TOILET

WASH DOWN AREA TRAINING MAINTENANCE STORE ROOM SPARE PARTS ROOM
พื้นที่สำหรับงานล้าง ROOM ROOM

CONCRETE/SOIL FLOOR

MAINTENANCE / PARKING TRAILER AREA

ALE SHOP

SHOP

ENTRANCE AREA

WATER DIRECTION
ALE OFFICE
KROLL CRANE 1
BUILD POSITION
NEW EXTENSION EXISTING BUILDING

AC500
ADVANCE BASE 1 ADVANCE BASE 2
LAYDOWN LAYDOWN
OPEN DRAIN
3376 ROAD

KROLL CRANE 1 KROLL CRANE 3


LAYDOWN LAYDOWN
ALE OFFICE CONTAINER MAINTENANCE / PARKING TRAILER AREA

WATER DIRECTION
OPEN DRAIN
BANGKOK

TECHNICAL DRAWING NOTE : LEGEND

1. UNIT USED IN mm.


DRAINAGE
B C 2. WE REFERENCE FROM THE RIGHT CORNER OF DRAINAGE ALE YARD.
3. GREEN AREA (1188.3 m^2): ENTRANCE AREA
- WE PLAN FOR AC500 AND K1650 CRANE BUILD SO WE NEED
SPECIFIC GBP. TEST IS 20 t/m^2 .
WATER DIRECTION
- FOR SLOPE NEED TO BE 0.5% SLOPE (MAXIMUM). AREA FOR GBP. (20 t/m^2)
A AND 0.5% SLOPE
KROLL CRANE 1 4. GBP TESTING IN 5 POSITION (A,B,C,D,E).
BUILD POSITION POSITION FOR GBP TEST (20 t/m^2)
5. WATER DIRECTION AND DRAINAGE:
AC500
- FOLLOW IN THE ARROW IN THIS DRAWING.
D E
ADVANCE BASE 1
LAYDOWN
ADVANCE BASE 2
LAYDOWN
ELECTRIC CONCRETE POLE

SECURITY GUARD

WATER DIRECTION

2 24 JAN 19 PM JM UPDATE AREA FOR RECOMPACTION


1 24 JAN 19 PM JM UPDATE AREA FOR CIVIL WORK
0 22 JAN 19 PM JM FOR INFORMATION
B C Rev. Date Drawn Check Description QF19 (Issue 6)
KROLL CRANE 1 KROLL CRANE 3 ALE Heavylift and Transport (Thailand) Co. Ltd.
LAYDOWN LAYDOWN Rayong, Thailand
Tel: +66 38 893 700-1
Fax: +66 38 917 072
A Web: www.ale-heavylift.com
Client

WATER DIRECTION D E ALE

Project Title
OFFICE LAYOUT

Drawing Title
LAYOUT AREA FOR RECOMPECTION
PLAN FOR SUPPORT KROLL (K1650) CRANE
Date Drawn Checked Scale (A1) Sheet
22 JAN 2019 PM JM None 1 of 1