ACTION VERIFIED BY
CATEGORY/ INITIATED CLOSE-OUT
SI NO. DISCIPLINE DESCRIPTION OF ITEM OR PENDING PONTS TAKEN RESULT SUB
COMPONENT BY/DATE DATE
BY/DATE CONTRACTOR CONTRACTOR COMPANY
External area
Shaded car parking column foundation grouting work
1 Civil A OPEN
incomplete
2 Civil Shaded car parking column & truss paint touch up requried A OPEN
7 Civil Uneven bolt thread length connection from column to truss A OPEN
9 Civil All around the roof sheet gutter installation work incomplete A OPEN
Page 1 of 3
10 Electrical Cable joint to SMDB's conduit pipe to seal with form A OPEN
15 Mechanical Some fixed AC outdoor unit was not proper level A OPEN
22 Plumbing All external area around ppr pipe gap to fill A OPEN
Page 2 of 3
24 Mechanical Some external AC trunking top portion to cover A OPEN
West side ouside of entrance door gap to fill with sealant
25 Civil A OPEN
(roof sheet north east corner)
West side entrance door damage ramp to rectify ( north
26 Civil A OPEN
east corner)
31 Mechanical west side visible gap to fill with form for AC cable A OPEN
32 Mechanical All external area fixed AC & Isolator trunking to clean A OPEN
42 Plumbing East side vent pipe was not properly supported A OPEN
Page 3 of 3