PROJECT: MBR MULBERRY HILL PHASE III DETB1ILS OF CONNECTED LOAD/MAX.

DEMAND AREA: Main Building


PLANNED COMPLETION DATE: OWNER: DUBAI HILLS ESTATE LLC PLOT No.: 631-6286
EMCC-TA-S-B01 CONSULTANT: NEB LOCATION: BASEMENT FLOOR
FED FROM : ESMDB-TC-S-B01
CABLE SIZE, TYPE AND NO. OF TOTAL MAX. PROPOSED TYPE & No. OF
LENGTH ECC CONNECTED LOAD - kW
CIRCUIT / FAULT CORES CONN- DEMAND kWh METERS
ACB/MCCB/ OF SIZE -
FEEDER SP / TP DUTY NO. OF ECTED LOAD LV/HV REMARKS
ISOLATOR TYPE XLPE / CABLE 1C, R - PH Y - PH B - PH 1 - PH 3- PH
DB No. kA SIZE CORES LOAD (MDL) CT (3)
PVC /SWA (m) mm2 kW kW kW (1) (2)
1C/2C/3 (TCL) KW
INCOMER 630 TP 35 2x240 FR4 4 100 240 49.79 49.79 49.79 149.36 149.36

OUTGOING:

AHU-BF-01-01 20 TP 25 4 FR4 3 120 4 1.00 1.00 1.00 3.00 3.00 __ __ __ DIRECT ONLINE STARTER

DIRECT ONLINE STARTER


AHU-BF-01-01 20 TP 25 4 FR4 3 120 4 1.00 1.00 1.00 3.00 3.00 __ __ __
STANDBY LOAD

AHU-BF-01-02 20 TP 25 4 FR4 3 35 4 1.00 1.00 1.00 3.00 3.00 __ __ __ DIRECT ONLINE STARTER

DIRECT ONLINE STARTER


AHU-BF-01-02 20 TP 25 4 FR4 3 35 4 1.00 1.00 1.00 3.00 3.00 __ __ __
STANDBY LOAD

EF-BF-01 63 TP 25 25 FR4 3 130 16 6.17 6.17 6.17 18.50 18.50 __ __ __ VFD STARTER

EF-BF-02 63 TP 25 25 FR4 3 70 16 6.17 6.17 6.17 18.50 18.50 __ __ __ VFD STARTER

EF-BF-03 63 TP 25 25 FR4 3 50 16 6.17 6.17 6.17 18.50 18.50 __ __ __ VFD STARTER

CP(SP-BF-02-01/02) 20 TP 25 4 FR4 4 100 4 1.47 1.47 1.47 4.40 4.40 __ __ __

CP(SP-BF-03-01/02) 20 TP 25 4 FR4 4 100 4 0.67 0.67 0.67 2.00 2.00 __ __ __

CP(SP-BF-03-03/04) 20 TP 25 4 FR4 4 35 4 0.67 0.67 0.67 2.00 2.00 __ __ __

CP(SP-BF-03-05/06) 20 TP 25 4 FR4 4 30 4 0.67 0.67 0.67 2.00 2.00 __ __ __

EF-GF-01 63 TP 25 25 FR4 3 50 16 5.00 5.00 5.00 15.00 15.00 __ __ __ VFD STARTER

EF-GF-02 63 TP 25 25 FR4 3 90 16 5.00 5.00 5.00 15.00 15.00 __ __ __ VFD STARTER

EF-GF-03 63 TP 25 25 FR4 3 120 16 5.00 5.00 5.00 15.00 15.00 __ __ __ VFD STARTER

EF-GF-04 63 TP 25 25 FR4 3 25 16 5.00 5.00 5.00 15.00 15.00 __ __ __ VFD STARTER

FF-GF-01 20 SP 25 4 FR4 3 70 4 0.50 0.50 0.50 1.50 1.50 __ __ __ DIRECT ONLINE STARTER

SPARE 20 __ __ __ __ __ __ __ 1.66 1.66 1.66 4.98 4.98 __ __ __

SPARE 20 __ __ __ __ __ __ __ 1.66 1.66 1.66 4.98 4.98 __ __ __

MDB CONNECTED TO: TR-TC-3 TOTAL CONNECTED LOAD PER PHASE 49.79 49.79 49.79 149.36 149.36 TOTAL

MAX. DEMAND (3 ph): 149.36 kW AT 1 DIVERSITY TOTAL CONNECTED LOAD (3 PH): 149.36
CONSULTANT: Dar Al- Handasah TEL: 04 - 33 55 502
Type of Meter (Rating of Incomer): (1) Up to 60 A (2) Up to 125 A (3) LV CT …./…A ******* / ****** A