INTRODUCTION
1.1 BACKGROUND
In order to meet the growing market demand, M/s. Allchem Laboratories plan to expand the existing
advance pharmaceutical intermediates manufacturing. The lists of products along with their productions
capacity is given in Table 1.1.
TABLE 1.1
LIST OF PRODUCTS ALONG WITH THEIR PRODUCTION CAPACITY (EXISTING & PROPOSED SCENARIO)
SIGN.
SOLID WASTESTORAGE SOLID WASTESTORAGE
E . T. P.
ETP LAB. SOLID WASTESTORAGE
Bore Well
3.00 M. W I D E R O A D
Sump
3.00 M.
D
W I D E R O A D
UTILITIES BUILDINGS
FUTURE EXPANSION
PROPOSED PLANT
D.G.SET
A
6.00 M. W I D E R O A D 4.00 M. W I D E R O A D
O
3.00 M.
R
future
W I D E R O A D
expansion ware house
SCALE
12.06.10
12.06.10
of ware house 17.50x13.50 1 : 300
FORMULATION BUULDINGS
NO RTH
E
Tushar
13.78 x 17.23
R.K.L.
APPD.
D
DRN.
CHD.
I
WA SH ING
ICE S TORA GE
R.M. STORE
9'0" X 13'0"
C YLINDER STORAGE
R.M. STORE
HAZ. STORE
PANNEL
CLOCK
PANNEL
ELECTRICAL
9 '0 " X 22 '8"
PLA NT ENTR Y
10'0" X 14'9"
10'0" X 14'0"
DRYER
PRODUCT
FINISH
13'7 1/2" X 14'9"
Q.C.
TOILET
P EN TRY
11'0" X 14'9"
CONFERANCE
11'0" X 14'0"
OFFICE
CAR PARKING
R O A D
R O A D
CAR PARKING
CYCLE PARKING SCOOTER PARKING
PRINT ISSUED DATE PRINT ISSUED DATE
STRUCTURE:
MAIN GATE WICKET
NAME OF
GATE
CLIENT:
TITLE:
SITE PLAN NO. DATE REVISION DRAW N CHD.
PROJECT NO.
DETAILS OF WATER COMPUTION AND WASTEWATER GENERATION (EXISTING & PROPOSED SCENARIO)
* In existing scenario, domestic wastewater is disposed in Septic Tank/Sock Pit and after proposed
expansion; additional domestic waste water quantity will also be disposed in manner as existing scenario.
** In existing scenario, waste water from process and washing is treated in existing ETP and final treated
effluent is reused for gardening purpose. Thus existing unit is zero discharge unit.
CHAPTER – 2
PROJECT COST & FEASIBILITY
2.2 CONCLUSION
The project feasibility has been check on the bases of 100% production & sales. Seeing the today’s existing
industrial scenario, all the proposed plants are feasible and should be implemented at the earliest.