Sie sind auf Seite 1von 33

Zone :South Zone

Circle :Civil Circle -18


Division : Southern Division-2
Name of work : In Situ Rehabilitation at A-14 Kalka Ji Extn.
SH. : Construction of 3000 Multi Storeyed DU’S at .
. Community centre Site ( Turnkey Project)
Agency : Era Infra Engineering Limited.
Agreement No : 01/EE/SD-2/DDA/12-13
HISTORY OF THE PROJECT
 The total 8000 houses for in situ rehabilitation of slum dwellers comprising
Jawahar camp, Navjeevan camp & Bhoomihin camp is to be constructed .
 The total area of the plot comprising these three camps is 10.59 Hac.
 Originally this work of in situ rehabilitation at A-14 Kalkaji Extn. including
construction of 8000 flats was proposed to be executed under PPP Mode
(Public Private Partnership Mode)
 Later on Hon’ble L.G in the meeting dated 16-09-2011 decided that DDA
should do this work with its own funds.
 The meetings were held and it was decided that initially 3000 flats may be
constructed in the adjacent plots ( measuring 3.068 hectares) earmarked as
community centre plot and the land use may be swapped with an equivalent
area at A-14 Kalkaji Extn. (in NavjeevanCamp/Bhumiheen Camp/Jawahar
camp).
 The scheme has been approved in 318th meeting of screening committee vide
dated 23-01-2014 vide agenda item no 14-2014 for built-up area
127529.80sqm for construction of 3024 DUs, accordingly the work is being
executed at site in four cluster ie cluster-1,2,3&4 comprising cluster-1 -6
towers, cluster-2 – 2 towers, cluster-3- 6 towers & cluster-4 – 6 towers.The
building is of 14 storeys.
 Each dwelling unit comprises of 25 sqm carpet area having one living
room, one bed room, one kitchen, bath / WC and balcony finished with
vitrified floor tiles , ceramics tiles , Udaipur green marble counter in
Kitchen etc. The building is of RCC framed structure.
 There is provision of STP and treated water will be used for flushing in
cistern in toilets and for horticulture purpose . However DJB is not ready
to approve the dual water supply system ( treated water+ potable
water).
PROJECT HIGHLIGHTS
WORK AWARDED – VIDE F7(08)/A/SD-2/DDA/11-12/438 DT10-1- 13

AGENCY M/S ERA INFRA ENGINEERING LTD


DESIGN CONSULTANT ADLAKHA ASSOCIATES PVT .LTD
 CONSULTANT(QUALITY) IRCLASS SYSTEMS & SOLUTIONS
 TYPE OF CONTRACT TURNKEY
ESTIMATED COST Rs. 205,99,63,495/-
TENDER AMOUNT Rs. 260,38,27,200/-
NEGOTIATED / ACCEPTED RATE Rs. 22,232 /-per Sqm
NEGOTIATED ACCEPT AMOUNT Rs. 2,31,92,42,240/-
PLINTH AREA 104320 SQM
 AS PER ACTUAL 120502 SQM
TIME SCHEDULE
• Date of Award: 10.01.2013
• St. Date of Start: 25.01.2013
• St. Date of Completion: 24.01.2016
SALIENT FEATURES
S No. ITEM DESCRIPTION
1 Masonry Work Cellular Lightweight Concrete Blocks / AAC Blocks
2 Plastering 12mm Thick Plastering on Wall, 6mm thick Plastering on Ceiling
3 Windows Standard Z- Section of 16 Gauge with 4 mm Glass Shutter
4 Window Fitting MS Oxidized Hinges, Handles, Stays etc.
5 Door Frame Pressed Steel Door frame in Bedroom & Living Room, T-Iron Frame in WC, Bathroom.
6 Door Shutter Flush Door Shutter with 40mm thick Aluminium Fittings.
Flooring Work Vitrified Floor Tiles in Bedroom, Living Room, Kitchen & Balcony, Antiskid Ceramic Floor Tile
7 in WC & Bathroom, Glazed wall Tile in WC, Bathroom & Kitchen, Udaipur Marble on Kitchen
Counter Slab, Kota Stone in Corridor & Staircase.
Painting Work Oil Bound Distemper on Wall in Flat, Water Proofing Cement paint on Corridor, Shaft & Stair
8 Wall, White Wash on All Ceiling, Coating With Synthetic Enamel Paint Including Primer for
Wood & Steel Work.
Internal Plumbing & Sanitary Work S&S Centrifugally Cast Iron Pipe With Standard Fitting Including Sluice Valve Jointed by Pig
9
Lead for Soil & Waste, CPVC Pipes for Plumbing Work
10 Plumbing & Sanitary Fittings CP Fittings, White Vitreous Indian WC (580X440mm)Along With Cistern, Wash Basin, sink.
11 Rain Water Pipe UPVC Pipe
12 UGR RCC UGR Required Capacity With Boosting Arrangement Including D.G Sets
Sewerage HDPE Pipe Along with Necessary Manholes Covered With SFRC Light Duty Cover , SFRC Covers
13
Provided to Cover Sewer Drain
14 External Finishing 18mm Thick Plaster With Texture Paint.
Boundary Wall Height of The Boundary Wall 1.8 Metre , Consisting of 0.9 Metre SFRC Railing & 0.9 Metre
15
Random Rubble Masonry From Ground Level.
Internal Roads, Paths CC Pavement Divided With M-25 Precast Kerb Stone, 250X250mm Chequered Tiles in Colour
16
& Pattern on Pedestrian Foot Path.
17 Lift & Staircase 26 Numbers of Lift, 23 Numbers of Staircase.
18 Water Supply Dual Water Supply Scheme.
19 Eco- Friendly Environment Plant Horticulture-Rainwater Harvesting TreatmentPlant are Used for Horticulture.
20 Sewage Treatment Plant Treated Water from Sewage Treatment Plant are Used for Horticuulture Purposes.
21 Fire Fighting System On Each Floor Fire Fight Operating System be Implemented for Safety Purpose.
22 D.G Sets For Emergency Backup Power Supply, D.G Sets are Being Installed.
COST OF THE PROJECT
• .
1 Major Head : B.G.D.A.
• 2. Minor Head : 10A, Construction of Houses
• 3. A/A & E/S : EM6(10)2012/Est/Pt/5081 dated
• 23.10.2012 for Rs. 2180812953/-
• 4. Estimated Cost : Rs. 2059963493/-
• 5. Tendered Amount : Rs. 2319242240/-
• 6 Tentative cost :Rs. 2679014470 /-
• 7. Budget Code : 44003079
Salient features
 Area of plot : 3.068 Hact
 Building : 14 Storeyed
 Structure : RCC Framed Structure
 Total Du’s as per agreement : 3000
 As per 318th screening committee : 3024
 (Vide agenda no 14:2014 dt23/1/14)
 Area of one Flat : 25 Sqm
 NO. OF CLUSTERS : 4 ( Cluster-1,Cluster-2,Cluster-3 & Cluster-4)
 NO. OF TOWERS : 20 TOWERS (6 towers in cluster-1, 2 towers in cluster-2, . .
. 6 towers in cluster-3 & 6 towers in Cluster-4
 NO. OF FLOORS : Stilt +14
 Water supply : Dual water supply system (drinking & treated water)
 Sewerage : Sewerage treatment plant is to be constructed by agency
 Payment : Stage wise payment
 Final payment : Slab area shall be measured

 CAMPS TO BE SHIFTED
• Navjeevan camp
• Bhoomi heen camp
• Jawahar camp
 Clearance from various departments : EIA ,DUAC,AVIATION, DFS,DPCC
obtained
 Approval of services : SW drain sanction by MCD
(MCD/DJB) Water supply & sewerage scheme yet to be sanction by DJB
In-situ Rehabilitation of JJ clusters
KEY PLAN

PROPOSED
HOUSING

KEY PLAN
SITE CONTOUR PLAN
SITE LAYOUT
Single Dwelling unit Plan
Cluster 1 Cluster 3 Cluster 4
TOWER NOS. LIFTS
OF
FLATS
TOWER-1 140 2
TOWER-2 112 2
TOWER-3 168 0
TOWER-4 98 2
TOWER-5 126 2
TOWER-6 168 0
TOTAL 812 8

Cluster 2
Stilts Plan CLUSTER-1
Typical floor plan CLUSTER 1
Terrace Plan CLUSTER-1
Schematic Water Supply CLUSTER-1
Notes on Structure
Notes on Structure
Typical floor slab reinforcement detail
Section Through Cluster 4
Raft Foundation Cluster 4
Railing detail at expansion jt.
Stilts plan – Cluster 4
CLUSTER-4 PROJECT :- DDA KALKA JI DELHI

CLUSTER-4, PICTORIAL CHART

M/C @ MUMTY ROOM

14th FLOOR

13th FLOOR

12th FLOOR

11th FLOOR

10th FLOOR

9th FLOOR

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

16-Nov-14

STILT FLOOR

RAFT COMP

CO
COMP COMP COMP COMP COMP MP

PCC
COMP COMP COMP COMP COMP COMP

EXCAVATION COMP COMP COMP COMP COMP COMP

CL-4 TOWER - 1 CL-4 TOWER - 2 CL-4 TOWER - 3 CL-4 TOWER - 4 CL-4 TOWER - 5 CL-4 TOWER - 6

Colour Identification

Completed

PLANNING SLAB

CASTED ALREADY

Work in progress

Block work completed

BLOCK WORK PLANNING

Internal plastering completed

Internal plastering WIP

Tile work in Progress

Tile laying Completed (Bed,living room)


CLUSTER-3 ERA INFRA ENGINEERING LTD

CLUSTER 3, PICTORIAL CHART

M/C @ MUMTY ROOM

6-Dec-17 21-Dec-17
14th FLOOR

20-Nov-17 5-Dec-17
13th FLOOR

12th FLOOR

11th FLOOR

10th FLOOR

9th FLOOR

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

STILT FLOOR

PLINTH BEAM

RAFT

PCC
EXCAVATION

CL-3 TOWER - 1 CL-3 TOWER - 2 CL-3 TOWER - 3 CL-3 TOWER - 4 CL-3 TOWER - 5 CL-3 TOWER - 6

Colour Identification
Completed

PLANNING SLAB

CASTED ALREADY

Work in progress

Block work completed

Internal plastering completed

Internal plastering WIP

Tile work in Progress

Tile laying Completed (Bed,living room)


CLUSTER-2 ERA INFRA ENGINEERING LTD
PROJECT :- DDA KALKA JI DELJI
CLUSTER-2, PICTORIAL CHART

M/C @ MUMTY
ROOM

14th FLOOR

13th FLOOR

12th FLOOR

11th FLOOR

10th FLOOR

9th FLOOR

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

STILT FLOOR

PLINTH BEAM

RAFT

PCC
EXCAVATION

CL-2 TOWER - 1 CL-2 TOWER - 2

Colour Identification

Completed

Work in progress
Block work completed

Internal plastering completed

Internal plastering WIP

Tile work in Progress

Tile laying Completed (Bed,living room)


CLUSTER-1 ERA INFRA ENGINEERING LTD
PROJECT :- DDA KALKA JI DELHI
CLUSTER-1,PICTORIAL CHART

M/C @ MUMTY
ROOM

5-Dec-17 20-Dec-17 24-Dec-17 8-Jan-18 24-Nov-17 9-Dec-17 16-Dec-17 31-Dec-17


14th FLOOR

19-Nov-17 4-Dec-17 8-Dec-17 23-Dec-17 30-Nov-17 15-Dec-17


13th FLOOR

22-Nov-17 7-Dec-17
12th FLOOR

11th FLOOR

10th FLOOR

9th FLOOR

8th FLOOR

7th FLOOR

6th FLOOR

5th FLOOR

4th FLOOR

3rd FLOOR

2nd FLOOR

1st FLOOR

PLINTH BEAM

RAFT comp
PCC COMP COMP

EXCAVATION
COMP COMP

CL-1 TOWER - 1 CL-1 TOWER - 2 CL-1 TOWER - 3 CL-1 TOWER - 4 CL-1 TOWER - 5 CL-1 TOWER - 6

Colour Identification
Completed
PLANNING SLAB
CASTED ALREADY

Work in progress

Block work completed

Internal plastering completed

Internal plastering WIP

Tile work in Progress

Tile laying Completed (Bed,living room)


Cluster- 4, from Deepalya side
Cluster- 3
Cluster 2
Cluster 4 Tower 2