of Conveyable Material
with
Wirtgen Surface Miners
1
Transportation of raw materials out of the mine
Truck versus Conveyor
Competition of Systems
Present circumstances favour conveyors:
- Energy cost
- Personnel cost
2
Conveyor transport requirements
• IPCC • SMC
– In - Surface Miner
– Pit
– Crushing
=
Production of conveyable particle size
for
conveyor transport
3
Wirtgen Surface Miner
4
A Surface Miner – here’s how it works
Slewing and
height-adjustable
discharge conveyor
Working direction
5
Capabilities of Surface Miners
The following jobs are not longer required:
6
General Description
of
Conveyor System
in a given
Mining System
7
General descriptions of mining and conveying system
8
General description - block advance and ramp layout
9
Mining Sequences
10
Starting block mining
11
Starting block - removal of turning area material
12
Standard block mining on a continuous slope
Starting configuration
13
Standard block finished - leaving a continuous slope
14
Final slope partly used as a ramp
15
Conveyor location after further strips finished
16
Prairie / DMS Flexiveyor
Continuous Haulage System
17
Flexiveyor - Generation III
18
Conceptual modelling
19
Wirtgen Surface Miner
20
Operating Possibilities
of the
Surface Miner / Conveyor System
22
1st Cut (max. distance 16 m)
23
2nd Cut (max. distance 12 m)
24
3rd Cut (distance 8 m)
25
4th Cut (distance 4 m)
26
Shifting of the
Mobile Conveyor
27
Shifting of mobile conveyor
1st layer, starting configuration
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
28
Shifting of mobile conveyor
1st layer, 2nd sequence
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
29
Shifting of mobile conveyor
1st layer, 3rd sequence
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
30
Shifting of mobile conveyor
1st layer, final sequence
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
Ramp for conveyor 1:4, established by dozer
31
Shifting of mobile conveyor
2nd layer, starting configuration
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
Ramp for conveyor 1:4, established by dozer
32
Shifting of mobile conveyor
2nd layer, 1st sequence
Not to scale
Cutting width 4m
Cutting depth 0,5m
Travel speed of conveyor ≥2m/min
Ramp for conveyor 1:4, established by dozer
33
Conclusion
34
Surface Miner owners benefit from:
SURFACE MINER
FLEXIVEYOR
Fast repositioning in length- and cross direction
Loadable on the entire length
35