Chapter - 25
BRIDGES - PILE FOUNDATION
SI. No. Description Unit Rate
Rs. Ps.
197
7-
198
SI. No. Description Unit Rate
Rs. Ps.
25.19 KSRRB M1100-8.2. -do- RCC with OPC design mix M20 @320kgs, with Cum 4,666.00
20mm and down size graded granite metal coarse aggregates @0.69cum
and fine aggregtes @ 0.46cum, with superplastisiser @31ts confirming
to 1S9103-1999 Reaffirmed-2008, including costs of all materials, labour,
HOM form works, scaffolding & centering.
Case-II: Using Batching Plant, Transit Mixer and Concrete Pump
MORTH Specification No.1100, 1500 & 1700
25.20 KSRRB M1100-9.1. Cement Concrete for Reinforced Concrete in Cum 5,552.00
Pile Cap as per Drawing and Technical Specification complete as per
specifications. RCC with OPC design mix M25 @ 340kgs, with 20mm
and down size graded granite metal coarse aggregates @0.7cum and
fine aggregtes @ 0.47cum, with superplastisiser @31ts confirming to
IS9103-1999 Reaffirmed-2009. including costs of all materials, labour,
HOM form works, scaffolding & centering
Case-l: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700
25.21 KSRRB M1100-9.2. -do- RCC with OPC design mix M25 @ 340kgs, with Cum 4,965.00
20mm and down size graded granite metal coarse aggregates @0.7cum
and fine aggregtes @ 0.47cum, with superplastisiser @3Its confirming
to 159103-1999 Reaffirmed-2009. including costs of all materials, labour,
HOM form works, scaffolding & centering.
Case-II: Using Batching Plant, Transit Mixer and Concrete Pump
MORTH Specification No.1100, 1500 & 1700
25.22 KSRRB M1100-10.1. Cement Concrete for Reinforced Concrete in Pile Cum 5,670.00
Cap per Drawing and Technical Specification complete as per specifications.
RCC with OPC design mix M30 @ 360kgs, with 20mm and down size
graded granite metal coarse aggregates @0.69cum and fine aggregtes
@ 0.46cum, with superplastisiser @31ts confirming to IS 9103-1999
Reaffirmed-2008. including costs of all materials, labour, HOM form
works, scaffolding & centering.
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700
25.23 KSRRB M1100-10.2. -do- RCC with OPC design mix M30 @ 360kgs, Cum 4,985.00
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregtes @ 0.46cum, with superplastisiser @3lts
confirming to IS 9103-1999 Reaffirmed-2008. including costs of all
materials, labour, HOM form works, scaffolding & centering.
Case-II: Using Batching Plant, Transit Mixer and Concrete Pump
MORTH Specification No.1100, 1500 & 1700
199
SI. No. Description Unit Rate
Rs. Ps.
25.24 KSRRB M1100-11.1. Cement Concrete for Reinforced Concrete in Cum 5,826.00
Pile Cap complete as per Drawing and Technical Specification complete
as per specifications. RCC with OPC design mix M35 @ 390kgs, with
20mm and down size graded granite metal coarse aggregates @0.68cum
and fine aggregtes @ 0.45cum, with superplastisiser @3Its confirming
to 159103-1999 Reaffirmed-2008. including costs of all materials, labour,
HOM, form works, scaffolding & centering.
Case-I: Using Concrete Mixer
MORTH Specification No.1100, 1500 & 1700
25.25 KSRRB M1100-11.2. -do- RCC with OPC design mix M35 @ 390kgs, Cum 5,231.00
with 20mm and down size graded granite metal coarse aggregates
@0.68cum and fine aggregtes @ 0.45cum, with superplastisiser @31ts
confirming to 159103-1999 Reaffirmed-2008. Case-11: Using Batching
Plant, Transit Mixer and Concrete Pump. including costs of all materials,
labour, HOM, form works, scaffolding & centering.
MORTH Specification No.1100, 1500 & 1700
25.26 KSRRB M1100-12. Providing and laying of PCC M 15 levelling course 100 Cum 4,345.00
mm thick below the pile cap including costs of all materials, labour, HOM
,form works, scaffolding & centering complete as per specifications.
MORTH Specification No.1100 & 1700
25.27 KSRRB M1100-13. Providing and Placing un-coated TMT steel
reinforcement for RCC work including straightening, cutting, bending,
hooking, placing in position of lapping and / or welding wherever required,
tying with binding wire and anchoring to the adjoining members wherever
necessary complete as per design (Flats, hooks & wastage shall not be
measured and paid) including cast of materials, labours, HOM complete as
per specifications.
MORTH Specification No.1600 & 2200.
25.27.2 -do- TMT bars Fe 500 Tonne 68,001.00
25.27.3 -do- TMT bars Fe 550 Tonne 68,480.00
25.28 KSRRB M1100-14. Supplying, fitting and placing un-coated Mild steel Tonne 51,703.00
reinforcement in foundation as per drawing and technical specification
including costs of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
MORTH Specification No.1600
1,389.00
25.29 Trail Bores : Drilling 80mm dia hole through all kinds of soil using cas- m
ing shoe bit vertical or inclined up to 10 degree to vertical, as directed
including cost of materials, machineries, labour, water charges, remain-
ing, collection of wash samples at suitable intervals, logging and leaving,
supplying honne wood core box, fixing casing pipes (excluding cost of
casing pipes etc.,) including costs of all materials, labour, HOM, form
works, scaffolding & centering.
200
SI. No. Description Unit Rate
Rs. Ps.
25.30 Trail Bores : Drilling 76mm dia (NX) core hole in soft rock using dia- m 2,416.00
mond core bit vertical or inclined up to 10 degree to vertical, as directed
including cost of materials, machineries, labour, water charges, collection
of core samples, logging and leaving, supplying honne wood core box
including cement grounding (excluding cost of cement for grouting) and
re-drilling in case of collapse of sides etc., including costs of all materials,
labour, HOM form works, scaffolding & centering.
25.31 Trail Bores : Drilling 76 mm dia (NX) core hole in Hard rock using m 4,416.00
diamond core bit vertical or inclined up to 10 degree to vertical as di-
rected including cost of materials, machineries, labour, including cement
grouting (excluding cost of cement for grouting) and re-drilling incase
of collapse of sides etc., including costs of all materials, labour, HOM,
form works, scaffolding & centering.
Note 1 : Rate for 450mm dia, 550mm dia, 750mm dia. piles and
1200mm. dia. piles can be extrapolated as per proportion of pile
cross-sectional area.
201
.9-1 La
Chapter - 26
203
SI. No. Description Unit Rate
Rs. Ps.
204
SI. No. Description Unit Rate
Rs. Ps.
26.5.12 KSRRB M1200-4.9. ix) RCC with OPC cement design mix M40 Cum 5,654.00
@ 420kgs, with 20mm and down size graded granite metal coarse
aggregates @0.67cum and fine aggregates @ 0.44cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
- Using Batching Plant, Transit Mixer and Concrete Pump MORTH
Specification No.1200,1500 & 1700 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
26.6 KSRRB M1200-5.1. Plain / Reinforced Concrete, in Well Foundation Cum 5,320.00
complete as per Drawing and Technical Specification Concrete to be
placed using tremie pipe. Bottom Plug: i) PCC with 43 grade cement
design mix M20 @ 320kgs, with 40mm and down size graded granite
metal coarse aggregates @0.69cum and fine aggregates @ 0.46cum,
with superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.7 KSRRB M1200-5.2. Plain / Reinforced Concrete, in Well Foundation Cum 4,653.00
complete as per Drawing and Technical Specification Concrete to be
placed using tremie pipe ii) PCC with OPC design mix M20 @ 320kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser @3Its
confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane / Concrete Pump.
MORTH Specification No.1200,1500 & 1700
26.8 KSRRB M1200-6.1. Plain / Reinforced Cement Concrete, in Well Cum 5,763.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe iii) PCC with OPC design
mix M25 @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.9 KSRRB M1200-6.2. Plain / Reinforced Cement Concrete, in Well Cum 4,963.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe iv) PCC with OPC design
mix M25 @ 340kgs, with 40mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane I Concrete Pump. MORTH
Specification No.1200,1500 & 1700
205
SI. No. Description Unit Rate
Rs. Ps.
26.10 KSRRB M1200-7.1. Plain / Reinforced Cement Concrete, in Well Cum 6,432.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M30 @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.11 KSRRB M1200-7.2. Plain / Reinforced Cement Concrete, in Well Cum 5,060.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M30 @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - II : Using Batching
Plant, Transit Mixer and Crane / Concrete Pump. MORTH
Specification No.1200,1500 & 1700
26.12 KSRRB M1200-8.1. Plain / Reinforced Cement Concrete, in Well Cum 6,644.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe. PCC with OPC design mix
M35 @ 390kgs, with 40mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008.
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Case - I : Using Concrete
Mixer. MORTH Specification No.1200,1500 & 1700
26.13 KSRRB M1200-8.2. Plain I Reinforced Cement Concrete, in Well Cum 5,225.00
Foundation complete as per Drawing and Technical Specification
Concrete to be placed using tremie pipe PCC with OPC design mix
M35 @ 390kgs, with 40mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump. MORTH Specification No.1200,1500 & 1700
5,210.00
26.14 KSRRB M1200-9.1. (i) PCC with OPC design mix M20 @ 320kgs, Cum
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplastisiser
@3Its confirming to IS9103-1999 Reaffirmed-2008 including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. Same as in bottom plug concrete, excluding cost
of forming sump, protective bunds, chiselling etc.MORTH Specification
No.1200,1500 & 1700
206
sl. No. Description Unit Rate
Rs. Ps.
207
SI. No. Description Unit Rate
Rs. Ps.
26.20 "KSRRB M1200-11.1. Plain / Reinforced Cement Concrete, in Well Cum 6,066.00
Foundation complete as per Drawing and Technical Specification F.
Well cap. i) RCC with OPC design mix M20 @ 320kgs, with 20mm
and down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @31ts confirming to
1S9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I:Using Concrete Mixer"
MORTH Specification No.1200,1500 & 1700
26.21 "KSRRB M1200-11.2. Plain / Reinforced Cement Concrete, in Well Cum 4,751.00
Foundation complete as per Drawing and Technical Specification.
i) RCC with OPC design mix M20 @ 320kgs, with 20mm and down
size graded granite metal coarse aggregates @0.69cum and fine
aggregates @ 0.46cum, with superplastisiser @3Its confirming to
IS9103-1999 Reaffirmed-2008 including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
(Case - II : Using Batching Plant, Transit Mixer and Crane Concrete
Pump" MORTH Specification No.1200,1500 & 1700)
26.22 KSRRB M1200-11.3. Plain / Reinforced Cement Concrete, in Well Cum 5,412.00
Foundation complete as per Drawing and Technical Specification.
i) RCC with OPC design mix M20 @ 320kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @31ts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer MORTH Specification No.1200,1500
& 1700
26.23 "KSRRB M1200-11.4. Plain / Reinforced Cement Concrete, in Well Cum 4,920,00
Foundation complete as per Drawing and Technical Specification.
(ii) RCC with OPC design mix M25 @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.7cum and
fine aggregates @ 0.47cum, with superplastisiser @31ts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
(Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump" MORTH Specification No.1200,1500 & 1700)
26.24 "KSRRB M1200-11.5. Plain / Reinforced Cement Concrete, in Well Cum 5,676.00
Foundation complete as per Drawing and Technical Specification.
(iii) RCC with OPC design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @3Its confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer" MORTH Specification No.1200,1500
& 1700
208
SI. No. Description Unit Rate
Rs. Ps.
26:25 "KSRRB M1200-11.6. Plain / Reinforced Cement Concrete, in Well Cum 4,993.00
Foundation complete as per Drawing and Technical Specification.
:RCC with OPC design mix M30 @ 360kgs, with 20mm and
down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @31ts confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump" MORTH Specification No.1200,1500 & 1700
26.26 "KSRRB M1200-11.7. Plain / Reinforced Cement Concrete, in Well Cum 5,798.00
Foundation complete as per Drawing and Technical Specification.
(iv) RCC with OPC design mix M35 @ 390kgs, with 20mm and
down size graded granite metal coarse aggregates @0.68cum and
fine aggregates @ 0.45cum, with superplastisiser @3Its confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - I : Using Concrete Mixer" MORTH Specification No.1200,1500
& 1700
26.27 "KSRRB M1200-11.8. Plain / Reinforced Cement Concrete, in Well Cum 5,155.00
Foundation complete as per Drawing and Technical Specification:
RCC with OPC design mix M35 @ 390kgs, with 20mm and down
size graded granite metal coarse aggregates @0.68cum and fine
aggregates @ 0.45cum, with superplastisiser @3Its confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Case - II : Using Batching Plant, Transit Mixer and Crane / Concrete
Pump" MORTH Specification No.1200,1500 & 1700
26.28 "KSRRB M1200-12. Plain / Reinforced Cement Concrete, in Well Cum 5,292.00
Foundation complete as per Drawing and Technical Specification
(v) RCC with OPC design mix M40 @ 420kgs, with 20mm and
down size graded granite metal coarse aggregates @0.67cum and
fine aggregates @ 0.44cum, with superplastisiser @3Its confirming to
IS9103-1999 Reaffirmed-2008. including cost of all materials, labour,
HOM, form works, scaffolding & centering complete as per specifications.
Using Batching Plant, Transit Mixer and Concrete Pump" MORTH
Specification
KSRRB M1200- Sinking of well in sandy soil
26.29 KSRRB M1200-13.1. Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.29 KSRRB M1200-13.1. -do- i) Depth below bed level upto 3.00 m. Rate m 2,436.00
of sinking = 0.50 m per hour
209
SI. No. Description Unit Rate
Rs. Ps.
26.30 KSRRB M1200-13.2, -do- ii) Beyond 3 m upto 10 m depth, Rate of m 3,195.00
sinking = 0.33 m per hour
26.34 KSRRB M1200-14.1. Sinking of 7 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is
reckoned from bed level including cost of all materials, labour, HOM
form works, scaffolding & centering complete as per specifications.
A. Sandy Soil, Diameter of well = 7 m
MORTH Specification No. Section 1200
26.34 KSRRB M1200-14.2. -do- i) Depth below bed level upto 3.0 m, Rate m 3,269.00
of sinking = 0.30 m per hour.
26.35 KSRRB M1200-14.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 4,101.00
sinking = 0.22 m per hour
26.39 KSRRB M1200-15.1. Sinking of 8 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.39 KSRRB M1200-15.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 3,953.00
of sinking at 0.25 m per hour
26.40 KSRRB M1200-15.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 4,736.00
sinking at 0.20 m per hour
26.44 KSRRB M1200-16.1. Sinking of 9 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.44 KSRRB M1200-16.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 4,106.00
of sinking at 0.25 m per hour
26.45 KSRRB M1200-16.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 5,192,00
sinking = 0.18 m per hour
26.49 KSRRB M1200-17.1. Sinking of 10 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
210
SI. No. Description Unit Rate
Rs. Ps.
26.49.1 i) Depth below bed level upto 3.0 m. Rate of sinking = 0.20 m / hour m 4,557.00
26.49.2 (ii) Beyond 3 m upto 10 m depth. Rate of sinking = 0.17 m/ hour m 5,586.00
26.53 KSRRB M1200-18.1. Sinking of 11 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.53 KSRRB M1200-18.2. -do- i) Depth below bed level upto 3.0 m, Rate m 9,488.00
of sinking = 0.15 m per hour
26.54 KSRRB M1200-18.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 10,438.00
sinking at 0.13 m per hour
26.58 KSRRB M1200-19.1. Sinking of 12 m external diameter well ( other
than pneumatic method of sinking ) through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, complete
as per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.58 KSRRB M1200-19.2. -do- i) Depth below bed level upto 3.0 m, Rate m 21,236.00
of sinking at 0.05 m/ hour
26.59 KSRRB M1200-19.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 25,747.00
sinking at 0.038 m/hour.
26.63 KSRRB M1200-20.1. Sinking of Twin D Type well ( other than
pneumatic method of sinking ) through all types of strata namely, sandy
soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned
from bed level complete including cost of all materials, labour, HOM
of machineries, form works, scaffolding & centering complete as per
specifications. Overall length = 12 m, Overall width = 6 m.
MORTH Specification No. 1200
26.63 KSRRB M1200-20.1. -do- (i) Depth from bed level upto 3.0 m, Rate m 4,706.00
of sinking at 0.18 m/ hour
26.64 KSRRB M1200-20.2. -do- (ii) Beyond 3 m upto 10 m depth: Rate of m 5,178.00
sinking at 0.17 m/hour
26.68 KSRRB M1200-21.1. Sinking of 6 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM form works,
scaffolding & centering complete as per specifications.
MORTH Specification No.Section 1200
211
SI. No. Description Unit Rate
Rs. Ps.
26.68 KSRRB M1200-21.2. -do- (i) Depth below bed level upto 3.00m, rate m 3,194.00
of sinking at 0.33m per hour
26.69 KSRRB M1200-21.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 7,024.00
sinking = 0.17 m per hour
26.73 KSRRB M1200-22.1. Sinking of 7 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
MORTH Specification No. Section 1200
26.73 KSRRB M1200-22.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 4,101.00
of sinking = 0.22 m per hour
26.74 KSRRB M1200-22.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 6,497.00
sinking = 0.17 m per hour
26.78 KSRRB M1200-23.1. Sinking of 8 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.78 KSRRB M1200-23.2. -do- (i) Depth from bed level upto 3.0 m. Rate m 5,013.00
of sinking = 0.18 m/ hour
26.79 KSRRB M1200-23.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of m 7,200.00
sinking = 0.17 m/ hour
26.83 KSRRB M1200-24.1. Sinking of 9 m external diameter well (other than
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. MORTH
Specification No. Section 1200
26.83 KSRRB M1200-24.1. -do- (i) Depth below bed level upto 3.0 m. Rate m 5,394.00
of sinking = 0.17 m per hour
26.84 KSRRB M1200-24.2. -do- (ii) Beyond 3 m upto 10 m depth. Rate of 7,732.00
sinking = 0.15 m per hour
212
SI. No. Description, Unit Rate
Rs. Ps.
213
SI. No. Description Unit Rate
Rs. Ps,
214
sl, No. Description Unit Rate
Rs. Ps.
26.112 KSRRB M1200.34. Sinking of 11m external diameter well (other than m 38,133.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in soft
rock strata upto 3 m. Rate of sinking = 0.06 m / hour MORTH
Specification No. Section 1200
26.113 KSRRB M1200.35. Sinking of 12m external diameter well (other than m 82,714.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications_ Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in soft
rock strata upto 3 m. Rate of sinking = 0.025 m / hour MORTH
Specification No. Section 1200
26.114 KSRRB M1200.36. Sinking of Twin D Type Well (other than pneumatic m 17,896.00
method of sinking) through all types of strata namely sandy soil, clayey
soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications.
Depth in soft rock strata upto 3 m. Rate of sinking = 0.12 m / hour
MORTH Specification No. Section 1200
26.115 KSRRB M1200.37. Sinking of 6 m external diameter well (other than m 15,607.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications.
Depth in hard rock strata upto 3 m. Rate of sinking = 0.17 m per hour
MORTH Specification No. Section 1200
26.116 KSRRB M1200.38. Sinking of 7 m external diameter well (other than m 20,182.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned from
bed including cost of all materials, labour, HOM, form works, scaffolding
& centering complete as per specifications. Depth in hard rock strata
upto 3 m. Rate of sinking = 0.17 m per hour MORTH Specification
No. Section 1200
215
SI. No. Description Unit Rate
Rs. p
26.117 KSRRB M1200.39. Sinking of 8 m external diameter well (other than m 20,913.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.17 m per hour MORTH
Specification No. Section 1200
26.118 KSRRB M1200.40. Sinking of 9 m external diameter well (other than m 23,662.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.15 m per hour MORTH
Specification No. Section 1200
26.119 KSRRB M1200.41. Sinking of 10 m external diameter well (other than m 24,639.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard
rock strata upto 3 m. Rate of sinking = 0.12 m per hour MORTH
Specification No. Section 1200
26.120 KSRRB M1200.42. Sinking of 11 m external diameter well (other than m 53,475.00
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard rock
strata upto 3 m. Rate of sinking = 0.05 m/hour MORTH Specification
No. Section 1200
26.121 KSRRB M1200.43. Sinking of 12 m external diameter well (other than m 1,10,329.
pneumatic method of sinking) through all types of strata namely sandy
soil, clayey soil and rock as shown against each case, complete as
per drawing and technical specifications. Depth of sinking is reckoned
from bed level including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. Depth in hard rock
strata upto 3 m. Rate of sinking = 0.020 m/hour MORTH Specification
No. Section 1200
26.122 KSRRB M1200.44. Sinking of Twin D Type Well (other than pneumatic m 26,24
method of sinking) through all types of strata namely sandy soil, clayey
soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level
including cost of all materials, labour, HOM, form works, scaffolding &
centering complete as per specifications. Depth in hard rock strata upto
3 m. Rate of sinking = 0.10 mihour
MORTH Specification No. Section 1200
216
Si. No. Description Unit Rate
Rs. Ps.
26.123 KSRRB M1200-45. Pneumatic sinking of wells with equipment of Cum 57,647.00
approved design, drawing and specifications worked by competent and
trained personnel and comprising of compression and decompression
chambers, reducers, two air locks separately for men and plant &
materials, arrangement for supply of fresh air to working chambers,
check valves, exhaust valves, shafts made from steel plates of riveted
construction not less than 6 mm thick to withstand an air pressure of 0.50
MPa, controlled blasting of hard rock where required, staircases and 1
m wide landing platforms with railing, arrangement for compression and
decompression, electric lighting of 50 V maximum, proper rooms for rest
and medical examinations and compliance with safety precautions as
per IS:4138, including cost of all materials, labour, HOM, form works,
scaffolding & centering complete as per specifications. all as per clause
1200.7.6 of MORTH Specifications.
MORTH Specification No. Section 1200
26.124 KSRRB M1200-46. Sand filling in wells complete as per drawing and Cum 2,648.00
technical specifications including cost of all materials, labour, HOM, form
works, scaffolding & centering complete as per specifications.
MORTH Specification No.1207
26.125 KSRRB M1200-47. Providing steel liner 10 mm thick for curbs and Tonne 68,589.00
6 mm thick for seining of wells including fabricating and setting out as
per detailed drawing complete as per specifications including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. MORTH Specification No.1200 & 1900
KSRRB M1200-Reinforced cement concrete for well Kerb
26.126 KSRRB M1200-48.1. Construction of cement concrete kerb with m 346.00
top and bottom width 115 and 165 mm respectively, 250 mm high in
M-20 grade PCC on M-10 grade foundation 150 mm thick, foundation
having 50 mm projection beyond kerb stone, kerb stone laid with kerb
lying machine, founation concrete laid manually, including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. all complete as per Clause 400.8 complete as per
spcifications. A. Using Concrete Mixer
MORTH Specification No.408
26.127 KSRRB M1200-48.2. Construction of cement concrete kerb with m 276.00
top and bottom width 115 and 165 mm respectively, 250 mm high in
M-20 grade PCC on M-10 grade foundation 150 mm thick, foundation
having 50 mm projection beyond kerb stone, kerb stone laid with kerb
lying machine, foundation concrete laid manually, including cost of all
materials, labour, HOM, form works, scaffolding & centering complete
as per specifications. all complete as per Clause 400.8 complete as per
spcifications. B. Using Concrete Belching and Mixing Plant
MORTH Specification No.408
26.128 KSRRB M1200-49.1. Cast-in-Situ Cement Concrete M 20 Kerb with m 632.00
Channel. Construction of cement concrete kerb with channel with top
and bottom width 115 and 165 mm respectively, 250 mm high in M-20
grade PCC on M-10 grade foundation 150 mm thick, kerb channel laid
217
SI. No. Description Unit Rate
Rs. Ps.
Note: 1. KSRRB M 1200-13.3,14.3, 15.3, 16.3, 17.3, 18.3, 19.3, 20.3, 21.3,
22.3, 23.3, 24.3, 25.3, 26.3, 27.3 and 28.3 beyond 10m upto 20m
a) Add 5% for every additional meter depth of sinking over the rate
for sinking of previous meter
218
Chapter - 27
BRIDGES - OPEN FOUNDATIONS
219
rb-
i
SI. No. Description Unit Rate
Rs. Ps.
27.9.3 "KSRRB M2100-4.1 -do- (iii) Above 6 m depth by manual means Cum 719.00
SI. No. Description Unit Rate
Rs. Ps.
27.10 "KSRRB M2100-4.2. Earth work excavation in hard rock without blasting
for foundation of bridges and allied works as per drawing and technical
specifications, including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and
bottom and filling back with approved material including cost of all
materials, labour, HOM complete as per specifications.
MORTH Specification No. 304
27.10.1 KSRRB M2100-4.2. -do- i) 0 m to 3 m depth by mechanical means Cum 471.00
27.10.2 KSRRB M2100-4.2. -do- ii) 3 m to 6 m depth by mechanical means Cum 551.00
27.10.3 KSRRB M2100-4.2. -do- iii) Above 6 m depth by mechanical means Cum 631.00
27.11 KSRRB 2100-5. Excavation in marshy soil upto 3m depth for Cum 902.00
foundations of structures as per drawing and technical specifications
including removing the excavated stuff to a lead of 15m., including
dewatering , shoring strutting wherever necessary watering and ramming
including cost of all materials, labour, HOM complete as per specifications
MORTH Chapter 12
27.12 "KSRRB M2100-5.1. Earth work excavation in marshy soil for foundation
of structures as per drawing and technical specifications, including setting
out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and filling back with
approved material including cost of all materials, labour, HOM complete
as per specifications.
MORTH Specification No. 304
27.12 "KSRRB M2100-5.1. -do- Manual Means upto 3 m depth Cum 614.00
27.13 "KSRRB M2100-5.2. -do- Mechanical Means upto 3 m depth Cum 145.00
27.14 KSRRB 2100-6. Filling the foundations trenches using approved Cum 3,039.00
sand as per drawing and technical specifications in 250mm layers,
wherever necessary watering and ramming including cost of all materials,
labour, NOM complete as per specifications.
MORTH Chapter 12
27.15 "KSRRB M2100-7. Back filling the Marshy Foundations Pits of abutment Cum 349.00
wing walls and returns using approved material with ramming and
watering with all lead and lifts, cost of labour, HOM etc., complete as
per specification and direction of the Engineer incharge of the work"
MORTH Specification No. 304
4,908.00
27.16 KSRRB M2100-8. Filling Annular Space Around Footing in Rock Cum
Lean cement concrete M 10 mix. including cost of all materials, labour,
HOM of machineries, curing, form works, scaffolding and centering
complete as per specifications
221
SI. No. Description Unit Rate
Rs. Ps.
27.18 KSRRB M2100-10. Providing and laying Plain cement concrete of Cum 5,115.00
mix 1:3:6 with OPC @ 220kgs, with crushed 40mm and down size
graded granite metal coarse aggregates @0.89cum and fine aggregates
@ 0.46cum, in foundation mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days including cost of all
materials, labour, HOM curing, form works, scaffolding and centering
complete as per specifications.
MORTH Specification No. 2100
27.22 "KSRRB M2100-12.1. Providing and constructing Stone Masonry Cum 4,354.00
Work in Cement Mortar 1:3 in Foundation complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications A. Square Rubble Coursed Rubbie Masonry (first sort)"
MORTH Specification No. 1405.4
27.23 KSRRB M2100-12.2. Providing and constructing Stone Masonry Cum 4,236.00
Work in Cement Mortar 1:4 in Foundation complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications. B. Random Rubble Masonry( coursed I uncoursed)
MORTH Specification No. 1405.4
27.24 KSRRB M2100-13. Providing and laying Plain I Reinforced Cement Cum 5,103.00
Concrete of mix 1:2:4 with OPC @ 240kgs, with 40mm and down size
graded granite metal coarse aggregates @0.84cum and fine aggregates
@ 0.56cum in Open Foundation including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications complete as per Drawing and Technical Specifications.
MORTH Specification No. 1500,1700 & 2100
27.25 "KSRRB M2100-14. Providing and laying Plain /Reinforcement Cum 5,285.00
Cement Concrete M20 with OPC @ 320 kgs, with 40mm and down size
graded granite metal coarse aggregates @0.64cum and fine aggregates
@ 0.43cum, with superplasticizer @3Its confirming to IS9103-1999
Reaffirmed-2008 in Open Foundation including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications complete as per Drawing and Technical Specifications.
"MORTH Specification No. 1500,1700 & 2100
27.27 "KSRRB M2100-15.2. Providing and laying Plain /Reinforcement Cum 4,857.00
Cement Concrete M20 with OPC @ 320 kgs, with 20mm and down
size graded granite metal coarse aggregates @0.69cum and fine
aggregates @ 0.46cum, with superplasticizer @31ts confirming to
IS9103-1999 Reaffirmed-2008 in Open Foundation complete as per
Drawing and Technical Specifications including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No. 1500,1700 & 2100
222
SI. No. Description Unit Rate
Rs. Ps.
27.29 KSRRB M2100-16.2. Providing and laying Plain / Reinforced Cement Cum 4,995.00
Concrete design mix M25 with OPC @ 340kgs, with 40mm and
down size graded granite metal coarse aggregates @0.70cum and
fine aggregates @ 0.47cum, with superplasticizer @31ts confirming
to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per
Drawing and Technical Specifications including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No.1500,1700 & 2100
27.31 KSRRB M2100-17.2. Providing and laying Plain / Reinforced Cement Cum 4,995.00
Concrete design mix M25 with OPC @ 340kgs, with 20mm and
down size graded granite metal coarse aggregates @0.70cum and
fine aggregates @ 0.47cum, with superplasticizer @31ts confirming
to IS9103-1999 Reaffirmed-2008,Open Foundation complete as per
Drawing and Technical Specification including cost of all materials,
labour, HOM curing, form works, scaffolding and centering complete as
per specifications.
MORTH Specification No. 1500,1700 & 2100
27.33 KSRRB M2100-18.2. Providing and laying Plain / Reinforced Cement Cum 5,084.00
Concrete in Open Foundation with OPC design mix M30 @ 360kgs,
with 40mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplasticizer @31ts
confirming to IS9103-1999 Reaffirmed-2008 complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications.
MORTH Specification No. 1500,1700 & 2100
27.35 KSRRB M2100-19.2. Providing and laying Plain / Reinforced Cement Cum 5,084.00
Concrete in Open Foundation with OPC design mix M30 @ 360kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with superplasticizer @3Its
confirming to IS9103-1999 Reaffirmed-2008 complete as per Drawing
and Technical Specifications including cost of all materials, labour,
HOM curing, form works, scaffolding and centering complete as per
specifications.
MORTH Specification No. 1500,1700 & 2100
27.37 KSRRB M2100-20.2. Providing and laying Plain / Reinforced Cement Cum 5,222.00
Concrete in Open Foundation with OPC design mix M35 @ 390kgs,
with 20mm and down size graded granite metal coarse aggregates
@0.68cum and fine aggregates @ 0.45cum, with superplasticizer
@31ts confirming to IS9103-1999 Reaffirmed-2008. including cost of all
materials, labour, HOM curing, form works, scaffolding and centering
complete as per specifications.
MORTH Specification No. 1500,1700 & 2100
223
SI. No. Description Unit Rate
Rs. Ps.
4. Add 15% extra for shoring and strutting for items KSRRB M2100-
5.1 specification is to be modified accordingly.
5. Add 10% extra for shoring and strutting for items KSRRB M2100-
5.2.
6. For excavation by manual means, add Rs. 5/m for every 'm' depth
for 3m to 6m & Rs. 10/m for above 6m.
224
Chapter - 28
BRIDGES - SUB-STRUCTURE
SI. No. Description Unit Rate
Rs. Ps.
226
SI. No. Description Unit Rate
Rs. Ps.
28.7.6 KSRRB M2200-5.6. Providing and laying Design mix M30 with Cum 5,415.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) upto 5 m height
28.7.7 KSRRB M2200-5.7. Providing and laying Design mix M30 with Cum 6,118.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
ii) For height above 5 m and upto 10 m.
28.7.8 KSRRB M2200-5.8. Providing and laying Design mix M30 with Cum 6,470.00
OPC @ 360kgs, with 40mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10 m.
28.7.9 KSRRB M2200-5.9. Providing and laying Design mix M20 with Cum 5,173.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) Upto 5 m height.
28.7.10 KSRRB M2200-5.10. Providing and laying Design mix M20 with Cum 5,845.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii) For height, 5m to 10m
28.7.11 KSRRB M2200-5.11. Providing and laying Design mix M20 with Cum 6,181.00
OPC @ 320kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10 m.
5,321.00
28.7.12 KSRRB M2200-5.12. Providing and laying Design mix M25 with Cum
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
- i) Upto 5m height
227
SI. No. Description Unit Rate
Rs. Ps.
28.7.13 KSRRB M2200-5.13. Providing and laying Design mix M25 with Cum 6,012.00
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii)For height, 5m to 10m
28.7.14 KSRRB M2200-5.14. Providing and laying Design mix M25 with Cum 6,358.00
OPC @ 340kgs, with 20mm and down size graded granite metal
coarse aggregates @0.7cum and fine aggregates @ 0.47cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height, above 10m,
28.7.15 KSRRB M2200-5.15. Providing and laying Design mix M30 with Cum 5,415.00
OPC @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) Upto 5m height,
28.7.16 KSRRB M2200-5.16. Design mix M30 with OPC @ 360kgs, with 20mm Cum 6,118.00
and down size graded granite metal coarse aggregates @0.69cum and
fine aggregates @ 0.46cum, with superplastisiser @31ts confirming to
IS9103-1999 Reaffirmed-2008
ii) For height, 5m to 10m
28.7.17 KSRRB M2200-5.17. Providing and laying Design mix M30 with Cum 6,470.00
OPC @ 360kgs, with 20mm and down size graded granite metal
coarse aggregates @0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
iii) For height, above 10m
28.7.18 KSRRB M2200-5.18. Providing and laying Design mix M35 with Cum 5,562.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @31ts confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- i) U pto 5m height
28.7.19 KSRRB M2200-5.19. Providing and laying Design mix M35 with Cum 6,285.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- ii) For height 5m to 10m
228
SI. No. Description Unit Rate
Rs. Ps.
28.7.20 KSRRB M2200-5.20. Providing and laying Design mix M35 with Cum 6,646.00
OPC @ 390kgs, with 20mm and down size graded granite metal
coarse aggregates @0.68cum and fine aggregates @ 0.45cum, with
superplastisiser @3Its confirming to IS9103-1999 Reaffirmed-2008
including cost of materials, labour, HOM curing, form works, scaffolding
and centering complete as per specifications.
- iii) For height above 10m,
28.8 KSRRB M2200-6. Providing T.M.T. steel reinforcement for R.C.C. work
including straightening, cutting, bending, hooking, placing in position,
lapping and/or welding wherever required, tying with binding wire and
anchoring to the adjoining members wherever necessary complete as
per disign (laps, hooks and wastage shall not be measured and paid)
cost of materials, labour, HOM complete as per specification.
MORTH Specification No.1600 & 2200
28.8.2 -do- TMT Bars Fe 500 Tonne 68,233.00
28.8.3 -do- TMT Bars Fe 550 Tonne 68,812.00
KSRRB M2200- Providing Weep Holes
28.10 KSRRB M2200-8. Providing weep holes in Brick masonry / Plain / Nos Imtr 147.00
Reinforced concrete abutment, wing wall / return wall with 100 mm dia
AC pipe, extending through the full width of the structure with slope of
1V :20H towards drawing force. Complete as per drawing and Technical
Specifications including cost of materials, labour, HOM complete as
per specifications. MORTH Specification No.2706 & 2200
28.11 KSRRB M2200-8.1. Back filling behind abutment, wing wall and return Cum 698.00
wall complete as per drawing and Technical Specification including cost
of materials, labour, HOM of machineries, complete as per specifications.
A. Granular material MORTH Specification No. 2204 & 304
KSRRB M2200- Filter Media
28.13 KSRRB M2200-9. Providing and laying of Filter media with granular Cum 2,091.00
materials /stone crushed aggregates satisfying the requirements laid
down in clause 2504.2.2. of MORTH specifications to a thickness of
not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and provided over the entire surface behind abutment,
wing wall and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification including cost of
materials, labour, HOM complete as per specifications.
MORTH Specification No. 2504.2.2
KSRRB M2200- Bearings
359.00
28.14 KSRRB M2200-10. Supplying, fitting and fixing in position true to line and Each
level cast steel rocker bearing conforming to IRC: 83 (Pt.-1) section Tonne
IX and clause 2000.3 of MORTH specifications complete including all bearing
accessories as per drawing and Technical Specifications including cost capacity
of materials, labour, HOM complete as per specifications.
MORTH Specification No.1000, 2000 & 2200
229
SI. No. Description Unit Rate
Rs. Ps.
28.15 KSRRB M2200-11. Supplying, fitting and fixing in position true to line and Each 20.00
level forged steel roller bearing conforming to IRC: 83(Pt.-1) section Tonne
IX and clause 2000.3 of MORTH specifications complete including all bearing
accessories as per drawing and Technical Specifications including cost capacity
of materials, labour, HOM complete as per specifications.
MORTH Specification No.1000, 2000 & 2200
28.16 KSRRB M2200-12. Supplying, fitting and fixing in position true to line Tonne 1,123.00
and level sliding plate bearing with PTFE surface sliding on stainless
steel complete including all accessories as per drawing and Technical
Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause
2000.4 of MORTH Specifications including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No.2000 & 2200
28.17 KSRRB M2200-13. Supplying, fitting and fixing in position true to line C.C. 0.60
and level elastomeric bearing conforming to IRC: 83 (Part-II) section
IX and clause 2000.5 of MORTH specifications complete including all
accessories as per drawing and Technical Specifications including cost
of materials, labour, HOM complete as per specifications.
MORTH Specification No. 2000 & 2200
28.18 KSRRB M2200-14. Supplying, fitting and fixing in position true to line and Tonne 1,121.00
level sliding plate bearing with stainless steel plate sliding on stainless
steel plate with mild steel matrix complete including all accessories as
per drawing and Technical Specifications including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No.2000 & 2200
28.19 KSRRB M2200-15. Supplying, fitting and fixing in position true to line Tonne 363.00
and level POT-PTFE bearing consisting of a metal piston supported by
a disc or unreinforced elastomer confined within a metal cylinder, sealing
rings, dust seals, PTFE surface sliding against stainless steel mating
surface, complete assembly to be of cast steel/fabricated structural
steel, metal and elastomer elements to be as per IRC: 83 part-I & II
respectively and other parts conforming to BS: 5400, section 9.1 & 9.2
and clause 2000.6 of MORTH Specifications complete as per drawing
and approved Technical Specifications including cost of materials, labour,
HOM complete as per specifications.
MORTH Specification No.2000 & 2200
Note : 1. In case of stone masonry, the size of the weep hole shall be
150mm x 80mm or circular with 150mm diameter.
2. For structure in stone masonry, the weep holes shall be deemed
to be included in the item of stone masonry work and shall not
be paid separately.
230