


Rate as per SSR 1.00 RM 396.00 1 RM 396.00
Add for MA @ 40% 0.40 40.00 16.00
412.00
Overheads&Contractors Profit @14% 0.14 412.00 57.68
469.68
Rate per 1 RM say 470

f) 50mm Nominal bore


Rate as per SSR 1.00 RM 427.00 1 RM 427.00
Add for MA @ 40% 0.40 61.00 24.40
451.40
Overheads&Contractors Profit @14% 0.14 451.40 63.20
514.60
Rate per 1 RM say 515

17 Supplying and fixing 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per
IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs including
excavation for trenches and refilling the trenches ,chiselling masonry walls and making good the
walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges , overheads & contractors profit complete for
finished item of work except for GI bends union and GI connectors with checkout and socket Tata
or Zenith make or equivalent

Rate as per SSR 1.00 RM 757.00 1 RM 757.00


Overheads&Contractors Profit @14% 0.14 757.00 105.98
862.98
Rate per 1 RM say 863

18 Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make
heavy type including cost and conveyance of all materials , labour charges , overheads &
contractors profit complete for finished item of work.

a) 15mm Nominal bore


Rate as per SSR 1 No. 350.00 Each 350.00
Add for MA @ 40% 0.40 40.00 16.00
366.00
WS & SA DATA 2013-14 Page-47

Sl.No Description Qty Unit Rate per Unit Amount


Overheads&Contractors Profit @14% 0.14 366.00 51.24
417.24
Rate per Each say 417
WS & SA DATA 2013-14 Page-48

Sl.No Description Qty Unit Rate per Unit Amount


b) 20mm Nominal bore
Rate as per SSR 1 No. 474.00 Each 474.00
Add for MA @ 40% 0.40 40.00 16.00
490.00
Overheads&Contractors Profit @14% 0.14 490.00 68.60
558.60
Rate per Each say 559

c) 25mm Nominal bore


Rate as per SSR 1 No. 698.00 Each 698.00
Add for MA @ 40% 0.40 40.00 16.00
714.00
Overheads&Contractors Profit @14% 0.14 714.00 99.96
813.96
Rate per Each say 814

d) 32mm Nominal bore


Rate as per SSR 1 No. 1044.00 Each 1044.00
Add for MA @ 40% 0.40 40.00 16.00
1060.00
Overheads&Contractors Profit @14% 0.14 1060.00 148.40
1208.40
Rate per Each say 1208

e) 40mm Nominal bore


Rate as per SSR 1 No. 1423.00 Each 1423.00
Add for MA @ 40% 0.40 61.00 24.40
1447.40
Overheads&Contractors Profit @14% 0.14 1447.40 202.64
1650.04
Rate per Each say 1650

f) 50mm Nominal bore


Rate as per SSR 1 No. 2055.00 Each 2055.00
Add for MA @ 40% 0.40 82.00 32.80
2087.80
Overheads&Contractors Profit @14% 0.14 2087.80 292.29
2380.09
Rate per Each say 2380

g) 65mm Nominal bore


Rate as per SSR 1 No. 3920.00 Each 3920.00
Add for MA @ 40% 0.40 102.00 40.80
3960.80
Overheads&Contractors Profit @14% 0.14 3960.80 554.51
4515.31
Rate per Each say 4515

h) 80mm Nominal bore


Rate as per SSR 1 No. 5548.00 Each 5548.00
Add for MA @ 40% 0.40 121.00 48.40
5596.40
Overheads&Contractors Profit @14% 0.14 5596.40 783.50
6379.90
Rate per Each say 6380
WS & SA DATA 2013-14 Page-49

Sl.No Description Qty Unit Rate per Unit Amount


19 Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with
double layer approved brand and manufacture with cover and suitable locking arrangement and
making necessary holes for inlet and outlets and over flow pipes but without fittings and base
support for tanks including cost and conveyance of all materials and labour charges , overheads &
contractors profit complete for finished item of work.

Rate as per SSR 1 Ltr 6.00 1 Ltr 6.00


Add for MA @ 40% 0.40 1.00 0.40
6.40
Overheads&Contractors Profit @14% 0.14 6.40 0.90
Rate per 1 Ltr 7.30

20 Supplying and fixing of stainless steel sink of size 508.00mm x 457.2mm x 203.20mm, 1mm
thick of Indian make fixed on cantilever brackets including supply and fixing 31.75mm C.P. waste
coupling, 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality ncluding
chiselling brick masonry wall and making good & restoring to original surfaces , overheads &
contractors profit complete for finished item of work in all floors

Rate as per SSR 1 No 4579.00 Each 4579.00


Add for MA @ 40% 0.40 409.00 163.60
4742.60
Overheads&Contractors Profit @14% 0.14 4742.60 663.96
5406.56
Rate per Each say 5407

20 Supplying and fixing of stainless steel sink of size 914.4 mm x457.2mm, 1mm thick of Indian
make fixed on cantilever brackets including supply and fixing 31.75mm C.P. waste coupling, 31.75
mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality ncluding chiselling brick masonry
wall and making good & restoring to original surfaces overheads & contractors profit complete.for
finished item of work in all floors.

Rate as per SSR 1 No 6409.00 Each 6409.00


Add for MA @ 40% 0.40 461.00 184.40
6593.40
Overheads&Contractors Profit @14% 0.14 6593.40 923.08
7516.48
Rate per Each say 7516

21 Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm
with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming
to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC
connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved
make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and
conveyance of all materials to site, labour charges , overheads & contractors profit complete for
finished item of work for all floors.

Rate as per SSR 1 No 759.00 Each 759.00


Add for MA @ 40% 0.40 128.00 51.20
12.7mm PVC connections with brass
plumber union nuts 1 No 95.00 Each 95.00
Add for MA @ 40% 0.40 18.00 7.20
12.70mm NP push cock 1 No 253.00 Each 253.00
31.75mm dia. PVC flexible waste pipe 1 No 26.00 Each 26.00
1191.40
Overheads&Contractors Profit @14% 0.14 1191.40 166.80
1358.20
Rate per Each Say 1358
WS & SA DATA 2013-14 Page-50

Sl.No Description Qty Unit Rate per Unit Amount


22 Supplying and fixing white glazed flat back half stall urinals of size 590 mm x 375 mm x 390
mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer)
conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing
12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality
of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality
including cost and conveyance of all materials to site, labour charges etc., overheads & contractors
profit complete for finished item of work for all floors.

Rate as per SSR 1 No 2530.00 Each 2530.00


Add for MA @ 40% 0.40 128.00 51.20
12.7mm PVC connections with brass
plumber union nuts 1 No 95.00 Each 95.00
Add for MA @ 40% 0.40 18.00 7.20
12.70mm NP push cock 1 No 253.00 Each 253.00
31.75mm dia. PVC flexible waste pipe 1 No 26.00 Each 26.00
2962.40
Overheads&Contractors Profit @14% 0.14 2962.40 414.74
3377.14
Rate per Each Say 3377

23 Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 4' 0" x
2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and
conveyance of all materials and labour charges , overheads & contractors profit complete for
finished item of work for all floors.

Rate as per SSR 0.72 Sqm 935.97 1 Sqm 673.90


Chiselling the brick masonry wall 1.20 RM 26.00 1 RM 31.20
Add for MA @ 40% 0.40 31.20 12.48
Rounding the edges of marble 2.40 RM 317.00 1 RM 760.80
Labour charges for fixing ( dadooing
labour charges ) 0.72 Sqm 498.44 10 Sqm 35.89
Add for MA @ 40% 0.40 35.89 14.35
1528.62
Overheads&Contractors Profit @14% 0.14 1528.62 214.01
1742.63
Rate per Each Say 1743

24 Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality
fixed in brick masonry to the required slopes , white cement pointing including cost and
conveyance of all materials and labour charges , overheads & contractors profit complete for
finished item of work for all floors.
Rate as per SSR 1 No 462.00 1 Each 462.00
Rate for 1 RM (1/0.6096) 462.00 757.87
Overheads&Contractors Profit @14% 0.14 757.87 106.10
863.97
Say 864

25 Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60
mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost
and conveyance of all materials and all labour charges, overheads & contractors profit complete for
finished item of work for all floors.

Rate as per SSR 1 No 68.00 1 Each 68.00


Overheads&Contractors Profit @14% 0.14 68.00 9.52
77.52
Rate per Each Say 78
Name of the Work: :- Construction of Office building for District Live Stock
Development Association at Visakhapatnam in Visakhapatnam District

GENERAL ABSTRACT

Sl.
Description Amount
No.
1 Civil Works 11480142

2 Water Supply & Sanitary Arrangements. 362307

3 Electrical works 1096418

Sub Total: 12938867

4 Provision towards VAT @ 5% 646943

5 Provision towards Tender Premium 61439

6 Provision towards Price adjustment (G.O.Ms.No.94 & 1) @ 1% 129389

7 Provision towards Bore well 50000

8 Provision towards APTRANSCO Charges. 100000

9 Provision for designs & architectural consultant charges 50000

10 Provision towards inauguration charges 15000

Provision for variation in quantities, unforeseen items and rounding


11 28947
off.

12 Provision towards Engineering Supervision charges @ 7% 979415

Grand Total: 15000000


Abstract Estimate Civil Page-52

Name of the Work: :- Construction of Office building for District Live Stock Development
Association at Visakhapatnam in Visakhapatnam District

Unit Rate Amount


Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
1 Earth work excavation for foundations (Mechanical Means)
for buildings in ordinary soils and depositing on bank for all lifts
and with an initial lead of 10m and up to 3m depth including all
operational,incidental, labour charges such as shoring, sheeting,
planking, strutting etc., and overheads & contractors profit
complete for finished item of work including seigniorage excluding
dewatering charges etc., as per SS 20 B(APSS 308)
1 436.00 CUM ONE CUM 87.00 37932

2 Filling with carted gravel in trenches,sides of foundations and


basement with initial lead in layers not exceeding 15cm
thick,watering and ramming including cost and conveyance of
water to work site and all peraitonal,incidental, labour charges,hire
charges of T&P etc., and overheads & contractors profit complete
for fnished item of work(APSS NO.309&310)
1 300.00 CUM ONE CUM 292.00 87600

3 Filling with useful available excavated earth (excluding rock)


with a lead of 50 m in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15cm thick,
watering and ramming including cost and conveyance of water to
work site and all operaitonal, incidental, labour charges, hire
charges of T&P etc., and overheads & contractors profit complete
for fnished item of work (APSS NO.309&310)
1 350.00 CUM ONE CUM 23.00 8050

4 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse


aggregate) for foundations and under flooring bed using
coarse aggregate 40mm size hard , machine crushed granite
from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials
and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers
finishing top surface to the required level curing etc., and
overheads & contractors profit complete for finished item of work.
(APSS No. 402)
1 24.00 CUM ONE CUM 3760.00 90240

5 Plain Cement Concrete (1:5:10) (cement: fine aggregate:


Coarse aggregate) for foundations and under flooring bed
using coarse aggregate 40mm size hard , machine crushed
granite from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to
site, including seigniorage charges, sales & other taxes on all
materials and including all charges for machine mixing, laying
concrete in foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing etc.,and
overheads & contractors profit complete for finished item of work.
(APSS No. 402)

1 52.00 CUM ONE CUM 3610.00 187720


Abstract Estimate Civil Page-53
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
6 Random Rubble stone masonry in CM (1:8) prop: (Cement:
Screened sand) using hard other than granite stones carted
from approved quarry including cost and conveyance of all
materials like cement, screened sand, water, stones etc., from
approved quarry, to site and including seigniorage charges, sales
& other taxes on all materials including labour for cutting stones
to required size and shape, mixing, of cement, mortar,
construction, curing etc.,and overheads & contractors profit
complete for finished item of work in foundation and basement.
(APSS No. 601 & 615)
1 145.00 CUM ONE CUM 3047.00 441815

7 Supply and placing of the Design Mix Concrete M 30 grade


corresponding to IS 456 with minimum cement content of 400
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm )
from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales &
other taxes on all materials , centering using Steel scaffolding
pipes , jack props , wallers , Foot plates , brackets , steel
centering plates etc., including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying
concrete, curing etc., and overheads & contractors profit complete
but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402)

FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)


a Footings 1 59.00 CUM ONE CUM 8191.00 483269

b Column pedestals 1 6.00 CUM ONE CUM 8550.00 51300

c Plinth Beams 1 27.00 CUM ONE CUM 10289.00 277803

8 Supply and placing of the Design Mix Concrete M 30 grade


corresponding to IS 456 with minimum cement content of 400
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm )
from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales &
other taxes on all materials, centering using Casurina Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates
etc., including all operational, incidental and labour charges such
as weigh batching, machine mixing, lifting of concrete manually,
laying concrete, curing , overheads & contractors profit etc.,
complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

a) COLUMNS :
un supported height up to 3.66 m
First Floor 1 22.00 CUM ONE CUM 9890.00 217580

Second Floor 1 14.00 CUM ONE CUM 10345.00 144830

b) LINTELS :
First Floor 1 2.00 CUM ONE CUM 9894.00 19788
Abstract Estimate Civil Page-54
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
Second Floor 1 2.00 CUM ONE CUM 10294.00 20588

9 Supply and placing of the Design Mix Concrete M 30 grade


corresponding to IS 456 with minimum cement content of 400
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm )
from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales &
other taxes on all materials , centering using Casurina Ballies ,
Bamboos , Wooden Reapers , Runners , Wood Posts , Wall
Plates etc., including all operational, incidental and labour charges
such as weigh batching, machine mixing, lifting of concrete
manually, laying concrete, curing , overheads & contractors profit
etc., complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)

A) BEAMS :
un supported height up to 3.66 m
First Floor 1 28.00 CUM ONE CUM 8572.00 240016

Second Floor 1 28.00 CUM ONE CUM 8876.00 248528

B) RCC SLABS :
a) Roof Slabs 125mm thick :
un supported height up to 3.66 m
First Floor 1 400.00 SQM ONE SQM 1037.00 414800

Second Floor 1 380.00 SQM ONE SQM 1073.00 407740

b) Roof Slabs 200mm thick :


First Floor 1 20.47 SQM ONE SQM 1469.00 30070

Second Floor 1 20.47 SQM ONE SQM 1516.00 31033

10 Supply and placing of the Design Mix Concrete M 30 grade


corresponding to IS 456 with minimum cement content of 400
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with
20mm size graded machine crushed hard granite metal (coarse
aggregate) ( consisting of nominal size metal 60% of 20mm , 15%
of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from
approved quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate, water etc.,
to site and including Seigniorage charges, sales & other taxes on
all materials , centering using Casurina Ballies , Bamboos ,
Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for
60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick
at free end with an average thickness of 6.25cm including all
operational, incidental and labour charges such as weigh
batching, machine mixing, lifting of concrete manually, laying
concrete, curing, overheads & contractors profit complete etc.,
but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402, 403 & 903)

First Floor 1 28.00 RM ONE RM 423.00 11844

Second Floor 1 33.00 RM ONE RM 441.00 14553


Abstract Estimate Civil Page-55
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
11 Masonry work in CM(1:6) prop (Cement : Screened sand) in
superstructure with fly ash cement / lime solid blocks of size
290mm x 225mm x 140mm from approved source having
minimum crushing strength of 50 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks, water etc.,
to site, including seigniorage charges, sales & other taxes on all
materials and such as labour charges, like mixing cement mortar,
scaffolding charges, constructing masonry, lift charges, curing,
overheads and contrctor profit etc., complete for finished item of
work. (APSS No. 501 & 504).

a) Superstructure :
First Floor 1 75.00 CUM ONE CUM 4461.00 334575

Second Floor 1 65.00 CUM ONE CUM 4749.00 308685

Third Floor 1 6.00 CUM ONE CUM 5038.00 30228

12 Reinforced Masonry for partition walls (100 mm thick) in CM


(1:4) prop. (Cement : Screened sand) using fly ash cement /
lime solid blocks of size 290mm x 100mm x 140mm having
minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos.
of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where
applicable including cost and conveyance of all materials like
cement, steel, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges such as labour charges for mixing
cement mortar, scaffolding charges, constructing masonry, lift
charges, curing, etc., and overheads & contractors profit but
excluding cost of steel and its fabrication charges complete for
finished item of work. (APSS No. of 509)

Internal walls :
First Floor 1 280.00 SQM ONE SQM 614.00 171920

Second Floor 1 288.00 SQM ONE SQM 669.00 192672

Third Floor 1 75.00 SQM ONE SQM 724.00 54300

13 Plain Cement Concrete (1:3:6) nominal mix using 20mm size


graded machine crushed hard granite metal (coarse aggregate)
( consisting of nominal size metal 60% of 20mm, 15% of
13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved
quarry including cost and conveyance of all materials like cement,
fine aggregate(sand), coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials
and including all charges for mixing, laying concrete in position,
curing etc., & lift charges , and overheads & contractors profit for
Bed Blocks & Hold Fasts for finished item of work. (APSS No.
402)

First Floor 1 4.00 CUM ONE CUM 5191.00 20764

Second Floor 1 3.00 CUM ONE CUM 5325.00 15975


Abstract Estimate Civil Page-56
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
14 Plain Cement Concrete M 20 design mix using WEIGH
BATCHER / MIXER, 20mm size hard granite machine crushed
graded metal (Coarse aggregate) ( consisting of nominal size
metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and
10% of 6mm ) from approved quarry, using a minimum quantity of
350 kgs. of cement per 1 cum of concrete including cost and
conveyance of all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of seigniorage
charges on all materials including steel centering, shuttering,
machine mixing, lift charges, laying concrete,vibrating, curing,
overheads & contrctors profit etc., complete for finished item of
work (APSS No. 402 & 403) for steps

First Floor 1 1.00 CUM ONE CUM 6024.00 6024

Second Floor 1 1.00 CUM ONE CUM 6158.00 6158

15 Reinforced Cement Concrete M 20 design mix using 12mm


size hard granite machine crushed graded metal (Coarse
aggregate) ( consisting of nominal size metal 60% of
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved
quarry, using a minimum quantity of 350 kgs. of cement per 1 cum
of concrete including cost and conveyance of all materials like
cement, fine aggregate (Sand), coarse aggregate, water etc., to
site and cost of seigniorage charges on all materials including
steel centering, shuttering, machine mixing, laying concrete, lift
charges, curing etc., and overheads & contractors profit complete
for finished item of work (APSS No. 402 & 403) for sill slabs.

First Floor 1 8.00 CUM ONE CUM 6735.00 53880

Second Floor 1 2.00 CUM ONE CUM 6984.00 13968

16 Reinforced Cement Concrete M 20 design mix using 12mm


size hard granite machine crushed graded metal (Coarse
aggregate) ( consisting of nominal size metal 60% of
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved
quarry, using a minimum quantity of 350 kgs. of cement per 1 cum
of concrete including cost and conveyance of all materials like
cement, fine aggregate (Sand), coarse aggregate, water etc., to
site and cost of seigniorage charges on all materials including
steel centering, shuttering, machine mixing, laying concrete, lift
charges, curing etc., and overheads & contractors profit complete
for finished item of work (APSS No. 402 & 403) for platforms
and shelves.

a) 50mm thick platforms :


First Floor 1 18.00 SQM ONE SQM 417.00 7506

Second Floor 1 18.00 SQM ONE SQM 431.00 7758

b) 25mm thick shelves :


First Floor 1 24.00 SQM ONE SQM 291.00 6984

Second Floor 1 16.00 SQM ONE SQM 303.00 4848


Abstract Estimate Civil Page-57
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
17 Providing Thermo Mechanically Treated (TMT) (Fe 500 grade
as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lap-splicing with
binding wire of 18 SWG, forming grills for reinforcement work as
per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying
including sales and other taxes on all materials etc. ,and
overheads & contractors profit complete for finished item of work
in all floors.( APSS No.126)

First Floor 1 23.00 MT ONE MT 66282.00 1524486

Second Floor 1 11.00 MT ONE MT 67288.00 740168

18 Providing Mild steel (MS) steel bars (Fe 250 grade as per IS
432) of different diameters including labour charges for
straightening, cutting, bending to required sizes and shapes,
placing in position with cover blocks of approved materials and
size and tying and lap-splicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including
all wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks and
all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes
on all materials etc. ,and overheads & contractors profit complete
for finished item of work in all floors.( APSS No.126)

First Floor 1 1.00 MT ONE MT 59699.00 59699

19 Providing Plinth protection 1.20m width along with drain


constructed with 230 mm thick brick walls using common burnt
clay bricks (23x11x7cm) over 100 mm thick over PCC(1:5:10) bed
and plastering with CM (1:5) 12mm thick single coat for brick
masonry drain and providing PCC(1:5:10) 100mm thick in
between basement of the building and brick wall and 20mm thick
granolithic concrete flooring with CC(1:1:2) prop. up to the edge of
the brick masonry wall using 6mm to 12mm size graded hard
granite machine crushed metal laid monolithically already laid, in
alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing
5mm thick glass strips between the pannels and finishing the top
surface to required smoothness and slopes including grooves,
thread lining as directed by the Engineer - in - charge including
cost and conveyance of all materials to site, seigniorage charges,
sales & other taxes on all materials and operational & incidental
and labour charges like mixing of cement concrete, laying, curing,
overheads & contractor profit etc., complete

1 158.00 SQM ONE SQM 1208.00 190864


Abstract Estimate Civil Page-58
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
20 Ornamental ceiling plastering 12mm thick single coat in CM
(1:5) using screened sand including cost and conveyance of all
materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, and all
operational, incidental charges on materials and including cost of
all labour charges for mixing mortar, finishing, curing as directed
by Engineer-in-charge etc., and overheads & contractors profit
complete for finished item of work.(SS 901,903 & 904)

First Floor 1 435.00 SQM ONE SQM 132.00 57420

Second Floor 1 415.00 SQM ONE SQM 147.00 61005

21 Plastering 12mm thick in two coats using screened sand with


base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar, finishing,
scaffolding, lift charges, curing, including cutting grooves as
directed by Engineer - in - charge etc., and overheads &
contractors profit complete for finished item of work. (SS 901,903
& 904)

First Floor 1 1520.00 SQM ONE SQM 328.00 498560

Second Floor 1 1210.00 SQM ONE SQM 360.00 435600

Third Floor 1 170.00 SQM ONE SQM 393.00 66810

22 Plastering 20mm thick single coat in CM(1:5) using screened


sand including cost and conveyance of all materials like cement,
sand, water etc., to site, including seigniorage charges, sales &
other taxes on all materials, and all operational, incidental charges
on materials and including cost of all labour charges for mixing
mortar, finishing, curing as directed by Engineer-in-charge etc.,
and overheads & contractors profit complete for finished item of
work .(SS 901,903 & 904)

for basement : 1 415.00 SQM ONE SQM 169.00 70135

23 Providing impervious coat to exposed RCC roof slab surfaces


to required slopes with CM (1:3) prop. using screened sand 20mm
thick (average) mixed with water proofing compound
manufactured by reputed manufacturers as approved by
Engineer-in-charge at 1 Kg per one bag of cement, laid over roof
slab when it is green, finished smooth with a floating coat of neat
cement and thread lining at regular intervals of 45cmx45cm
including cost and conveyance of all materials like cement, sand,
water proofing compound, water etc., to site, including seigniorage
charges, sales & other taxes on all materials and operational,
incidental, and labour charges for mixing mortar, laying, lift
charges, rendering smooth and thread lining, curing including
rounding off junctions of wall and slab etc., and overheads &
contractors profit complete for finished item of work. (APSS No.
901 & 903).

Second Floor 1 375.00 SQM ONE SQM 388.00 145500


Abstract Estimate Civil Page-59
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
24 Providing impervious coat to exposed RCC roof slab surfaces
of sump , sump side wall,sump bottom slab,in side of septic
tank , in sunken slabs etc. to required slopes with CM (1:3)
prop. using screened sand 12mm thick mixed with water
proofing compound manufactured by reputed manufacturers as
approved by Engineer-in-charge at 1 Kg per one bag of cement,
laid over roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of
45cmx45cm where ever necessary including cost and conveyance
of all materials like cement, sand, water proofing compound, water
etc., to site, including seigniorage charges, sales & other taxes on
all materials and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread
lining, curing including rounding off junctions of wall and slab etc.,
and overheads & contractors profit complete for finished item of
work. (APSS No. 901 & 903).

First Floor 1 80.00 SQM ONE SQM 133.00 10640

25 Flooring with polished shahabad / Tandur stone slabs of


15mm to 18mm thick 0.457m x 0.457m or any other size as
specified set over a base coat of CM (1:8) , 12mm thick using
screened sand over already laid CC bed / RCC roof slab including
neat cement slurry of honey like consistency spread @ 3.3 Kgs
per Sqm and jointed with neat cement to full depth including cost
and conveyance of all materials like cement, sand, water, flooring
stones etc. complete including seigniorage charges, sales & other
taxes on all materials including all labour charges like dressing of
flooring stones to the required size, mixing of cement mortar,
laying, lift charges , cost of base coat etc., and overheads &
contractors profit complete for finished item of work. (APSS
No.703 & 701)

First Floor 1 35.00 SQM ONE SQM 522.00 18270

Second Floor 1 26.00 SQM ONE SQM 549.00 14274

26 Flooring with ceramic tiles 7.30mm thick , 1st quality and of


size as approved by Engineer-in-charge, set over base coat of
cement mortar (1:8), 12mm thick using screened sand over CC
bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3 Kgs per Sqm & jointed
neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, sand ,
water and tiles etc., and overheads & contractors profit complete
including seigniorage charges etc., complete for finished item of
work. (APSS No.701 & 707)

First Floor 1 47.00 SQM ONE SQM 897.00 42159

Second Floor 1 49.00 SQM ONE SQM 929.00 45521


Abstract Estimate Civil Page-60
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
27 Flooring with vitrified polished floor tiles of 1st quality and
make as approved by Engineer-in-charge of size not less than
598 mm x 598 mm , 8mm thickness regular finish and normal
colours with borders and design as per the approved flooring
pattern as directed by the Engineer-In -Charge, laying tiles using
spacers of 2mm thick, set over a base coat of CM (1:8) prop.
12mm thick using screened sand over CC bed already laid or
RCC roof slab , including neat cement slurry of honey like
consistancy spread @ 3.3 kgs per Sqm. and jointed neately with
white cement paste to full depth mixed with pigment of matching
shade including cost and conveyance of all materials like
cement, sand, water, tiles, white cement etc., to site (excluding
cost of C.C. bed) including cost of seigniorage charges on all
materials, cost of base coat and all labour charges for mixing of
cement mortar, laying tiles to required slope as directed by the
Engineer- in-charge etc.,and overheads & contractors profit
complete for finished item of work. (APSS No.701 & 707)

First Floor 1 305.00 SQM ONE SQM 1101.00 335805

Second Floor 1 310.00 SQM ONE SQM 1133.00 351230

28 Providing polished shahabad / Tandur stone slabs of 15mm


to 18mm thick in single piece as specified set over a base coat of
CM (1:5) , 12mm thick using screened sand over already laid CC
bed / RCC roof slab including neat cement slurry of honey like
consistency spread @ 3.3 Kgs per Sqm and jointed with neat
cement to full depth including cost and conveyance of all materials
like cement, sand, water, flooring stones etc. complete including
seigniorage charges, sales & other taxes on all materials
including all labour charges like dressing of flooring stones to the
required size, flat nosing the edges, mixing of cement mortar,
laying, lift charges , cost of base coat etc., and overheads &
contractors profit complete for finished item of work for treads
and risers. (APSS No.703 & 701)

a) Treads of 0.30m wide :


First Floor 1 24.00 SQM ONE SQM 586.00 14064

Second Floor 1 9.00 SQM ONE SQM 613.00 5517

b) Risers of 0.15m height :


First Floor 1 26.00 SQM ONE SQM 558.00 14508

Second Floor 1 10.00 SQM ONE SQM 589.00 5890

29 Providing skirting to internal walls to 10 cm height with


ceramic tiles 7.30 mm thick length equal to flooring tiles, set
over base coat of CM(1:5) 12 mm thick using screened sand with
cement slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., complete
including seigniorage charges etc., and overheads & contractors
profitcomplete for finished item of work.(APSS No.701 &707)

First Floor 1 74.00 RM ONE RM 68.00 5032

Second Floor 1 84.00 RM ONE RM 68.00 5712


Abstract Estimate Civil Page-61
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
30 Providing skirting to internal walls to 10 cm height with
vitrified tiles 8mm thick , regular finish and normal colour,
length equal to flooring tiles, set over base coat of CM(1:5) 12 mm
thick using screened sand with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointing
with white cement paste mixed with pigment of matching shade to
full depth, including cost of all materials like tiles, cement, sand
and water etc.,and overheads & contractors profit complete
including seigniorage charges etc., complete for finished item of
work.(APSS No.701 &707)

First Floor 1 284.00 RM ONE RM 86.00 24424

Second Floor 1 234.00 RM ONE RM 86.00 20124

31 Providing dadooing to walls with glazed plain coloured wall


tiles 1st quality of size of size not less than 300mm x 200mm with
bordersas approved by Engineer-in-Charge set over base coat of
CM(1:5) 12 mm thick using screened sand with cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of matching
shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete including seigniorage
charges etc., and overheads & contractors profit complete for
finished item of work.

First Floor 1 410.00 SQM ONE SQM 617.00 252970

Second Floor 1 377.00 SQM ONE SQM 625.00 235625

32 Reinforced cement concrete (1:5:10) proportion (Cement: fine


aggregates: coarse aggregate) using 40mm size (SS5) hard
granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate
(sand), coarse aggregate, water etc., to site and cost of
seigniorage charges on all materials including centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood
Posts , Wall Plates etc., shuttering, machine mixing, laying
concrete, lifting concrete manually , curing etc., and overheads &
contractors profit complete as per drawings but excluding cost of
steel and it's fabrication charges for finished item of work (APSS
NO. 402 & 403) for Dummy columns.

Second Floor 1 10.00 CUM ONE CUM 7960.00 79600

33 Supplying and fixing of stainless steel ( grade 202 ) hand


railing as per approved drawing with top rail of 50mm dia pipe
and 2mm thick medium class and vertical posts of 25mm dia and
1.6mm thick medium class 2 Nos for each step fixed with base
plate of 75mm dia using bonding agent and anchor fastner and
welding, drilling of 20mm dia holes with pneumatic compressor
for fixing railing, buffing, polishing all members of the railing
thouroughly , lacquer finishing to present seamless finish
including cost and conveyance of all materials, electrodes,
welding charges, cost of all consumables, labour charges ,
overheads & contractors profit etc., complete for finished item of
work.
1 30.00 SQM ONE SQM 2967.00 89010
Abstract Estimate Civil Page-62
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
34 Providing 110 mm Dia ISI marked PVC down water take pipes
with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked
including cost of necessary PVC Bends, shoes, iron / PVC clamps
and all other accessories and fixing in position including cost and
conveyance of all materials, sales & other taxes on materials to
site, operational & incidental charges including all labour charges
for fixing at site etc., and overheads & contractors profit complete
for finished item of work. (APSS No. 1328)
1 42.00 RM ONE RM 243.00 10206
Abstract Estimate Civil Page-63
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
35 Supply and fixing powder coated aluminium fully glazed
swing door as per the approved drawing with fixed fan light of
500mm height at top door using aluminium sections of 101.60
mmm x 44.45mm , 3.18 mm thick for frame and door shutter made
of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm
thick and bottom rail of 114.30mm x 44.45 mm , 3.18mm
thick,powder coating of alluminium sections 25mm microns thick,
5 mm thick plain float glass fitted with suitable aluminium glazing
clips and rubber beading in fan light portion, double shutters
fitted with 5mm thick frosted / ground glass in the top half
and 12mm thick prelaminated particle board ( One side
choice colour and other side balancing white lamnation ) in
the bottom half fitted with suitable aluminium glazing clips and
rubber beading,shutters mounted on double action hydraulic floor
spring of approved brand manufacture IS : 6315 marked ,
Hardwyn make M-3000 for doors including cost of cutting floors as
required , embedding in floors

and SS cover plates with brass pivot and sigle piece MS Sheet
outer box with slide plate etc.complete( Weight Capacity up to 130
Kgs ) as approved by Engineer-in-Charge including supply and
fixing ISI marked powder coated aluminium fixtures of 4
Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4
Nos.alluminium handles (IS:208) 150mm dia and 2 Nos. aldrops
(IS:2681) 300mm long including labour charges for manufacturing
door , fixing the door with required No. of screws etc., including
overheads & contractors profit complete for finished item of work.
(The Aluminium section used shall be standard make confirming
to IS 1948 – 1961) and as approved by the Engineer)
(1500mmx2600mm)

1 11.70 SQM ONE SQM 7871.00 92091

36 Supply and fixing of two shutter main door cum fixed window
as per approved drawing with best teak wood frame of section
150mm x 100 mm with fixed fan light of 500mm at top and fixed
panels of 600mm width at sides fixed with 12mm thick Tinted -
Bronze/Green glass using 12mm x 12mm teak wood beading and
fixing ornamental grill made of 25mm x 5mm MS flats as per the
approved drawing in fan light portion and fixed panels and 1st
class teak wood top and middle rails & styles of section 120mm x
35mm, bottom rail of size 150mm x 35mm and 12mm thick plain
float glass for shutter with ornamental etching including cost and

conveyance to site of teak wood frame, shutters, glass including


supply and fixing 6 nos MS Zhold fasts of size 300 mm x 40 mm x
5mm including cost of ISI marked brass fixtures of 8 Nos butt
hinges(IS:205) 250mm long , 1 No. aldrop (IS:2681) 450mm long,
3 Nos tower bolts- 10mm (IS:204) of 200 mm long , 2 Nos 450
mm long fancy handles, 2 Nos door stoppers including fixing the
fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the
shutters to the frame etc., including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of
not less than 40 mm) (3000mmX2600mm)

1 7.80 SQM ONE SQM 10944.00 85363


Abstract Estimate Civil Page-64
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
37 Supply and fixing of doors as per approved drawings with
medium teak wood frame of section 100mm x 65 mm with split
type fan light of 500mm at the top fixed with 4mm thick pin
headed glass using 12mm x 12mm Teak Wood beading and 2
Nos. of 10mm MS Square bars and ISI marked flush door shutter
of 30mm thick double shutters with bond wood solid block board
type core having cross bands and face veneers, hot pressed
bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides,

including cost and conveyance to site of teak wood frame, flush


shutter including supply and fixing 6 Nos. MS Z hold fasts of size
300 mm x 40 mm x 5mm including cost of ISI marked MS powder
coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No.
aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200
mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2
Nos. door stoppers and 2 Nos. rubber bushes including fixing the
fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the
shutter to the frame etc, including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of
not less than 10 mm) (1200mm x 2600mm)

1 18.72 SQM ONE SQM 2985.00 55879

38 Supply and fixing doors as per drawings with medium teak


wood frame of section 100mm x 65 mm and ISI marked flush
door shutters of 30 mm thick single shutter with bond wood solid
block board type Core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and
conveyance to site of teak wood frame, flush shutter including
supply and

fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm


including cost of ISI marked MS powder coated fixtures of 3 Nos.
butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm
long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top , 2
Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No.
rubber bush including fixing the fixtures to door with required
number of screws, bolt and nuts including labour charges for fixing
the frame in position, fixing the shutter to the frame etc., including
overheads & contractors profit complete for finished item of work
as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm)
(1000mm x 2100mm)
1 16.80 SQM ONE SQM 3004.00 50467
Abstract Estimate Civil Page-65
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
39 Supply and fixing doors as per drawings with medium teak
wood frame of section 100mm x 65mm and ISI marked flush door
shutter of 30mm thick single shutter with bond wood solid block
board type Core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and
conveyance to site of medium teak wood door frame, flush
shutter, including suply and fixing 6 Nos. MS Z hold fasts of size
300mm x 40mm x 5mm including ISI marked MS powder coated
fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop
(IS:2681) 250 mm long,

1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm


long handles (IS:208),1 No. rubber bush including supplying and
fixing 1.20mm thick PVC sheet to full height of the shutter inside
including labour charges for fixing the frame in position, fixing the
shutter to the frame etc., including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002. (The
vertical frame of door shall be embedded in flooring for deth of
not less than 10mm) ( 750mm x 2100mm )

1 22.05 SQM ONE SQM 3564.00 78586

40 Providing & Fixing of Openable Windows with Fly-mesh made


of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick
galvanized as per IS 277 with zinc of 150 GSM) primer coated
with epoxy primer of 5-7 microns thick, finish painted with a
polyester paint of 12-16 microns thick and back coated with 5-7
microns thick alkyd backer and the section for outer frame of 72 x
55mm, centre mullion of 72 x 50mm, section for fixed glass
beading section of 12 x 12 mm and section for shutters of 48 x 25
mm and outer frame & mullion sections with rebate for glazed
shutters, fly mesh and a 20 mm provision for guard bars/grills and
fly mesh shutter section of 20 x 40 mm and the sections cut to
length metre joined with corner bracket, centre mullions fixed with
mullion cap, stay, handles, latch 2 Nos of heavy duty stainless
steel pivot hinges per shutter and panelled with 5mm thick plain
float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted
using rubber gaskets including fixing the windows in the
concrete/masonry wall by means of self expanding screws,
including 10mm Square guard bars with 6” (152.4mm) pitch
including overheads and contractor profit etc., complete for
finished item of work

WINDOWS
Centre fixed both side openable shutter window : 1800mm
x1800mm 1 30.60 SQM ONE SQM 6185.00 189261

Centre fixed both side openable shutter window : 1500mm


x1800mm 1 28.56 SQM ONE SQM 6833.00 195150
Abstract Estimate Civil Page-66
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
41 Supply and fixing of pre-painted steel windows & top hung
and fixed louvered ventilators made of pre - painted steel
(base steel as per IS 513 of -0.58 mm thick 'D" quality, galvanized
as per IS 277 with zinc of 120 GSM) primer coated with epoxy
primer of 5-7 microns thick, finish painted with a polyester paint of
12-16 microns thick and back coated with 5-7 microns thick alkyd
backer, section for outer frame of 46 x 52 mm section and for
shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section
for beading should be 18 x 25 mm and section for louvered
ventilation of 33 x 56 mm Box section and the windows panelled
with 5 mm thick plain float glass & 4 mm pinhead glass for
ventilators with Ethyl propylene Diamine monomer Gasket
(EPDM) and the sections cut to length mitre joined with corner
brocket centre mullions fixed using mullion cap and with handle
made of high grade aluminium powder coated and nylon receiver,
corner brackets made of CRCA with Zinc Phosphate, Mullion caps
made of glass filled nylon, frames fixed to the concrete /masonry
wall by means of self expanding screws including 10 mm square
guard bars with 6" pitch including overheads & contractors profit
etc., complete for finished item of work.

VENTILATORS
Fixed louvered of any size 1 2.40 SQM ONE SQM 4668.00 11203

42 Providing and fixing RAJSHRI or equivalent false ceiling


consisting of 600mmX600mm, Solid PVC insulation panels
having wall thickness of 1mm thick plain PVC rigid foam sheet and
EPS as defined in of desired thickness depending on nsulation
required shall be insert in a frame work made using anodized
aluminium Tee section of sizes 1”X1” (25X25mm, 19 auge or 1mm
thick) in square pattern of grid sizes of 2’X2’ (600X600mm). The
aluminium framework is supported from the ceiling with the help of
G.I. hook and G.I. wire/6mm.M.S. rods of required sizes to
maintain proper level etc. the aluminium framework is supported
on side wall with the use of aluminium 1”X1” (25X25mm) angles,
complete as per direction inclusive of conveyance of all materials
accessories, labour charges, and erection at site including
overheads & contractors profit etc., complete finished item of
work.
1 60.00 SQM ONE SQM 1436.00 86160

43 White washing two coats with paint grade white lime to


ceiling to give an even shade after thouroughly brushing the
surface to remove all dirt and remains of loose powdered
materials including cost of all materials , labour charges and
incidental such as scaffolding , lift charges etc., and overheads &
contractors profit complete for finished item of work but excluding
conveyance of materials in all floors.
1 862.00 SQM ONE SQM 31.00 26722

44 Supply & application of one coat deco orient base & two
coats of acrylic emulsion paint having VOC (Volatile Organic
Compound) content less than 50 grams/litre for internal walls
including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc.,and
overheads & contractors profit complete for finished item of work
in all floors.

1 1926.00 SQM ONE SQM 125.00 240750


Abstract Estimate Civil Page-67
Unit Rate Amount
Sl. No. Description Quantity
(in words) (in Rs.) (Rs.)
45 Supply & application of one coat of deco orient base & two
coats of acrylic exterior emulsion paint having VOC (Volatile
Organic Compound) content less than 50 grams/litre for exterior
walls including cost and conveyance of all materials to site, sales
& other taxes, incidental, operational and all labour charges
etc.,and overheads & contractors profit complete for finished item
of work in all floors.
1 960.00 SQM ONE SQM 165.00 158400

46 Painting to new wood work and flush shutters with lappam


finish , over a primary coat and painting two coats of
synthetic enamel paint Grade-II VOC (Volatile Organic
Compound) content less than 50 grams/litre of approved shade
including cost and conveyance of all materials to site cost of
primer coat and all labour charges etc. complete including
applying sand paper on lappam coats for neat finish including
sales & other taxes on cost of all materials etc.and overheads &
contractors profit complete (APSS No.1200, 1207 & 1211) in all
floors.

1 156.00 SQM ONE SQM 155.00 24180

47 Supplying & fixing collapsible steel shutters with vertical,


double channel of 20 x10x2 mm of 100 mm centre ,Bracers with
flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom
and side vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at site height with
65mmx8mm MS flat for the pulleys to guide and fixed with
necessary hold fasts, bolts, nuts, rivets, locking arrangements,
stoppers, handles, all accessories all fixtures and painted with one
coat of approved steel primer etc., overheads & contractors profit
complete for finished item of work as per special spn 1105

1 11.00 SQM ONE SQM 2493.18 27425

48 Supplying and fixing 50mm dia nominal bore Medium Grade


properties & weight as per IS 1239 ISI mark MS Tube for fixing of
GI Sheet including cost and conveyance of all materials to work
site and all operational, incidental, labour charges , overheads &
contractors profit for finished item of work.etc., complete for
finished item of work in all floors for stair case head room roof.
1 25.00 RM ONE RM 499.00 12475

49 Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I
‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled
with white lead & including a coat of approved steel primer and
two coats of approved paint on over lapping of sheets complete
(up to a pitch of 600) and seigniorage charges, etc., complete,
excluding the cost of purlins, rafters, trusses including cost and
conveyance of all materials , labour charges , overheads and
contractors profit etc., complete for finished item of work in all
floors.
1 14.00 SQM ONE SQM 847.00 11858
Sub Total (CIVIL) Rs. 11480142
Abstract Estimate WS & SA Page-68

PART-II :- WATER SUPPLY AND SANITARY ITEMS


Unit Rate Amount
Sl.No Description Quantity
(in words) (in Rs.) (Rs.)
1 Supplying and laying, filling, jointing and testing SWG
SP-1 pipe conforming to ISI 651 & 4127 with air tight
Cement joints in CM (1.5:1) prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) and refilling with watering and tamping to the
required slope including cost and conveyance of all materials
to site and all labour charges , overheads & contractor profit
etc., complete for finished item of work (APSS NO 1301 &
1318)

a) 101.60mm dia upto 914.40mm (3') depth 1 15.00 RM ONE RM 299.00 4485

b) 152.40mm dia upto 914.40mm (3') depth 1 30.00 RM ONE RM 464.00 13920

2 Constructing 904.0 mm (3’0”) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225
mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement
mortar 1:3 prop; ½” thick both inside and outside fitted with
20” dia RCC manhole covers and frames including
excavating pits up to a depth of 904 mm (3'-0") in all sorts
of soils (exculding rock) and laying cement conrete (1:4:8)
150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing , overheads &
contractors profit etc., complete for finished item of work as
per Standard specification.

1 6 EACH EACH 5699.00 34194

3 Constructing 904.0 mm (3’0”) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225
mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement
mortar 1:3 prop; ½” thick both inside and outside fitted with
20” dia RCC manhole covers and frames including
excavating pits up to a depth of 1524 mm (5'-0") in all
sorts of soils (exculding rock) and laying cement conrete
(1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C.
1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing , overheads &
contractors profit etc., complete for finished item of work as
per Standard specification.

1 6 EACH EACH 8735.00 52410


Abstract Estimate WS & SA Page-69

Unit Rate Amount


Sl.No Description Quantity
(in words) (in Rs.) (Rs.)
4 Supplying and fixing of SWG Gully traps 150mm x
100mm of ISI make confirming to IS 651 & 4127 with C.I
grating & constructing cement brick masonry in CM (1:6)
prop., intermediate chamber and fitted with 304.8 mm X
288.6 mm (12"x9") C.I Frame with hinged cover of standard
make as approved including cost and conveyance of all
materials to site, labour charges, overheads & contractors
profit etc., complete for finished item of work.

1 20 EACH EACH 592.00 11840

5 Supplying and fixing of 3" (76.2mm) multi floor trap with


jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as
per site requirements with standard practice for all floors
including cost and conveyance of all materials to site, labour
charges , overheads & contractors profit etc., complete for
finished item of work.
1 20 EACH EACH 116.00 2320

6 Supplying and fixing of 4" (101.6mm) multi floor trap


with jali - UPVC/SWR pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as
per site requirements with standard practice for all floors
including cost and conveyance of all materials to site, labour
charges , overheads & contractors profit etc., complete for
finished item of work.
1 8 EACH EACH 164.00 1312

7 Supplying and fixing 580mm x 440mm long Orissa pan


white glazed Water Closet 1st quality ISI marked
confirming to IS:2556-Part-3-1981 with "P" or "S" trap
Hindware / Parryware / Neycer with brick - ISI mark and
providing masonry seat, CC squatting plate and 10 litres
capacity single flush PVC low level cistern Parryware or
equivalent with internal components fixed on 2 Nos. of teak
wood blocks of size 76.20mm x 101.60mm using required
size of nails, screws as approved by Engineer-in-charge,
angle stop cock 12.70mm dia. first quality Indian make
heavy duty Seiko/Senior/Nice or equivalent, 12.70mm PVC
connection with brass union nuts CP coated , 31.75mm
brass plumber union, P trap or S trap of Indian W.C. shall be
encased on CC (1:2:4) 150mm alround well above the joint
to stop leakage at the joint etc., complete including cost and
conveyance of all materials to site, cost of CC bed, labour
charges and seigniorage charges, overheads & contractors
profit etc., complete for finished item of work.

1 5 EACH EACH 4312.00 21560


Abstract Estimate WS & SA Page-70

Unit Rate Amount


Sl.No Description Quantity
(in words) (in Rs.) (Rs.)
8 Supplying and fixing European Water Closet of 1st quality
conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or
Parryware make white glazed with 'S' trap,supplying and
fixing best Indian make plastic seat and lid for European
water closets with rubber or plastic Buffers as per IS 2548-
1996 and 10 litres capacity single flush PVC low level
cistern Parryware or equivalent with internal components
and fixed using required size of nails and screws, angle stop
cock 12.70mm dia. first quality Indian make heavy duty
Seiko/Senior/Nice or equivalent, 12mm PVC connections
with brass union nuts CP coated including cost and
conveyance of all materials to site, overheads & contractors
profit etc., complete for finished item of work for all floors.

1 9 EACH EACH 4782.00 43038

9 Supplying and fixing Indian make Flat Back Wash Hand


Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm
nominal size C.P. Fitting with parallel pipe thread conforming
to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400
grams Seiko/Senior/Nice or equivalent complete with
standard CI brackets including wooden blocks ,1
No.12.70mm PVC connection with brass union nuts CP
coated , angle stop cock 12.70mm dia. first quality Indian
make heavy duty Seiko/Senior/Nice or equivalent, 1
No.12.70mm NP bib tap 400 gms Seiko or equivalent ,
31.75mm dia. PVC flexible waste pipe 914.4mm length of
1st quality including cost and conveyance of all materials to
site, labour charges , overheads & contractors profit for
finished item of work

1 6 EACH EACH 2429.00 14574

10 Supplying and fixing NP soap dish heavy type of


approved make ISI quality with NP screws etc., complete
including cost and conveyance of all materials, labour
charges for fixing , overheads & contractors profit for finished
item of work in all floors 1 6 EACH EACH 264.00 1584

11 Supplying and fixing TV shape mirror with plastic frame


of size 609.6mm x 457.2mm , plywood back with NP
screws 1st quality including cost and conveyance of all
materials, labour charges , overheads & contractors profit for
finished item of work in all floors. 1 6 EACH EACH 594.00 3564

12 Supplying and fixing of 25.4mm dia , 609.6mm long


aluminium anodized towel rods with brackets and
aluminium screws including cost and conveyance of all
materials, labour charges , overheads & contractors profit for
finished item of work. 1 6 EACH EACH 193.00 1158

13 Supplying and fixing NP bib taps of size 12.70mm dia of


Indian make heavy duty as approved by the Engineer-In-
Charge including cost and conveyance of all materials,
labour charges , overheads & contractors profit complete for
finished item of work in all floors. 1 15 EACH EACH 287.00 4305
Abstract Estimate WS & SA Page-71

Unit Rate Amount


Sl.No Description Quantity
(in words) (in Rs.) (Rs.)
14 Supplying and fixing of SWR PVC pipes
(Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4
Kg/Sq.cm. and fixing all special such as plain bends, off
sets, door bends, single junctions, double junctions as per
site requirement, fixing with PVC clamps if necessary with
required number of Bombay nails including cost and
conveyance of all materials to site, labour charges,
overheads & contractors profit complete for finished item of
work at all floor levels. (APSS No. 1302 1319 & 1326)

a) 75mm dia 1 30 RM RM 180.00 5400

b) 90mm dia 1 30 RM RM 238.00 7140

c) 110mm dia 1 30 RM RM 268.00 8040

15 Supplying & fixing GI pipe Medium Grade properties &


weight as per IS 1239 ISI mark in ground or on wall
including cost of tees, elbows, bends, reducers, couplings,
running joints, union flanges, unions etc. with necessary
excavation in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the walls
& floors to the original surface and fixing MS clamps on TW
blocks on walls including cost and conveyance of all
materials and labour charges , overheads & contractors
profit complete for finished item of work.

a) 15mm Nominal bore 1 60.00 RM RM 214.00 12840

b) 20mm Nominal bore 1 30.00 RM RM 236.00 7080

c) 25mm Nominal bore 1 30.00 RM RM 304.00 9120

d) 32mm Nominal bore 1 15.00 RM RM 420.00 6300

e) 40mm Nominal bore 1 15.00 RM RM 470.00 7050

f) 50mm Nominal bore 1 40.00 RM RM 515.00 20600

16 Supplying and fixing Gunmetal Gate ( GM peet ) valve as


per IS-778 Class - I , Indian make heavy type including cost
and conveyance of all materials , labour charges , overheads
& contractors profit complete for finished item of work.

a) 20mm Nominal bore 1 15 EACH EACH 559.00 8385

b) 25mm Nominal bore 1 6 EACH EACH 814.00 4884

c) 32mm Nominal bore 1 3 EACH EACH 1208.00 3624

d) 40mm Nominal bore 1 3 EACH EACH 1650.00 4950

e) 50mm Nominal bore 1 3 EACH EACH 2380.00 7140


Abstract Estimate WS & SA Page-72

Unit Rate Amount


Sl.No Description Quantity
(in words) (in Rs.) (Rs.)
17 Providing and placing on terrace (at all floor
levels)polyetheylene water storage tank with double
layer approved brand and manufacture with cover and
suitable locking arrangement and making necessary holes
for inlet and outlets and over flow pipes but without fittings
and base support for tanks including cost and conveyance
of all materials and labour charges , overheads & contractors
profit complete for finished item of work.

1 1000 LITER ONE LITER 7.30 7296

18 Supplying and fixing of stainless steel sink of size


508.00mm x 457.2mm x 203.20mm, 1mm thick of Indian
make fixed on cantilever brackets including supply and fixing
31.75mm C.P. waste coupling, 31.75 mm dia PVC flexible
waste pipe of 914.4 mm length of Ist quality ncluding
chiselling brick masonry wall and making good & restoring to
original surfaces , overheads & contractors profit complete
for finished item of work in all floors
1 2 EACH EACH 5407.00 10814

19 Supplying and fixing white glazed flat back Bowl urinals


of size 440 mm x 265 mm x 315 mm with integral flushing
rim fixed with screws complete Indian make
(HSW/Parry/Neycer) conforming to IS:2556-1995 as
approved by Engineer-in-charge, including supply and fixing
12.7mm PVC connection with brass plumber union nuts CP
coated, 12.70mm push cock 1st quality of approved make ,
31.75 mm dia PVC flexible waste pipe of 914.4 mm length
of Ist quality including cost and conveyance of all materials
to site, labour charges , overheads & contractors profit
complete for finished item of work for all floors.

1 4 EACH EACH 1358.00 5432

20 Supplying and fixing of 16mm to 20 mm thick polished


marble slab partitioins of size 4' 0" x 2' 0" for urinals
including full rounding the edges , fixing in position,
polishing, including cost and conveyance of all materials and
labour charges , overheads & contractors profit complete for
finished item of work for all floors.
1 6 EACH EACH 1743.00 10458

21 Supplying and fixing of 101.60mm x 609.60mm white


glazed porcelain channels 1st quality fixed in brick
masonry to the required slopes , white cement pointing
including cost and conveyance of all materials and labour
charges , overheads & contractors profit complete for
finished item of work for all floors.
1 5 RM ONE RM 864.00 4320

22 Construction of brick masonry support for GI pipe of


size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop
including plastering and finishing with 12mm thick in CM
(1:5) including cost and conveyance of all materials and all
labour charges, overheads & contractors profit complete for
finished item of work for all floors.
1 15 EACH EACH 78.00 1170
Sub Total (WS): 362307
DETAILED ESTIMATE

Up gradation of Government Hospital, Allur from 30 Bedded

S.
Description of Item No's L B D Quantity
No

1 Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing on
bank with an initial lead of 10m and 1m additional lift charges over the initial depth up to 3m including all
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and Overheads
& Contractors profit complete for finished item of work including seigniorage excluding dewatering
charges etc., as per SS 20 B(APSS 308) (BLD-CSTN-2-1& COM-LDLFT-6-66)

Under columns 1 x 52 2.40 2.40 2.10 628.99


Under columns 1 x 50 2.10 2.10 2.10 463.05
Under columns 1 x 29 1.80 1.80 2.10 197.32
Under columns 1 x 2 1.80 1.80 2.10 13.61
under external long walls (1) 1 x 1 58.62 0.60 0.45 15.83
under external long walls( 2) 1 x 1 29.03 0.60 0.45 7.84
under external long walls( 3) 1 x 1 70.06 0.60 0.45 18.92
under external long walls (4) 1 x 1 54.16 0.60 0.45 14.62
under external long walls (5) 1 x 1 30.17 0.60 0.45 8.15
under external long walls (6) 1 x 1 56.52 0.60 0.45 15.26
under external long walls (7) 1 x 1 49.66 0.60 0.45 13.41
Add: Extra for variation 353.00
Total 1749.99
say 1750.00

2 Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing
on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,
incidental, labour charges such as shoring, sheeting, planking, strutting etc., and Overheads &
Contractors profit complete for finished item of work including seigniorage including dewatering charges
etc., as per SS 20 B(APSS 308) (BLKD-CSTN-2-2)

For sump 1 x 1 6.60 3.60 2.00 47.52


For Septic tank 1 x 1 6.60 3.60 2.00 47.52
Add: Extra for variation 24.00
Total 119.04
say 120.00
3 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations
and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite
from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all
materials and including all charges for machine mixing, laying concrete in foundations and
under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing
etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402)
(BLD-CSTN-3-5)

Under columns 1 x 52 2.40 2.40 0.15 44.93


Under columns 1 x 50 2.10 2.10 0.15 33.08
Under columns 1 x 29 1.80 1.80 0.15 14.09
Under columns 1 x 2 1.80 1.80 0.15 0.97
under external long walls (1) 1 x 1 58.62 0.60 0.15 5.28
under external long walls( 2) 1 x 1 29.03 0.60 0.15 2.61
under external long walls( 3) 1 x 1 70.06 0.60 0.15 6.31
under external long walls (4) 1 x 1 54.16 0.60 0.15 4.87
under external long walls (5) 1 x 1 30.17 0.60 0.15 2.72
under external long walls (6) 1 x 1 56.52 0.60 0.15 5.09
under external long walls (7) 1 x 1 49.66 0.60 0.15 4.47
For sump 1 x 1 6.60 3.60 0.15 3.56
For Septic tank 1 x 1 6.60 3.60 0.15 3.56
Add: Extra for variation 38.00
Total 169.54
say 170.00
cum
4 Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations
and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite
from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all
materials and including all charges for machine mixing, laying concrete in foundations and
under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing
etc.,and Overheads & Contractors profit complete for finished item of work. (APSS No. 402)
(BLD-CSTN-3-7)

Staff toilets 1 x1 6.00 2.63 0.10 1.58


Dark room 1 x1 2.87 3.00 0.10 0.86
Store room 1 x1 2.87 3.00 0.10 0.86
x ray room 1 x1 4.00 6.00 0.10 2.40
Wating area ( 1) 1 x1 4.00 6.00 0.10 2.40
Clinical laboratory 1 x1 3.89 6.00 0.10 2.33
Medical clinical room 1 x1 3.89 6.00 0.10 2.33
Wating area (2) 1 x1 4.00 6.00 0.10 2.40
central injection room 1 x1 4.00 6.00 0.10 2.40
Surgical clinic cons &Exam 1 x1 3.89 6.00 0.10 2.33
Wating area (3) 1 x1 4.00 6.00 0.10 2.40
OBS &Gyenic clinic 1 x1 3.77 6.00 0.10 2.26
1 x1 1.80 2.77 0.10 0.50
Gents toilets 1 x1 2.75 6.00 0.10 1.65
Ladies toilets 1 x1 2.75 6.00 0.10 1.65
Corridor (1) 1 x1 58.62 2.00 0.10 11.72
Family planning clinic (1) 1 x1 5.00 3.65 0.10 1.83
Family planning clinic (2) 1 x1 5.00 3.65 0.10 1.83
Eye &Ent clinic 1 x1 5.00 3.65 0.10 1.83
Wating area (6) 1 x1 5.00 3.71 0.10 1.86
Pharmacy 1 x1 5.00 3.94 0.10 1.97
Corridor (2) 1 x1 18.55 2.00 0.10 3.71
Dental clinic 1 x1 5.00 3.94 0.10 1.97
Wating area (5) 1 x1 5.00 3.71 0.10 1.86
Padiatric clinic 1 x1 5.00 3.65 0.10 1.83
Streli store 1 x1 5.00 3.65 0.10 1.83
Wating area (4) 1 x1 5.00 3.65 0.10 1.83
Reception /Registratation 1 x1 5.00 5.83 0.10 2.92
Wating area (8) 1 x1 10.45 5.83 0.10 6.09
Corridor (5) 1 x1 15.45 2.00 0.10 3.09
semi/Ramp 1 x1 9.39 4.60 0.10 4.32
ramp 1 x1 24.75 4.66 0.10 11.53
Nurses room 1 x1 5.00 3.54 0.10 1.77
Docter room 1 x1 5.00 3.65 0.10 1.83
Store room 1 x1 3.66 5.00 0.10 1.83
ECG Room 1 x1 3.65 5.00 0.10 1.83
Corridor (2) 1 x1 14.60 2.00 0.10 2.92
Ultra sound scan 1 x1 5.00 3.65 0.10 1.83
Office incharge /Administratator 1 x1 5.00 3.65 0.10 1.83
Treatment room 1 x1 5.00 3.65 0.10 1.83
Examinatation room 1 x1 5.00 3.54 0.10 1.77
For inside flooring 1 x1 25.12 10.95 0.10 27.51
Corridor (3) 1 x1 14.60 2.00 0.10 2.92
under stair case 1 x1 4.75 7.76 0.10 3.69
Portico 1 x1 5.85 5.00 0.10 2.93
Open to sky (1) 1 x1 10.23 14.60 0.10 14.94
Open to sky (2) 1 x1 8.45 14.60 0.10 12.34
Deduct staircase 1 x1 4.75 7.76 0.10 -3.69
Long beams 1 x2 55.35 0.45 0.15 7.47
Ramp beams 1 x6 4.66 0.45 0.15 1.89
1 x6 8.76 0.45 0.15 3.55
Short beams 1 x 13 8.76 0.45 0.15 7.69
Long beams/toilet 2 x2 6.46 0.45 0.15 1.74
1 x 11 1.50 0.45 0.15 1.11
1 x2 1.20 0.45 0.15 0.16
Add: Extra for variation 57.00
Total 249.00
say 250.00
cum

5 Filling with useful available excavated earth (excluding rock) with a lead of 50 m in
trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm
thick, watering and ramming including cost and conveyance of water to work site and all
operaitonal, incidental, labour charges, hire charges of T&P etc., and Overheads &
Contractors profit complete for fnished item of work (APSS NO.309&310) (BLD-CSTN-2-9)

1492.04
Add: Extra for variation 357.00
Total 1849.04
1850.00
cum
6 Filling with carted gravel in trenches,sides of foundations and basement with initial lead in
layers not exceeding 15cm thick,watering and ramming including cost and conveyance of
water to work site and all peraitonal,incidental,loabour charges,hire charges of T&P etc., and
Overheads & Contractors profit complete for fnished item of work(APSS NO.309&310) ( BLD-
CSTN-2-8)

1 x1 58.62 29.53 1.20 2077.26


Add: Extra for variation 522.00
Total 2599.26
2600.00
cum
7 Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite
metal (coarse aggregate) ratio from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand), coarse aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials, all charges for mixing, laying concrete in position, vibrating, curing,
centering charges, overheads & contractors profit etc.,for finished item of work for footings and
basement 400mm thick.

under external long walls (1) 1 x 1 58.62 0.45 1.20 31.65


under external long walls( 2) 1 x 1 29.03 0.45 1.20 15.68
under external long walls( 3) 1 x 1 70.06 0.45 1.20 37.83
under external long walls (4) 1 x 1 54.16 0.45 1.20 29.25
under external long walls (5) 1 x 1 30.17 0.45 1.20 16.29
under external long walls (6) 1 x 1 56.52 0.45 1.20 30.52
under external long walls (7) 1 x 1 49.66 0.45 1.20 26.82
Add: Extra for variation 51.00
Total 239.04
say 240.00
cum

8 Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with
minimum cement content of 380kgs per 1 cum of concrete and required quantity of Chemical
Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60%
of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates ,
brackets , steel centering plates etc., including all operational, incidental and labour charges
such as weigh batching, machine mixing, laying concrete, curing etc.,and Overheads &
Contractors profit complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) (BLD-CSTN-3-14)

a) Footings
Under columns 1 x 52 2.10 2.10 0.55 126.13
Under columns 1 x 50 1.80 1.80 0.45 72.90
Under columns 1 x 29 1.50 1.50 0.35 22.84
Under columns 1 x 2 1.50 1.50 0.35 1.58
Add: Extra for variation 56.00
Total 279.44
say 280.00
b) Pedestals cum
Under columns 1 x 52 0.90 0.90 0.60 25.27
1 x 50 0.75 0.75 0.60 16.88
1 x 29 0.60 0.60 0.60 6.26
1 x 2 0.60 0.60 0.60 0.43
Add: Extra for variation 11.00
Total 59.84
say 60.00
cum
c) Tie Beams / Plinth Beams
Long beams 1 x3 51.29 0.23 0.45 15.93
Short beams 2 x3 12.92 0.23 0.45 8.02
Ramp beams 1 x7 4.66 0.23 0.45 3.38
Stair case 1 x2 4.75 0.23 0.45 0.98
Lift side 1 x2 2.36 0.23 0.45 0.49
Long beams /front 1 x1 61.98 0.23 0.45 6.41
Circle beams 1 x2 2.26 0.23 0.45 0.47
1 x3 4.23 0.23 0.45 1.31
Short beams 1 x1 3.23 0.23 0.45 0.33
Short beams 1 x1 12.23 0.23 0.45 1.27
1 x1 18.31 0.23 0.45 1.90
1 x1 12.92 0.23 0.45 1.34
Long beams Ramp 1 x3 24.98 0.23 0.45 7.76
Short beams 1 x 14 8.76 0.23 0.45 12.69
Short beams 1 x 12 14.83 0.23 0.45 18.42
1 x2 2.36 0.23 0.45 0.49
1 x6 2.46 0.23 0.45 1.53
Short beams 1 x5 6.29 0.23 0.45 3.26
1 x3 4.41 0.23 0.45 1.37
2 x2 2.49 0.23 0.45 1.03
Long beams/toilet 2 x2 6.46 0.23 0.45 2.67
1 x 11 1.50 0.23 0.45 1.71
1 x2 1.20 0.23 0.45 0.25
Add: Extra for variation 26.50
119.50
say 120.00
cum
9 Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with
minimum cement content of 380kgs per 1 cum of concrete and required quantity of Chemical
Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60%
of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials , Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering
plates etc. including all operational, incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete mechanically, laying concrete, curing etc.,and Overheads &
Contractors profit complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402 (BLD-CSTN-3-15)

a) COLUMNS :
i) F .Floor
below plinth
Under columns 1 x 52 0.45 0.55 1.60 20.59
Under columns 1 x 50 0.30 0.38 1.60 9.12
Under columns 1 x 29 0.30 0.38 1.60 5.29
Under columns 1 x 2 0.30 0.38 1.60 0.36
Under columns(above plinth ) 1 x 52 0.38 0.45 3.25 28.90
Under columns 1 x 50 0.30 0.45 3.25 21.94
Under columns 1 x 29 0.30 0.23 3.25 6.50
Under columns 1 x 2 0.30 0.23 3.25 0.45
Add: Extra for variation 26.00
Total 119.15
say 120.00
cum
b) S .Floor
Under columns(above plinth ) 1 x 52 0.38 0.45 3.25 28.90
Under columns 1 x 50 0.30 0.45 3.25 21.94
Under columns 1 x 29 0.30 0.23 3.25 6.50
Under columns 1 x 2 0.30 0.23 3.25 0.45
Add: Extra for variation 18.00
Total 75.79
say 76.00
cum

10 Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with
minimum cement content of 380kgs per 1 cum of concrete and required quantity of Chemical
Admixtures per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded
machine crushed hard granite metal (coarse aggregate) ( consisting of nominal size metal 60%
of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates ,
brackets , steel centering plates etc., including all operational, incidental and labour charges
such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete,
curing etc.,and Overheads & Contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402 (BLD-CSTN-3-16)

a) BEAMS :
i) F .Floor
Long beams 1 x3 51.29 0.23 0.45 15.93
Short beams 2 x3 12.92 0.23 0.45 8.02
Ramp beams 1 x7 4.66 0.23 0.45 3.38
Stair case 1 x2 4.75 0.23 0.45 0.98
Lift side 1 x2 2.36 0.23 0.45 0.49
Long beams 1 x1 61.98 0.23 0.45 6.41
Circle beams 1 x2 2.26 0.23 0.45 0.47
1 x3 4.23 0.23 0.45 1.31
Short beams 1 x1 3.23 0.23 0.45 0.33
Short beams 1 x1 12.23 0.23 0.45 1.27
1 x1 18.31 0.23 0.45 1.90
1 x1 12.92 0.23 0.45 1.34
Long beams Ramp 1 x3 24.98 0.23 0.45 7.76
Short beams 1 x 14 8.76 0.23 0.45 12.69
Short beams 1 x 12 14.83 0.23 0.45 18.42
1 x2 2.36 0.23 0.45 0.49
1 x6 2.46 0.23 0.45 1.53
Short beams 1 x5 6.29 0.23 0.45 3.26
1 x3 4.41 0.23 0.45 1.37
2 x2 2.49 0.23 0.45 1.03
Long beams/toilet 2 x2 6.46 0.23 0.45 2.67
1 x 11 1.50 0.23 0.45 1.71
1 x2 1.20 0.23 0.45 0.25
Add: Extra for variation 26.50
Total 119.50
say 120.00
cum
ii) S .Floor
Long beams 1 x3 51.29 0.23 0.45 15.93
Short beams 2 x3 12.92 0.23 0.45 8.02
Ramp beams 1 x7 4.66 0.23 0.45 3.38
Stair case 1 x2 4.75 0.23 0.45 0.98
Lift side 1 x2 2.36 0.23 0.45 0.49
Long beams 1 x1 61.98 0.23 0.45 6.41
Circle beams 1 x2 2.26 0.23 0.45 0.47
1 x3 4.23 0.23 0.45 1.31
Short beams 1 x1 3.23 0.23 0.45 0.33
Short beams 1 x1 12.23 0.23 0.45 1.27
1 x1 18.31 0.23 0.45 1.90
1 x1 12.92 0.23 0.45 1.34
Long beams Ramp 1 x3 24.98 0.23 0.45 7.76
Short beams 1 x 14 8.76 0.23 0.45 12.69
Short beams 1 x 12 14.83 0.23 0.45 18.42
1 x2 2.36 0.23 0.45 0.49
1 x6 2.46 0.23 0.45 1.53
Short beams 1 x5 6.29 0.23 0.45 3.26
1 x3 4.41 0.23 0.45 1.37
2 x2 2.49 0.23 0.45 1.03
Long beams/toilet 2 x2 6.46 0.23 0.45 2.67
1 x 11 1.50 0.23 0.45 1.71
1 x2 1.20 0.23 0.45 0.25
Add: Extra for variation 26.50
Total 119.50
say 120.00
cum
b) Roof Slabs 125mm thick :
F .Floor
1 x1 51.29 8.69 445.71
1 x1 47.23 14.60 689.56
1 x1 16.00 2.46 39.36
1 x1 18.08 6.29 113.72
1 x1 12.69 4.20 53.30
1 x1 5.92 5.00 29.60
1 x1 9.00 14.60 -131.40
1 x1 8.43 14.60 -123.08
1 x1 4.75 6.84 32.49
1 x1 3.23 2.03 6.56
Add: Extra for variation 244.00
Total 1399.82
say 1400.00
sqm

S .Floor
1 x1 51.29 8.69 445.71
1 x1 47.23 14.60 689.56
1 x1 16.00 2.46 39.36
1 x1 18.08 6.29 113.72
1 x1 12.69 4.20 53.30
1 x1 9.00 14.60 -131.40
1 x1 8.43 14.60 -123.08
1 x1 4.75 6.84 32.49
1 x1 3.23 2.03 6.56
For Ramp 1 x1 24.75 4.66 115.34
Add: Extra for variation 308.00
Total 1549.55
say 1550.00
sqm
d) Roof Slabs 175mm thick :
F .Floor
1 x2 24.75 2.10 103.95
1 x1 4.66 2.03 9.46
1 x1 9.65 5.83 56.26
Stair case 1 x3 2.85 2.42 20.69
1 x2 1.90 1.90 7.22
Add: Extra for variation 52.00
Total 249.58
say 250.00
sqm

S .Floor
1 x2 24.75 2.10 103.95
1 x1 4.66 2.03 9.46
1 x1 9.65 5.83 56.26
Stair case 1 x3 2.85 2.42 20.69
1 x2 1.90 1.90 7.22
Add: Extra for variation 52.00
Total 249.58
say 250.00
sqm

d) Roof Slabs 200mm thick :


F .Floor
passenger Lif/bottom 1 x1 2.50 2.50 6.25
Strecher lift/bottom 1 x1 3.60 2.40 8.64
passenger Lif/Vertical all round 1 x1 8.52 3.25 27.69
Strecher lift/bottom /Vertical all round 1 x1 10.52 3.25 34.19
For sump bottom 1 x1 5.30 2.30 12.19
sump /Vertical all round 1 x1 15.06 2.00 30.12
For septic bottom 1 x1 5.30 3.00 15.90
sump /Vertical all round 1 x1 16.60 2.00 33.20
1 x1 3.00 1.60 4.80
Add: Extra for variation 47.00
Total 219.98
say 220.00
sqm

c) LINTELS :
F .Floor
Windows (1) 1 x 54 1.96 0.23 0.15 3.65
Windows (2) 1 x5 1.66 0.23 0.15 0.29
Windows (4) 1 x1 0.96 0.23 0.15 0.03
Ventilator 1 x 12 0.96 0.23 0.15 0.40
M Doors 1 x1 2.26 0.23 0.23 0.12
D1 1 x2 1.96 0.23 0.15 0.14
D2 1 x 24 1.46 0.23 0.15 1.21
D3 1 x9 1.26 0.23 0.15 0.39
Add: Extra for variation 2.00
Total 8.22
say 9.00
cum
S .Floor
Windows (1) 1 x 47 1.96 0.23 0.15 3.18
Windows (2) 1 x8 1.66 0.23 0.15 0.46
Windows (4) 1 x6 0.96 0.23 0.15 0.20
Ventilator 1 x 15 0.96 0.23 0.15 0.50
D1 1 x 21 1.96 0.23 0.15 1.42
D2 1 x4 1.46 0.23 0.15 0.20
D3 1 x 25 1.26 0.23 0.15 1.09
Add: Extra for variation 2.00
Total 9.04
say 10.00
cum
11 Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum
cement content of 380kgs per 1 cum of concrete and required quantity of Chemical Admixtures per 1
cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard
granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of
13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials , centering using Steel scaffolding pipes , jack
props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental
and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying
concrete, curing, and Overheads & Contractors profit complete etc., but excluding cost of steel and its
fabrication charges for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with
an average thickness of 6.25cm but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402, 403 & 903) (BLD-CSTN-3-16)

F .Floor
Windows (1) 1 x 54 1.96 105.84
Windows (2) 1 x5 1.66 8.3
Windows (4) 1 x1 0.96 0.96
Ventilator 1 x 12 0.96 11.52
Add: Extra for variation 33.00
Total 159.62
say 160.00
Rm
S .Floor
Windows (1) 1 x 47 1.96 92.12
Windows (2) 1 x8 1.66 13.28
Windows (4) 1 x6 0.96 5.76
Ventilator 1 x 15 0.96 14.4
Add: Extra for variation 34.00
Total 159.56
say 160.00
Rm
12 Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite
metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15%
of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like
cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales
& other taxes on all materials and including all charges for mixing, laying concrete in position, curing
etc., & lift charges , and Overheads & Contractors profit for Bed Blocks & Hold Fasts for finished item of
work. (APSS No. 402) (BLD-CSTN-3-10 & 11)

F .Floor
Windows (1) 1 x 54 0.23 0.23 0.23 0.66
Windows (2) 1 x5 0.23 0.23 0.23 0.06
Windows (4) 1 x1 0.23 0.23 0.23 0.01
M Doors 1 x1 0.23 0.23 0.23 0.01
D1 1 x2 0.23 0.23 0.23 0.02
D2 1 x 24 0.23 0.23 0.23 0.29
D3 1 x9 0.23 0.23 0.23 0.11
Add: Extra for variation 0.30
Total 1.47
say 1.50
sqm
S .Floor
Windows (1) 1 x 47 0.23 0.23 0.23 0.57
Windows (2) 1 x8 0.23 0.23 0.23 0.10
Windows (4) 1 x6 0.23 0.23 0.23 0.07
D1 1 x 21 0.23 0.23 0.23 0.26
D2 1 x4 0.23 0.23 0.23 0.05
D3 1 x 25 0.23 0.23 0.23 0.30
Add: Extra for variation 0.60
Total 1.95
say 2.00
sqm
13 Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 12mm size hard granite
machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved quarry, using a minimum quantity of
330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement,
fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all
materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges,
curing etc., and Overheads & Contractors profit complete for finished item of work (APSS No. 402 &
403) for sill slabs , platforms , shelves. (BLD-CSTN-3-13)

Sill slabs :
F .Floor
walls 1 x1 178.50 0.23 0.05 2.05
steps 3 x9 2.50 0.3 0.15 3.04
Add: Extra for variation 1.40
Total 6.49
say 6.50
sqm
S .Floor
Sill slabs : 1 x1 178.50 0.23 0.05 2.05
3 x9 2.50 0.3 0.15 3.04
Add: Extra for variation 1.60
Total 6.69
say 6.70
50mm thick platforms : sqm
F .Floor
1 x5 3.68 0.60 11.04
1 x5 5.00 0.60 15.00
Total 26.04
say 27.00
S .Floor sqm
1 x5 3.68 0.60 11.04
1 x5 5.00 0.60 15.00
Total 26.04
say 27.00
25mm thick shelves : sqm
F .Floor
5 x5 1.05 0.35 9.19
5 x5 1.05 0.35 9.19
Total 18.38
say 19.00
S .Floor sqm
5 x5 3.68 0.35 32.2
5 x5 5.00 0.35 43.75
Total 75.95
say 76.00
sqm
14 Brick masonry for panel walls 230mm thick in superstructure with CM (1:8) prop: (cement :
sand) using second class bricks of size 23 x 11 x 7 cms from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on
all materials and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc.,and Overheads & Contractors profit complete
for finished item of work. (APSS No. 501 & 504).(BLD-CSTN-5-5)

a) F .Floor
Clinical block Long walls /toilet wall
2 x2 5.50 0.23 3.36 17.00
Long walls 2 x9 3.89 0.23 3.36 54.11
Cross walls 1 x5 6.00 0.23 3.36 23.18
Corridor 1 x2 2.03 0.23 3.36 3.14
Corridor/ward /long walls 1 x2 53.32 0.23 3.36 82.41
cross wallss 3 x2 3.65 0.23 3.36 16.92
1 x 10 14.60 0.23 3.36 112.83
1 x2 8.45 0.23 3.36 13.06
1 x2 10.23 0.23 3.36 15.81
Front side wall 1 x4 2.03 0.23 3.36 6.28
1 x6 3.77 0.23 3.36 17.48
1 x2 3.45 0.23 3.36 5.33
1 x2 5.23 0.23 3.36 8.08
1 x1 2.23 0.23 3.36 1.72
1 x2 4.29 0.23 3.36 6.63
1 x1 12.85 0.23 3.36 9.93
2 x2 3.95 0.23 3.36 12.21
Lift sids 2 x2 4.75 0.23 3.36 14.68
1 x1 7.60 0.23 3.36 5.87
Ramp 1 x1 4.43 0.23 3.36 3.42
1 x2 23.85 0.23 3.36 36.86
1 x1 21.70 0.23 3.36 16.77
Deduct opening 1 x4 2.10 0.23 3.36 -6.49
1 x4 3.77 0.23 3.36 -11.65
Windows (1) 1 x 54 1.96 0.23 0.15 -3.65
Windows (2) 1 x5 1.66 0.23 0.15 -0.29
Windows (4) 1 x1 0.96 0.23 0.15 -0.03
Ventilator 1 x 12 0.96 0.23 0.15 -0.40
M Doors 1 x1 2.26 0.23 0.23 -0.12
D1 1 x2 1.96 0.23 0.15 -0.14
D2 1 x 24 1.46 0.23 0.15 -1.21
D3 1 x9 1.26 0.23 0.15 -0.39
Add: Extra for variation 140.00
Total 599.38
say 600.00
cum
i) S .Floor
wards 1 x2 5.32 0.23 3.36 8.22
2 x2 2.03 0.23 3.36 6.28
2 x9 3.77 0.23 3.36 52.44
1 x2 2.03 0.23 3.36 3.14
1 x8 14.60 0.23 3.36 90.26
1 x1 7.76 0.23 3.36 6.00
1 x2 3.88 0.23 3.36 6.00
1 x2 4.75 0.23 3.36 7.34
1 x4 5.00 0.23 3.36 15.46
2 x2 3.30 0.23 3.36 10.20
1 x4 1.67 0.23 3.36 5.16
Front side wall 1 x1 54.60 0.23 3.36 42.19
1 x4 3.83 0.23 3.36 11.84
ramp 1 x2 24.75 0.23 3.36 38.25
1 x1 22.65 0.23 3.36 17.50
1 x1 4.66 0.23 3.36 3.60
Windows (1) 1 x 47 1.96 0.23 0.15 -3.18
Windows (2) 1 x8 1.66 0.23 0.15 -0.46
Windows (4) 1 x6 0.96 0.23 0.15 -0.20
Ventilator 1 x 15 0.96 0.23 0.15 -0.50
D1 1 x 21 1.96 0.23 0.15 -1.42
D2 1 x4 1.46 0.23 0.15 -0.20
D3 1 x 25 1.26 0.23 0.15 -1.09
Add: Extra for variation 83.00
Total 399.85
say 400.00
cum
T .Floor
For head room/lift 1 x2 4.75 0.23 3.05 6.66
1 x2 7.75 0.23 3.05 10.87
Deduct door 1 x1 0.90 0.23 2.10 0.43
lift walls /strecher lift 1 x2 3.23 0.23 3.05 4.53
1 x8 2.03 0.23 3.03 11.32
Add: Extra for variation 6.00
Total 39.82
say 40.00
cum

15 Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Sand) using
second class bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of
40 Kg/Sq.cm and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where applicable including cost and
conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges
like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and
Overheads & Contractors profit but excluding cost of steel and its fabrication charges complete for
finished item of work. (APSS No. of 501 & 509) (BLD-CSTN-5-12)

F .Floor
plinth protection wall 1 x1 178.60 1.00 178.60
Toilets 1 x1 3.00 2.60 7.80
1 x2 1.50 2.60 7.80
Dark room 1 x1 6.00 3.52 21.12
1 x1 2.87 3.52 10.10
Cross walls 1 x8 6.00 3.36 161.28
Toilets 1 x2 6.00 3.52 42.24
1 x5 1.50 3.52 26.40
waiting area 1 x4 5.00 3.36 67.20
Total 522.54
say 523.00
sqm
S .Floor
1.M ward /toilets 1 x2 6.00 2.60 31.20
1 x6 6.00 2.60 93.60
F ward /toilets 1 x2 6.00 2.60 31.20
1 x6 6.00 2.60 93.60
2.M ward /toilets 1 x2 3.65 2.60 18.98
1 x2 1.50 2.60 7.80
F ward /toilets 1 x2 3.65 2.60 18.98
1 x2 1.50 2.60 7.80
Chambers 1 x3 5.00 3.36 50.40
Total 353.56
say 354.00
sqm

i) T .Floor (parapet wall)


Long walls all round 1 x1 178.20 1.00 178.20
Total 178.20
say 179.00
cum

16 Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, and all operational, incidental charges on materials and including cost of
all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and Overheads & Contractors profit
complete for finished item of work. (SS 901,903 & 904) ( BLD-CSTN-8-10)

F.Floor
External walls 1 x2 14.63 4.65 136.06
1 x1 10.56 4.65 49.10
back side 1 x1 62.18 4.65 289.14
1 x1 18.81 4.65 87.47
front side 1 x1 18.08 4.65 84.07
1 x1 41.11 4.65 191.16
Ramp side 1 x2 24.75 4.65 230.18
1 x1 4.16 4.65 19.34
Open to sky 1 x1 43.78 4.65 203.58
1 x1 49.66 4.65 230.92
Windows (1) 1 x 54 1.50 1.80 -145.80
Windows (2) 1 x5 1.20 1.80 -10.80
Windows (4) 1 x1 0.60 1.80 -1.08
Ventilator 1 x 12 0.60 1.80 -12.96
Add: Extra for variation 349.00
Total 1699.38
say 1700.00
sqm
F.Floor
Internal walls /toilets 2 x2 1.50 2.60 15.60
2 x1 3.00 2.60 15.60
Dark room 2 x1 6.00 3.52 42.24
2 x1 2.87 3.52 20.20
8 x2 6.00 3.36 322.56
toilets 5 x2 1.50 3.52 52.80
corridor inside 1 x2 52.61 3.36 353.54
corridor inside 1 x2 14.60 3.36 98.11
1 x8 5.00 3.36 134.40
corridor inside 1 x2 14.60 3.36 98.11
1 x2 14.60 3.36 98.11
corridor inside 1 x2 7.76 3.36 52.15
1 x1 3.65 3.36 12.26
1 x1 3.95 3.36 13.26
Dental /pharmacy 2 x2 5.00 3.36 67.20
M Doors 2 x1 1.80 2.60 -9.36
D1 2 x2 1.50 2.60 -15.60
D2 2 x 24 1.00 2.60 -124.80
D3 2 x9 0.80 2.10 -30.24
Add: Extra for variation 283.00
Total 1499.15
say 1500.00
S .Floor sqm
External walls 1 x2 14.63 3.65 106.80
1 x1 10.56 3.65 38.54
1 x1 62.18 3.65 226.96
1 x1 18.81 3.65 68.66
1 x1 18.08 3.65 65.99
1 x1 41.11 3.65 150.05
1 x2 24.75 3.65 180.68
1 x1 4.16 3.65 15.18
1 x1 43.78 3.65 159.80
1 x1 49.66 3.65 181.26
1 x 47 1.50 1.80 -126.90
1 x8 1.20 1.80 -17.28
1 x6 0.60 1.80 -6.48
1 x 15 0.60 1.80 -16.20
Add: Extra for variation 272.00
Total 1299.06
say 1300.00
sqm
S .Floor
Internal walls /toilets 1 x2 3.90 2.60 20.28
2 x1 3.00 2.60 15.60
3 x2 1.50 2.60 23.40
toilets 1 x2 3.90 2.60 20.28
2 x1 3.00 2.60 15.60
corridor inside 1 x2 45.07 3.36 302.87
corridor inside 1 x2 14.60 3.36 98.11
1 x8 5.00 3.36 134.40
corridor inside 1 x2 14.60 3.36 98.11
1 x2 14.60 3.36 98.11
corridor inside 1 x2 7.76 3.36 52.15
1 x1 3.65 3.36 12.26
1 x1 3.95 3.36 13.26
Dental /pharmacy 2 x2 5.00 3.36 67.20
M Doors 2 x1 1.80 2.60 -9.36
D1 2 x2 1.50 2.60 -15.60
D2 2 x 24 1.00 2.60 -124.80
D3 2 x9 0.80 2.10 -30.24
Add: Extra for variation 208.00
Total 999.63
say 1000.00
sqm

T .Floor
Parapet wall 1 x2 178.45 2.10 749.49
For head room/lift 1 x2 4.75 3.05 28.98
1 x2 7.75 3.05 47.28
Deduct door 1 x1 0.90 2.10 1.89
lift walls /strecher lift 1 x2 3.23 3.05 19.70
1 x8 2.03 3.03 49.21
Add: Extra for variation 203.00
Total 1099.54
say 1100.00
Sqm

17 Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top coat of
4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other
taxes on all materials, and all operational, incidental charges on materials and including cost of
all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete
for finished item of work .(SS 901,903 & 904) (BLD-CSTN-8-9)

Internal walls
F.Floor
Dark room 1 x2 5.03 3.35 33.70
x ray room 1 x2 4.00 3.35 26.80
Main block cross walls 7 x2 3.89 3.35 182.44
Ecg 4 x2 3.65 3.35 97.82
7 x2 3.65 3.35 171.19
open to sky 1 x2 8.45 3.35 56.62
1 x2 4.75 3.35 31.83
1 x1 7.76 3.35 26.00
1 x2 10.23 3.35 68.54
1 x2 14.60 3.35 97.82
2 x2 10.95 3.35 146.73
sterili store 9 x1 5.00 3.35 150.75
10 x1 3.65 3.35 122.28
1 x2 10.95 3.35 73.37
1 x2 4.29 3.35 28.74
1 x2 12.00 3.35 80.40
1 x2 10.95 3.35 73.37
Front side 1 x2 17.62 3.35 118.05
1 x2 41.81 3.35 280.13
Ramp in side 1 x2 24.52 2.60 127.50
1 x2 11.29 2.60 58.71
Total 2052.77
say 2053.00
Sqm
S .Floor
Internal walls /
toilets 2 x2 6.00 3.35 80.40
2 x2 5.23 3.35 70.08
M .Ward(15 beded) 1 x2 15.77 3.35 105.66
1 x2 6.00 3.35 40.20
Nursing 1 x1 4.00 3.35 13.40
F.Ward(15 beded) 1 x2 15.77 3.35 105.66
1 x2 6.00 3.35 40.20
F&M .Ward(10+10) beded) 1 x2 11.20 3.35 75.04
1 x2 12.45 3.35 83.42
1 x2 7.76 3.35 51.99
o sky 1 x2 10.23 3.35 68.54
1 x2 15.50 3.35 103.85
OT block 1 x5 3.65 3.35 61.14
1 x5 5.00 3.35 83.75
1 x2 10.95 3.35 73.37
Front side 1 x2 17.62 3.35 118.05
1 x2 41.81 3.35 280.13
Ramp in side 1 x2 24.52 2.60 127.50
1 x2 11.29 2.60 58.71
1641.08
say 1642.00
Sqm

T .Floor
For head room/lift 1 x2 4.75 3.05 28.98
1 x2 7.75 3.05 47.28
Deduct door 1 x1 0.90 2.10 1.89
lift walls /strecher lift 1 x2 3.23 3.05 19.70
1 x8 2.03 3.03 49.21
147.05
say 148.00
Sqm

18 Ornamental plastering to ceiling 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, and all operational, incidental charges on
materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift
charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and
Overheads & Contractors profit complete for finished item of work. (SS 901,903 & 904) (BLD-
CSTN-8-9)

F .Floor
Roof slab 1 x1 51.29 8.69 445.71
1 x1 47.23 14.60 689.56
1 x1 16.00 2.46 39.36
1 x1 18.08 6.29 113.72
1 x1 12.69 4.20 53.30
1 x1 5.92 5.00 29.60
1 x1 9.00 14.60 -131.40
1 x1 8.43 14.60 -123.08
1 x1 4.75 6.84 32.49
1 x1 3.23 2.03 6.56
passenger Lif/bottom 1 x1 2.50 2.50 6.25
Strecher lift/bottom 1 x1 3.60 2.40 8.64
passenger Lif/Vertical all round 1 x1 8.52 3.25 27.69
Strecher lift/bottom /Vertical all round 1 x1 10.52 3.25 34.19
For sump bottom 1 x1 5.30 2.30 12.19
sump /Vertical all round 1 x1 15.06 2.00 30.12
For septic bottom 1 x1 5.30 3.00 15.90
sump /Vertical all round 1 x1 16.60 2.00 33.20
1 x1 3.00 1.60 4.80
1 x2 24.75 2.10 103.95
1 x1 4.66 2.03 9.46
1 x1 9.65 5.83 56.26
Stair case 1 x3 2.85 2.42 20.69
1 x2 1.90 1.90 7.22
Total 1526.38
say 1527.00
Sqm

S .Floor
1 x1 51.29 8.69 445.71
1 x1 47.23 14.60 689.56
1 x1 16.00 2.46 39.36
1 x1 18.08 6.29 113.72
1 x1 12.69 4.20 53.30
1 x1 9.00 14.60 -131.40
1 x1 8.43 14.60 -123.08
1 x1 4.75 6.84 32.49
1 x1 3.23 2.03 6.56
For Ramp 1 x1 24.75 4.66 115.34
1 x2 24.75 2.10 103.95
1 x1 4.66 2.03 9.46
1 x1 9.65 5.83 56.26
Stair case 1 x3 2.85 2.42 20.69
1 x2 1.90 1.90 7.22
Total 1439.13
say 1440.00
Sqm
19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3) 20mm thick with 1kg
of water proof compound per bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, including conveyannce of materials and including all
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and
thread lining, curing, rounding off junctions of wall and slab etc.,and Overheads & Contractors
profit complete for finished item of work. (APSS No. 901 & 903).(BLD-CSTN-10-25)

S .Floor
1 x1 51.29 8.69 445.71
1 x1 47.23 14.60 689.56
1 x1 16.00 2.46 39.36
1 x1 18.08 6.29 113.72
1 x1 12.69 4.20 53.30
1 x1 9.00 14.60 -131.40
1 x1 8.43 14.60 -123.08
1 x1 4.75 6.84 32.49
1 x1 3.23 2.03 6.56
1 x2 24.75 4.66 230.67
Total 1356.89
say 1357.00
Sqm
20 Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes
and shapes, placing in position with cover blocks of approved materials and size and tying and lap-
splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales
and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of
work in all floors.( APSS No.126)

F.Floor
a) Footing 280.00 22400
b)Pedestals 60.00 4800
c)Columns 120.00 18000
d)plinth Beams 120.00 18000
e)Roof Beams 120.00 18000
f)Roof Slab (125mm) 1400.00 17500
Roof Slab (175mm) 250.00 4375
Roof Slab (200mm) 220.00 4400
g)Lintels 9.00 720
Sun shades 160.00 832
Add: Extra for variation 10000
119027
say 120.000
MT
S.Floor
c)Columns 76.00 11400.000
e)Roof Beams 120.00 18000.000
f)Roof Slab 125mm 1550.00 19375.000
Roof Slab (175mm) 250.00 4375
Sun shades 160.00 832
g)Lintels 10.00 800.000
Add: Extra for variation 5000
59782.000
say 60.000
MT
21 Supplying , fitting and placing Mild steel bar reinforcement complete as per drawings and technical
specifications for bars below 36mm dia including over laps and wastage,where they are not welded
including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position,
tying with binding wire , all tools etc., and Overheads & Contractors profit complete for finished item of
work(APSS No.126)(BLD-CSTN-4-1& BLD-CSTN-4.2)

F.Floor 0.750
say 1.00
MT

S.Floor 0.750
say 1.00
MT

22 Flooring with ceramic tiles 7.30mm thick , 1st quality and of size as approved by Engineer-in-charge,
set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade, including cost of all materials
like cement, sand , water and tiles etc.,and Overheads & Contractors profit complete including
seigniorage charges etc., complete for finished item of work. (APSS No.701 & 707) (BLD-CSTN-9-6)

F.Floor
M.Toilets R/S 1 x 2 1.50 1.20 3.60
1 x 1 2.87 3.00 8.61
1 x 1 1.44 1.50 2.16
L/S Gync 1 x 1 1.80 2.70 4.86
G. Toilets 1 x 1 6.00 2.70 16.20
L. Toilets 1 x 1 6.00 2.70 16.20
D/N room 1 x 2 1.50 1.20 3.60
Total 55.23
say 56.00
sqm
S.Floor
Common toilets 1 x 2 5.55 6.00 66.60
Ward toilets 1 x 2 3.06 3.65 22.34
88.94
say 89.00
sqm
23 Flooring / treads 0.30m wide with vitrified polished floor tiles of 1st quality and make as approved by
Engineer-in-charge of size not less than 598 mm x 598 mm , 8mm thickness regular finish and normal
colours with borders and design as per the approved flooring pattern as directed by the Engineer-In
-Charge set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof
slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed
neately with white cement paste to full depth mixed with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost
of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour
charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-
charge etc.,and Overheads & Contractors profit complete for finished item of work. (APSS No.701 &
707) (BLD-CSTN-9-5)

F.Floor
Dark room/store room 1 x 2 2.87 3.00 17.22
xray room 1 x 1 4.00 8.00 32.00
Waiting room/Rooms 1 x 8 3.89 6.00 186.48
room 1 x 1 1.80 2.77 4.99
room/clinics/Ecg/Treat 4 x 2 5.00 3.65 146.00
room/clinics/Waiting /family planning 4 x 2 5.00 3.65 146.00
Pharmacy/Dental clinic 1 x 2 5.00 3.95 39.50
Corridor (1) 1 x 1 50.49 2.00 100.98
Corridor (2) 1 x 3 15.06 2.00 90.36
1 x 1 4.18 2.00 8.36
Corridor ( 3) 1 x 3 15.06 2.00 90.36
Front side 1 1 x 1 17.85 5.83 104.07
Front side 2 1 x 1 15.00 2.00 30.00
Front side 3( c) 1 x 1 9.65 6.00 57.90
Total 1054.21
say 1055.00
S.Floor sqm
Corridor (1) 1 x 1 46.43 2.00 92.86
M.ward /F.ward 1 x 2 15.77 6.00 189.24
Nursing 1 x 1 4.00 4.50 18.00
Corridor (1) 1 x 1 3.88 2.00 7.76
M.ward /F.ward 2 x 2 6.12 11.20 273.95
Corridor (1) 1 x 1 18.97 2.00 37.94
OT block 1 x 2 5.00 3.65 36.50
1 x 2 5.00 5.23 52.30
1 x 2 5.00 2.00 20.00
1 x 2 5.00 3.83 38.30
Preparation room 1 x 1 5.00 5.83 29.15
Waiting 1 x 1 12.88 5.83 75.09
Corridor (1) 1 x 1 12.88 2.00 25.76
Corridor (c) 1 x 1 9.65 5.83 56.26
Total 953.11
say 954.00
sqm

24 Providing skirting to internal walls to 10 cm height with 8mm thick mirror polished granite tiles length
equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement
slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement
paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., and overheads & contractors profit complete including seigniorage
charges etc., complete for finished item of work.(APSS No.701 &707)

F.Floor
Dark room/store room 1 x 2 11.68 23.36
xray room 1 x 1 24.00 24.00
Waiting room/Rooms 1 x 8 20.00 160.00
room 1 x 1 9.14 9.14
room/clinics/Ecg/Treat 4 x 2 17.30 138.40
room/clinics/Waiting /family planning 4 x 2 17.30 138.40
Pharmacy/Dental clinic 1 x 2 18.00 36.00
Corridor (1) 1 x 1 105.00 105.00
Corridor (2) 1 x 3 34.00 102.00
1 x 1 12.00 12.00
Corridor ( 3) 1 x 3 35.00 105.00
Front side 1 1 x 1 47.36 47.36
Front side 2 1 x 1 34.00 34.00
Front side 3( c) 1 x 1 31.30 31.30
Total 965.96
say 966.00
S.Floor Rm
Corridor (1) 1 x 1 96.86 96.86
M.ward /F.ward 1 x 2 43.54 87.08
Nursing 1 x 1 19.00 19.00
Corridor (1) 1 x 1 12.00 12.00
M.ward /F.ward 2 x 2 35.00 140.00
Corridor (1) 1 x 1 42.00 42.00
OT block 1 x 2 17.50 35.00
1 x 2 11.00 22.00
1 x 2 14.00 28.00
1 x 2 17.23 34.46
Preparation room 1 x 1 22.00 22.00
Waiting 1 x 1 37.42 37.42
Corridor (1) 1 x 1 30.00 30.00
Corridor (c) 1 x 1 30.96 30.96
Total 636.78
say 637.00
Rm
25 Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours
(i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design
as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base
coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof
slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed
neatly with white cement paste mixed with pigment of matching shade to full depth including cost and
conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all
operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and
seigniorage charges and all other taxes on all materials, cost of base coat and overheads & contractors
profit complete for finished item of work (S.S.701 & special)

F.Floor
Open to sky 1 x 1 8.45 15.52 131.144
1 x 1 18 5.5 99.00
1 x 2 10.76 2.1 45.19
1 x 1 10.23 15.52 158.7696
landing 1 x 2 2.42 1.90 9.196
Deduct steps 1 x 1 4.75 7.76 -36.86
steps sids 1 x 1 7.75 1.90 14.725
Total 421.1666
say 422.00
S.Floor sqm
1 x 2 10.76 2.1 45.19
1 x 1 10.23 15.52 158.7696
landing 1 x 2 2.42 1.90 9.196
Total 213.16
say 214.00
sqm

25 Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e.
of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as
per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat
of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab
including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly
with white cement paste mixed with pigment of matching shade to full depth including cost and
conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all
operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and
seigniorage charges and all other taxes on all materials, cost of base coat and overheads & contractors
profit complete for finished item of work for treads and risers (S.S.701 & special)

Treads 0.30m wide :


First Floor 3 x 9 2.50 0.30 20.25
Total 20.25
say 21.00
sqm
Second Floor 3 x 9 2.50 0.30 20.25
Total 20.25
say 21.00
sqm
Risers for Steps :
First Floor 3 x 9 2.50 0.15 10.125
2 x 1 7.50 0.15 2.25
cladding front side 1 x 1 12.75 2.6 33.15
Total 45.525
say 46.00
sqm
Second Floor 3 x 9 2.50 0.15 10.125
2 x 1 7.50 0.15 2.25
Total 12.375
say 13.00
sqm
27 Providing dadooing to walls with glazed coloured tiles 1st quality of size with borders as approved by
Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water
etc., complete including seigniorage charges etc., and Overheads & Contractors profit complete for
finished item of work. (BLD-CSTN-9-18)

F.Floor
M.Toilets R/S 1 x 2 5.40 1.50 16.20
1 x 1 10.74 1.50 16.11
1 x 1 5.88 1.50 8.82
L/S Gync 1 x 1 17.40 1.50 26.10
G. Toilets 1 x 1 16.80 1.50 25.20
L. Toilets 1 x 1 16.80 1.50 25.20
D/N room 1 x 2 10.80 1.50 32.40
Corridor 1 x 2 51.52 1.50 154.56
Corridor 3 x 2 14.60 1.50 131.40
Corridor 1 x 2 4.00 1.50 12.00
Front side 1 x 2 18.08 1.50 54.24
1 x 1 5.83 1.50 8.75
1 x 2 3.72 1.50 11.16
1 x 2 16.00 1.50 48.00
1 x 1 16.06 1.50 24.09
Total 594.23
say 595.00
sqm
S.Floor
Common toilets 1 x 2 23.10 1.50 69.30
Ward toilets 1 x 2 14.40 1.50 43.20
D/N room 1 x 2 10.80 1.50 32.40
Corridor 1 x 2 51.52 1.50 154.56
Corridor 3 x 2 14.60 1.50 131.40
Corridor 1 x 2 4.00 1.50 12.00
Front side 1 x 2 18.08 1.50 54.24
1 x 1 5.83 1.50 8.75
1 x 2 3.72 1.50 11.16
1 x 2 16.00 1.50 48.00
1 x 1 16.06 1.50 24.09
OT 1 x 2 20.00 3.35 134.00
Labour room 1 x 2 27.81 3.35 186.33
Utility 1 x 2 10.60 1.50 31.80
Ward 1 x 2 43.54 1.50 130.62
nursing 1 x 1 13.00 1.50 19.50
Total 1091.34
say 1092.00
sqm
28 Flooring with chequered terrazo tiles of 30mm thick (dark shade) of size 0.305m x 0.305m set over base
coat of cement mortar (1:6), 12 mm thick over CC bed alredy laid or RCC roof slab including neat
cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat white cement
to full depth mixed with pigment of matching shade including cost and conveyance of all materials like
cement , sand , water and tiles etc.,and Overheads & Contractors profit complete including seigniorage
charges complete for finished item of work. (BLD-CSTN-9-4)

F.Floor
For Ramp 1 x 2 24.75 2.10 103.95
1 x 1 12.75 5.20 66.30
1 x 1 4.75 2.10 9.98
Total 180.23
say 181.00
S.Floor sqm
For Ramp 1 x 2 24.75 2.10 103.95
1 x 1 4.75 2.10 9.98
Total 113.93
say 114.00
sqm
29 Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine
crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding
1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining
including cost of all materials like cement, metal sand and water etc. complete, including seigniorage
charges etc.,and Overheads & Contractors profit complete for finished item of work. (APSS No.701 &
710) (BLD-CSTN-9-13)

F.Floor
1 x 4 2.03 2.03 16.48
sky b/w ramp 1 x 1 24.76 4.75 117.61
Total 134.09
say 135.00
sqm

30 RCM facia 50mm thick for drop walls,fins with rabbit wire mesh&nomianl reinforcement a directred by
Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to
site,seigniorage charges,sales&othertaxes on all materials,operationals &incidental,cost and
conveyance of cement,wire mesh,water to work site,centering,scaffolding and form work,lift charges
etc.,and Overheads & Contractors profit complete for finished item of work but excluding cost of steel
and its fabrication charges for finished item of work(APSS NO.403&903) ( BLD-CSTN-8-11)

F.Floor
drops /sky /area 1 x 1 40.18 0.60 24.11
1 x 1 51.51 0.60 30.91
Total 55.01
say 56.00
sqm
S.Floor
drops /sky /area 1 x 1 40.18 0.60 24.11
1 x 1 51.51 0.60 30.91
Total 55.01
say 56.00
sqm

31 Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 2.5kg/sq.cm
pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other
accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on
materials to site, operational & incidental charges including all labour charges for fixing at site etc., and
Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

1 x 18 8.20 147.60
Total 147.60
say 148.00
Rm
32 Supply and fixing of BISON LAM aluminium glazed partitions using 10MM BISONLAM and 5.00 mm
thick plain glass to full height. Using with BISON LAM to a height of 0.91 meter at bottom panel and
remaining height with glass and aluminium sections anodized to 12 to 15 microns and of sections of size
37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on
both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and
conveyance of all materials including overheads & contractors profit etc., complete as directed during
execution.

Rate adopted as per BISON LAM Aluminum partition 1 x3 6.00 3.36 60.48
(DATA communicated by Head Office)
1 x2 3.36 3.36 22.58
Total 83.06
say 84.00
sqm
33 Painting to new walls with 2 coats of Acrylic based Oil bound Washable Distemper having VOC content
less than 50 grams/litre over deco orient base as approved by Engineer-In-Charge, making 3 coats in
all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose
powdered materials, including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., and overheads & contractors profit complete for finished item of work as
per APSS 911 for internal walls in all floors.

LS 2967.00 2967.00
say 2967.00
Sqm

34 Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with
fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm , 3.18
mm thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18
mm thick and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium
sections 25mm microns thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and
rubber beading in fan light portion, double shutters fitted with 5mm thick frosted / ground glass in the top
half and 12mm thick prelaminated particle board ( One side choice colour and other side balancing
white lamnation ) in the bottom half fitted with suitable aluminium glazing clips and rubber
beading,shutters mounted on double action hydraulic floor spring of approved brand manufacture IS :
6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required , embedding
in floors

and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate
etc.complete( Weight Capacity up to 130 Kgs ) as approved by Engineer-in-Charge including supply
and fixing ISI marked powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204)
300mm long , 4 Nos.alluminium handles (IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long
including labour charges for manufacturing door , fixing the door with required No. of screws etc.,
including Overheads & Contractors profit complete for finished item of work. (The Aluminium section
used shall be standard make confirming to IS 1948 – 1961) and as approved by the Engineer)
(2000mmx2600mm) (BLD-CSTN-13-31)

1 x 1 2.00 2.60 5.2


5.20
Sqm
35 Providing Plinth protection with a bed of 100mm thick PCC(1:5:10) using 40mm size HB Granite metal
and on top of PCC, 20mm thick granolithic concrete flooring with CC(1:1:2) prop.using 6mm to 12mm
size graded hard granite machine crushed metal laid monolithically already laid, in alternate panels of
size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strips between the pannels and
finishing the top surface to required smoothness and slopes including grooves, thread lining as directed
by the Engineer - in - charge including cost and conveyance of all materials to site including seigniorage
charges, sales & other taxes on all materials and operational & incidental and labour charges like mixing
of cement concrete, laying, curing, lift charges etc.,and Overheads & Contractors profit complete
including cost of CC bed for finished item of work. (APSS No.701 & 710)

1 x1 178.85 1.05 187.79


188.00
Sqm

36 Supply & application of one coat deco orient base & two coats of acrylic emulsion paint having VOC
(Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and
conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges
etc.,and overheads & contractors profit complete for finished item of work in all floors.

Internal Walls 4248.00 4248.00


4248.00
Sqm

36 Supply & application of one coat of deco orient base & two coats of acrylic exterior emulsion paint
having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including
cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour
charges etc.,and overheads & contractors profit complete for finished item of work in all floors.

External Walls 6195.00 6195.00


6195.00
Sqm

37 Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS
513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer
of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-
7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x
50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and
outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard
bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with
corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless
steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh
shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry
wall by means of self expanding screws, including 10mm Square guard bars with 6” (152.4mm) pitch
including overheads and contractor profit etc., complete for finished item of work

a) Centre fixed both side openable shutter window : 1500mm x1800mm

Windows (1) F.F 1 x 54 1.50 1.80 145.80


S.F 1 x 47 1.50 1.80 126.90
272.70
sqm
b) Double shutter window 1200x1800 with fixed fan light of 500mm at top :
Windows (2)/F.F 1 x5 1.20 1.80 10.80
S.F 1 x8 1.20 1.80 17.28
28.08
sqm
c) Double shutter window 900x1800 with fixed fan light of 500mm at top :
Windows (4) F.F 1 x1 0.90 1.80 1.62
S.F 1 x6 0.90 1.80 9.72
11.34
sqm
Top Hung of any size (734) (BMT-P.17)
Ventilator F.F 1 x 12 0.60 0.50 3.60
Ventilator S.F 1 x 15 0.60 0.50 4.50
8.10
sqm

38 Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x
65 mm with fixed fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x
12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of
30mm thick double shutters with bond wood solid block board type core having cross bands and face
veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made
conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides

including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6
Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower
bolts - 10mm (IS:204) of 200 mm long at top, 2 Nos. 150mm long handles (IS:208), 2 Nos. door
stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws,
bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.,
including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002
The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1800mm x
2600mm)

Main door 1 x1 1.80 2.60 4.68


4.68
sqm
39 Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x
65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x
12mm Teak Wood beading and 2Nos. of 10mm MS Square bars and ISI marked flush door shutter
(ANAND/RAAVILA/KUTTY/STANDARD/SUBHDWAR/ITP) of 35mm thick double shutters with bond
wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water
proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides,
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6
nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked aluminium fixtures of
6 Nos butt hinges 150mm long , 1 No. aldrop 300mm x 16 mm dia, 2 Nos tower bolts of 300 mm x 12
mm dia at top, 1 No. tower bolt of 150mm x 12mm dia at bottom, 2 Nos. 150mm long handles, 2 Nos
heavy duty door stoppers and 2 Nos rubber bushes including fixing the fixtures to door with required
number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame etc., including Overheads & Contractors profit complete for finished item of work as
per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less
than 10 mm) (1500mm x 2600mm) (BLD-CSTN-13-16)

F.F 1 x2 1.50 2.60 7.80


S.F 1 x 21 1.50 2.60 81.90
Total 89.70
89.70
sqm
40 Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x
65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x
12mm Teak Wood beading and 2Nos. of 10mm MS Square bars and ISI marked flush door shutter
(ANAND/RAAVILA/KUTTY/STANDARD/SUBHDWAR/ITP) of 35mm thick single shutter with bond wood
solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof
phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood
frame, flush shutter including supply and fixing

6 nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked aluminium fixtures
of 3 Nos butt hinges 150mm long , 1 No. aldrop 300mm x 16 mm dia, 1 No tower bolt of 300 mm x 12
mm dia at top, 2 Nos. 150mm long handles, 1 Nos heavy duty door stopper and 1 No rubber bush
including fixing the fixtures to door with required number of screws, bolt and nuts including labour
charges for fixing the frame in position, fixing the shutter to the frame etc, including Overheads &
Contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of
door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2600mm) (BLD-
CSTN-13-16)

F.F 1 x 24 1.00 2.60 62.40


S.F 1 x4 1.00 2.60 10.40
Total 72.80
72.80
sqm
41 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and
ISI marked flush door shutter (ANAND/RAAVILA/KUTTY/STANDARD/SUBHDWAR/ITP) of 30mm thick
single shutter with bond wood solid block board type Core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS
2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and
conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos MS
Z hold fasts of size 300mm x 40mm x 5mm including ISI marked aluminium fixtures 3 Nos butt hinges
of 150mm long,

1 No. aldrop 250 mm long, 1 No. tower bolt of 300 mm x 12mm dia, 2 Nos 125mm long handles,1 No.
rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside
including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including
Overheads & Contractors profit complete for finished item of work as per APSS 1001 & 1002. (The
vertical frame of door shall be embedded in flooring for deth of not less than 10mm) ( 800mm x
2100mm )(BLD-CSTN-13-16)

F.F 1 x9 0.80 2.10 15.12


S.F 1 x 25 0.80 2.10 42.00
Total 57.12
57.12
sqm

42 Painting to new wood work and flush shutters with lappam finish , over a primary coat
( Asian/Berger/Nerolac/Saicoat/Indocem) and painting two coats of synthetic enamel paint Grade-I
(Asian/Berger/Nerolac/Indocem) of approved shade including cost and conveyance of all materials to
site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam
coats for neat finish including sales & other taxes on cost of all materials etc.and Overheads &
Contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.(BLD-CSTN-12-6 & 12-12-195)

Main door 2.3 x1 1.80 2.60 10.53


F.F 2.3 x2 1.50 2.60 17.55
S.F 2.3 x 21 1.50 2.60 184.28
F.F 2.3 x 24 1.00 2.60 140.40
S.F 2.3 x4 1.00 2.60 23.40
F.F 2.3 x9 0.80 2.10 34.02
S.F 2.3 x 25 0.80 2.10 94.50
Total 504.68
505.00
sqm
43 Supply and fixing of stainless steel (304 grade) hand railing as per approved drawing with top rail of 63
mm dia. & 2 mm thick, vertical postsl of 50 mm dia and 2 mm thick and 20 mm dia. & 2 mm thick and
two rows of 15 mm dia. & 1.6 mm thick medium class pipes including fixing verticals to 75 mm dia. base
plates using bonding agent and anchor fastner and welding including fixing railing, buffing, polishing all
members of the railing thouroughly, lacquer finishing to presement seamless finish including cost and
conveyance of all materials, welding charges cost of all consumables, labour charges etc., and
Overheads & Contractors profit complete for finished item of work.

F.F 1 x1 10.75 1.05 11.29


S.F 1 x1 10.75 1.05 11.29
Total 22.58
23.00
sqm

44 Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using
40mm size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and
cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack
props, wallers, Foot plates, brackets, steel centering plates etc.,shuttering, machine mixing, laying
concrete, lift charges curing etc., and Overheads & Contractors profit complete as per drawings but
excluding cost of steel and it's fabrication charges for finished item of work (APSS NO. 402 & 403) for
Dummy columns. (BLDS-CSTN-3-13)

Under columns 1 x 52 0.38 0.45 1.00 8.89


Under columns 1 x 50 0.30 0.45 1.00 6.75
Under columns 1 x 29 0.30 0.23 1.00 2.00
Under columns 1 x 2 0.30 0.23 1.00 0.14
Total 17.78
18.00
cum
45 Supply and application of two coats of Birla wallcare water based cement primer and two coats of Birla
wall care for internal walls (Emulusion paint ) including cost and conveyance of all materials to site,
sales & other taxes, incidental, operational and all labour charges etc.,and Overheads & Contractors
profit complete for finished item of work

Internal walls
F.Floor
Dark room 1 x2 5.03 3.35 33.70
x ray room 1 x2 4.00 3.35 26.80
Main block cross walls 7 x2 3.89 3.35 182.44
Ecg 4 x2 3.65 3.35 97.82
7 x2 3.65 3.35 171.19
open to sky 1 x2 8.45 3.35 56.62
1 x2 4.75 3.35 31.83
1 x1 7.76 3.35 26.00
1 x2 10.23 3.35 68.54
1 x2 14.60 3.35 97.82
2 x2 10.95 3.35 146.73
sterili store 9 x1 5.00 3.35 150.75
10 x1 3.65 3.35 122.28
1 x2 10.95 3.35 73.37
1 x2 4.29 3.35 28.74
1 x2 12.00 3.35 80.40
1 x2 10.95 3.35 73.37
Front side 1 x2 17.62 3.35 118.05
1 x2 41.81 3.35 280.13
Ramp in side 1 x2 24.52 2.60 127.50
F.Floor 1 x2 11.29 2.60 58.71
Internal walls /toilets 2 x2 1.50 2.60 15.60
2 x1 3.00 2.60 15.60
Dark room 2 x1 6.00 3.52 42.24
2 x1 2.87 3.52 20.20
8 x2 6.00 3.36 322.56
toilets 5 x2 1.50 3.52 52.80
corridor inside 1 x2 52.61 1.86 195.71
corridor inside 1 x2 14.60 1.86 54.31
1 x8 5.00 1.86 74.40
corridor inside 1 x2 14.60 1.86 54.31
1 x2 14.60 1.86 54.31
corridor inside 1 x2 7.76 1.86 28.87
1 x1 3.65 1.86 6.79
1 x1 3.95 1.86 7.34
Dental /pharmacy 2 x2 5.00 3.36 67.20
M Doors 2 x1 1.80 2.60 -9.36
D1 2 x2 1.50 2.60 -15.60
D2 2 x 24 1.00 2.60 -124.80
D3 2 x9 0.80 2.10 -30.24
S .Floor
Internal walls /toilets 1 x2 3.90 2.60 20.28
2 x1 3.00 2.60 15.60
3 x2 1.50 2.60 23.40
toilets 1 x2 3.90 2.60 20.28
2 x1 3.00 2.60 15.60
corridor inside 1 x2 45.07 1.86 167.66
corridor inside 1 x2 14.60 1.86 54.31
1 x8 5.00 1.86 74.40
corridor inside 1 x2 14.60 1.86 54.31
1 x2 14.60 1.86 54.31
corridor inside 1 x2 7.76 1.86 28.87
1 x1 3.65 1.86 6.79
1 x1 3.95 1.86 7.34
Dental /pharmacy 2 x2 5.00 3.36 67.20
M Doors 2 x1 1.80 2.60 -9.36
D1 2 x2 1.50 2.60 -15.60
D2 2 x 24 1.00 2.60 -124.80
D3 2 x9 0.80 2.10 -30.24
T .Floor
Parapet wall 1 x2 178.45 2.10 749.49
For head room/lift 1 x2 4.75 3.05 28.98
1 x2 7.75 3.05 47.28
Deduct door 1 x1 0.90 2.10 1.89
lift walls /strecher lift 1 x2 3.23 3.05 19.70
1 x8 2.03 3.03 49.21
Total 4211.90
say 4211.90
sqm
ESTIMATE
Name of the Work: " Construction of Office Building for District Live Stock Development Association at
Visakhapatnam in Visakhapatnam District.,
Sub Work: Providing Internal Electrification., for (G + First Floor )
( SoR 2013-14)

S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.

CONDUIT PIPE

1 1100 RM Supply and fixing of 25mm outer dia 2.20 mm thick ONE 56.00 61600
Heavy grade PVC pipe (ISI MARK) concealed in Roof RM
Slabs with all required MS deep boxes and all
accessories including and labour charges etc.,
complete.
Makes:- Sudhakar/ Modi.

2 750 RM Supply and fixing of 25mm outer dia Medium grade (1.8 ONE 60.00 45000
mm thick) P.V.C. pipe (ISI MARK) concealed in wall with RM
all required MS junction boxes and all accessories
including masonary work for light, Fan and separate plug
point with MS Modular switch box including all labour
charges etc., complete for EPABX, LAN, and CCTV, Bell,
light, Fan points.
Makes:- Sudhakar/ Modi.

3 52 Nos Supply and erecting MS galvanished Fan hook box with EACH 45.00 2340
hook in RCC slab including all Labour charges etc.,
complete.

WIRING

4 185 PTS Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS EACH 460.00 85100
P.V.C. insulated flexible copper cable (ISI MARK) in POINT
existing pipe with 6A Modular switch, Ceiling
rose/BH/SBH Modular switches with cover plate
including all labour charges etc., complete. (for Non-
Residential Building)
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL/ Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
5 2 PTS Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS EACH 690.00 1380
P.V.C. insulated flexible copper cable (ISI MARK) in POINT
existing pipe with 6A Modular switch, Ceiling
rose/BH/SBH Modular switches with cover plate
including all labour charges etc., complete (Non-
Residential Building) for Staircase points. ( 2 way
Switch ).
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

6 26 PTS Wiring with three runs of 1.5 sq.mm FRLS P.V.C. EACH 273.00 7098
insulated flexible copper cable (phase, neutral, earth) in POINT
the existing conduit pipe with 6 Amps Modular type
switch, and 6 A 3/2 pin Modular type socket with cover
plate on common switch board etc., complete.
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

7 4 PTS Wiring with 2 of 22/0.3mm ( 1.5 Sq.mm) FRLS P.V.C. EACH 415.00 1660
insulated flexible copper cable (ISI MARK) in existing POINT
pipe with 6A switch and 6A, 3/2 pin socket Modular type
with 6A switch control and MS boxes with cover plate
fixing on separate board including all labour charges
etc., complete.
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets :- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
8 12 PTS Wiring with 2 of 22/0.3mm (1.5 Sq.mm) FRLS P.V.C. EACH 865.00 10380
insulated flexible copper cable (ISI MARK) in existing POINT
pipe with 6A Modular switch control- 3nos and 6A, 3/2
pin Modular sockets - 3 nos fixing on separate board
including all labour charges etc., complete. ( for LABs &
Computer Use )
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets :- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

9 12 NOS S&D of 16A/6A, 2 in one socket with 16A switch control EACH 335.00 4020
modular type with MS flush boxes with front cover plate
including all labour charges etc., complete.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL

RUN of MAINS

10 650 RM Supply and run of 1 of 22 /0.3mm (1.5 Sq.mm) FRLS ONE 19.00 12350
P.V.C. insulated flexible copper cable in existing pipe for RM
earth continuity including all labour charges etc.,
complete.
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL / L&T / Power
Flex/RPG /Anchor

11 200 RM Supply and run of 3 of 1.5 sq.mm (phase neutral and ONE 56.00 11200
earth) FRLS PVC insulated flexible copper cable in RM
existing MS conduit pipe for sub-circuits including labour
charges etc., complete as required for small switch
boards.
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL / L&T / Power
Flex/RPG /Anchor
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
12 750 RM Supply and run of 3 of 2.5 sq.mm (phase neutral and ONE 80.00 60000
earth) FRLS PVC insulated flexible copper cable in RM
existing MS conduit pipe for individual ligting circuits
including labour charges etc., complete as required for
switch boards.
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

13 400 RM Supply and 3 runs of 4.0 sq mm (phase neutral and ONE 113.00 45200
earth) FRLS PVC insulated flexible copper cable in RM
existing conduit pipe for run of mains including labour
charges etc., complete as required including labour
charges for 16A sockets.
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

14 200 RM Supply & run of 3 of 6.0 Sqmm (84/0.3mm) (phase ONE 167.00 33400
neutral and earth) FRLS PVC insulated flexible copper RM
cable in existing MS conduit pipe for run of mains
including labour charges etc. complete for AC points &
SDB's etc as required.
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL/L&T / Power
Flex/RPG /Anchor

15 100 RM Supply and run of 5 of 6 Sq mm (phases, neutral and ONE 278.00 27800
earth) FRLS PVC insulated flexible copper cable in RM
existing MS conduit pipe for circuits including labour
charges etc. complete as required for run of mains from
Lighting panel board to TPN DB'S with pin type lugs
and connections. [for LDBs]
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

16 100 RM Supply & run of 5 of 10.0 Sqmm (phases, neutral and ONE 422.00 42200
earth) FRLS PVC insulated flexible copper cable in the RM
existing conduict pipe for run of mains from Power panel
board to TPN DB"s with pin type lugs and connections
etc., complete. [for PDBs]
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.

DISTRIBUTION BOARDS

17 8 NOS Supply and fixing single phase DB in sheet steel EACH 1456.00 11648
enclosure with metallic plug and socket with 1 No.
20/32A,10KA 'c' curve SPMCB (Motor characteristics
MCBs) control including making connections etc.,
complete concealing in wall for A.C. points etc.
Makes : Legrand / Schneider.

18 4 NOS Supply and fixing of TPN 4 way distribution board IP-43 EACH 7094.00 28376
(8+12 Module) with provision to accommodate the ELCB
incomer and suitable for single pole outgoing MCB's in
sheet Steel enclosure with 32A 4 pole MCB as incomer
and 12 No of 6 to 32 Amps single pole, 10 KA breaking
capacity 'c' Curve MCB outgoings including making
connections etc., complete concealing in wall.
(LIGHTING DB's) Makes : Legrand / Schneider.

19 4 NOS Supply and fixing of TPN 4 way distribution board IP-43 EACH 7712.00 30848
(8+12 Mofule) with provision to accommodate ELCB as
incomer and suitable for single pole outgoing MCB's in
sheet Steel enclosure with 63 Amps 4 pole MCB as
incomer and 12 No of 6 to 32 Amps single pole, 10 KA
breaking capacity 'c' curve MCBs as outgoings
including making connections etc., complete concealing
in wall.

(POWER DB's) Makes : Legrand / Schneider.

20 1 NOS Supply and fixing TPN - 8 way Vertical type Distribution EACH 29631.00 29631
board with IP-43 Protection (Metal Door) suitable to
accommodate MCCB as incomer and single/three pole
MCBs as outgoings with 125A, 4Pole 25 kA MCCB as
incomer with 6No of 40/63A, 10 KA TP MCBs 'c' curve
and 6 No, 6-32A, 10 kA SP MCBs 'c' curve as outgoing
including making connections and labour charges etc.,
complete concealing in wall.
Makes : Legrand / Schneider.

21 5 Nos Supply and fixing of cable adopteres box with cover for EACH 600.00 3000
DBs including, massanory work etc., complete.,
Makes : Legrand / Schneider.

EARTHINGS
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
22 2 NOS Providing independent earthing for Important equipment EACH 3520.00 7040
with 40mm dia 'B' class 2.5m long G.I pipe and 19mm
dia 'B' class G.I pipe of 0.3mtr. long connected with
reducer providing G.I funnel with mesh enclosed in
C.C.Chamber of 400m x 400m x 400mm with R.C.C.
Slab cover duly providing staggered holes filling with salt
and charcoal from the bottom of the pipe giving earth
connection from electrode through G.I strip of 40 x 6mm
x 200mm length with all accessories and labour charges
complete, as per IS specifications 732/1982 (Part II)

23 1 NOS Providing independent earthing for Sophisticated EACH 9155.00 9155


Electronic equipment with 600mm x 600mm x 3.15mm
thick copper plate rigidly fixed to 40mm dia G.I Pipe of
2.5mtr. length filling with salt and charcoal giving earth
connection from electrode G.I strip of 40 mm x 6mm x
200mm length and hume pipe with all accessories and
labour charges complete as per IS specification
732/1982 (Part II).

24 50 RM Supply and run of No. 8SWG GI wire including cost of all ONE 13.00 650
accessories and labour charges etc complete. RM

25 50 RM Supply and run of 25mmX6mm GI strip including cost of ONE 88.00 4400
all accessories and labour charges etc complete. RM

26 50 RM Supply and run of 25mmX3mm copper strip including ONE 379.00 18950
cost of all accessories and labour charges etc complete. RM

FIXTURES

27 85 NOS Supply, Transportaton, and fixing of 4-28W box type EACH 1180.00 100300
tube light fitting with 28Watt electronic ballast with all
accessories with 40Watt tube and operating voltage 90
to 350 Volts, power factor 0.98 and harmonics shall be
as per IS specifications including all labour charges and
conveyance of all materials etc complete with with
flexible wire and connections.
( Trinic Make only with 4 Years Warranty., )
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
28 2 NOS Supply, Transportaton, installation, testing and EACH 1035.00 2070
commissioning of vertical CFL down lighter of 1X13 /
18W Watt recessed mounted with suitable for 1 Nos
13/18W CFL lamps, with electronic ballast including all
labour charges and conveyance of all materials etc
complete with wire leads and connections.
(Makes: Wipro/ Phillips make fittings as
desired by the dept equivalent models)..

29 6 NOS Supply, Transportaton, installation, testing and EACH 4542.00 27252


commissioning of 2X 36 Watt CFL recessed mounted
mirror optic fitting with P5 Lowers, suitable for 2 Nos
36W CFL lamps,energy saving electronic ballast
including all labour charges and conveyance of all
materials etc complete with wire leads and connections
required anchor hold fasteners and GI wire..
(Makes: Wipro/ Phillips make fittings as desired by
the dept equivalent models).

30 10 NOS Supply and fixing of BH/SBH in lieu of ceiling rose with EACH 11.00 110
1 NO 3-5 W bulb with connections etc., complete with
labour charges
(Gold Medal / Million )

31 4 NOS Supply and fixing of ding dong bell on 4"x7" decolam EACH 187.00 748
block including giving connections cost of all accessories
and all labour charges etc., complete.
Make: Gold Medal / Million.

32 1 NOS Supply and fixing of electronic card less remote bell EACH 535.00 535
including giving connections cost of all accessories and
all labour charges etc., complete.

33 52 NOS Supply, Transportation of Ceiling fan 48"(1200mm) EACH 1600.00 83200


ceiling fans with 3 blades & double ball bearings with out
Regulators and all standard accessories and giving
connections etc., complete.
Make: Crompton High Speed / Orient Summer Pride
PSPO / Bajaj Ultima / Havells Velocity.

34 52 NOS Supply and fixing of modular Electronic stept type fan EACH 473.00 24596
regulator hum free step type socket size with MS box,
front plate in the existing switch board ( Modular Type )
Make: MK / Cabtree / anchor roma / Salzar /
Legrand / Mosaic model as per Dept., Direction.
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
35 100 RM Supply and erecting 19/20mm steel tube down rod of ONE 84.00 8400
one meter length with bolts & nuts duly painted with RM
matching colour of fan complete.

36 52 NOS Labour charges for Fixing of Ceiling fan including giving EACH 91.00 4732
connections with twin core wire etc., complete.

37 3 NOS Supply,Transportation of Light duty exhaust fan 12"(300 EACH 1350.00 4050
mm) size1350 rpm with metal blades wiremesh with all
accessories etc complete
Make: Orient/ Crompton Greeves/GE/Almonard/ Bajaj
Fresh.

38 6 NOS Supply,Transportation of Heavy duty exhaust fan EACH 2645.00 15870


12"(300 mm) size with all accessories such as louver
shutter etc.,
Make: Orient/ Crompton Greeves/Bajaj / / Almonard.

39 9 NOS Labour charges for fixing of Exhaust fan in wall with EACH 410.00 3690
necessary connections and masonary work of making
hole, finishing etc., complete.

40 9 NOS Supply and fixing of louver shutter suitable for 12" EACH 250.00 2250
Exhaust fan including all labour charges etc complete
with connections and colouring matching to the wall with
enamel paint.

MAIN POWER PANEL IN ELECTRICAL ROOM


41 1 NOS Supply, installation, testing and commissioning of EACH 73000.00 73000
wall/floor mounting type panel board with alluminium bus
bars fabricated with 16 Gauge CRCA Sheet comprising
of TPN bus bars of equal size in all phases and neutral
equipped with bus bar chambers and cable
chambers.The bus bars fault level shall be 50 KA and
shall be as per the requirement of local CEIG, fire
regulations, CPRI norms and other authorities etc. The
painting of the complete system shall be powder coated
duly processing the panel in 7 tank process. The panel
shall be suitable for accomdating the following switch
gear including supply of all components, hard wares etc
including all necessary civil works, adequate
reinforcement, foundation bolts, suitable G.I earth strip
50 x 6mm, door loop earthings, bus bars should be
colour sleeved with heat shrinkable sleeves for phase
and neutral duly supported at regular intervels by
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
SMC supports and all cables shall have proper cable
entry, danger board, feeder identification marks, rigid
inter connections, cadmium plated bolts and nuts and
shall be installed on wall/flooring and consisting of the
following as required and as per IS standards for [MAIN
POWER PANEL IN ELECTRICAL ROOM ] Panel shall
be manufacture only from CPRI approval
Fabricators.

400A Aluminium Bus Bar with colour code.(0.8A/Sqmm).

Internal wiring with approved make cable


Earthing Flat: Providing suitable G.I Flat
Incommer: 250A, 4 Pole, MCCB, 36/35 KA - 1 No.
Makes: L&T / Siemens / schenieder.
Metering Set:
0- 250A Digital Ammeter with selector switch . - 1 No.
(conserve / Elmeasure)
0-500V Digital Volt meter with selector switch - 1 No.
( conserve / Elmeasure make)
R, Y, B Indication lamps of LED type - 3 Nos.
250/5A C.T coils - 3 Nos.
20A Bakelite Fuse Fittings - 3 Nos.
2A HRC Fuse link - 3 Nos.
Outgoing:-
125A, TP, MCCB, 35/36 KA - 2 Nos
Makes: L&T / Siemens / schenieder.
63A, TP, MCB, 25 KA - 4 Nos
Makes: Legrand / schenieder.
Labour charges etc complete with connections for
Finished item of work.

U.G CABLES

42 Supply of the Following PVC XLPE armoured cable


1100 V Grade with ISI mark stranded / solid, aluminimum
conductor complete
Make: RPG/ POLY CAB/ Havells/Finolex/ Paragan /
Unicab/ V-Guard/ fortune Art EBXL.

a 100 RM 3.5 Core 70.00 Sq.mm. ONE 363.00 36300


RM
b 50 RM 3.5 Core 25 Sq.mm. ONE 180.00 9000
RM
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
43 100 RM Earth work excavation of Trench in hard ground soil, ONE 154.00 15400
laying of U.G cables of size up to 70 Sqmm on sand RM
cusion covering the cable with bricks and back filling of
Trench duly providing route indicator (as per general
instruction S.No. 14 of SSR) embedded in C.C including
cost and conveyance of materials and labour charges
etc., complete.

44 50 RM Labour charges for run of U.G cable on wall / existing ONE 32.00 1600
pipe with necessary fixing arrangments such as saddles, RM
clamps,wooden separators etc., (as directed by
departmental official) for the cables.

CABLE GLANDS:
45 S&fixing of heavy duty flange type brass cable glands of
following sizes for PVC armoured cables with brass
washers, earth tag etc complete including all labolur
charges.
a 2 NO 70 to 150 Sq.mm EACH 264.00 528
b 2 NO 25 to 50Sq.mm EACH 138.00 276

ALUMINIUM LUGS:
46 Supply and fixing of crimping type Aluminium lugs
confirming to IS specifications for following cables
including nuts and bolts with connections.
a 6 NO 70Sq.mm EACH 25.00 150
b 2 NO 50Sq.mm EACH 20.00 40
c 2 NO 35Sq.mm EACH 17.00 34
d 6 NO 25Sq.mm EACH 14.00 84

STREET LIGHT

47 2 NOS Supply and fixing of 4' - 28 w weatherproof streetlight EACH 1800.00 3600
Fitting comprising canopy of sheet aluminium in stove
enamel Dinish with energy saving Electronic ballast and
1 No 40/36 W Tube Light to the pole / wall with suitable
length of G.I pipe bracket massonry work etc., complete
with connections as required at site.
Makes: Crompton / Philips/Bajaj / HPL / Surya /
Havells/Trinic.

48 1 NOS Supply of Integral street light luminaire of 150W HPSV EACH 6037.00 6037
lamp Fitting comprises of single piece die cast aluminium
bofy with copper wound ballast and capacitor, Ignitor,
with pot optics including 150w HPSV lamp etc.,
complete.
Make : Crompton /Phillips/Bajaj/Wipro/ GE)
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
49 1 NOS fixing of MV / SV/MH luminaire on wall with 1.0Mtr of EACH 396.00 396
40mm dia GI pipe bracket and anti tilting MS Flat with
2.5 Sq.mm flexible copper wire etc.,including all labour
charges for mason work and giving connections etc.,
complete.

TV WIRING

50 100 RM Supply and laying of RG6 co-axial cable in the existing ONE 23.00 2300
metallic/non metallic conduit pipe with connections RM
etc.,complete for TVs and CCTV Net work.
Makes: Finolex/ Million / Gold Medal / Polycab

51 2 Nos Supply and fixing of TV outlet Modular type in existing Each 216.00 432
MS/modular box with modular front cover plate with
screws connections etc., complete. (Makes:- Cabtree
Thames Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL)

GI PIPES/ HUME PIPES


52 Supply and Laying NP2 class RCC hume pipe with
bends, Collars and other accessores of following siges
including trench excavation for laying the same with RCC
incsing around.
a 5 RM 300 mm ONE 348.00 1740
RM

WATER COOLERS

53 1 NOS Supply and fixing of water cooler fully stainless steel of Each 42994.00 42994
capacity 60/120 to be operated on single phase supply
with ISI mark. Makes Blue star / Voltas / Usha.

EPABX - TELEPHONE WIRING

54 200 RM Supply and laying of 2 pair telephone wire 0.5mm copper ONE 16.00 3200
in the existing metallic/non metallic conduit pipe with RM
connections etc., complete.
Makes: Finolex/L&T/Gold Medal/Million/ Delton/
Polycab/ RPG
S. Rate (Rs.)
Quantity Description of Work Unit Amount (Rs.)
NO. in fig.
55 10 NOS Supply and fixing of 2 Line telephone jack socket model Each 170.00 1700
modular type with connector front and back plate in
existing modular box with screws connections etc.,
complete.
(makes :- Cabtree Thames Platinum / GM / Million
/Anchor Roma viola / Toyoma / L&T / fortune Art /
CPL)

LAN

56 12 Nos Supply and termination of cat-6 RJ 45 out lets including Each 400.00 4800
dual face plate of Makes Beldan/D
Link/Legrand/AMP/Krone

57 300 RM Supply and laying of Cat 6 UTP cable including all ONE 33.00 9900
taxes etc complete. RM
Make : D-Link/AMP/Krone/Finolex.

V - FIRE EXTINGUISHERS

58 2 Nos Supply and fixing of ISI make Ceiling Mounted ABC EACH 5339.00 10678
MAP50, 5 Kg stored pressure type, pressure gauge,
Gross Wt.7.7 kg,Empty Wt.2.7 kg, Can Ht226mm , Dia
230mm, Discharge time : less than 8 sec, Auto discharge
mechanism on temperature rise, Applicable on A,B,C, &
Electrically - started fires, Can Construction: Forging &
Machining, Internal coating of Can: Epoxy Power
coating, External Coating of Can: Epoxy Polyster powder
coating, sheet metal thickness:1.80mm , Helium leakage
detection tested, ISI & EN approved with 2 years
warranty (Safex / Kenex / Bharat / Reliance make)
Including transportation, all taxes and all labour charges
etc complete.
( SSR - 13-14 - 9.4.8 )

GRAND TOTAL: 1096418


\\electrical2\Electrical Division\Estimates 06-07\Vishakhapatanam\Dist Live Stock - VSP - 13-14- F.xls
Abstract Estimate Civil Page-122

Name of the Work: :- Construction of Office building for District Live Stock Devel

Sl. No. Description

1 Earth work excavation for foundations (Mechanical Means) Earth work excavation for
for buildings in ordinary soils and depositing on bank for all lifts foundations (Mechanical
and with an initial lead of 10m and up to 3m depth including all Means) for buildings in
operational,incidental, labour charges such as shoring, sheeting, ordinary soils
planking, strutting etc., and overheads & contractors profit
complete for finished item of work including seigniorage excluding
dewatering charges etc., as per SS 20 B(APSS 308)

2 Filling with carted gravel in trenches,sides of foundations and Filling with carted gravel in
basement with initial lead in layers not exceeding 15cm trenches,sides of
thick,watering and ramming including cost and conveyance of foundations and basement
water to work site and all peraitonal,incidental, labour charges,hire
charges of T&P etc., and overheads & contractors profit complete
for fnished item of work(APSS NO.309&310)

3 Filling with useful available excavated earth (excluding rock) Filling with useful available
with a lead of 50 m in trenches, sides of foundations and excavated earth (excluding
basement with initial lead in layers not exceeding 15cm thick, rock)
watering and ramming including cost and conveyance of water to
work site and all operaitonal, incidental, labour charges, hire
charges of T&P etc., and overheads & contractors profit complete
for fnished item of work (APSS NO.309&310)

4 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse Plain Cement Concrete
aggregate) for foundations and under flooring bed using (1:4:8)
coarse aggregate 40mm size hard , machine crushed granite
from approved quarry including cost and conveyance of all
materials like cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all materials
and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers
finishing top surface to the required level curing etc., and
overheads & contractors profit complete for finished item of work.
(APSS No. 402)

5 Plain Cement Concrete (1:5:10) (cement: fine aggregate: Plain Cement Concrete
Coarse aggregate) for foundations and under flooring bed (1:5:10)
using coarse aggregate 40mm size hard , machine crushed
granite from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to
site, including seigniorage charges, sales & other taxes on all
materials and including all charges for machine mixing, laying
concrete in foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing etc.,and
overheads & contractors profit complete for finished item of work.
(APSS No. 402)

6 Random Rubble stone masonry in CM (1:8) prop: (Cement: Random Rubble stone
Screened sand) using hard other than granite stones carted masonry in CM (1:8)
from approved quarry including cost and conveyance of all
materials like cement, screened sand, water, stones etc., from
approved quarry, to site and including seigniorage charges, sales
& other taxes on all materials including labour for cutting stones
to required size and shape, mixing, of cement, mortar,
construction, curing etc.,and overheads & contractors profit
complete for finished item of work in foundation and basement.
(APSS No. 601 & 615)
Abstract Estimate Civil Page-123

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Steel scaffolding pipes , jack props , wallers , Foot plates ,
brackets , steel centering plates etc., including all
operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and
overheads & contractors profit complete but excluding cost
of steel and its fabrication charges for finished item of work
(APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
Footings

a
Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Steel scaffolding pipes , jack props , wallers , Foot plates ,
brackets , steel centering plates etc., including all
operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and
overheads & contractors profit complete but excluding cost
of steel and its fabrication charges for finished item of work
(APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
Column pedestals

b
Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Steel scaffolding pipes , jack props , wallers , Foot plates ,
brackets , steel centering plates etc., including all
operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc., and
overheads & contractors profit complete but excluding cost
of steel and its fabrication charges for finished item of work
(APSS No. 402)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
Plinth Beams

c
Abstract Estimate Civil Page-124

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade 'Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials, centering using
Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
COLUMNS :
un supported height up to 3.66 m
First Floor

Supply and placing of the Design Mix Concrete M 30 grade 'Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials, centering using
Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
COLUMNS :
un supported height up to 3.66 m
Second Floor
Abstract Estimate Civil Page-125

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade 'Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials, centering using
Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
LINTELS :
First Floor

Supply and placing of the Design Mix Concrete M 30 grade 'Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials, centering using
Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
LINTELS :
Second Floor
Abstract Estimate Civil Page-126

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
BEAMS :
un supported height up to 3.66 m
First Floor

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
BEAMS :
un supported height up to 3.66 m
Second Floor
Abstract Estimate Civil Page-127

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
RCC SLABS :
Roof Slabs 125mm thick :
un supported height up to 3.66 m
First Floor

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
RCC SLABS :
Roof Slabs 125mm thick :
un supported height up to 3.66 m
Second Floor
Abstract Estimate Civil Page-128

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
RCC SLABS :
Roof Slabs 200mm thick :
First Floor

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of 400 Design Mix Concrete M 30
kgs per 1 cum of concrete using WEIGH BATCHER / MIXER grade
with 20mm size graded machine crushed hard granite metal
(coarse aggregate) ( consisting of nominal size metal 60% of
20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of
6mm ) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials , centering using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as weigh batching,
machine mixing, lifting of concrete manually, laying concrete,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)
RCC SLABS :
Roof Slabs 200mm thick :
Second Floor
Abstract Estimate Civil Page-129

Sl. No. Description

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of Design Mix Concrete M 30
400 kgs per 1 cum of concrete using WEIGH BATCHER / grade
MIXER with 20mm size graded machine crushed hard granite
metal (coarse aggregate) ( consisting of nominal size metal
60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10%
of 6mm ) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials ,
centering using Casurina Ballies , Bamboos , Wooden
Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm
wide sun-shades 7.5cm thick at fixed end and 5cm thick at
free end with an average thickness of 6.25cm including all
operational, incidental and labour charges such as weigh
batching, machine mixing, lifting of concrete manually,
laying concrete, curing, overheads & contractors profit
complete etc., but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402, 403 & 903)
First Floor

Supply and placing of the Design Mix Concrete M 30 grade Supply and placing of the
corresponding to IS 456 with minimum cement content of Design Mix Concrete M 30
400 kgs per 1 cum of concrete using WEIGH BATCHER / grade
MIXER with 20mm size graded machine crushed hard granite
metal (coarse aggregate) ( consisting of nominal size metal
60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10%
of 6mm ) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials ,
centering using Casurina Ballies , Bamboos , Wooden
Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm
wide sun-shades 7.5cm thick at fixed end and 5cm thick at
free end with an average thickness of 6.25cm including all
operational, incidental and labour charges such as weigh
batching, machine mixing, lifting of concrete manually,
laying concrete, curing, overheads & contractors profit
complete etc., but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402, 403 & 903)
Second Floor

Masonry work in CM(1:6) prop (Cement : Screened sand) in Masonry work in CM(1:6)
superstructure with fly ash cement / lime solid blocks of size prop (Cement : Screened
290mm x 225mm x 140mm from approved source having sand)
minimum crushing strength of 50 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales &
other taxes on all materials and such as labour charges, like
mixing cement mortar, scaffolding charges, constructing
masonry, lift charges, curing, overheads and contrctor profit
etc., complete for finished item of work. (APSS No. 501 &
504).
Superstructure :
First Floor
Abstract Estimate Civil Page-130

Sl. No. Description

Masonry work in CM(1:6) prop (Cement : Screened sand) in Masonry work in CM(1:6)
superstructure with fly ash cement / lime solid blocks of size prop (Cement : Screened
290mm x 225mm x 140mm from approved source having sand)
minimum crushing strength of 50 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales &
other taxes on all materials and such as labour charges, like
mixing cement mortar, scaffolding charges, constructing
masonry, lift charges, curing, overheads and contrctor profit
etc., complete for finished item of work. (APSS No. 501 &
504).
Superstructure :
Second Floor

Masonry work in CM(1:6) prop (Cement : Screened sand) in Masonry work in CM(1:6)
superstructure with fly ash cement / lime solid blocks of size prop (Cement : Screened
290mm x 225mm x 140mm from approved source having sand)
minimum crushing strength of 50 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales &
other taxes on all materials and such as labour charges, like
mixing cement mortar, scaffolding charges, constructing
masonry, lift charges, curing, overheads and contrctor profit
etc., complete for finished item of work. (APSS No. 501 &
504).
Superstructure :
Third Floor

Reinforced Masonry for partition walls (100 mm thick) in CM Reinforced Masonry for
(1:4) prop. (Cement : Screened sand) using fly ash cement / partition walls (100 mm thick)
lime solid blocks of size 290mm x 100mm x 140mm having in CM (1:4)
minimum compressive strength of 50 Kg/Sq.cmand placing 2
Nos. of 6mm M.S plain rods in every third layer with free ends
of the reinforcement pegged into mortar joints of main brick
walls where applicable including cost and conveyance of all
materials like cement, steel, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all
materials, all operational, incidental charges such as labour
charges for mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and
overheads & contractors profit but excluding cost of steel
and its fabrication charges complete for finished item of
work. (APSS No. of 509)
Internal walls :
First Floor
Abstract Estimate Civil Page-131

Sl. No. Description

Reinforced Masonry for partition walls (100 mm thick) in CM Reinforced Masonry for
(1:4) prop. (Cement : Screened sand) using fly ash cement / partition walls (100 mm thick)
lime solid blocks of size 290mm x 100mm x 140mm having in CM (1:4)
minimum compressive strength of 50 Kg/Sq.cmand placing 2
Nos. of 6mm M.S plain rods in every third layer with free ends
of the reinforcement pegged into mortar joints of main brick
walls where applicable including cost and conveyance of all
materials like cement, steel, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all
materials, all operational, incidental charges such as labour
charges for mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and
overheads & contractors profit but excluding cost of steel
and its fabrication charges complete for finished item of
work. (APSS No. of 509)
Internal walls :
Second Floor

Reinforced Masonry for partition walls (100 mm thick) in CM Reinforced Masonry for
(1:4) prop. (Cement : Screened sand) using fly ash cement / partition walls (100 mm thick)
lime solid blocks of size 290mm x 100mm x 140mm having in CM (1:4)
minimum compressive strength of 50 Kg/Sq.cmand placing 2
Nos. of 6mm M.S plain rods in every third layer with free ends
of the reinforcement pegged into mortar joints of main brick
walls where applicable including cost and conveyance of all
materials like cement, steel, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all
materials, all operational, incidental charges such as labour
charges for mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and
overheads & contractors profit but excluding cost of steel
and its fabrication charges complete for finished item of
work. (APSS No. of 509)
Internal walls :
Third Floor

Plain Cement Concrete (1:3:6) nominal mix using 20mm size Plain Cement Concrete
graded machine crushed hard granite metal (coarse (1:3:6) nominal mix using
aggregate) ( consisting of nominal size metal 60% of 20mm, 20mm size
15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate(sand), coarse
aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials and including all charges
for mixing, laying concrete in position, curing etc., & lift
charges , and overheads & contractors profit for Bed Blocks
& Hold Fasts for finished item of work. (APSS No. 402)
First Floor
Abstract Estimate Civil Page-132

Sl. No. Description

Plain Cement Concrete (1:3:6) nominal mix using 20mm size Plain Cement Concrete
graded machine crushed hard granite metal (coarse (1:3:6) nominal mix using
aggregate) ( consisting of nominal size metal 60% of 20mm, 20mm size
15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate(sand), coarse
aggregate, water etc. to site, including seigniorage charges,
sales & other taxes on all materials and including all charges
for mixing, laying concrete in position, curing etc., & lift
charges , and overheads & contractors profit for Bed Blocks
& Hold Fasts for finished item of work. (APSS No. 402)
Second Floor

Plain Cement Concrete M 20 design mix using WEIGH Plain Cement Concrete M 20
BATCHER / MIXER, 20mm size hard granite machine crushed design mix using WEIGH
graded metal (Coarse aggregate) ( consisting of nominal size BATCHER / MIXER
metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm
and 10% of 6mm ) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement,
fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials including
steel centering, shuttering, machine mixing, lift charges,
laying concrete,vibrating, curing, overheads & contrctors
profit etc., complete for finished item of work (APSS No. 402
& 403) for steps
First Floor

Plain Cement Concrete M 20 design mix using WEIGH Plain Cement Concrete M 20
BATCHER / MIXER, 20mm size hard granite machine crushed design mix using WEIGH
graded metal (Coarse aggregate) ( consisting of nominal size BATCHER / MIXER
metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm
and 10% of 6mm ) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concrete
including cost and conveyance of all materials like cement,
fine aggregate (Sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials including
steel centering, shuttering, machine mixing, lift charges,
laying concrete,vibrating, curing, overheads & contrctors
profit etc., complete for finished item of work (APSS No. 402
& 403) for steps
Second Floor

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for sill slabs.
First Floor
Abstract Estimate Civil Page-133

Sl. No. Description

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for sill slabs.
Second Floor

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm size
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for platforms and shelves.
50mm thick platforms :
First Floor

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm size
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for platforms and shelves.
50mm thick platforms :
Second Floor

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm size
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for platforms and shelves.
25mm thick shelves :
First Floor
Abstract Estimate Civil Page-134

Sl. No. Description

Reinforced Cement Concrete M 20 design mix using 12mm Reinforced Cement Concrete
size hard granite machine crushed graded metal (Coarse M 20 design mix using
aggregate) ( consisting of nominal size metal 60% of 12mm size
13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from
approved quarry, using a minimum quantity of 350 kgs. of
cement per 1 cum of concrete including cost and conveyance
of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges
on all materials including steel centering, shuttering, machine
mixing, laying concrete, lift charges, curing etc., and
overheads & contractors profit complete for finished item of
work (APSS No. 402 & 403) for platforms and shelves.
25mm thick shelves :
Second Floor

Providing Thermo Mechanically Treated (TMT) (Fe 500 grade Providing Thermo
as per IS 1786-1979) of different diameters for RCC works , Mechanically Treated (TMT)
including labour charges for straightening, cutting, bending (Fe 500 grade
to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-
splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks
and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales
and other taxes on all materials etc. ,and overheads &
contractors profit complete for finished item of work in all
floors.( APSS No.126)
First Floor

Providing Thermo Mechanically Treated (TMT) (Fe 500 grade Providing Thermo
as per IS 1786-1979) of different diameters for RCC works , Mechanically Treated (TMT)
including labour charges for straightening, cutting, bending (Fe 500 grade
to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-
splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all
wastages such as overlaps, couplings, chairs, spacer bars
including cost and conveyance of binding wire, cover blocks
and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales
and other taxes on all materials etc. ,and overheads &
contractors profit complete for finished item of work in all
floors.( APSS No.126)
Second Floor
Abstract Estimate Civil Page-135

Sl. No. Description

Providing Mild steel (MS) steel bars (Fe 250 grade as per IS Providing Mild steel (MS)
432) of different diameters including labour charges for steel bars (Fe 250 grade as
straightening, cutting, bending to required sizes and shapes, per IS 432)
placing in position with cover blocks of approved materials
and size and tying and lap-splicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing
in position, tying including sales and other taxes on all
materials etc. ,and overheads & contractors profit complete
for finished item of work in all floors.( APSS No.126)
First Floor

#REF! Providing Plinth protection 1.20m width along with drain Providing Plinth protection
constructed with 230 mm thick brick walls using common burnt 1.20m width along with drain
clay bricks (23x11x7cm) over 100 mm thick over PCC(1:5:10) bed
and plastering with CM (1:5) 12mm thick single coat for brick
masonry drain and providing PCC(1:5:10) 100mm thick in
between basement of the building and brick wall and 20mm thick
granolithic concrete flooring with CC(1:1:2) prop. up to the edge of
the brick masonry wall using 6mm to 12mm size graded hard
granite machine crushed metal laid monolithically already laid, in
alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing
5mm thick glass strips between the pannels and finishing the top
surface to required smoothness and slopes including grooves,
thread lining as directed by the Engineer - in - charge including
cost and conveyance of all materials to site, seigniorage charges,
sales & other taxes on all materials and operational & incidental
and labour charges like mixing of cement concrete, laying, curing,
overheads & contractor profit etc., complete

Ornamental ceiling plastering 12mm thick single coat in CM Ornamental ceiling


(1:5) using screened sand including cost and conveyance of plastering 12mm thick single
all materials like cement, sand, water etc., to site, including coat in CM (1:5)
seigniorage charges, sales & other taxes on all materials, and
all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, curing
as directed by Engineer-in-charge etc., and overheads &
contractors profit complete for finished item of work.(SS
901,903 & 904)
First Floor

Ornamental ceiling plastering 12mm thick single coat in CM Ornamental ceiling


(1:5) using screened sand including cost and conveyance of plastering 12mm thick single
all materials like cement, sand, water etc., to site, including coat in CM (1:5)
seigniorage charges, sales & other taxes on all materials, and
all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, curing
as directed by Engineer-in-charge etc., and overheads &
contractors profit complete for finished item of work.(SS
901,903 & 904)
Second Floor
Abstract Estimate Civil Page-136

Sl. No. Description

Plastering 12mm thick in two coats using screened sand with Plastering 12mm thick in two
base coat of 8mm thick in CM (1:6) and top coat of 4mm thick coats using screened sand
in CM (1:4) with dubara sponge finishing including cost and with base coat of 8mm thick
conveyance of all materials like cement, sand, water etc., to in CM (1:6)
site, including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials
and including cost of all labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of
work. (SS 901,903 & 904)
First Floor

Plastering 12mm thick in two coats using screened sand with Plastering 12mm thick in two
base coat of 8mm thick in CM (1:6) and top coat of 4mm thick coats using screened sand
in CM (1:4) with dubara sponge finishing including cost and with base coat of 8mm thick
conveyance of all materials like cement, sand, water etc., to in CM (1:6)
site, including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials
and including cost of all labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of
work. (SS 901,903 & 904)
Second Floor

Plastering 12mm thick in two coats using screened sand with Plastering 12mm thick in two
base coat of 8mm thick in CM (1:6) and top coat of 4mm thick coats using screened sand
in CM (1:4) with dubara sponge finishing including cost and with base coat of 8mm thick
conveyance of all materials like cement, sand, water etc., to in CM (1:6)
site, including seigniorage charges, sales & other taxes on all
materials, and all operational, incidental charges on materials
and including cost of all labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing, including cutting
grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of
work. (SS 901,903 & 904)
Third Floor

Plastering 20mm thick single coat in CM(1:5) using screened Plastering 20mm thick single
sand including cost and conveyance of all materials like coat in CM(1:5) using
cement, sand, water etc., to site, including seigniorage screened sand
charges, sales & other taxes on all materials, and all
operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, curing
as directed by Engineer-in-charge etc., and overheads &
contractors profit complete for finished item of work .(SS
901,903 & 904)
for basement :
Abstract Estimate Civil Page-137

Sl. No. Description

Providing impervious coat to exposed RCC roof slab surfaces Providing impervious coat to
to required slopes with CM (1:3) prop. using screened sand exposed RCC roof slab
20mm thick (average) mixed with water proofing compound surfaces
manufactured by reputed manufacturers as approved by
Engineer-in-charge at 1 Kg per one bag of cement, laid over
roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of
45cmx45cm including cost and conveyance of all materials
like cement, sand, water proofing compound, water etc., to
site, including seigniorage charges, sales & other taxes on all
materials and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and
thread lining, curing including rounding off junctions of wall
and slab etc., and overheads & contractors profit complete
for finished item of work. (APSS No. 901 & 903).
Second Floor

Providing impervious coat to exposed RCC roof slab surfaces Providing impervious coat to
of sump , sump side wall,sump bottom slab,in side of septic exposed RCC roof slab
tank , in sunken slabs etc. to required slopes with CM (1:3) surfaces of sump
prop. using screened sand 12mm thick mixed with water
proofing compound manufactured by reputed manufacturers
as approved by Engineer-in-charge at 1 Kg per one bag of
cement, laid over roof slab when it is green, finished smooth
with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm where ever necessary
including cost and conveyance of all materials like cement,
sand, water proofing compound, water etc., to site, including
seigniorage charges, sales & other taxes on all materials and
operational, incidental, and labour charges for mixing mortar,
laying, lift charges, rendering smooth and thread lining,
curing including rounding off junctions of wall and slab etc.,
and overheads & contractors profit complete for finished item
of work. (APSS No. 901 & 903).
First Floor

Flooring with polished shahabad / Tandur stone slabs of Flooring with polished
15mm to 18mm thick 0.457m x 0.457m or any other size as shahabad / Tandur stone
specified set over a base coat of CM (1:8) , 12mm thick using slabs of 15mm to 18mm thick
screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency
spread @ 3.3 Kgs per Sqm and jointed with neat cement to
full depth including cost and conveyance of all materials like
cement, sand, water, flooring stones etc. complete including
seigniorage charges, sales & other taxes on all materials
including all labour charges like dressing of flooring stones
to the required size, mixing of cement mortar, laying, lift
charges , cost of base coat etc., and overheads & contractors
profit complete for finished item of work. (APSS No.703 &
701)
First Floor
Abstract Estimate Civil Page-138

Sl. No. Description

Flooring with polished shahabad / Tandur stone slabs of Flooring with polished
15mm to 18mm thick 0.457m x 0.457m or any other size as shahabad / Tandur stone
specified set over a base coat of CM (1:8) , 12mm thick using slabs of 15mm to 18mm thick
screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency
spread @ 3.3 Kgs per Sqm and jointed with neat cement to
full depth including cost and conveyance of all materials like
cement, sand, water, flooring stones etc. complete including
seigniorage charges, sales & other taxes on all materials
including all labour charges like dressing of flooring stones
to the required size, mixing of cement mortar, laying, lift
charges , cost of base coat etc., and overheads & contractors
profit complete for finished item of work. (APSS No.703 &
701)
Second Floor

Flooring with ceramic tiles 7.30mm thick , 1st quality and of Flooring with ceramic tiles
size as approved by Engineer-in-charge, set over base coat 7.30mm thick , 1st quality
of cement mortar (1:8), 12mm thick using screened sand over and of size
CC bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm &
jointed neatly with white cement paste to full depth mixed
with pigment of matching shade, including cost of all
materials like cement, sand , water and tiles etc., and
overheads & contractors profit complete including
seigniorage charges etc., complete for finished item of work.
(APSS No.701 & 707)
First Floor

Flooring with ceramic tiles 7.30mm thick , 1st quality and of Flooring with ceramic tiles
size as approved by Engineer-in-charge, set over base coat 7.30mm thick , 1st quality
of cement mortar (1:8), 12mm thick using screened sand over and of size
CC bed already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm &
jointed neatly with white cement paste to full depth mixed
with pigment of matching shade, including cost of all
materials like cement, sand , water and tiles etc., and
overheads & contractors profit complete including
seigniorage charges etc., complete for finished item of work.
(APSS No.701 & 707)
Second Floor

Flooring with vitrified polished floor tiles of 1st quality and Flooring with vitrified
make as approved by Engineer-in-charge of size not less polished floor tiles of 1st
than 598 mm x 598 mm , 8mm thickness regular finish and quality
normal colours with borders and design as per the approved
flooring pattern as directed by the Engineer-In -Charge, laying
tiles using spacers of 2mm thick, set over a base coat of
CM (1:8) prop. 12mm thick using screened sand over CC bed
already laid or RCC roof slab , including neat cement slurry
of honey like consistancy spread @ 3.3 kgs per Sqm. and
jointed neately with white cement paste to full depth mixed
with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles,
white cement etc., to site (excluding cost of C.C. bed)
including cost of seigniorage charges on all materials, cost
of base coat and all labour charges for mixing of cement
mortar, laying tiles to required slope as directed by the
Engineer- in-charge etc.,and overheads & contractors profit
complete for finished item of work. (APSS No.701 & 707)
First Floor
Abstract Estimate Civil Page-139

Sl. No. Description

Flooring with vitrified polished floor tiles of 1st quality and Flooring with vitrified
make as approved by Engineer-in-charge of size not less polished floor tiles of 1st
than 598 mm x 598 mm , 8mm thickness regular finish and quality
normal colours with borders and design as per the approved
flooring pattern as directed by the Engineer-In -Charge, laying
tiles using spacers of 2mm thick, set over a base coat of
CM (1:8) prop. 12mm thick using screened sand over CC bed
already laid or RCC roof slab , including neat cement slurry
of honey like consistancy spread @ 3.3 kgs per Sqm. and
jointed neately with white cement paste to full depth mixed
with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles,
white cement etc., to site (excluding cost of C.C. bed)
including cost of seigniorage charges on all materials, cost
of base coat and all labour charges for mixing of cement
mortar, laying tiles to required slope as directed by the
Engineer- in-charge etc.,and overheads & contractors profit
complete for finished item of work. (APSS No.701 & 707)
Second Floor

Providing polished shahabad / Tandur stone slabs of 15mm Providing polished shahabad
to 18mm thick in single piece as specified set over a base / Tandur stone slabs of
coat of CM (1:5) , 12mm thick using screened sand over 15mm to 18mm thick
already laid CC bed / RCC roof slab including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm
and jointed with neat cement to full depth including cost and
conveyance of all materials like cement, sand, water, flooring
stones etc. complete including seigniorage charges, sales &
other taxes on all materials including all labour charges like
dressing of flooring stones to the required size, flat nosing
the edges, mixing of cement mortar, laying, lift charges , cost
of base coat etc., and overheads & contractors profit
complete for finished item of work for treads and risers.
(APSS No.703 & 701)
Treads of 0.30m wide :
First Floor

Providing polished shahabad / Tandur stone slabs of 15mm Providing polished shahabad
to 18mm thick in single piece as specified set over a base / Tandur stone slabs of
coat of CM (1:5) , 12mm thick using screened sand over 15mm to 18mm thick
already laid CC bed / RCC roof slab including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm
and jointed with neat cement to full depth including cost and
conveyance of all materials like cement, sand, water, flooring
stones etc. complete including seigniorage charges, sales &
other taxes on all materials including all labour charges like
dressing of flooring stones to the required size, flat nosing
the edges, mixing of cement mortar, laying, lift charges , cost
of base coat etc., and overheads & contractors profit
complete for finished item of work for treads and risers.
(APSS No.703 & 701)
Treads of 0.30m wide :
Second Floor
Abstract Estimate Civil Page-140

Sl. No. Description

Providing polished shahabad / Tandur stone slabs of 15mm Providing polished shahabad
to 18mm thick in single piece as specified set over a base / Tandur stone slabs of
coat of CM (1:5) , 12mm thick using screened sand over 15mm to 18mm thick
already laid CC bed / RCC roof slab including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm
and jointed with neat cement to full depth including cost and
conveyance of all materials like cement, sand, water, flooring
stones etc. complete including seigniorage charges, sales &
other taxes on all materials including all labour charges like
dressing of flooring stones to the required size, flat nosing
the edges, mixing of cement mortar, laying, lift charges , cost
of base coat etc., and overheads & contractors profit
complete for finished item of work for treads and risers.
(APSS No.703 & 701)
Risers of 0.15m height :
First Floor

Providing polished shahabad / Tandur stone slabs of 15mm Providing polished shahabad
to 18mm thick in single piece as specified set over a base / Tandur stone slabs of
coat of CM (1:5) , 12mm thick using screened sand over 15mm to 18mm thick
already laid CC bed / RCC roof slab including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per Sqm
and jointed with neat cement to full depth including cost and
conveyance of all materials like cement, sand, water, flooring
stones etc. complete including seigniorage charges, sales &
other taxes on all materials including all labour charges like
dressing of flooring stones to the required size, flat nosing
the edges, mixing of cement mortar, laying, lift charges , cost
of base coat etc., and overheads & contractors profit
complete for finished item of work for treads and risers.
(APSS No.703 & 701)
Risers of 0.15m height :
Second Floor

Providing skirting to internal walls to 10 cm height with Providing skirting to internal


ceramic tiles 7.30 mm thick length equal to flooring tiles, set walls to 10 cm height with
over base coat of CM(1:5) 12 mm thick using screened sand ceramic tiles
with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointing with white cement paste
mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges etc., and overheads
& contractors profitcomplete for finished item of work.(APSS
No.701 &707)
First Floor

Providing skirting to internal walls to 10 cm height with Providing skirting to internal


ceramic tiles 7.30 mm thick length equal to flooring tiles, set walls to 10 cm height with
over base coat of CM(1:5) 12 mm thick using screened sand ceramic tiles
with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointing with white cement paste
mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges etc., and overheads
& contractors profitcomplete for finished item of work.(APSS
No.701 &707)
Second Floor
Abstract Estimate Civil Page-141

Sl. No. Description

Providing skirting to internal walls to 10 cm height with Providing skirting to internal


vitrified tiles 8mm thick , regular finish and normal colour, walls to 10 cm height with
length equal to flooring tiles, set over base coat of CM(1:5) 12 vitrified tiles
mm thick using screened sand with cement slurry of honey
like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials
like tiles, cement, sand and water etc.,and overheads &
contractors profit complete including seigniorage charges
etc., complete for finished item of work.(APSS No.701 &707)
First Floor

Providing skirting to internal walls to 10 cm height with Providing skirting to internal


vitrified tiles 8mm thick , regular finish and normal colour, walls to 10 cm height with
length equal to flooring tiles, set over base coat of CM(1:5) 12 vitrified tiles
mm thick using screened sand with cement slurry of honey
like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of
matching shade to full depth, including cost of all materials
like tiles, cement, sand and water etc.,and overheads &
contractors profit complete including seigniorage charges
etc., complete for finished item of work.(APSS No.701 &707)
Second Floor

Providing dadooing to walls with glazed plain coloured wall Providing dadooing to walls
tiles 1st quality of size of size not less than 300mm x 200mm with glazed plain coloured
with bordersas approved by Engineer-in-Charge set over wall tiles
base coat of CM(1:5) 12 mm thick using screened sand with
cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including cost
of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges etc., and overheads
& contractors profit complete for finished item of work.

First Floor

Providing dadooing to walls with glazed plain coloured wall Providing dadooing to walls
tiles 1st quality of size of size not less than 300mm x 200mm with glazed plain coloured
with bordersas approved by Engineer-in-Charge set over wall tiles
base coat of CM(1:5) 12 mm thick using screened sand with
cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including cost
of all materials like tiles, cement, sand and water etc.,
complete including seigniorage charges etc., and overheads
& contractors profit complete for finished item of work.

Second Floor
Abstract Estimate Civil Page-142

Sl. No. Description

Reinforced cement concrete (1:5:10) proportion (Cement: fine 'Reinforced cement concrete
aggregates: coarse aggregate) using 40mm size (SS5) hard (1:5:10) proportion (Cement:
granite metal (coarse aggregate) from approved quarry fine aggregates
including cost and conveyance of all materials like cement,
fine aggregate (sand), coarse aggregate, water etc., to site
and cost of seigniorage charges on all materials including
centering using Casurina Ballies , Bamboos , Wooden
Reapers , Runners , Wood Posts , Wall Plates etc., shuttering,
machine mixing, laying concrete, lifting concrete manually ,
curing etc., and overheads & contractors profit complete as
per drawings but excluding cost of steel and it's fabrication
charges for finished item of work (APSS NO. 402 & 403) for
Dummy columns.
Second Floor

### Supplying and fixing of stainless steel ( grade 202 ) hand Supplying and fixing of
railing as per approved drawing with top rail of 50mm dia pipe stainless steel ( grade 202 )
and 2mm thick medium class and vertical posts of 25mm dia and hand railing
1.6mm thick medium class 2 Nos for each step fixed with base
plate of 75mm dia using bonding agent and anchor fastner and
welding, drilling of 20mm dia holes with pneumatic compressor
for fixing railing, buffing, polishing all members of the railing
thouroughly , lacquer finishing to present seamless finish
including cost and conveyance of all materials, electrodes,
welding charges, cost of all consumables, labour charges ,
overheads & contractors profit etc., complete for finished item of
work.

### Providing 110 mm Dia ISI marked PVC down water take pipes 'Providing 110 mm Dia ISI
with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked marked PVC down water take
including cost of necessary PVC Bends, shoes, iron / PVC clamps pipes
and all other accessories and fixing in position including cost and
conveyance of all materials, sales & other taxes on materials to
site, operational & incidental charges including all labour charges
for fixing at site etc., and overheads & contractors profit complete
for finished item of work. (APSS No. 1328)

Supply and fixing powder coated aluminium fully glazed swing Supply and fixing powder
door as per the approved drawing with fixed fan light of 500mm coated aluminium fully glazed
height at top door using aluminium sections of 101.60 mmm x swing door
44.45mm , 3.18 mm thick for frame and door shutter made of
styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm
thick and bottom rail of 114.30mm x 44.45 mm , 3.18mm
thick,powder coating of alluminium sections 25mm microns thick,
5 mm thick plain float glass fitted with suitable aluminium glazing
clips and rubber beading in fan light portion, double shutters fitted
with 5mm thick frosted / ground glass in the top half and 12mm
thick prelaminated particle board ( One side choice colour and
other side balancing white lamnation ) in the bottom half fitted
with suitable aluminium glazing clips and rubber beading,shutters
mounted on double action hydraulic floor spring of approved
brand manufacture IS : 6315 marked , Hardwyn make M-3000 for
doors including cost of cutting floors as required , embedding in
floors and SS cover plates with brass pivot and sigle piece MS
Sheet outer box with slide plate etc.complete( Weight Capacity up
to 130 Kgs ) as approved by Engineer-in-Charge including
supply and fixing ISI marked powder coated aluminium fixtures
of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4
Abstract Estimate Civil Page-143

Sl. No. Description

Supply and fixing of two shutter main door cum fixed window as Supply and fixing of two shutter
per approved drawing with best teak wood frame of section main door cum fixed window
150mm x 100 mm with fixed fan light of 500mm at top and fixed
panels of 600mm width at sides fixed with 12mm thick Tinted -
Bronze/Green glass using 12mm x 12mm teak wood beading and
fixing ornamental grill made of 25mm x 5mm MS flats as per the
approved drawing in fan light portion and fixed panels and 1st
class teak wood top and middle rails & styles of section 120mm x
35mm, bottom rail of size 150mm x 35mm and 12mm thick plain
float glass for shutter with ornamental etching including cost and
conveyance to site of teak wood frame, shutters, glass including
supply and fixing 6 nos MS Zhold fasts of size 300 mm x 40 mm x
5mm including cost of ISI marked brass fixtures of 8 Nos butt
hinges(IS:205) 250mm long , 1 No. aldrop (IS:2681) 450mm long,
3 Nos tower bolts- 10mm (IS:204) of 200 mm long , 2 Nos 450
mm long fancy handles, 2 Nos door stoppers including fixing the
fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the
shutters to the frame etc., including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of
not less than 40 mm) (3000mmX2600mm)
Supply and fixing of doors as per approved drawings with medium Supply and fixing of doors as
teak wood frame of section 100mm x 65 mm with split type fan per approved drawings with
light of 500mm at the top fixed with 4mm thick pin headed glass medium teak wood frame
using 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS
Square bars and ISI marked flush door shutter of 30mm thick
double shutters with bond wood solid block board type core
having cross bands and face veneers, hot pressed bonded with
water proof phenol formaldehyde synthetic resin factory made
conforming to IS 2202-1991 (Part-I) both sides commercial ply
with internal lipping on all sides, including cost and conveyance to
site of teak wood frame, flush shutter including supply and fixing
6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including
cost of ISI marked MS powder coated fixtures of 6 Nos. butt
hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long,
2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos.
150mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos.
rubber bushes including fixing the fixtures to door with required
number of screws, bolt and nuts including labour charges for fixing
the frame in position, fixing the shutter to the frame etc, including
overheads & contractors profit complete for finished item of work
as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm)
Supply and fixing doors as per drawings with medium teak wood Supply and fixing doors as per
frame of section 100mm x 65 mm and ISI marked flush door drawings with medium teak
shutters of 30 mm thick single shutter with bond wood solid block wood frame
board type Core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and
conveyance to site of teak wood frame, flush shutter including
supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm
x 5mm including cost of ISI marked MS powder coated fixtures of
3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681)
300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at
top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper
and 1 No. rubber bush including fixing the fixtures to door with
required number of screws, bolt and nuts including labour charges
for fixing the frame in position, fixing the shutter to the frame etc.,
including overheads & contractors profit complete for finished item
of work as per APSS 1001 & 1002 (The vertical frame of door
shall be embedded in flooring for a depth of not less than 10 mm)
(1000mm x 2100mm)
Abstract Estimate Civil Page-144

Sl. No. Description

Supply and fixing doors as per drawings with medium teak wood Supply and fixing doors as per
frame of section 100mm x 65mm and ISI marked flush door drawings with medium teak
shutter of 30mm thick single shutter with bond wood solid block wood frame
board type Core having cross bands and face veneers, hot
pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and
conveyance to site of medium teak wood door frame, flush
shutter, including suply and fixing 6 Nos. MS Z hold fasts of size
300mm x 40mm x 5mm including ISI marked MS powder coated
fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop
(IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x
10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber
bush including supplying and fixing 1.20mm thick PVC sheet to full
height of the shutter inside including labour charges for fixing the
frame in position, fixing the shutter to the frame etc., including
overheads & contractors profit complete for finished item of work
as per APSS 1001 & 1002. (The vertical frame of door shall be
embedded in flooring for deth of not less than 10mm) ( 750mm x
2100mm )

Providing & Fixing of Openable Windows with Fly-mesh made Providing & Fixing of
of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick Openable Windows with Fly-
galvanized as per IS 277 with zinc of 150 GSM) primer coated mesh made of pre-painted
with epoxy primer of 5-7 microns thick, finish painted with a steel
polyester paint of 12-16 microns thick and back coated with
5-7 microns thick alkyd backer and the section for outer
frame of 72 x 55mm, centre mullion of 72 x 50mm, section for
fixed glass beading section of 12 x 12 mm and section for
shutters of 48 x 25 mm and outer frame & mullion sections
with rebate for glazed shutters, fly mesh and a 20 mm
provision for guard bars/grills and fly mesh shutter section of
20 x 40 mm and the sections cut to length metre joined with
corner bracket, centre mullions fixed with mullion cap, stay,
handles, latch 2 Nos of heavy duty stainless steel pivot
hinges per shutter and panelled with 5mm thick plain float
glass and S.S. Mesh for fly mesh shutter (304 grade), fitted
using rubber gaskets including fixing the windows in the
concrete/masonry wall by means of self expanding screws,
including 10mm Square guard bars with 6” (152.4mm) pitch
including overheads and contractor profit etc., complete for
finished item of work
WINDOWS
Centre fixed both side openable shutter window : 1800mm
x1800mm
Abstract Estimate Civil Page-145

Sl. No. Description

Providing & Fixing of Openable Windows with Fly-mesh made Providing & Fixing of
of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick Openable Windows with Fly-
galvanized as per IS 277 with zinc of 150 GSM) primer coated mesh made of pre-painted
with epoxy primer of 5-7 microns thick, finish painted with a steel
polyester paint of 12-16 microns thick and back coated with
5-7 microns thick alkyd backer and the section for outer
frame of 72 x 55mm, centre mullion of 72 x 50mm, section for
fixed glass beading section of 12 x 12 mm and section for
shutters of 48 x 25 mm and outer frame & mullion sections
with rebate for glazed shutters, fly mesh and a 20 mm
provision for guard bars/grills and fly mesh shutter section of
20 x 40 mm and the sections cut to length metre joined with
corner bracket, centre mullions fixed with mullion cap, stay,
handles, latch 2 Nos of heavy duty stainless steel pivot
hinges per shutter and panelled with 5mm thick plain float
glass and S.S. Mesh for fly mesh shutter (304 grade), fitted
using rubber gaskets including fixing the windows in the
concrete/masonry wall by means of self expanding screws,
including 10mm Square guard bars with 6” (152.4mm) pitch
including overheads and contractor profit etc., complete for
finished item of work
WINDOWS
Centre fixed both side openable shutter window : 1500mm
x1800mm

Supply and fixing of pre-painted steel windows & top hung Supply and fixing of pre-
and fixed louvered ventilators made of pre - painted steel painted steel windows & top
(base steel as per IS 513 of -0.58 mm thick 'D" quality, hung and fixed louvered
galvanized as per IS 277 with zinc of 120 GSM) primer coated ventilators made of pre -
with epoxy primer of 5-7 microns thick, finish painted with a painted steel
polyester paint of 12-16 microns thick and back coated with
5-7 microns thick alkyd backer, section for outer frame of 46 x
52 mm section and for shutter of 46 x 46 mm section for
mullion 46 x 70 mm, and section for beading should be 18 x
25 mm and section for louvered ventilation of 33 x 56 mm Box
section and the windows panelled with 5 mm thick plain float
glass & 4 mm pinhead glass for ventilators with Ethyl
propylene Diamine monomer Gasket (EPDM) and the sections
cut to length mitre joined with corner brocket centre mullions
fixed using mullion cap and with handle made of high grade
aluminium powder coated and nylon receiver, corner
brackets made of CRCA with Zinc Phosphate, Mullion caps
made of glass filled nylon, frames fixed to the concrete
/masonry wall by means of self expanding screws including
10 mm square guard bars with 6" pitch including overheads &
contractors profit etc., complete for finished item of work.
VENTILATORS
Fixed louvered of any size

### Providing and fixing RAJSHRI or equivalent false ceiling Providing and fixing
consisting of 600mmX600mm, Solid PVC insulation panels RAJSHRI or equivalent false
having wall thickness of 1mm thick plain PVC rigid foam sheet and ceiling consisting of
EPS as defined in of desired thickness depending on nsulation 600mmX600mm
required shall be insert in a frame work made using anodized
aluminium Tee section of sizes 1”X1” (25X25mm, 19 auge or 1mm
thick) in square pattern of grid sizes of 2’X2’ (600X600mm). The
aluminium framework is supported from the ceiling with the help of
G.I. hook and G.I. wire/6mm.M.S. rods of required sizes to
maintain proper level etc. the aluminium framework is supported
on side wall with the use of aluminium 1”X1” (25X25mm) angles,
complete as per direction inclusive of conveyance of all materials
accessories, labour charges, and erection at site including
overheads & contractors profit etc., complete finished item of
work.
Abstract Estimate Civil Page-146

Sl. No. Description


#REF! White washing two coats with paint grade white lime to White washing two coats
ceiling to give an even shade after thouroughly brushing the with paint grade white lime to
surface to remove all dirt and remains of loose powdered ceiling
materials including cost of all materials , labour charges and
incidental such as scaffolding , lift charges etc., and overheads &
contractors profit complete for finished item of work but excluding
conveyance of materials in all floors.

### Supply & application of one coat deco orient base & two Supply & application of one
coats of acrylic emulsion paint having VOC (Volatile Organic coat deco orient base & two
Compound) content less than 50 grams/litre for internal walls coats of acrylic emulsion paint
including cost and conveyance of all materials to site, sales &
other taxes, incidental, operational and all labour charges etc.,and
overheads & contractors profit complete for finished item of work
in all floors.

### Supply & application of one coat of deco orient base & two Supply & application of one
coats of acrylic exterior emulsion paint having VOC (Volatile coat of deco orient base & two
Organic Compound) content less than 50 grams/litre for exterior coats of acrylic exterior
walls including cost and conveyance of all materials to site, sales emulsion paint having VOC
& other taxes, incidental, operational and all labour charges
etc.,and overheads & contractors profit complete for finished item
of work in all floors.
#REF! Painting to new wood work and flush shutters with lappam Painting to new wood work
finish , over a primary coat and painting two coats of and flush shutters with
synthetic enamel paint Grade-II VOC (Volatile Organic lappam finish
Compound) content less than 50 grams/litre of approved shade
including cost and conveyance of all materials to site cost of
primer coat and all labour charges etc. complete including
applying sand paper on lappam coats for neat finish including
sales & other taxes on cost of all materials etc.and overheads &
contractors profit complete (APSS No.1200, 1207 & 1211) in all
floors.

### Supplying & fixing collapsible steel shutters with vertical, Supplying & fixing
double channel of 20 x10x2 mm of 100 mm centre ,Bracers with collapsible steel shutters
flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom with vertical, double
and side vertical frames of the collapsible gate with
65x65mmx8mm MS Angle and middle guide rail at site height with
65mmx8mm MS flat for the pulleys to guide and fixed with
necessary hold fasts, bolts, nuts, rivets, locking arrangements,
stoppers, handles, all accessories all fixtures and painted with one
coat of approved steel primer etc., overheads & contractors profit
complete for finished item of work as per special spn 1105

### Supplying and fixing 50mm dia nominal bore Medium Grade Supplying and fixing 50mm
properties & weight as per IS 1239 ISI mark MS Tube for fixing of dia nominal bore Medium
GI Sheet including cost and conveyance of all materials to work Grade
site and all operational, incidental, labour charges , overheads &
contractors profit for finished item of work.etc., complete for
finished item of work in all floors for stair case head room roof.

### Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I Roofing with corrugated G.I
‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled sheets 0.80mm thick fixed with
with white lead & including a coat of approved steel primer and G.I ‘J’ bolts
two coats of approved paint on over lapping of sheets complete
(up to a pitch of 600) and seigniorage charges, etc., complete,
excluding the cost of purlins, rafters, trusses including cost and
conveyance of all materials , labour charges , overheads and
contractors profit etc., complete for finished item of work in all
floors.
Abstract Estimate Civil Page-147

strict Live Stock Development Association at Visakhapatnam in Visakhapatnam District

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Earth work excavation for APSS 308
foundations (Mechanical
Means) for buildings in
ordinary soils

ONE ONE
1 436.00 CUM ONE CUM 87.00 37932
Filling with carted gravel in APSS NO.309&310
trenches,sides of
foundations and basement

ONE ONE
1 300.00 CUM ONE CUM 292.00 87600
Filling with useful available APSS NO.309&310
excavated earth (excluding
rock)

ONE ONE
1 350.00 CUM ONE CUM 23.00 8050
Plain Cement Concrete APSS No. 402
(1:4:8)

ONE ONE
1 24.00 CUM ONE CUM 3760.00 90240
Plain Cement Concrete APSS No. 402
(1:5:10)

ONE ONE
1 52.00 CUM ONE CUM 3610.00 187720
Random Rubble stone APSS No. 601 & 615
masonry in CM (1:8)

ONE ONE
1 145.00 CUM ONE CUM 3047.00 441815
Abstract Estimate Civil Page-148
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 59.00 CUM ONE CUM 8191.00 483269
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 6.00 CUM ONE CUM 8550.00 51300
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 27.00 CUM ONE CUM 10289.00 277803
Abstract Estimate Civil Page-149
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
'Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 22.00 CUM ONE CUM 9890.00 217580
'Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 14.00 CUM ONE CUM 10345.00 144830
Abstract Estimate Civil Page-150
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
'Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 2.00 CUM ONE CUM 9894.00 19788
'Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 2.00 CUM ONE CUM 10294.00 20588
Abstract Estimate Civil Page-151
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 28.00 CUM ONE CUM 8572.00 240016
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 28.00 CUM ONE CUM 8876.00 248528
Abstract Estimate Civil Page-152
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 400.00 SQM ONE SQM 1037.00 414800
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 380.00 SQM ONE SQM 1073.00 407740
Abstract Estimate Civil Page-153
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 20.47 SQM ONE SQM 1469.00 30070
Supply and placing of the APSS No. 402
Design Mix Concrete M 30
grade

ONE ONE
1 20.47 SQM ONE SQM 1516.00 31033
Abstract Estimate Civil Page-154
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and placing of the APSS No. 402, 403 & 903
Design Mix Concrete M 30
grade

ONE ONE
1 28.00 RM ONE RM 423.00 11844
Supply and placing of the APSS No. 402, 403 & 903
Design Mix Concrete M 30
grade

ONE ONE
1 33.00 RM ONE RM 441.00 14553
Masonry work in CM(1:6) APSS No. 501 & 504
prop (Cement : Screened
sand)

ONE ONE
1 75.00 CUM ONE CUM 4461.00 334575
Abstract Estimate Civil Page-155
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Masonry work in CM(1:6) APSS No. 501 & 504
prop (Cement : Screened
sand)

ONE ONE
1 65.00 CUM ONE CUM 4749.00 308685
Masonry work in CM(1:6) APSS No. 501 & 504
prop (Cement : Screened
sand)

ONE ONE
1 6.00 CUM ONE CUM 5038.00 30228
Reinforced Masonry for APSS No. of 509
partition walls (100 mm thick)
in CM (1:4)

ONE ONE
1 280.00 SQM ONE SQM 614.00 171920
Abstract Estimate Civil Page-156
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Reinforced Masonry for APSS No. of 509
partition walls (100 mm thick)
in CM (1:4)

ONE ONE
1 288.00 SQM ONE SQM 669.00 192672
Reinforced Masonry for APSS No. of 509
partition walls (100 mm thick)
in CM (1:4)

ONE ONE
1 75.00 SQM ONE SQM 724.00 54300
Plain Cement Concrete APSS No. 402
(1:3:6) nominal mix using
20mm size

ONE ONE
1 4.00 CUM ONE CUM 5191.00 20764
Abstract Estimate Civil Page-157
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Plain Cement Concrete APSS No. 402
(1:3:6) nominal mix using
20mm size

ONE ONE
1 3.00 CUM ONE CUM 5325.00 15975
Plain Cement Concrete M 20 APSS No. 402 & 403
design mix using WEIGH
BATCHER / MIXER

ONE ONE
1 1.00 CUM ONE CUM 6024.00 6024
Plain Cement Concrete M 20 APSS No. 402 & 403
design mix using WEIGH
BATCHER / MIXER

ONE ONE
1 1.00 CUM ONE CUM 6158.00 6158
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm

ONE ONE
1 8.00 CUM ONE CUM 6735.00 53880
Abstract Estimate Civil Page-158
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm

ONE ONE
1 2.00 CUM ONE CUM 6984.00 13968
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm size

ONE ONE
1 18.00 SQM ONE SQM 417.00 7506
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm size

ONE ONE
1 18.00 SQM ONE SQM 431.00 7758
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm size

ONE ONE
1 24.00 SQM ONE SQM 291.00 6984
Abstract Estimate Civil Page-159
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Reinforced Cement Concrete APSS No. 402 & 403
M 20 design mix using
12mm size

ONE ONE
1 16.00 SQM ONE SQM 303.00 4848
Providing Thermo APSS No.126
Mechanically Treated (TMT)
(Fe 500 grade

ONE ONE
1 23.00 MT ONE MT 66282.00 1524486
Providing Thermo APSS No.126
Mechanically Treated (TMT)
(Fe 500 grade

ONE ONE
1 11.00 MT ONE MT 67288.00 740168
Abstract Estimate Civil Page-160
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Providing Mild steel (MS) APSS No.126
steel bars (Fe 250 grade as
per IS 432)

ONE ONE
1 1.00 MT ONE MT 59699.00 59699
Providing Plinth protection NA
1.20m width along with drain

ONE ONE
1 158.00 SQM ONE SQM 1208.00 190864
Ornamental ceiling SS 901,903 & 904
plastering 12mm thick single
coat in CM (1:5)

ONE ONE
1 435.00 SQM ONE SQM 132.00 57420
Ornamental ceiling SS 901,903 & 904
plastering 12mm thick single
coat in CM (1:5)

ONE ONE
1 415.00 SQM ONE SQM 147.00 61005
Abstract Estimate Civil Page-161
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Plastering 12mm thick in two SS 901,903 & 904
coats using screened sand
with base coat of 8mm thick
in CM (1:6)

ONE ONE
1 1520.00 SQM ONE SQM 328.00 498560
Plastering 12mm thick in two SS 901,903 & 904
coats using screened sand
with base coat of 8mm thick
in CM (1:6)

ONE ONE
1 1210.00 SQM ONE SQM 360.00 435600
Plastering 12mm thick in two SS 901,903 & 904
coats using screened sand
with base coat of 8mm thick
in CM (1:6)

ONE ONE
1 170.00 SQM ONE SQM 393.00 66810
Plastering 20mm thick single SS 901,903 & 904
coat in CM(1:5) using
screened sand

ONE ONE
1 415.00 SQM ONE SQM 169.00 70135
Abstract Estimate Civil Page-162
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Providing impervious coat to APSS No. 901 & 903
exposed RCC roof slab
surfaces

ONE ONE
1 375.00 SQM ONE SQM 388.00 145500
Providing impervious coat to APSS No. 901 & 903
exposed RCC roof slab
surfaces of sump

ONE ONE
1 80.00 SQM ONE SQM 133.00 10640
Flooring with polished APSS No.703 & 701
shahabad / Tandur stone
slabs of 15mm to 18mm thick

ONE ONE
1 35.00 SQM ONE SQM 522.00 18270
Abstract Estimate Civil Page-163
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Flooring with polished APSS No.703 & 701
shahabad / Tandur stone
slabs of 15mm to 18mm thick

ONE ONE
1 26.00 SQM ONE SQM 549.00 14274
Flooring with ceramic tiles APSS No.701 & 707
7.30mm thick , 1st quality
and of size

ONE ONE
1 47.00 SQM ONE SQM 897.00 42159
Flooring with ceramic tiles APSS No.701 & 707
7.30mm thick , 1st quality
and of size

ONE ONE
1 49.00 SQM ONE SQM 929.00 45521
Flooring with vitrified APSS No.701 & 707
polished floor tiles of 1st
quality

ONE ONE
1 305.00 SQM ONE SQM 1101.00 335805
Abstract Estimate Civil Page-164
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Flooring with vitrified APSS No.701 & 707
polished floor tiles of 1st
quality

ONE ONE
1 310.00 SQM ONE SQM 1133.00 351230
Providing polished shahabad APSS No.703 & 701
/ Tandur stone slabs of
15mm to 18mm thick

ONE ONE
1 24.00 SQM ONE SQM 586.00 14064
Providing polished shahabad APSS No.703 & 701
/ Tandur stone slabs of
15mm to 18mm thick

ONE ONE
1 9.00 SQM ONE SQM 613.00 5517
Abstract Estimate Civil Page-165
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Providing polished shahabad APSS No.703 & 701
/ Tandur stone slabs of
15mm to 18mm thick

ONE ONE
1 26.00 SQM ONE SQM 558.00 14508
Providing polished shahabad APSS No.703 & 701
/ Tandur stone slabs of
15mm to 18mm thick

ONE ONE
1 10.00 SQM ONE SQM 589.00 5890
Providing skirting to internal APSS No.701 &707
walls to 10 cm height with
ceramic tiles

ONE ONE
1 74.00 RM ONE RM 68.00 5032
Providing skirting to internal APSS No.701 &707
walls to 10 cm height with
ceramic tiles

ONE ONE
1 84.00 RM ONE RM 68.00 5712
Abstract Estimate Civil Page-166
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Providing skirting to internal APSS No.701 &707
walls to 10 cm height with
vitrified tiles

ONE ONE
1 284.00 RM ONE RM 86.00 24424
Providing skirting to internal APSS No.701 &707
walls to 10 cm height with
vitrified tiles

ONE ONE
1 234.00 RM ONE RM 86.00 20124
Providing dadooing to walls NA
with glazed plain coloured
wall tiles

ONE ONE
1 410.00 SQM ONE SQM 617.00 252970
Providing dadooing to walls NA
with glazed plain coloured
wall tiles

ONE ONE
1 377.00 SQM ONE SQM 625.00 235625
Abstract Estimate Civil Page-167
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
'Reinforced cement concrete APSS NO. 402 & 403
(1:5:10) proportion (Cement:
fine aggregates

ONE ONE
1 10.00 CUM ONE CUM 7960.00 79600
Supplying and fixing of NA
stainless steel ( grade 202 )
hand railing

ONE ONE
1 30.00 SQM ONE SQM 2967.00 89010
'Providing 110 mm Dia ISI APSS No. 1328
marked PVC down water take
pipes

ONE ONE
1 42.00 RM ONE RM 243.00 10206
Supply and fixing powder NA
coated aluminium fully glazed
swing door

ONE ONE
1 11.70 SQM ONE SQM 7871.00 92091
Abstract Estimate Civil Page-168
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and fixing of two shutter APSS 1001 & 1002
main door cum fixed window

ONE ONE
1 7.80 SQM ONE SQM 10944.00 85363
Supply and fixing of doors as APSS 1001 & 1002
per approved drawings with
medium teak wood frame

ONE ONE
1 18.72 SQM ONE SQM 2985.00 55879
Supply and fixing doors as per APSS 1001 & 1002
drawings with medium teak
wood frame

ONE ONE
1 16.80 SQM ONE SQM 3004.00 50467
Abstract Estimate Civil Page-169
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Supply and fixing doors as per APSS 1001 & 1002
drawings with medium teak
wood frame

ONE ONE
1 22.05 SQM ONE SQM 3564.00 78586
Providing & Fixing of NA
Openable Windows with Fly-
mesh made of pre-painted
steel

ONE ONE
1 30.60 SQM ONE SQM 6185.00 189261
Abstract Estimate Civil Page-170
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
Providing & Fixing of NA
Openable Windows with Fly-
mesh made of pre-painted
steel

ONE ONE
1 28.56 SQM ONE SQM 6833.00 195150
Supply and fixing of pre- NA
painted steel windows & top
hung and fixed louvered
ventilators made of pre -
painted steel

ONE ONE
1 2.40 SQM ONE SQM 4668.00 11203
Providing and fixing NA
RAJSHRI or equivalent false
ceiling consisting of
600mmX600mm

ONE ONE
1 60.00 SQM ONE SQM 1436.00 86160
Abstract Estimate Civil Page-171
Unit Rate Amount
Quantity
(in words) (in Rs.) (Rs.)
White washing two coats NA
with paint grade white lime to
ceiling

ONE ONE
1 862.00 SQM ONE SQM 31.00 26722
Supply & application of one NA
coat deco orient base & two
coats of acrylic emulsion paint

ONE ONE
1 1926.00 SQM ONE SQM 125.00 240750
Supply & application of one NA
coat of deco orient base & two
coats of acrylic exterior
emulsion paint having VOC

ONE ONE
1 960.00 SQM ONE SQM 165.00 158400
Painting to new wood work APSS No.1200, 1207 & 1211
and flush shutters with
lappam finish

ONE ONE
1 156.00 SQM ONE SQM 155.00 24180
Supplying & fixing special spn 1105
collapsible steel shutters
with vertical, double

ONE ONE
1 11.00 SQM ONE SQM 2493.18 27425
Supplying and fixing 50mm NA
dia nominal bore Medium
Grade

ONE ONE
1 25.00 RM ONE RM 499.00 12475
Roofing with corrugated G.I NA
sheets 0.80mm thick fixed with
G.I ‘J’ bolts

ONE ONE
1 14.00 SQM ONE SQM 847.00 11858
Sub Total (CIVIL) Rs. 11480142
Abstract Estimate WS & SA Page-172

PART-II :- WATER SUPPLY AND SANITARY ITEMS


Sl.No Description

a) Supplying and laying, filling, jointing and testing SWG Supplying and laying, filling,
SP-1 pipe conforming to ISI 651 & 4127 with air tight jointing and testing SWG SP-
Cement joints in CM (1.5:1) prop. including excavation of 1 pipe
trenches and socket pits in any soil (except rock
requiring blasting) and refilling with watering and
tamping to the required slope including cost and
conveyance of all materials to site and all labour
charges , overheads & contractor profit etc., complete
for finished item of work (APSS NO 1301 & 1318)
101.60mm dia upto 914.40mm (3') depth

b) Supplying and laying, filling, jointing and testing SWG Supplying and laying, filling,
SP-1 pipe conforming to ISI 651 & 4127 with air tight jointing and testing SWG SP-
Cement joints in CM (1.5:1) prop. including excavation of 1 pipe
trenches and socket pits in any soil (except rock
requiring blasting) and refilling with watering and
tamping to the required slope including cost and
conveyance of all materials to site and all labour
charges , overheads & contractor profit etc., complete
for finished item of work (APSS NO 1301 & 1318)
152.40mm dia upto 914.40mm (3') depth

### Constructing 904.0 mm (3’0”) dia brick masonry Constructing 904.0 mm (3’0”)
inspection chamber as per IS - 4111: Part-1:1986 with dia brick masonry inspection
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 chamber as per IS - 4111:
mm thick from approved source having a minimum crushing Part-1:1986 with cement
strength of 5 N/sq.mm including plastering with cement mortar (1:6) prop using 2nd
mortar 1:3 prop; ½” thick both inside and outside fitted with Class Clay Bricks of 225 mm
20” dia RCC manhole covers and frames including thick from appro
excavating pits up to a depth of 904 mm (3'-0") in all sorts
of soils (exculding rock) and laying cement conrete (1:4:8)
150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing , overheads &
contractors profit etc., complete for finished item of work as
per Standard specification.
Abstract Estimate WS & SA Page-173

Sl.No Description

### Constructing 904.0 mm (3’0”) dia brick masonry Constructing 904.0 mm (3’0”)
inspection chamber as per IS - 4111: Part-1:1986 with dia brick masonry inspection
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 chamber as per IS - 4111:
mm thick from approved source having a minimum crushing Part-1:1986 with cement
strength of 5 N/sq.mm including plastering with cement mortar (1:6) prop using 2nd
mortar 1:3 prop; ½” thick both inside and outside fitted with Class Clay Bricks of 225 mm
20” dia RCC manhole covers and frames including thick from appro
excavating pits up to a depth of 1524 mm (5'-0") in all
sorts of soils (exculding rock) and laying cement conrete
(1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C.
1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing , overheads &
contractors profit etc., complete for finished item of work as
per Standard specification.

### Supplying and fixing of SWG Gully traps 150mm x Supplying and fixing of SWG
100mm of ISI make confirming to IS 651 & 4127 with C.I Gully traps 150mm x 100mm
grating & constructing cement brick masonry in CM (1:6) of ISI make confirming to IS
prop., intermediate chamber and fitted with 304.8 mm X 651 & 4127 with C.I grating &
288.6 mm (12"x9") C.I Frame with hinged cover of standard constructing cement brick
make as approved including cost and conveyance of all masonry in CM (1:6) prop.,
materials to site, labour charges, overheads & contractors intermediate c
profit etc., complete for finished item of work.

### Supplying and fixing of 3" (76.2mm) multi floor trap with Supplying and fixing of 3"
jali - UPVC/SWR pipe fittings (76.2mm) multi floor trap with
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as jali - UPVC/SWR pipe fittings
per site requirements with standard practice for all floors (Prince/Sudhakar/Kisan/Supr
including cost and conveyance of all materials to site, labour eme or any other ISI Brand)
charges , overheads & contractors profit etc., complete for as per site requirements with
finished item of work. standar

### Supplying and fixing of 4" (101.6mm) multi floor trap Supplying and fixing of 4"
with jali - UPVC/SWR pipe fittings (101.6mm) multi floor trap
(Prince/Sudhakar/Kisan/Supreme or any other ISI Brand) as with jali - UPVC/SWR pipe
per site requirements with standard practice for all floors fittings
including cost and conveyance of all materials to site, labour (Prince/Sudhakar/Kisan/Supr
charges , overheads & contractors profit etc., complete for eme or any other ISI Brand)
finished item of work. as per site requirements with
standa
Abstract Estimate WS & SA Page-174

Sl.No Description

### Supplying and fixing 580mm x 440mm long Orissa pan Supplying and fixing 580mm
white glazed Water Closet 1st quality ISI marked x 440mm long Orissa pan
confirming to IS:2556-Part-3-1981 with "P" or "S" trap white glazed Water Closet 1st
Hindware / Parryware / Neycer with brick - ISI mark and quality ISI marked confirming
providing masonry seat, CC squatting plate and 10 litres to IS:2556-Part-3-1981 with
capacity single flush PVC low level cistern Parryware or "P" or "S" trap Hindware /
equivalent with internal components fixed on 2 Nos. of teak Parryware / Ne
wood blocks of size 76.20mm x 101.60mm using required
size of nails, screws as approved by Engineer-in-charge,
angle stop cock 12.70mm dia. first quality Indian make
heavy duty Seiko/Senior/Nice or equivalent, 12.70mm PVC
connection with brass union nuts CP coated , 31.75mm
brass plumber union, P trap or S trap of Indian W.C. shall be
encased on CC (1:2:4) 150mm alround well above the joint
to stop leakage at the joint etc., complete including cost and
conveyance of all materials to site, cost of CC bed, labour
charges and seigniorage charges, overheads & contractors
profit etc., complete for finished item of work.

### Supplying and fixing European Water Closet of 1st quality Supplying and fixing
conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or European Water Closet of 1st
Parryware make white glazed with 'S' trap,supplying and quality conforming to IS:2556-
fixing best Indian make plastic seat and lid for European Part-2-1973 of Hindustan /
water closets with rubber or plastic Buffers as per IS 2548- Neycer or Parryware make
1996 and 10 litres capacity single flush PVC low level white glazed with 'S'
cistern Parryware or equivalent with internal components trap,supplying and fixing
and fixed using required size of nails and screws, angle stop
cock 12.70mm dia. first quality Indian make heavy duty
Seiko/Senior/Nice or equivalent, 12mm PVC connections
with brass union nuts CP coated including cost and
conveyance of all materials to site, overheads & contractors
profit etc., complete for finished item of work for all floors.

### Supplying and fixing Indian make Flat Back Wash Hand Supplying and fixing Indian
Basin (HSW/Parryware/ Neycer) 1st quality conforming to make Flat Back Wash Hand
IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm Basin (HSW/Parryware/
nominal size C.P. Fitting with parallel pipe thread conforming Neycer) 1st quality
to IS:2963-1979 and fitted with 15 mm nominal bore conforming to IS:2556-Part-
Chromium Plated Pillar Tap of 1st quality Indian make 400 4:1972 of size 550mm x
grams Seiko/Senior/Nice or equivalent complete with 400mm with 32 mm nominal
standard CI brackets including wooden blocks ,1 size C.P
No.12.70mm PVC connection with brass union nuts CP
coated , angle stop cock 12.70mm dia. first quality Indian
make heavy duty Seiko/Senior/Nice or equivalent, 1
No.12.70mm NP bib tap 400 gms Seiko or equivalent ,
31.75mm dia. PVC flexible waste pipe 914.4mm length of
1st quality including cost and conveyance of all materials to
site, labour charges , overheads & contractors profit for
finished item of work

### Supplying and fixing NP soap dish heavy type of Supplying and fixing NP soap
approved make ISI quality with NP screws etc., complete dish heavy type of approved
including cost and conveyance of all materials, labour make ISI quality with NP
charges for fixing , overheads & contractors profit for finished screws etc., complete
item of work in all floors including cost and
conveyance of all materials,
labour charges for fixing ,
Abstract Estimate WS & SA Page-175

Sl.No Description

### Supplying and fixing TV shape mirror with plastic frame Supplying and fixing TV
of size 609.6mm x 457.2mm , plywood back with NP shape mirror with plastic
screws 1st quality including cost and conveyance of all frame of size 609.6mm x
materials, labour charges , overheads & contractors profit for 457.2mm , plywood back with
finished item of work in all floors. NP screws 1st quality
including cost and
conveyance of all materials,
labour c
### Supplying and fixing of 25.4mm dia , 609.6mm long Supplying and fixing of
aluminium anodized towel rods with brackets and 25.4mm dia , 609.6mm long
aluminium screws including cost and conveyance of all aluminium anodized towel
materials, labour charges , overheads & contractors profit for rods with brackets and
finished item of work. aluminium screws including
cost and conveyance of all
materials, labour charges ,

### Supplying and fixing NP bib taps of size 12.70mm dia of Supplying and fixing NP bib
Indian make heavy duty as approved by the Engineer-In- taps of size 12.70mm dia of
Charge including cost and conveyance of all materials, Indian make heavy duty as
labour charges , overheads & contractors profit complete for approved by the Engineer-In-
finished item of work in all floors. Charge including cost and
conveyance of all materials,
labour charges

a) Supplying and fixing of SWR PVC pipes Supplying and fixing of SWR
(Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 PVC pipes
Kg/Sq.cm. and fixing all special such as plain bends, off (Prince/Sudhakar/Kisan/Supr
sets, door bends, single junctions, double junctions as eme or any ISI brand) 4
per site requirement, fixing with PVC clamps if Kg/Sq.cm. and fixing all
necessary with required number of Bombay nails special such as plain bends,
including cost and conveyance of all materials to site, off sets, door bends, single
labour charges, overheads & contractors profit complete junction
for finished item of work at all floor levels. (APSS No.
1302 1319 & 1326)
75mm dia

b) Supplying and fixing of SWR PVC pipes Supplying and fixing of SWR
(Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 PVC pipes
Kg/Sq.cm. and fixing all special such as plain bends, off (Prince/Sudhakar/Kisan/Supr
sets, door bends, single junctions, double junctions as eme or any ISI brand) 4
per site requirement, fixing with PVC clamps if Kg/Sq.cm. and fixing all
necessary with required number of Bombay nails special such as plain bends,
including cost and conveyance of all materials to site, off sets, door bends, single
labour charges, overheads & contractors profit complete junction
for finished item of work at all floor levels. (APSS No.
1302 1319 & 1326)
90mm dia

c) Supplying and fixing of SWR PVC pipes Supplying and fixing of SWR
(Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 PVC pipes
Kg/Sq.cm. and fixing all special such as plain bends, off (Prince/Sudhakar/Kisan/Supr
sets, door bends, single junctions, double junctions as eme or any ISI brand) 4
per site requirement, fixing with PVC clamps if Kg/Sq.cm. and fixing all
necessary with required number of Bombay nails special such as plain bends,
including cost and conveyance of all materials to site, off sets, door bends, single
labour charges, overheads & contractors profit complete junction
for finished item of work at all floor levels. (APSS No.
1302 1319 & 1326)
110mm dia
Abstract Estimate WS & SA Page-176

Sl.No Description

a) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
15mm Nominal bore

b) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
20mm Nominal bore

c) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
25mm Nominal bore

d) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
32mm Nominal bore
Abstract Estimate WS & SA Page-177

Sl.No Description

e) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
40mm Nominal bore

f) Supplying & fixing GI pipe Medium Grade properties & Supplying & fixing GI pipe
weight as per IS 1239 ISI mark in ground or on wall Medium Grade properties &
including cost of tees, elbows, bends, reducers, weight as per IS 1239 ISI mark
couplings, running joints, union flanges, unions etc. in ground or on wall
with necessary excavation in all types of soils except including cost of tees,
rock requiring blasting, refilling, chiselling masonry elbows, bends, reducers,
walls and making good the walls & floors to the original couplings, running joint
surface and fixing MS clamps on TW blocks on walls
including cost and conveyance of all materials and
labour charges , overheads & contractors profit
complete for finished item of work.
50mm Nominal bore

a) Supplying and fixing Gunmetal Gate ( GM peet ) valve as Supplying and fixing
per IS-778 Class - I , Indian make heavy type including Gunmetal Gate ( GM peet )
cost and conveyance of all materials , labour charges , valve
overheads & contractors profit complete for finished
item of work.
20mm Nominal bore

b) Supplying and fixing Gunmetal Gate ( GM peet ) valve as Supplying and fixing
per IS-778 Class - I , Indian make heavy type including Gunmetal Gate ( GM peet )
cost and conveyance of all materials , labour charges , valve
overheads & contractors profit complete for finished
item of work.
25mm Nominal bore

c) Supplying and fixing Gunmetal Gate ( GM peet ) valve as Supplying and fixing
per IS-778 Class - I , Indian make heavy type including Gunmetal Gate ( GM peet )
cost and conveyance of all materials , labour charges , valve
overheads & contractors profit complete for finished
item of work.
32mm Nominal bore

d) Supplying and fixing Gunmetal Gate ( GM peet ) valve as Supplying and fixing
per IS-778 Class - I , Indian make heavy type including Gunmetal Gate ( GM peet )
cost and conveyance of all materials , labour charges , valve
overheads & contractors profit complete for finished
item of work.
40mm Nominal bore

e) Supplying and fixing Gunmetal Gate ( GM peet ) valve as Supplying and fixing
per IS-778 Class - I , Indian make heavy type including Gunmetal Gate ( GM peet )
cost and conveyance of all materials , labour charges , valve
overheads & contractors profit complete for finished
item of work.
50mm Nominal bore
Abstract Estimate WS & SA Page-178

Sl.No Description

### Providing and placing on terrace (at all floor Providing and placing on
levels)polyetheylene water storage tank with double terrace (at all floor
layer approved brand and manufacture with cover and levels)polyetheylene water
suitable locking arrangement and making necessary holes storage tank
for inlet and outlets and over flow pipes but without fittings
and base support for tanks including cost and conveyance
of all materials and labour charges , overheads & contractors
profit complete for finished item of work.

### Supplying and fixing of stainless steel sink of size Supplying and fixing of
508.00mm x 457.2mm x 203.20mm, 1mm thick of Indian stainless steel sink
make fixed on cantilever brackets including supply and fixing
31.75mm C.P. waste coupling, 31.75 mm dia PVC flexible
waste pipe of 914.4 mm length of Ist quality ncluding
chiselling brick masonry wall and making good & restoring to
original surfaces , overheads & contractors profit complete
for finished item of work in all floors

### Supplying and fixing white glazed flat back Bowl urinals Supplying and fixing white
of size 440 mm x 265 mm x 315 mm with integral flushing glazed flat back Bowl urinals
rim fixed with screws complete Indian make
(HSW/Parry/Neycer) conforming to IS:2556-1995 as
approved by Engineer-in-charge, including supply and fixing
12.7mm PVC connection with brass plumber union nuts CP
coated, 12.70mm push cock 1st quality of approved make ,
31.75 mm dia PVC flexible waste pipe of 914.4 mm length
of Ist quality including cost and conveyance of all materials
to site, labour charges , overheads & contractors profit
complete for finished item of work for all floors.

### Supplying and fixing of 16mm to 20 mm thick polished Supplying and fixing of 16mm
marble slab partitioins of size 4' 0" x 2' 0" for urinals to 20 mm thick polished
including full rounding the edges , fixing in position, marble slab partitioins
polishing, including cost and conveyance of all materials and
labour charges , overheads & contractors profit complete for
finished item of work for all floors.

### Supplying and fixing of 101.60mm x 609.60mm white Supplying and fixing of
glazed porcelain channels 1st quality fixed in brick 101.60mm x 609.60mm white
masonry to the required slopes , white cement pointing glazed porcelain channels
including cost and conveyance of all materials and labour
charges , overheads & contractors profit complete for
finished item of work for all floors.

### Construction of brick masonry support for GI pipe of Construction of brick


size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop masonry support for GI pipe
including plastering and finishing with 12mm thick in CM
(1:5) including cost and conveyance of all materials and all
labour charges, overheads & contractors profit complete for
finished item of work for all floors.
Abstract Estimate WS & SA Page-179

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Supplying and laying, filling, APSS NO 1301 & 1318
jointing and testing SWG SP-
1 pipe

1 15.00 RM ONE RM 299.00 4485


Supplying and laying, filling, APSS NO 1301 & 1318
jointing and testing SWG SP-
1 pipe

1 30.00 RM ONE RM 464.00 13920


Constructing 904.0 mm (3’0”) NA
dia brick masonry inspection
chamber as per IS - 41

1 6 EACH EACH 5699.00 34194


Abstract Estimate WS & SA Page-180

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Constructing 904.0 mm (3’0”) NA
dia brick masonry inspection
chamber as per IS - 41

1 6 EACH EACH 8735.00 52410


Supplying and fixing of SWG NA
Gully traps 150mm x 100mm
of ISI make confirming to

1 20 EACH EACH 592.00 11840


Supplying and fixing of 3" NA
(76.2mm) multi floor trap with
jali - UPVC/SWR pipe f

1 20 EACH EACH 116.00 2320


Supplying and fixing of 4" NA
(101.6mm) multi floor trap
with jali - UPVC/SWR pipe

1 8 EACH EACH 164.00 1312


Abstract Estimate WS & SA Page-181

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Supplying and fixing 580mm NA
x 440mm long Orissa pan
white glazed Water Closet 1st

1 5 EACH EACH 4312.00 21560


Supplying and fixing NA
European Water Closet of 1st
quality conforming to IS:2556-

1 9 EACH EACH 4782.00 43038


Supplying and fixing Indian NA
make Flat Back Wash Hand
Basin (HSW/Parryware/ Neyc

1 6 EACH EACH 2429.00 14574


Supplying and fixing NP soap NA
dish heavy type of approved
make ISI quality with N

1 6 EACH EACH 264.00 1584


Abstract Estimate WS & SA Page-182

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Supplying and fixing TV NA
shape mirror with plastic
frame of size 609.6mm x
457.2m

1 6 EACH EACH 594.00 3564


Supplying and fixing of NA
25.4mm dia , 609.6mm long
aluminium anodized towel
rods

1 6 EACH EACH 193.00 1158


Supplying and fixing NP bib NA
taps of size 12.70mm dia of
Indian make heavy duty

1 15 EACH EACH 287.00 4305


Supplying and fixing of SWR APSS No. 1302 1319 & 1326
PVC pipes
(Prince/Sudhakar/Kisan/Supr
eme or any ISI

1 30 RM RM 180.00 5400
Supplying and fixing of SWR APSS No. 1302 1319 & 1326
PVC pipes
(Prince/Sudhakar/Kisan/Supr
eme or any ISI

1 30 RM RM 238.00 7140
Supplying and fixing of SWR APSS No. 1302 1319 & 1326
PVC pipes
(Prince/Sudhakar/Kisan/Supr
eme or any ISI

1 30 RM RM 268.00 8040
Abstract Estimate WS & SA Page-183

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 60.00 RM RM 214.00 12840


Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 30.00 RM RM 236.00 7080


Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 30.00 RM RM 304.00 9120


Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 15.00 RM RM 420.00 6300


Abstract Estimate WS & SA Page-184

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 15.00 RM RM 470.00 7050


Supplying & fixing GI pipe NA
Medium Grade properties &
weight as per IS 1239 ISI

1 40.00 RM RM 515.00 20600


Supplying and fixing NA
Gunmetal Gate ( GM peet )
valve

1 15 EACH EACH 559.00 8385


Supplying and fixing NA
Gunmetal Gate ( GM peet )
valve

1 6 EACH EACH 814.00 4884


Supplying and fixing NA
Gunmetal Gate ( GM peet )
valve

1 3 EACH EACH 1208.00 3624


Supplying and fixing NA
Gunmetal Gate ( GM peet )
valve

1 3 EACH EACH 1650.00 4950


Supplying and fixing NA
Gunmetal Gate ( GM peet )
valve

1 3 EACH EACH 2380.00 7140


Abstract Estimate WS & SA Page-185

Unit Rate Amount


Quantity
(in words) (in Rs.) (Rs.)
Providing and placing on NA
terrace (at all floor
levels)polyetheylene water
storage tank

1 1000 LITER ONE LITER 7.30 7296


Supplying and fixing of NA
stainless steel sink

1 2 EACH EACH 5407.00 10814


Supplying and fixing white NA
glazed flat back Bowl urinals

1 4 EACH EACH 1358.00 5432


Supplying and fixing of 16mm NA
to 20 mm thick polished
marble slab partitioins

1 6 EACH EACH 1743.00 10458


Supplying and fixing of NA
101.60mm x 609.60mm white
glazed porcelain channels

1 5 RM ONE RM 864.00 4320


Construction of brick NA
masonry support for GI pipe

1 15 EACH EACH 78.00 1170


Sub Total (WS): 362307
ESTIMAT

Name of the Work: " Construction of Office Building for District Live Stock Development Association at Visakha
Sub Work: Providing Internal Electrification., for (G + First Floor )
( SoR 2013-14)

S.
Quantity Description of Work
NO.
1 1100 RM CONDUIT PIPE Supply and fixing of 25mm outer dia
Supply and fixing of 25mm outer dia 2.20 mm thick 2.20 mm thick Heavy grade PVC pipe
Heavy grade PVC pipe (ISI MARK) concealed in Roof (ISI MARK) concealed in Roof Slabs
Slabs with all required MS deep boxes and all with all required MS deep boxes and all
accessories including and labour
accessories including and labour charges etc.,
complete.
Makes:- Sudhakar/ Modi.

2 750 RM Supply and fixing of 25mm outer dia Medium grade (1.8 Supply and fixing of 25mm outer dia
mm thick) P.V.C. pipe (ISI MARK) concealed in wall with Medium grade (1.8 mm thick) P.V.C.
all required MS junction boxes and all accessories pipe (ISI MARK) concealed in wall with
including masonary work for light, Fan and separate plug all required MS junction boxes and all
accessories including masonary
point with MS Modular switch box including all labour
charges etc., complete for EPABX, LAN, and CCTV, Bell,
light, Fan points.
Makes:- Sudhakar/ Modi.

3 52 Nos Supply and erecting MS galvanished Fan hook box with Supply and erecting MS galvanished
hook in RCC slab including all Labour charges etc., Fan hook box with hook in RCC slab
complete. including all Labour charges etc.,
complete.
4 185 PTS WIRING Wiring with 2 runs of 22/0.3mm ( 1.5
Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS Sq.mm) FRLS P.V.C. insulated flexible
P.V.C. insulated flexible copper cable (ISI MARK) in copper cable (ISI MARK) in existing
existing pipe with 6A Modular switch, Ceiling pipe with 6A Modular switch, Ceiling
rose/BH/SBH Modular switches
rose/BH/SBH Modular switches with cover plate
including all labour charges etc., complete. (for Non-
Residential Building)
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL/ Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.
S.
Quantity Description of Work
NO.
5 2 PTS Wiring with 2 runs of 22/0.3mm ( 1.5 Sq.mm) FRLS Wiring with 2 runs of 22/0.3mm ( 1.5
P.V.C. insulated flexible copper cable (ISI MARK) in Sq.mm) FRLS P.V.C. insulated flexible
existing pipe with 6A Modular switch, Ceiling copper cable (ISI MARK) in existing
rose/BH/SBH Modular switches with cover plate pipe with 6A Modular switch, Ceiling
rose/BH/SBH Modular switches
including all labour charges etc., complete (Non-
Residential Building) for Staircase points. ( 2 way
Switch ).
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

6 26 PTS Wiring with three runs of 1.5 sq.mm FRLS P.V.C. Wiring with three runs of 1.5 sq.mm
insulated flexible copper cable (phase, neutral, earth) in FRLS P.V.C. insulated flexible copper
the existing conduit pipe with 6 Amps Modular type cable (phase, neutral, earth) in the
switch, and 6 A 3/2 pin Modular type socket with cover existing conduit pipe with 6 Amps
Modular type switch, and 6 A 3/2
plate on common switch board etc., complete.
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets:- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

7 4 PTS Wiring with 2 of 22/0.3mm ( 1.5 Sq.mm) FRLS P.V.C. Wiring with 2 of 22/0.3mm ( 1.5 Sq.mm)
insulated flexible copper cable (ISI MARK) in existing FRLS P.V.C. insulated flexible copper
pipe with 6A switch and 6A, 3/2 pin socket Modular type cable (ISI MARK) in existing pipe with
with 6A switch control and MS boxes with cover plate 6A switch and 6A, 3/2 pin socket
Modular type with 6A switch
fixing on separate board including all labour charges
etc., complete.
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets :- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.
S.
Quantity Description of Work
NO.
8 12 PTS Wiring with 2 of 22/0.3mm (1.5 Sq.mm) FRLS P.V.C. Wiring with 2 of 22/0.3mm (1.5 Sq.mm)
insulated flexible copper cable (ISI MARK) in existing FRLS P.V.C. insulated flexible copper
pipe with 6A Modular switch control- 3nos and 6A, 3/2 cable (ISI MARK) in existing pipe with
pin Modular sockets - 3 nos fixing on separate board 6A Modular switch control- 3nos and
6A, 3/2 pin Modular socket
including all labour charges etc., complete. ( for LABs &
Computer Use )
Makes of wires:- L&T /Finolex/ RPG / Havells / V-
Guard / HPL / Power Flex / Polycab /Anchor/ Gold
Medal / Standard / Milion/ fortune Art / Suncab.
Makes of switches/sockets :- Cabtree Thames
Platinum / GM / Million /Anchor Roma viola /
Toyoma / L&T / fortune Art / CPL.

9 12 NOS S&D of 16A/6A, 2 in one socket with 16A switch control S&D of 16A/6A, 2 in one socket with
modular type with MS flush boxes with front cover plate 16A switch control modular type with
including all labour charges etc., complete. MS flush boxes with front cover plate
Makes of switches/sockets:- Cabtree Thames including all labour charges etc.,
complete.
Platinum / GM / Million /Anchor Roma viola /
Makes of switches/so
Toyoma / L&T / fortune Art / CPL

10 650 RM RUN of MAINS Supply and run of 1 of 22 /0.3mm (1.5


Supply and run of 1 of 22 /0.3mm (1.5 Sq.mm) FRLS Sq.mm) FRLS P.V.C. insulated flexible
P.V.C. insulated flexible copper cable in existing pipe for copper cable in existing pipe for earth
earth continuity including all labour charges etc., continuity including all labour charges
etc., complete.
complete.
Makes o
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL / L&T / Power
Flex/RPG /Anchor

11 200 RM Supply and run of 3 of 1.5 sq.mm (phase neutral and Supply and run of 3 of 1.5 sq.mm
earth) FRLS PVC insulated flexible copper cable in (phase neutral and earth) FRLS PVC
existing MS conduit pipe for sub-circuits including labour insulated flexible copper cable in
charges etc., complete as required for small switch existing MS conduit pipe for sub-
circuits including labour charges etc.,
boards.
com
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL / L&T / Power
Flex/RPG /Anchor

12 750 RM Supply and run of 3 of 2.5 sq.mm (phase neutral and Supply and run of 3 of 2.5 sq.mm
earth) FRLS PVC insulated flexible copper cable in (phase neutral and earth) FRLS PVC
existing MS conduit pipe for individual ligting circuits insulated flexible copper cable in
including labour charges etc., complete as required for existing MS conduit pipe for individual
ligting circuits including labour ch
switch boards.
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.
S.
Quantity Description of Work
NO.
13 400 RM Supply and 3 runs of 4.0 sq mm (phase neutral and Supply and 3 runs of 4.0 sq mm
earth) FRLS PVC insulated flexible copper cable in (phase neutral and earth) FRLS PVC
existing conduit pipe for run of mains including labour insulated flexible copper cable in
charges etc., complete as required including labour existing conduit pipe for run of mains
including labour charges etc., comple
charges for 16A sockets.
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

14 200 RM Supply & run of 3 of 6.0 Sqmm (84/0.3mm) (phase Supply & run of 3 of 6.0 Sqmm
neutral and earth) FRLS PVC insulated flexible copper (84/0.3mm) (phase neutral and earth)
cable in existing MS conduit pipe for run of mains FRLS PVC insulated flexible copper
including labour charges etc. complete for AC points & cable in existing MS conduit pipe for
run of mains including labour charges
SDB's etc as required.
et
Makes of wires:- Polycab/Havells/Sun Cab/Gold
Medal/ Million /fortune Art / HPL/L&T / Power
Flex/RPG /Anchor

15 100 RM Supply and run of 5 of 6 Sq mm (phases, neutral and Supply and run of 5 of 6 Sq mm
earth) FRLS PVC insulated flexible copper cable in (phases, neutral and earth) FRLS PVC
existing MS conduit pipe for circuits including labour insulated flexible copper cable in
charges etc. complete as required for run of mains from existing MS conduit pipe for circuits
including labour charges etc. complete
Lighting panel board to TPN DB'S with pin type lugs
and connections. [for LDBs]
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

16 100 RM Supply & run of 5 of 10.0 Sqmm (phases, neutral and Supply & run of 5 of 10.0 Sqmm
earth) FRLS PVC insulated flexible copper cable in the (phases, neutral and earth) FRLS PVC
existing conduict pipe for run of mains from Power panel insulated flexible copper cable in the
board to TPN DB"s with pin type lugs and connections existing conduict pipe for run of mains
from Power panel board to TPN DB"
etc., complete. [for PDBs]
Makes of wires:- KEI / Polycab / Havells / GM / Million
/ HPL / Gold Medal / Power Flex / RPG / Anchor /
Great White Sun Cab / Fortune Art.

17 8 NOS DISTRIBUTION BOARDS Supply and fixing single phase DB in


Supply and fixing single phase DB in sheet steel sheet steel enclosure with metallic
enclosure with metallic plug and socket with 1 No. plug and socket with 1 No.
20/32A,10KA 'c' curve SPMCB (Motor characteristics 20/32A,10KA 'c' curve SPMCB (Motor
characteristics MCBs) control
MCBs) control including making connections etc.,
including maki
complete concealing in wall for A.C. points etc.
Makes : Legrand / Schneider.
S.
Quantity Description of Work
NO.
18 4 NOS Supply and fixing of TPN 4 way distribution board IP-43 Supply and fixing of TPN 4 way
(8+12 Module) with provision to accommodate the ELCB distribution board IP-43 (8+12 Module)
incomer and suitable for single pole outgoing MCB's in with provision to accommodate the
sheet Steel enclosure with 32A 4 pole MCB as incomer ELCB incomer and suitable for single
pole outgoing MCB's in sheet Steel enc
and 12 No of 6 to 32 Amps single pole, 10 KA breaking
capacity 'c' Curve MCB outgoings including making
connections etc., complete concealing in wall.
(LIGHTING DB's) Makes : Legrand / Schneider.

19 4 NOS Supply and fixing of TPN 4 way distribution board IP-43 Supply and fixing of TPN 4 way
(8+12 Mofule) with provision to accommodate ELCB as distribution board IP-43 (8+12 Mofule)
incomer and suitable for single pole outgoing MCB's in with provision to accommodate ELCB
sheet Steel enclosure with 63 Amps 4 pole MCB as as incomer and suitable for single pole
outgoing MCB's in sheet Steel encl
incomer and 12 No of 6 to 32 Amps single pole, 10 KA
breaking capacity 'c' curve MCBs as outgoings
including making connections etc., complete concealing
in wall.

(POWER DB's) Makes : Legrand / Schneider.


20 1 NOS Supply and fixing TPN - 8 way Vertical type Distribution Supply and fixing TPN - 8 way Vertical
board with IP-43 Protection (Metal Door) suitable to type Distribution board with IP-43
accommodate MCCB as incomer and single/three pole Protection (Metal Door) suitable to
MCBs as outgoings with 125A, 4Pole 25 kA MCCB as accommodate MCCB as incomer and
single/three pole MCBs as outgoings w
incomer with 6No of 40/63A, 10 KA TP MCBs 'c' curve
and 6 No, 6-32A, 10 kA SP MCBs 'c' curve as outgoing
including making connections and labour charges etc.,
complete concealing in wall.
Makes : Legrand / Schneider.

21 5 Nos Supply and fixing of cable adopteres box with cover for Supply and fixing of cable adopteres
DBs including, massanory work etc., complete., box with cover for DBs including,
Makes : Legrand / Schneider. massanory work etc., complete.,
Makes : Legrand / Schneider.

22 2 NOS EARTHINGS Providing independent earthing for


Providing independent earthing for Important equipment Important equipment with 40mm dia 'B'
with 40mm dia 'B' class 2.5m long G.I pipe and 19mm class 2.5m long G.I pipe and 19mm dia
dia 'B' class G.I pipe of 0.3mtr. long connected with 'B' class G.I pipe of 0.3mtr. long
connected with reducer providing G
reducer providing G.I funnel with mesh enclosed in
C.C.Chamber of 400m x 400m x 400mm with R.C.C.
Slab cover duly providing staggered holes filling with salt
and charcoal from the bottom of the pipe giving earth
connection from electrode through G.I strip of 40 x 6mm
x 200mm length with all accessories and labour charges
complete, as per IS specifications 732/1982 (Part II)
S.
Quantity Description of Work
NO.
23 1 NOS Providing independent earthing for Sophisticated Providing independent earthing for
Electronic equipment with 600mm x 600mm x 3.15mm Sophisticated Electronic equipment
thick copper plate rigidly fixed to 40mm dia G.I Pipe of with 600mm x 600mm x 3.15mm thick
2.5mtr. length filling with salt and charcoal giving earth copper plate rigidly fixed to 40mm dia
G.I Pipe of 2.5mtr. length fillin
connection from electrode G.I strip of 40 mm x 6mm x
200mm length and hume pipe with all accessories and
labour charges complete as per IS specification
732/1982 (Part II).

24 50 RM Supply and run of No. 8SWG GI wire including cost of all Supply and run of No. 8SWG GI wire
accessories and labour charges etc complete. including cost of all accessories and
labour charges etc complete.
25 50 RM Supply and run of 25mmX6mm GI strip including cost of Supply and run of 25mmX6mm GI strip
all accessories and labour charges etc complete. including cost of all accessories and
labour charges etc complete.

26 50 RM Supply and run of 25mmX3mm copper strip including Supply and run of 25mmX3mm copper
cost of all accessories and labour charges etc complete. strip including cost of all accessories
and labour charges etc complete.

27 85 NOS FIXTURES Supply, Transportaton, and fixing of 4-


Supply, Transportaton, and fixing of 4-28W box type 28W box type tube light fitting with
tube light fitting with 28Watt electronic ballast with all 28Watt electronic ballast with all
accessories with 40Watt tube and operating voltage 90 accessories with 40Watt tube and
operating voltage 90 to 350 Volts,
to 350 Volts, power factor 0.98 and harmonics shall be
as per IS specifications including all labour charges and
conveyance of all materials etc complete with with
flexible wire and connections.
( Trinic Make only with 4 Years Warranty., )

28 2 NOS Supply, Transportaton, installation, testing and Supply, Transportaton, installation,


commissioning of vertical CFL down lighter of 1X13 / testing and commissioning of vertical
18W Watt recessed mounted with suitable for 1 Nos CFL down lighter of 1X13 /18W Watt
13/18W CFL lamps, with electronic ballast including all recessed mounted with suitable for 1
Nos 13/18W CFL lamps, with e
labour charges and conveyance of all materials etc
complete with wire leads and connections.
(Makes: Wipro/ Phillips make fittings as
desired by the dept equivalent models)..

29 6 NOS Supply, Transportaton, installation, testing and Supply, Transportaton, installation,


commissioning of 2X 36 Watt CFL recessed mounted testing and commissioning of 2X 36
mirror optic fitting with P5 Lowers, suitable for 2 Nos Watt CFL recessed mounted mirror
36W CFL lamps,energy saving electronic ballast optic fitting with P5 Lowers, suitable
for 2 Nos 36W CFL lamps,energy sa
including all labour charges and conveyance of all
materials etc complete with wire leads and connections
required anchor hold fasteners and GI wire..
(Makes: Wipro/ Phillips make fittings as desired by
the dept equivalent models).
S.
Quantity Description of Work
NO.
30 10 NOS Supply and fixing of BH/SBH in lieu of ceiling rose with Supply and fixing of BH/SBH in lieu of
1 NO 3-5 W bulb with connections etc., complete with ceiling rose with 1 NO 3-5 W bulb with
labour charges connections etc., complete with labour
(Gold Medal / Million ) charges
(Gold Medal / Million )
31 4 NOS Supply and fixing of ding dong bell on 4"x7" decolam Supply and fixing of ding dong bell on
block including giving connections cost of all accessories 4"x7" decolam block including giving
and all labour charges etc., complete. connections cost of all accessories
Make: Gold Medal / Million. and all labour charges etc., complete.
Make: Gold Medal / Million.

32 1 NOS Supply and fixing of electronic card less remote bell Supply and fixing of electronic card
including giving connections cost of all accessories and less remote bell including giving
all labour charges etc., complete. connections cost of all accessories
and all labour charges etc., complete.

33 52 NOS Supply, Transportation of Ceiling fan 48"(1200mm) Supply, Transportation of Ceiling fan
ceiling fans with 3 blades & double ball bearings with out 48"(1200mm) ceiling fans with 3 blades
Regulators and all standard accessories and giving & double ball bearings with out
connections etc., complete. Regulators and all standard
accessories and giving connections
Make: Crompton High Speed / Orient Summer Pride
etc.,
PSPO / Bajaj Ultima / Havells Velocity.

34 52 NOS Supply and fixing of modular Electronic stept type fan Supply and fixing of modular
regulator hum free step type socket size with MS box, Electronic stept type fan regulator hum
front plate in the existing switch board ( Modular Type ) free step type socket size with MS box,
Make: MK / Cabtree / anchor roma / Salzar / front plate in the existing switch board
( Modular Type )
Legrand / Mosaic model as per Dept., Direction.
Make: MK / C

35 100 RM Supply and erecting 19/20mm steel tube down rod of Supply and erecting 19/20mm steel
one meter length with bolts & nuts duly painted with tube down rod of one meter length with
matching colour of fan complete. bolts & nuts duly painted with
matching colour of fan complete.
36 52 NOS Labour charges for Fixing of Ceiling fan including giving Labour charges for Fixing of Ceiling
connections with twin core wire etc., complete. fan including giving connections with
twin core wire etc., complete.

37 3 NOS Supply,Transportation of Light duty exhaust fan 12"(300 Supply,Transportation of Light duty
mm) size1350 rpm with metal blades wiremesh with all exhaust fan 12"(300 mm) size1350 rpm
accessories etc complete with metal blades wiremesh with all
Make: Orient/ Crompton Greeves/GE/Almonard/ Bajaj accessories etc complete
Make: Orient/ Crompton
Fresh.
Greeves/GE/Almonard/

38 6 NOS Supply,Transportation of Heavy duty exhaust fan Supply,Transportation of Heavy duty


12"(300 mm) size with all accessories such as louver exhaust fan 12"(300 mm) size with all
shutter etc., accessories such as louver shutter
Make: Orient/ Crompton Greeves/Bajaj / / Almonard. etc.,
Make: Orient/ Crompton
Greeves/Bajaj / / Almonard.

39 9 NOS Labour charges for fixing of Exhaust fan in wall with Labour charges for fixing of Exhaust
necessary connections and masonary work of making fan in wall with necessary connections
hole, finishing etc., complete. and masonary work of making hole,
finishing etc., complete.
S.
Quantity Description of Work
NO.
40 9 NOS Supply and fixing of louver shutter suitable for 12" Supply and fixing of louver shutter
Exhaust fan including all labour charges etc complete suitable for 12" Exhaust fan including
with connections and colouring matching to the wall with all labour charges etc complete with
enamel paint. connections and colouring matching to
the wall with enamel paint.

41 1 NOS MAIN POWER PANEL IN ELECTRICAL ROOM Supply, installation, testing and
Supply, installation, testing and commissioning of commissioning of wall/floor mounting
wall/floor mounting type panel board with alluminium bus type panel board with alluminium bus
bars fabricated with 16 Gauge CRCA Sheet comprising bars fabricated with 16 Gauge CRCA
Sheet comprising of TPN bus bars of e
of TPN bus bars of equal size in all phases and neutral
equipped with bus bar chambers and cable
chambers.The bus bars fault level shall be 50 KA and
shall be as per the requirement of local CEIG, fire
regulations, CPRI norms and other authorities etc. The
painting of the complete system shall be powder coated
duly processing the panel in 7 tank process. The panel
shall be suitable for accomdating the following switch
gear including supply of all components, hard wares etc
including all necessary civil works, adequate
reinforcement, foundation bolts, suitable G.I earth strip
50 x 6mm, door loop earthings, bus bars should be
colour sleeved with heat shrinkable sleeves for phase
and neutral duly supported at regular intervels by SMC
supports and all cables shall have proper cable entry,
danger board, feeder identification marks, rigid inter
connections, cadmium plated bolts and nuts and shall be
installed on wall/flooring and consisting of the following
as required and as per IS standards for [MAIN POWER
PANEL IN ELECTRICAL ROOM ] Panel shall be
manufacture only from CPRI approval Fabricators.
400A Aluminium Bus Bar with colour code.(0.8A/Sqmm).
Internal wiring with approved make cable
Earthing Flat: Providing suitable G.I Flat
Incommer: 250A, 4 Pole, MCCB, 36/35 KA - 1 No.
Makes: L&T / Siemens / schenieder.
Metering Set:
0- 250A Digital Ammeter with selector switch . - 1 No.
(conserve / Elmeasure)
a 100 RM 0-500V Digital Volt meter with selector switch - 1 No.
U.G CABLES Supply of the Following PVC XLPE
Supply of the Following PVC XLPE armoured cable armoured cable 1100 V Grade with ISI
1100 V Grade with ISI mark stranded / solid, aluminimum mark stranded / solid, aluminimum
conductor complete conductor complete
Make: RPG/ POLY CAB/
Make: RPG/ POLY CAB/ Havells/Finolex/ Paragan /
Havells/Finolex/ Paragan / Unicab
Unicab/ V-Guard/ fortune Art EBXL.
3.5 Core 70.00 Sq.mm.

b 50 RM Supply of the Following PVC XLPE armoured cable Supply of the Following PVC XLPE
1100 V Grade with ISI mark stranded / solid, aluminimum armoured cable 1100 V Grade with ISI
conductor complete mark stranded / solid, aluminimum
Make: RPG/ POLY CAB/ Havells/Finolex/ Paragan / conductor complete
Make: RPG/ POLY CAB/
Unicab/ V-Guard/ fortune Art EBXL.
Havells/Finolex/ Paragan / Unicab
3.5 Core 25 Sq.mm.
S.
Quantity Description of Work
NO.
### 100 RM Earth work excavation of Trench in hard ground soil, Earth work excavation of Trench in
laying of U.G cables of size up to 70 Sqmm on sand hard ground soil, laying of U.G cables
cusion covering the cable with bricks and back filling of of size up to 70 Sqmm on sand cusion
Trench duly providing route indicator (as per general covering the cable with bricks and
back filling of Trench duly provid
instruction S.No. 14 of SSR) embedded in C.C including
cost and conveyance of materials and labour charges
etc., complete.

### 50 RM Labour charges for run of U.G cable on wall / existing Labour charges for run of U.G cable on
pipe with necessary fixing arrangments such as saddles, wall / existing pipe with necessary
clamps,wooden separators etc., (as directed by fixing arrangments such as saddles,
departmental official) for the cables. clamps,wooden separators etc., (as
directed by departmental official)

a 2 NO CABLE GLANDS: S&fixing of heavy duty flange type


S&fixing of heavy duty flange type brass cable glands of brass cable glands of following sizes
following sizes for PVC armoured cables with brass for PVC armoured cables with brass
washers, earth tag etc complete including all labolur washers, earth tag etc complete
including all labolur charges.
charges.
70 to 150 Sq.mm

b 2 NO S&fixing of heavy duty flange type brass cable glands of S&fixing of heavy duty flange type
following sizes for PVC armoured cables with brass brass cable glands of following sizes
washers, earth tag etc complete including all labolur for PVC armoured cables with brass
charges. washers, earth tag etc complete
including all labolur charges.
25 to 50Sq.mm

a 6 NO ALUMINIUM LUGS: Supply and fixing of crimping type


Supply and fixing of crimping type Aluminium lugs Aluminium lugs confirming to IS
confirming to IS specifications for following cables specifications for following cables
including nuts and bolts with connections. including nuts and bolts with
connections.
70Sq.mm

b 2 NO Supply and fixing of crimping type Aluminium lugs Supply and fixing of crimping type
confirming to IS specifications for following cables Aluminium lugs confirming to IS
including nuts and bolts with connections. specifications for following cables
50Sq.mm including nuts and bolts with
connections.
c 2 NO Supply and fixing of crimping type Aluminium lugs Supply and fixing of crimping type
confirming to IS specifications for following cables Aluminium lugs confirming to IS
including nuts and bolts with connections. specifications for following cables
35Sq.mm including nuts and bolts with
connections.
d 6 NO Supply and fixing of crimping type Aluminium lugs Supply and fixing of crimping type
confirming to IS specifications for following cables Aluminium lugs confirming to IS
including nuts and bolts with connections. specifications for following cables
25Sq.mm including nuts and bolts with
connections.
### 2 NOS STREET LIGHT Supply and fixing of 4' - 28 w
Supply and fixing of 4' - 28 w weatherproof streetlight weatherproof streetlight Fitting
Fitting comprising canopy of sheet aluminium in stove comprising canopy of sheet aluminium
enamel Dinish with energy saving Electronic ballast and in stove enamel Dinish with energy
saving Electronic ballast and 1 No
1 No 40/36 W Tube Light to the pole / wall with suitable
40/36
length of G.I pipe bracket massonry work etc., complete
with connections as required at site.
Makes: Crompton / Philips/Bajaj / HPL / Surya /
Havells/Trinic.
S.
Quantity Description of Work
NO.
### 1 NOS Supply of Integral street light luminaire of 150W HPSV Supply of Integral street light luminaire
lamp Fitting comprises of single piece die cast aluminium of 150W HPSV lamp Fitting comprises
bofy with copper wound ballast and capacitor, Ignitor, of single piece die cast aluminium bofy
with pot optics including 150w HPSV lamp etc., with copper wound ballast and
capacitor, Ignitor, with pot op
complete.
Make : Crompton /Phillips/Bajaj/Wipro/ GE)

### 1 NOS fixing of MV / SV/MH luminaire on wall with 1.0Mtr of fixing of MV / SV/MH luminaire on wall
40mm dia GI pipe bracket and anti tilting MS Flat with with 1.0Mtr of 40mm dia GI pipe
2.5 Sq.mm flexible copper wire etc.,including all labour bracket and anti tilting MS Flat with 2.5
charges for mason work and giving connections etc., Sq.mm flexible copper wire
etc.,including all labour charges for
complete.

### 100 RM TV WIRING Supply and laying of RG6 co-axial


Supply and laying of RG6 co-axial cable in the existing cable in the existing metallic/non
metallic/non metallic conduit pipe with connections metallic conduit pipe with connections
etc.,complete for TVs and CCTV Net work. etc.,complete for TVs and CCTV Net
work.
Makes: Finolex/ Million / Gold Medal / Polycab
Makes: Finolex/ Million / Gold

### 2 Nos Supply and fixing of TV outlet Modular type in existing Supply and fixing of TV outlet Modular
MS/modular box with modular front cover plate with type in existing MS/modular box with
screws connections etc., complete. (Makes:- Cabtree modular front cover plate with screws
Thames Platinum / GM / Million /Anchor Roma viola / connections etc., complete. (Makes:-
Cabtree Thames Platinum / GM
Toyoma / L&T / fortune Art / CPL)

a 5 RM GI PIPES/ HUME PIPES Supply and Laying NP2 class RCC


Supply and Laying NP2 class RCC hume pipe with hume pipe with bends, Collars and
bends, Collars and other accessores of following siges other accessores of following siges
including trench excavation for laying the same with RCC including trench excavation for laying
the same with RCC incsing around.
incsing around.
300 mm

### 1 NOS WATER COOLERS Supply and fixing of water cooler fully
Supply and fixing of water cooler fully stainless steel of stainless steel of capacity 60/120 to be
capacity 60/120 to be operated on single phase supply operated on single phase supply with
with ISI mark. Makes Blue star / Voltas / Usha. ISI mark. Makes Blue star / Voltas /
Usha.

### 200 RM EPABX - TELEPHONE WIRING Supply and laying of 2 pair telephone
Supply and laying of 2 pair telephone wire 0.5mm copper wire 0.5mm copper in the existing
in the existing metallic/non metallic conduit pipe with metallic/non metallic conduit pipe with
connections etc., complete. connections etc., complete.
Makes: Finolex/L&T/Gold Medal/Million
Makes: Finolex/L&T/Gold Medal/Million/ Delton/
Polycab/ RPG

### 10 NOS Supply and fixing of 2 Line telephone jack socket model Supply and fixing of 2 Line telephone
modular type with connector front and back plate in jack socket model modular type with
existing modular box with screws connections etc., connector front and back plate in
complete. existing modular box with screws
connections etc., complete.
(makes :- Cabtree Thames Platinum / GM / Million
(makes :- C
/Anchor Roma viola / Toyoma / L&T / fortune Art /
CPL)
S.
Quantity Description of Work
NO.
### 12 Nos LAN Supply and termination of cat-6 RJ 45
Supply and termination of cat-6 RJ 45 out lets including out lets including dual face plate of
dual face plate of Makes Beldan/D Makes Beldan/D
Link/Legrand/AMP/Krone Link/Legrand/AMP/Krone

### 300 RM Supply and laying of Cat 6 UTP cable including all Supply and laying of Cat 6 UTP cable
taxes etc complete. including all taxes etc complete.
Make : D-Link/AMP/Krone/Finolex. Make : D-Link/AMP/Krone/Finolex.

### 2 Nos V - FIRE EXTINGUISHERS Supply and fixing of ISI make Ceiling
Supply and fixing of ISI make Ceiling Mounted ABC Mounted ABC MAP50, 5 Kg stored
MAP50, 5 Kg stored pressure type, pressure gauge, pressure type, pressure gauge, Gross
Gross Wt.7.7 kg,Empty Wt.2.7 kg, Can Ht226mm , Dia Wt.7.7 kg,Empty Wt.2.7 kg, Can
Ht226mm , Dia 230mm, Discharge
230mm, Discharge time : less than 8 sec, Auto discharge
time : less
mechanism on temperature rise, Applicable on A,B,C, &
Electrically - started fires, Can Construction: Forging &
Machining, Internal coating of Can: Epoxy Power
coating, External Coating of Can: Epoxy Polyster powder
coating, sheet metal thickness:1.80mm , Helium leakage
detection tested, ISI & EN approved with 2 years
warranty (Safex / Kenex / Bharat / Reliance make)
Including transportation, all taxes and all labour charges
etc complete.
( SSR - 13-14 - 9.4.8 )

GRAND TOTAL:
STIMATE

Visakhapatnam in Visakhapatnam District.,

Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and fixing of 25mm outer dia NA ONE 56.00 61600
2.20 mm thick Heavy grade PVC pipe RM
(ISI MAR

Supply and fixing of 25mm outer dia NA ONE 60.00 45000


Medium grade (1.8 mm thick) P.V.C. RM
pipe (ISI

Supply and erecting MS galvanished NA EACH 45.00 2340


Fan hook box with hook in RCC slab
including

Wiring with 2 runs of 22/0.3mm ( 1.5 NA EACH 460.00 85100


Sq.mm) FRLS P.V.C. insulated flexible POINT
copp
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Wiring with 2 runs of 22/0.3mm ( 1.5 NA EACH 690.00 1380
Sq.mm) FRLS P.V.C. insulated flexible POINT
cop

Wiring with three runs of 1.5 sq.mm NA EACH 273.00 7098


FRLS P.V.C. insulated flexible copper POINT
cable

Wiring with 2 of 22/0.3mm ( 1.5 Sq.mm) NA EACH 415.00 1660


FRLS P.V.C. insulated flexible copper POINT
ca
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Wiring with 2 of 22/0.3mm (1.5 Sq.mm) NA EACH 865.00 10380
FRLS P.V.C. insulated flexible copper POINT
ca

S&D of 16A/6A, 2 in one socket with NA EACH 335.00 4020


16A switch control modular type with
MS flu

Supply and run of 1 of 22 /0.3mm (1.5 NA ONE 19.00 12350


Sq.mm) FRLS P.V.C. insulated flexible RM
cop

Supply and run of 3 of 1.5 sq.mm NA ONE 56.00 11200


(phase neutral and earth) FRLS PVC RM
insulated fl

Supply and run of 3 of 2.5 sq.mm NA ONE 80.00 60000


(phase neutral and earth) FRLS PVC RM
insulated fl
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and 3 runs of 4.0 sq mm NA ONE 113.00 45200
(phase neutral and earth) FRLS PVC RM
insulated fle

Supply & run of 3 of 6.0 Sqmm NA ONE 167.00 33400


(84/0.3mm) (phase neutral and earth) RM
FRLS PVC insu

Supply and run of 5 of 6 Sq mm NA ONE 278.00 27800


(phases, neutral and earth) FRLS PVC RM
insulated fl

Supply & run of 5 of 10.0 Sqmm NA ONE 422.00 42200


(phases, neutral and earth) FRLS PVC RM
insulated fl

Supply and fixing single phase DB in NA EACH 1456.00 11648


sheet steel enclosure with metallic
plug an
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and fixing of TPN 4 way NA EACH 7094.00 28376
distribution board IP-43 (8+12 Module)
with prov

Supply and fixing of TPN 4 way NA EACH 7712.00 30848


distribution board IP-43 (8+12 Mofule)
with prov

Supply and fixing TPN - 8 way Vertical NA EACH 29631.00 29631


type Distribution board with IP-43 Prote

Supply and fixing of cable adopteres NA EACH 600.00 3000


box with cover for DBs including,
massanor

Providing independent earthing for NA EACH 3520.00 7040


Important equipment with 40mm dia 'B'
class 2
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Providing independent earthing for NA EACH 9155.00 9155
Sophisticated Electronic equipment
with 600mm

Supply and run of No. 8SWG GI wire NA ONE 13.00 650


including cost of all accessories and RM
labour
Supply and run of 25mmX6mm GI strip NA ONE 88.00 4400
including cost of all accessories and RM
labour

Supply and run of 25mmX3mm copper NA ONE 379.00 18950


strip including cost of all accessories RM
and la

Supply, Transportaton, and fixing of 4- NA EACH 1180.00 100300


28W box type tube light fitting with 28

Supply, Transportaton, installation, NA EACH 1035.00 2070


testing and commissioning of vertical
CFL

Supply, Transportaton, installation, NA EACH 4542.00 27252


testing and commissioning of 2X 36
Watt C
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and fixing of BH/SBH in lieu of NA EACH 11.00 110
ceiling rose with 1 NO 3-5 W bulb with

Supply and fixing of ding dong bell on NA EACH 187.00 748


4"x7" decolam block including giving
conn

Supply and fixing of electronic card NA EACH 535.00 535


less remote bell including giving
connecti

Supply, Transportation of Ceiling fan NA EACH 1600.00 83200


48"(1200mm) ceiling fans with 3 blades
&

Supply and fixing of modular NA EACH 473.00 24596


Electronic stept type fan regulator hum
free step t

Supply and erecting 19/20mm steel NA ONE 84.00 8400


tube down rod of one meter length with RM
bolts &

Labour charges for Fixing of Ceiling NA EACH 91.00 4732


fan including giving connections with
tw

Supply,Transportation of Light duty NA EACH 1350.00 4050


exhaust fan 12"(300 mm) size1350 rpm
with

Supply,Transportation of Heavy duty NA EACH 2645.00 15870


exhaust fan 12"(300 mm) size with all
acces

Labour charges for fixing of Exhaust NA EACH 410.00 3690


fan in wall with necessary connections
and
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and fixing of louver shutter NA EACH 250.00 2250
suitable for 12" Exhaust fan including
all l

Supply, installation, testing and NA EACH 73000.00 73000


commissioning of wall/floor mounting
type pane

Supply of the Following PVC XLPE NA ONE 363.00 36300


armoured cable 1100 V Grade with ISI RM
mark stra

Supply of the Following PVC XLPE NA ONE 180.00 9000


armoured cable 1100 V Grade with ISI RM
mark stra
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Earth work excavation of Trench in NA ONE 154.00 15400
hard ground soil, laying of U.G cables RM
of siz

Labour charges for run of U.G cable on NA ONE 32.00 1600


wall / existing pipe with necessary fixin RM

S&fixing of heavy duty flange type NA EACH 264.00 528


brass cable glands of following sizes
for PVC

S&fixing of heavy duty flange type NA EACH 138.00 276


brass cable glands of following sizes
for PVC

Supply and fixing of crimping type NA EACH 25.00 150


Aluminium lugs confirming to IS
specification

Supply and fixing of crimping type NA EACH 20.00 40


Aluminium lugs confirming to IS
specification

Supply and fixing of crimping type NA EACH 17.00 34


Aluminium lugs confirming to IS
specification

Supply and fixing of crimping type NA EACH 14.00 84


Aluminium lugs confirming to IS
specification

Supply and fixing of 4' - 28 w NA EACH 1800.00 3600


weatherproof streetlight Fitting
comprising can
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply of Integral street light luminaire NA EACH 6037.00 6037
of 150W HPSV lamp Fitting comprises
of

fixing of MV / SV/MH luminaire on wall NA EACH 396.00 396


with 1.0Mtr of 40mm dia GI pipe
bracket

Supply and laying of RG6 co-axial NA ONE 23.00 2300


cable in the existing metallic/non RM
metallic co

Supply and fixing of TV outlet Modular NA Each 216.00 432


type in existing MS/modular box with
mod

Supply and Laying NP2 class RCC NA ONE 348.00 1740


hume pipe with bends, Collars and RM
other accessor

Supply and fixing of water cooler fully NA Each 42994.00 42994


stainless steel of capacity 60/120 to b

Supply and laying of 2 pair telephone NA ONE 16.00 3200


wire 0.5mm copper in the existing RM
metalli

Supply and fixing of 2 Line telephone NA Each 170.00 1700


jack socket model modular type with
connec
Rate (Rs.)
Unit Amount (Rs.)
in fig.
Supply and termination of cat-6 RJ 45 NA Each 400.00 4800
out lets including dual face plate of
Make

Supply and laying of Cat 6 UTP cable NA ONE 33.00 9900


including all taxes etc complete. RM
Make :

Supply and fixing of ISI make Ceiling NA EACH 5339.00 10678


Mounted ABC MAP50, 5 Kg stored
pressure ty

1096418