Sie sind auf Seite 1von 3

Contract between Oromia Mineral Water and Energy Burea, Ethiopia and GTB Engineering in JV with

TAM Geo - Engineering PLC & EMU General Import PLC.

BOREHOLE COMPLETION REPORT


Project : Borehole no. :

Client : UTM (E)* :

Region UTM (N)*:

Woreda Elevation :

Town: Date started :

Site : Date completed :


N.B * = Adindan
WELL DIAGRAMME

water zones
Bit diam. (")

yield (l/min)
Depth / time
Circulation

Estimated
Casing (")

Scale (m)

loss (%)

(m/min)
Top cap

Main
GEOLOGICAL FORMATION
Pipe above ground level : 80 cm

Concrete pad

Sanitary seal : 5 m

Sand layer : 20 cm

S.W.L. : (m)

Date :

Gravel packing
Backfilling

Screen casing
Plain casing

Sand trap : (m)

Total depth Bottom cap

408241852.xls Design
408241852.xls Design
Drilling consumption from - to (m)

Cement : kg Drag bit 9" :

Polymer : kg Drag bit 8" :

Foam : ltrs Drag bit 6 1/2" :

Gravelpack : kg Drag bit 5 3/4" :

Gravelpack diam. : mm Drag bit 4" :

Clay seal : kg Button bit 5 7/8" :

Diesel : ltrs Button bit 4 1/2" :

Sand : kg

Aggregate : kg Moved from well no. :

Stone : kg Moving to well no. :

Brick : kg Total distance : km

Geophysics Estimated aquifer depth : m Success rate : %

Drilling rig type Driller's name :

Development Duration : hrs Limpidity after : hrs

Disinfection Chemical used : Quantity : g

Hand pump AFRIDEV

Superstructure Concrete slab Drainage trench Soakaway pit

Water quality Bacteriological Chemical (basic) Chemical (complete)

Remarks and stoppage

Comments

Approved : Certified :

Contractor Client

408241852.xls Information