5/28/2018
S Rate in FPS In MKS
.
Transp Load /
N Materials Final Total
Unit Rate Unit Rate /Stacking Unload
o Rate
.
1 Cement (Structure) bag 875.00 bag 875.00 10.00 885.00
2 Cement ( Non Structure) bag 765.00 bag 765.00 10.00 775.00
3 White cement bag 1,200.00 m 1,200.00 1,200.00
4 Sand - Washed, Belkhu cft 110.00 m3 3,885.20 3,885.20
5 Sand ( for Plaster Works) cft 110.00 m3 3,885.20 3,885.20
6 Aggregate cft 105.00 m3 3,708.60 3,708.60
7 Chips cft 100.00 m3 3,532.00 3,532.00
8 Filling sand cft 80.00 m3 2,825.60 2,825.60
9 Gravel cft 70.00 m3 2,472.40 2,472.40
10 Stone Dust cft 50.00 m3 1,766.00 1,766.00
11 Local Brick nos 16.00 nos 16.00 16.00
12 Rebar TMT kg 82.00 MT 82,000.00 450.00 82,450.00
13 Binding Wire kg 95.00 kg 95.00 95.00
14 500 gauge Polythene sheet kg 250.00 kg 250.00 250.00
15 12mm marine Plywood sft 100.00 m2 1,076.00 1,076.00
16 Timba (Sallo) cft 850.00 m3 30,022.00 30,022.00
17 G.I Wire (14g) kg 135.00 kg 135.00 135.00
18 Nail kg 98.00 kg 98.00 98.00
19 Concrete nail kg 225.00 kg 225.00 225.00
20 Burnt Mobil ltr 70.00 ltr 70.00 70.00
21 Diesel ltr 92.00 ltr 92.00 92.00
22 CN Plast kg 135.00 ltr 141.75 141.75
23 Stone cft 85.00 m3 3,002.20 3,002.20
24 Ceramic tile : Floor sft 200.00 m2 2,152.00 21.52 2,173.52
25 Ceramic tile : Wall sft 225.00 m2 2,421.00 21.52 2,442.52
Flag stone sft 75.00 m2 807.00 21.52 828.52
Telia tile sft 120.00 m2 1,291.20 21.52 1,312.72
26 Marble sft 250.00 m2 2,690.00 2,690.00
27 Metal pipe, angle with primmer kg 90.00 kg 90.00 90.00
28 Stone cladding tile sft 285.00 m2 3,066.60 3,066.60
29 Granite sft 450.00 m2 4,842.00 75.32 4,917.32
Marble sft 250.00 m2 2,690.00 75.32 2,765.32
30 Clay tile nos 17.00 nos 17.00 17.00
31 White cement bag 1,300.00 bag 1,300.00 1,300.00
32 Mosaic tile sft 50.00 m2 538.00 538.00
33 Sal Wood cft 6,000.00 m3 211,920.00 1,766.00 213,686.00
34 Sal wood plank cft 6,500.00 m4 229,580.00 1,766.00 231,346.00
19 mm x 6 mm, 375 mm long
35 flat iron hold fast kg 100.00 kg 100.00 100.00
36 Malaysian door for room nos 1,000.00 nos 1,000.00 1,000.00
37 Malaysian door toilet nos 900.00 nos 900.00 900.00
38 Sallo wood cft 1,600.00 m3 56,512.00 56,512.00
39 MS Plain rod kg 100.00 kg 100.00 100.00
Rate In NRs.
S/N Work Description Unit Quantity
In figure
MOBILIZATION WORK
1 EARTHWORK
EARTHWORK IN EXCAVATION
Excavation in any kind of soils at all levels by using mechanical means, including shoring, strutting, pumping and bailing
out water, de-watering if any so as to keep foundations in dry condition at any stage of work, drain the water away from
the Site through sub drain and connecting into main drain, stacking the excavated earth at proper place,and disposal of the
1.1 surplus earth out of the Site, as per specification, drawings and instruction of the Engineer, all complete. Rate should Cum 1411.34 952.00
include cost for extra earthwork for providing shoring and strutting, working space required for any kind of works
complete and as instructed.
Note : Length and breadth at bottom of foundation and depth from the top of average ground level to the bottom of
foundation only will be measured for payment irrespective of extra excavation taken for any purposes.
EARTHWORK DISPOSAL
1.3 Cum 941.95 1,569.00
Earthwork disposal of excess soil from site excated during excavation after filling required quantity
Page 2 of 42
Rate In NRs.
S/N Work Description Unit Quantity
In figure
DPM LAYING WORK
2.0 Providing and laying 500 gauge polythene sheet with proper lapping as per drawings, specifications and instruction of the Sqm 562.27 98.00
Engineer, all complete.
SOLING WORK
3 Providing and laying, dry flat brick soling in foundation trench and floor with chimney made bricks complete to level Sqm 562.27 1,162.00
including sand filling on joints, as per drawing, specification and instruction of the engineer, all complete.
II CONCRETE WORKS
STEEL REINFORCEMENT
Providing, straightening, cleaning, cutting, fabricating, bending and placing TMT Thermex steel reinforcement bars and
III binding the bars with 18 gauge annealed wire for tying them at each junction as per design and details for all types of
RCC elements including all waste and cut pieces, provision for spacers, chairs, providing and placing cement mortar (1:1)
cover blocks to keep the bars in the intended position at all levels, all complete.
Page 3 of 42
Rate In NRs.
S/N Work Description Unit Quantity
In figure
FORM WORK
Formwork, centering and shuttering with 12 mm thick waterproof plywood for all kinds of R.C.C. works of any shape,
IV size and at any level with necessary propping, scaffolding, staging, supporting, cutting holes for utilization works, etc.
including providing final surface in correct and perfect line, level, cleaning the surface and applying form oil and removal
of forms all complete as per specification, drawing and instruction of the Engineer.
12mm thick Water Proof Ply Form Work Sqm 4296.93 798.00
V BRICKWORK
230mm tk. chimney made brickwork in 1:5 Cement Sand Mortar including joint racking with approved tools, all
1.0 Cum 304.29 14,938.00
complete in foundation
Page 4 of 42
NT
DU
HOTEL OPTION)
5/28/2018
Rate In NRs.
Amount (NRs.)
In Words
1,500,000.00
1,343,594.04
38,892.22
1,477,918.56
Page 5 of 42
Rate In NRs.
Amount (NRs.)
In Words
55,102.23
653,355.02
483,165.67
7,963,303.51
11,692,835.36
Page 6 of 42
Rate In NRs.
Amount (NRs.)
In Words
15,013,709.60
3,428,951.56
4,545,498.97
Page 7 of 42
General Notes :
1 Tools & plants is (of Labor) 0.03
2 Over head and profit 0.15
3 Escalation Is applicable in case of Cement, Rebar, Aggregate, Sand and Brick or changing the quality of
4 Transportation by six wheeler vehical
Base Cost of Materials
Rate in FPS
S.No. Materials
Unit Rate
1 Cement (Aghakhanchi) for structure bag 875.00
2 Cement (Bhawani, force etc) for non structural work bag 765.00
3 Sand (belkhu washed, jwaukhel) cft 87.00
4 Aggregate (Mahadevbensi) cft 102.00
5 Stone chips (Bhakunde) cft 98.00
6 Chimney made Brick (Rajdhani) nos 16.00
7 500 micron DPM sheet kg 250.00
8 Supa plast lit 135.00
9 Rebar TMT (Himal) kg 81.74
10 Binding Wire kg 91.65
11 12mm marine Plywood sft 100.00
12 Timba cft 850.00
13 G.I Wire (14g) kg 135.00
14 Nail kg 98.00
15 Concrete nail kg 225.00
16 Burnt Mobil ltr 70.00
17 Diesel ltr 85.00
18 Ceramic Tile sft 120.00
19 Roofing tile 4"x6" sft 130.00
20 Telia tile sft 120.00
21 Indian Normal granite sft 450.00
22 Sal Wood for door frame cft 5,800.00
23 Sal wood for plank cft 6,500.00
24 Sal wood for decorative cft 6,800.00
25 32mm solid core shutter sft 275.00
In FPS
S.N Description
Rate Unit
1. Earthwork in excavation
1.1 Machine Excavation 18.00 Cft
1.2 Mannual Excavation 13.00 Cft
2. Earthwork in Filling
2.1 Available soil at site by compactor 12.00 Cft
2.2 Purchased soil by Compactor 12.00 Cft
3. Brick soiling
3.1 Flat brick soling 6.00 Sft
3.2 Brick on edge soling 12.00 Sft
4. DPM sheet 2.00 Sft
5. Concreting work
5.1 PCC (1:3:6) 50.00 cft
5.2 PCC for RCC (M20)) 65.00 cft
6. Normal Formwork 17.00 sft
7. ReinforcementWork 11.00 kg
8. Brickwork
8.1 9'' Brickwork 44.00 cft
8.2 4.5" Brickwork 25.00 sft
9. Faircase Brickwork
9.1 9'' Brickwork 100.00 cft
9.2 4.5" Brickwork 65.00 sft
10. Plaster Works
10.1 inside Plaster on Brick wall (20mm thick in 1:6 c/s) 18.00 Sft
10.2 Outside Normal Plaster (20 mm thick in 1:6 ratio) 20.00 sft
10.3 Plaster on jamb and sill 18.00 Rft
10.4 IPS 30.00 sft
10.5 Rain Drip 28.00 Rft
10.6 Decorative Plaster on Window 60.00 Rft
11.Ceramic Tile Work Works
11.1 Floor Tile 35.00 Sft
11.2 Wall tile 35.00 sft
11.3 Tile skirting 35.00 Rft
12. Granite Works
12.1 Skirting 65.00 Rft
12.2 window sill with polished moulding and rain drip 185.00 Rft
12.3 coping work at parapate wall 290.00 Rft
13. Roofing clay tile Works 45.00 Sft
14. Tellia Tiles
on floor normal design 45.00 Sft
on skirting 45.00 Rft
15. Wood works
15.1 Sal wood Door Frame 225.00 Cft
15.2 32mm both side teak commercial 115.00 Sft
15.3 32mm both side teak water proof 115.00 Sft
15.4 wooden pannel main door shutter 450.00 sft
15.5 wooden hand rail with post 500.00 Rft
15.6 Newal post 500.00 No
16. Decorative Work
16.1 4"x4" decorative post 2,500.00 Cft
16.2 Sal wood rafter and purlin 1,500.00 cft
16.3 1" thik plank on roof 500.00 cft
16.4 1" sal wood cladding 600.00 cft
16.5 decorative jali on window Sft
16.6 20mm plank on flooring
1 Labour
Excavation 1.00 m3
4 Tools & Plant @ 3 % of Labour
1 Labour
Disposal by 80 cft vehical 1.00 m3
1 Labour
Filling 1.00 m3
2 Labour
Labour charge 1.00 m2
2 Labour
Labour charge 1.00 m3
4 Tools & Plant @ 3 % of Labour
2 Labour
Labour charge 1.00 m3
9 Normal Formwork
Analysis for 1 m2
S.No. Description Quantity Unit
1 Material
12mm marine plywood 0.19 m2
Timba 0.01 m3
Nails 0.25 kgs
Concrete nail - kgs
GI wire 0.07 kgs
Diesel 0.01 ltr
Burnt mobil 0.03 ltr
Scaffolding Materials 1.00 m2
2 Labour
Labour charge 1.00 m2
2 Labour
Labour charge 1.00 mt
2 Labour 1.00 m3
Scaffolding cost 1.00 m3
2 Labour
Labour charge 1.00 m2
scaffolding 1.00 m2
2 Labour
Labour charge 1.00 m2
3 Scaffolding 1.00 m2
2 Labour
Labour charge 1.00 m2
3 Scaffolding 1.00 m2
a Totals of Materials, Labor & Tools and Plant
b Over head & Profit @ 15% of (a)
c Total (a+b)
Item Rate per 1m2
Item Rate per sft
2 Labour
Labour charge 1.00 m2
2 Labour
Labour charge 1.00 m
40 Granite on parapate wall coping with rain drip and polished moulding on both side
Analysis For 1 Rm
S. No. Description Quantity Unit
1 Materials
Granite 0.34 m2
Cement (Reliance,Gorkha Cement) 0.04 bags
Sand 0.01 m3
Miscellaneous (white cement/cloth etc) 1.00 m
2 Labour
Labour charge 1.00 m
28 32mm Solid core Door Shutter Work with Both Side Teak finish (commercial)
Analysis For 17.23Sft
S. No. Description Quantity Unit
1 Materials
32mm board commercial 18.09 Sft
Sasam Lattice 0.11 Cft
Tower Bolt (Steel 8") 2.00 no
Door Lock (Normal) 1.00 no
Hinges (Steel 4") 3.00 no
screw 30.00 no
Miscellaneous (Adheshive, nails etc) 1.00 no
Transportation
2 Labour
Labour charge 17.23 Sft
3 Tools & plants is (of Labor)
28 32mm Solid core Door Shutter Work with Both Side Teak finish (water proof)
Analysis For 17.23Sft
S. No. Description Quantity Unit
1 Materials
32mm board water proof 18.09 Sft
Sasam Lattice 0.11 Cft
Tower Bolt (Steel 8") 2.00 no
Door Lock (Normal) 1.00 no
Hinges (Steel 4") 3.00 no
screw 30.00 no
Miscellaneous (Adheshive, nails etc) 1.00 no
Transportation
2 Labour
Labour charge 17.23 Sft
3 Tools & plants is (of Labor)
30 Newal post
Analysis For 1 Pc
S. No. Description Quantity Unit
1 Materials
Sisau 0.25 Cft
Miscellaneous (Adheshive, nails etc) 1.00 no
2 Labour
Labour charge 1.00 Pc
3 Tools & plants is (of Labor)
47 Water proffing
Analysis For 1 Sft
S. No. Description Quantity Unit
1 Materials + Labour
Water proffing + grout 1.00 Sft
Cement 0.02 bag
33 Decorative railing MS
Analysis For 1 Rft
S. No. Description Quantity Unit
1 Materials + Labour
Sub contractor Rate 1.00 Rft
In MKS
Unit Rate
bag 875.00
bag 765.00
m3 3,072.84
m3 3,602.64
m3 3,461.36
nos 16.00
kg 250.00
lit 135.00
MT 81,739.20
kg 91.65
m2 1,076.00
m3 30,022.00
kg 135.00
kg 98.00
kg 225.00
ltr 70.00
ltr 85.00
m2 1,291.20
m2 1,398.80
m2 1,291.20
m2 4,842.00
m3 204,856.00
m3 229,580.00
m3 240,176.00
m2 2,959.00
In MKS
Rate Unit
635.76 m3
459.16 m3
423.84 m3
423.84 m3
64.56 m2
129.12 m2
21.52 m2
1,766.00 m3
2,295.80 m3
182.92 m2
11,000.00 MT
1,554.08 m3
269.00 m2
3,532.00 m3
699.40 m2
193.68 m2
215.20 m2
59.04 Rm
322.80 m2
91.84 Rm
196.80 Rm
376.60 m2
376.60 m2
114.80 Rm
213.20 Rm
606.80 Rm
951.20 Rm
483.75 m2
483.75 m2
147.60 Rm
7,947.00 m3
1,237.40 m2
1,237.40 m2
4,842.00 m2
1,640.00 Rm
500.00 No
88,300.00 m3
52,980.00 m3
17,660.00 m3
21,192.00 m3
Rate Amount
635.76 635.76
19.07
654.83
98.22
753.06
753.00
21.00
Rate Amount
883.00 883.00
26.49
909.49
136.42
1,045.91
1,046.00
30.00
Rate Amount
423.84 423.84
12.72
436.56
65.48
502.04
502.00
14.00
Rate Amount
16.00 678.40
3,072.84 40.29
21.52 21.52
0.65
740.85
111.13
851.98
852.00
79.00
Rate Amount
250.00 75.00
21.52 21.52
0.65
97.17
14.57
111.74
112.00
10.00
Rate Amount
775.00 3,410.00
3,072.84 1,444.23
3,602.64 3,206.35
1,766.00 1,766.00
52.98
9,879.56
1,481.93
11,361.50
11,361.00
322.00
Rate Amount
885.00 7,257.00
3,072.84 1,404.51
3,602.64 3,293.33
135.00 221.40
2,295.80 2,295.80
68.87
14,540.91
2,181.14
16,722.04
16,722.00
473.00
Rate Amount
885.00 7,876.50
3,072.84 1,444.23
3,602.64 3,242.38
135.00 360.45
2,295.80 2,295.80
68.87
15,288.23
2,293.24
17,581.47
17,581.00
498.00
Rate Amount
1,076.00 206.23
30,022.00 150.11
98.00 24.50
225.00 -
135.00 9.45
85.00 0.85
70.00 2.10
86.08 86.08
182.92 182.92
5.49
667.73
100.16
767.89
768.00
71.00
Rate Amount
82,189.20 86,298.66
91.65 916.51
11,000.00 11,000.00
330.00
98,545.17
14,781.78
113,326.95
113,327.00
113.00
Rate Amount
16.00 8,960.00
775.00 1,302.00
3,072.84 959.18
1,554.08 1,554.08
176.60 176.60
46.62
14,552.56
2,182.88
16,735.44
16,735.44
474.00
Rate Amount
16.00 1,024.00
775.00 178.25
3,072.84 98.95
269.00 269.00
53.80 53.80
8.07
1,632.07
244.81
1,876.88
1,876.88
174.00
Rate Amount
775.00 90.40
3,072.84 62.23
193.68 193.68
32.28 32.28
6.78
385.36
57.80
443.16
443.16
41.00
Rate Amount
775.00 108.48
3,072.84 59.74
215.20 215.20
53.80 53.80
437.21
65.58
502.79
502.79
47.00
Rate Amount
775.00 244.13
3,072.84 91.88
3,602.64 215.44
322.80 322.80
9.68
883.92
132.59
1,016.51
1,016.51
94.00
Rate Amount
1,312.72 1,443.99
775.00 226.77
3,072.84 200.47
161.40 161.40
322.80 322.80
9.68
2,365.11
354.77
2,719.87
2,719.87
253.00
Rate Amount
1,312.72 1,443.99
775.00 180.73
3,072.84 106.51
161.40 161.40
107.60 107.60
376.60 376.60
11.30
2,388.13
358.22
2,746.35
2,746.35
255.00
Rate Amount
1,312.72 145.28
775.00 18.18
3,072.84 10.72
49.20 49.20
114.80 114.80
3.44
341.62
51.24
392.87
392.87
120.00
Rate Amount
4,938.84 1,656.32
775.00 31.45
3,072.84 27.80
32.80 32.80
606.80 606.80
18.20
2,373.38
356.01
2,729.38
2,729.38
832.00
Rate Amount
4,938.84 1,656.32
775.00 31.45
3,072.84 27.80
32.80 32.80
951.20 951.20
28.54
2,728.11
409.22
3,137.33
3,137.33
957.00
Rate Amount
206,622.00 11,389.95
25.00 150.00
900.00 900.00
7,947.00 398.25
550.00 550.00
28.45
13,416.65
2,012.50
15,429.14
15,429.14
8,717.00
Rate Amount
255.00 4,613.33
6,000.00 660.00
280.00 560.00
2,000.00 2,000.00
150.00 450.00
2.50 75.00
300.00 300.00
115.00 1,981.45
59.44
10,699.23
1,604.88
12,304.11
12,304.11
714.00
Rate Amount
290.00 5,246.54
6,000.00 660.00
280.00 560.00
2,000.00 2,000.00
150.00 450.00
2.50 75.00
300.00 300.00
115.00 1,981.45
59.44
11,332.43
1,699.86
13,032.29
13,032.29
756.00
Rate Amount
6,000.00 34,937.10
280.00 560.00
2,000.00 2,000.00
200.00 1,200.00
2.50 75.00
500.00 500.00
350.00 8,505.00
255.15
48,032.25
7,204.84
55,237.09
55,237.09
2,273.00
Rate Amount
6,500.00 1,625.00
500.00 500.00
1,500.00 1,500.00
45.00
3,670.00
550.50
4,220.50
4,221.00
Rate Amount
5,649.00 5,649.00
5,649.00
564.90
6,213.90
6,213.90
578.00
Rate Amount
6,025.60 6,025.60
6,025.60
602.56
6,628.16
6,628.16
616.00
Rate Amount
40.00 40.00
885.00 13.28
53.28
7.99
61.27
61.00
Rate Amount
16.00 16.00
16.00
2.40
18.40
18.00
Rate Amount
12.00 12.00
12.00
1.80
13.80
14.00
Rate Amount
13.00 13.00
13.00
1.95
14.95
15.00
Rate Amount
16.00 16.00
16.00
2.40
18.40
18.00
Rate Amount
18.00 18.00
18.00
2.70
20.70
21.00
Rate Amount
18.00 18.00
18.00
2.70
20.70
21.00
Rate Amount
110.00 110.00
110.00
16.50
126.50
127.00
Rate Amount
650.00 650.00
650.00
97.50
747.50
748.00
Sub total
S.N Particulars No. Length Breadth Height Quantity Total quantity Unit Rate Amount Remark
quantity
1 Site clerance and Removal of old CGI sheeti 1 1.00 1.00 LS 10,000.00 10,000.00
South side class room near south road 1 78.00 18.5 1443.00
3 1.5'' medium black pipe rafter and purlin 768.29 kg 140.00 107,560.98
Passage are near stage (way to inside block) 1 50.00 0.75 2.00 75.00
East side class room of inside block 1 69.00 0.75 2.00 103.50
South side class room near south road 1 115.00 0.75 2.00 172.50
Passage are near stage (way to inside block) 2 50.00 0.75 2.00 150.00
East side class room of inside block 2 69.00 0.75 2.00 207.00
South side class room near south road 2 115.00 0.75 2.00 345.00
Total 718,624.66