CAMPUS DEVELOPMENT AND MAINTENANCE OFFICE

University of the Philippines Visayas


Miagao, Iloilo

PROJECT ACCOMPLISHMENT REPORT

Project Name : Design of the School of Technology (SOTECH) Building


Location : UPV Campus, Miagao, Iloilo
Contractor : FFJJ CONSTRUCTION
Contract Amount : Php 69,321,351.72
Start of Contract : March 26,2017
Target Date of Completion : 13-May-17

Item
Description Quantity Unit Unit Cost
No.

I. GENERAL REQUIREMENT
1. Mobilization/Demobilization 1.00 lot. 442,960.00
2. Temporary Facilities
a. Fence Enclosure/Bunkhouse and Office 1.00 lot. 189,840.00

b. Provision and Consumption of Electricity/Water 1.00 lot. 632,800.00


1.65 c. Safety and Health 1.00 lot. 632,800.00
II. SITE WORK
1. Clearing, Grubbing & Lay -out 1.00 lot. 73,404.80
2. Excavation 1.00 lot. 677,096.00
3. Gravel Base 289.80 cu.m. 759.36
4. Backfilling 511.00 cu.m. 442.96
5 Soil Treatment 3,450.00 sq.m. 88.59
III. CONCRETE WORKS
1. Footing 1.00 lot. 1,428,216.94
2. Column(ground flr) 1.00 lot. 1,622,220.77
3 Column (2nd Flr) 1.00 lot. 1,268,042.61
4 Tie Beam 1.00 lot. 1,999,407.54
5 2nd Floor Beam 1.00 lot. 2,899,413.66
6 3rd Floor Beams 1.00 lot. 3,103,782.75
7 Slab (Ground) 1.00 lot. 1,752,400.38
8 Slab(2nd Floor) 1.00 lot. 2,874,240.88
9 Slab(3rd Floor) 1.00 lot. 4,025,177.52
10 Stainless Steel Grating 1.00 lot. 2,103,427.20
11 Entrance Canopy 1.00 lot. 1,321,450.93
12 Stairs 1.00 lot. 2,010,684.03
13 Elevator Shaf 1.00 lot. 1,028,983.42
14 Ramps 1.00 lot. 466,183.76
IV. MASONRY
1 Wall (Ground Floor) 1.00 lot. 1,641,078.21
2 Wall (2nd Floor) 1.00 lot. 1,930,849.98
V. FORMWORKS & SCAFFOLDINGS
1. Forms & Scaffoldigns 1.00 lot. 1,186,500.00
VI. THERMAL & MOISTURE PROTECTION
1. Waterproofing 1.00 lot. 1,045,306.50
VII. DOORS, WINDOWS & HARDWARES 1.00 lot. 6,037,367.62
VIII. FINISHES
1. Floor Finishes 1.00 lot. 4,895,632.51
2. Ceiling Works 1.00 lot. 1,780,319.52
3 Painting Works 1.00 lot. 2,278,080.00
IX. PLUMBING WORKS
1. pipes & fittings, fixtures, pressure pump and w 1.00 lot. 2,438,798.54
tank set and septic tank
X. ELECTRICAL
1. Ground Floor 1.00 lot. 2,514,747.20
2. Second Floor 1.00 lot. 2,826,704.94
XI. MECHANICAL WORKS
1. sprinkler system 1.00 lot. 2,657,760.00
2 Ventilation System 1.00 lot. 1,056,776.00
3 Centralized Ducting Works 1.00 lot. 4,746,000.00
XII. ELECTRONICS & COMMUNICATION WORKS
1. FDAD, PABX/Telephone system & cctv system 1.00 lot. 980,840.00
TOTAL

Prepared by:

JAYZON ANDOY
Project Engr. In-Charge
FFJJ CONSTRUCTION

Noted by:

OSMEÑA PALANGGALAN
Owner/Gen.Manager
FFJJ CONSTRUCTION
E OFFICE
s

gy (SOTECH) Building and Construction of Phase 1

TOTAL AMOUNT % Weight march 26-april 1 april 2-8

442,960.00 0.64% 10.00% 0.06% 15.00%

189,840.00 0.27% 25.00% 0.07% 15.00%


2.74%
632,800.00 0.91% 10.00% 0.09% 15.00%
632,800.00 0.91% 1.65%/week 2.00% 0.02% 3.50%

73,404.80 0.11% 70.00% 0.07% 70.00%


677,096.00 0.98% 40.00% 0.39% 50.00%
220,062.53 0.32% 2.17% 5.00% 0.02% 15.00%
226,352.56 0.33% 0.00%
305,642.40 0.44% 0.00%

1,428,216.94 2.06% 0.00% 10.00%


1,622,220.77 2.34% 0.00%
1,268,042.61 1.83% 0.00% 5.00%
1,999,407.54 2.88% 0.00%
2,899,413.66 4.18% 0.00%
3,103,782.75 4.48% 0.00%
1,752,400.38 2.53% 0.00%
40.25%
2,874,240.88 4.15% 0.00%
4,025,177.52 5.81% 0.00%
2,103,427.20 3.03% 0.00%
40.25%

1,321,450.93 1.91% 0.00%


2,010,684.03 2.90% 0.00%
1,028,983.42 1.48% 0.00%
466,183.76 0.67% 0.00%

1,641,078.21 2.37% 0.00%


5.15%
1,930,849.98 2.79% 0.00%

1,186,500.00 1.71% 1.71% 5.00% 0.09% 10.00%

1,045,306.50 1.51% 1.51% 0.00%


6,037,367.62 8.71% 8.71% 0.00%

4,895,632.51 7.06% 0.00%


1,780,319.52 2.57% 12.92% 0.00%
2,278,080.00 3.29% 0.00%

2,438,798.54 3.52% 3.52% 0.00%


0.00%

2,514,747.20 3.63% 0.00%


7.71%
2,826,704.94 4.08% 0.00%

2,657,760.00 3.83% 0.00%


1,056,776.00 1.52% 12.20%
4,746,000.00 6.85%

980,840.00 1.41% 1.41% 0.00%


69,321,351.72 100.00% 100% 0.81%
Accomplishment for the week

Checked by:

Engr. Ricar D. Francisco


Project Inspector In-charge
april 2-8 april 9-15 april 16-22 april 23-29 april 30-may 6

0.10% 15.00% 0.10% 20.00% 0.13% 20.00% 0.13% 20.00%

0.04% 15.00% 0.04% 20.00% 0.05% 20.00% 0.05% 20.00%

0.14% 15.00% 0.14% 20.00% 0.18% 20.00% 0.18% 22.00%


0.03% 5.00% 0.05% 6.50% 0.06% 8.00% 0.0730% 9.65%

0.07% 80.00% 0.08% 85.00% 0.09% 90.00% 0.10% 92.00%


0.49% 60.00% 0.59% 60.00% 0.59% 80.00% 0.78% 90.00%
0.05% 30.00% 0.10% 50.00% 0.16% 50.00% 0.16% 50.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.21% 10.00% 0.21% 10.00% 0.21% 15.00% 0.31% 15.00%
0.00% 0.00% 0.00%
0.09% 5.00% 0.09% 8.00% 0.15% 12.00% 0.22% 12.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 5.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.17% 10.00% 0.17% 15.00% 0.26% 20.00% 0.34% 23.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
1.38% 1.55% 1.87% 2.34%
0.58% 0.17% 0.31% 0.48%
april 30-may 6

0.13%

0.05%

0.20%
0.0000%

0.10%
0.88%
0.16%
0.00%
0.00%
0.00%
0.31%

0.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.15%

0.00%
0.00%

0.00%
0.39%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
2.59%
0.24%
may 7-13 may 14-20 may 21-27 may 28-june 3

16.00% 0.10% 18.00% 0.12% 20.00% 0.13% 25.00%

25.00% 0.07% 30.00% 0.08% 35.00% 0.10% 40.00%

25.00% 0.23% 30.00% 0.27% 35.00% 0.32% 40.00%


11.00% 0.10% 12.65% 0.12% 14.00% 0.13% 15.65%

93.00% 0.10% 93.00% 0.10% 95.00% 0.10% 100.00%


92.00% 0.90% 100.00% 0.98% 100.00% 0.98% 100.00%
55.00% 0.17% 57.00% 0.18% 65.00% 0.21% 70.00%
5.00% 0.02% 10.00% 0.03% 15.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
20.00% 0.41% 25.00% 0.52% 30.00% 0.62% 35.00%
0.00% 5.00% 0.12% 10.00% 0.23% 10.00%
14.00% 0.26% 15.00% 0.27% 20.00% 0.37% 20.00%
0.00% 10.00% 0.29% 15.00% 0.43% 20.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
6.00% 0.17% 0.00% 8.00% 0.23% 10.00%
0.00% 0.00%
0.00% 0.00%

0.00% 0.00% 0.00%


0.00%
0.00%
25.00% 0.43% 25.00% 0.43% 28.00% 0.48% 30.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 2.00% 0.07% 4.00% 0.15% 5.00%
0.00% 2.00% 0.08% 4.00% 0.16% 5.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
2.94% 3.64% 4.66%
0.36% 0.69% 1.02%
may 28-june 3 june 4-10 june 11-17 june 18-24

0.16% 30.00% 0.19% 35.00% 0.22% 40.00% 0.26%

0.11% 45.00% 0.12% 50.00% 0.14% 15.00% 0.04%

0.37% 45.00% 0.41% 48.00% 0.44% 50.00% 0.46%


0.14% 17.00% 0.16% 18.50% 0.17% 20.00% 0.18%

0.11% 100.00% 0.11% 100.00% 0.11% 100.00% 0.11%


0.98% 100.00% 0.98% 100.00% 0.98% 100.00% 0.98%
0.22% 75.00% 0.24% 78.00% 0.25% 85.00% 0.27%
0.05% 20.00% 0.07% 25.00% 0.08% 30.00% 0.10%
0.00% 0.00% 0.00% 0.00%

0.72% 40.00% 0.82% 45.00% 0.93% 50.00% 1.03%


0.23% 15.00% 0.35% 15.00% 0.35% 20.00% 0.47%
0.37% 20.00% 0.37% 20.00% 0.37% 22.00% 0.40%
0.58% 25.00% 0.72% 20.00% 0.58% 25.00% 0.72%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 5.00% 0.29%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.29% 10.00% 0.29% 20.00% 0.58% 22.00% 0.64%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.51% 33.00% 0.56% 35.00% 0.60% 35.00% 0.60%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.18% 5.00% 0.18% 5.00% 0.18% 5.00% 0.18%
0.20% 5.00% 0.20% 5.00% 0.20% 5.00% 0.20%
0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00%
5.22% 5.77% 6.16% 6.92%
0.56% 0.55% 0.40% 0.76%
june 25-july 1 july 2-8 july 9-15 july 16-22

45.00% 0.29% 50.00% 0.32% 52.00% 0.33% 55.00%

20.00% 0.05% 25.00% 0.07% 50.00% 0.14% 60.00%

50.00% 0.46% 50.00% 0.46% 50.00% 0.46% 50.00%


22.00% 0.20% 25.00% 0.23% 26.45% 0.24% 28.00%

100.00% 0.11% 100.00% 0.11% 100.00% 0.11% 100.00%


100.00% 0.98% 100.00% 0.98% 100.00% 0.98% 100.00%
85.00% 0.27% 85.00% 0.27% 85.00% 0.27% 85.00%
35.00% 0.11% 45.00% 0.15% 55.00% 0.18% 75.00%
0.00% 15.00% 0.07% 25.00% 0.11% 50.00%

55.00% 1.13% 65.00% 1.34% 75.00% 1.55% 90.00%


25.00% 0.59% 35.00% 0.82% 45.00% 1.05% 80.00%
25.00% 0.46% 25.00% 0.46% 27.00% 0.49% 30.00%
30.00% 0.87% 30.00% 0.87% 50.00% 1.44% 80.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
5.00% 0.29% 5.00% 0.29% 10.00% 0.58% 20.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
25.00% 0.73% 25.00% 0.73% 25.00% 0.73% 30.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 5.00% 0.12% 10.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
37.00% 0.63% 38.00% 0.65% 40.00% 0.68% 42.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
5.00% 0.18% 5.00% 0.18% 5.00% 0.18% 5.00%
5.00% 0.20% 5.00% 0.20% 5.00% 0.20% 5.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
7.54% 8.17% 9.84%
0.62% 0.63% 1.67%
july 16-22 july 23-29 july 30-aug 5 aug 6-12

0.35% 70.00% 0.45% 70.00% 0.45% 70.00% 0.45%

0.16% 90.00% 0.25% 90.00% 0.25% 90.00% 0.25%

0.46% 30.00% 0.27% 32.00% 0.29% 32.00% 0.29%


0.26% 30.00% 0.27% 31.65% 0.29% 32.00% 0.29%

0.11% 100.00% 0.11% 100.00% 0.11% 100.00% 0.11%


0.98% 100.00% 0.98% 100.00% 0.98% 100.00% 0.98%
0.27% 85.00% 0.27% 85.00% 0.27% 85.00% 0.27%
0.24% 75.00% 0.24% 75.00% 0.24% 85.00% 0.28%
0.22% 10.00% 0.04% 70.00% 0.31% 70.00% 0.31%

1.85% 100.00% 2.06% 100.00% 2.06% 100.00% 2.06%


1.87% 95.00% 2.22% 95.00% 2.22% 95.00% 2.22%
0.55% 35.00% 0.64% 35.00% 0.64% 35.00% 0.64%
2.31% 100.00% 2.88% 100.00% 2.88% 100.00% 2.88%
0.00% 5.00% 0.21% 5.00% 0.21% 5.00% 0.21%
0.00% 35.00% 1.57% 40.00% 1.79% 40.00% 1.79%
0.00% 5.00% 0.13% 5.00% 0.13% 5.00% 0.13%
0.00% 0.00% 0.00% 0.00%
1.16% 35.00% 2.03% 35.00% 2.03% 35.00% 2.03%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.87% 35.00% 1.02% 35.00% 1.02% 40.00% 1.16%
0.00% 30.00% 0.45% 30.00% 0.45% 32.00% 0.47%
0.00% 0.00% 0.00% 0.00%

0.24% 15.00% 0.36% 15.00% 0.36% 15.00% 0.36%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.72% 45.00% 0.77% 45.00% 0.77% 46.00% 0.79%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.18% 5.00% 0.18% 5.00% 0.18% 5.00% 0.18%
0.20% 5.00% 0.20% 5.00% 0.20% 5.00% 0.20%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
13.00% 17.60% 18.12% 18.35%
3.16% 4.60% 0.52% 0.23%
aug 13-19 aug 20-26

70.00% 0.45% 70% 0.45%


0.00%
91.00% 0.25% 91% 0.25%

34.00% 0.31% 35% 0.32%


34.00% 0.31% 35% 0.32%

100.00% 0.11% 100% 0.11%


100.00% 0.98% 100% 0.98%
85.00% 0.27% 85% 0.27%
85.00% 0.28% 85% 0.28%
70.00% 0.31% 70% 0.31%

100.000% 2.06% 100% 2.06%


95.00% 2.22% 95% 2.22%
35.00% 0.64% 35% 0.64%
100.00% 2.88% 100% 2.88%
5.00% 0.21% 5% 0.21%
40.00% 1.79% 40% 1.79%
5.00% 0.13% 5% 0.13%
0.00% 0.00%
35.00% 2.03% 35% 2.03%
5.00% 0.15% 5% 0.15%
0.00% 0.00%
40.00% 1.16% 40% 1.16%
32.00% 0.47% 35% 0.52%
0.00% 5% 0.03%

15.00% 0.36% 15% 0.36%


0.00% 0.00%
0.00%
48.00% 0.82% 49% 0.84%
0.00%
0.00% 0.00%
0.00%
0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00%
0.00% 0.00%
0.00% 0.00%
0.00%
5.00% 0.18% 5.00% 0.18%
5.00% 0.20% 5.00% 0.20%
0.00%
0.00% 0.00%

0.00%
0.00% 0.00%
18.57% 18.68%
0.23% 0.34%

234,811.45
aug 20-26 aug 27-sept 2 sept 3-9 sept 10-16

70% 0.45% 70% 0.45% 70% 0.45% 70%

92% 0.25% 92% 0.25% 92% 0.25% 92%

35% 0.32% 35% 0.32% 37% 0.34% 40%


36% 0.33% 38% 0.35% 40% 0.37% 42%

100% 0.11% 100% 0.11% 100% 0.11% 100%


100% 0.98% 100% 0.98% 100% 0.98% 100%
85% 0.27% 85% 0.27% 85% 0.27% 85%
85% 0.28% 85% 0.28% 85% 0.28% 85%
70% 0.31% 70% 0.31% 70% 0.31% 70%

100% 2.06% 100% 2.06% 100% 2.06% 100%


95% 2.22% 95% 2.22% 95% 2.22% 95%
35% 0.64% 35% 0.64% 35% 0.64% 35%
100% 2.88% 100% 2.88% 100% 2.88% 100%
5% 0.21% 5% 0.21% 10% 0.42% 10%
40% 1.79% 40% 1.79% 40% 1.79% 40%
5% 0.13% 5% 0.13% 5% 0.13% 5%
0.00% 0.00% 0.00%
35.00% 2.03% 37.00% 2.15% 40% 2.32% 40%
10.00% 0.30% 13.00% 0.39% 15% 0.46% 17%
0.00% 0.00% 0.00%
40.00% 1.16% 40.00% 1.16% 40% 1.16% 40%
37.00% 0.55% 38.00% 0.56% 40% 0.59% 40%
10.00% 0.07% 13.00% 0.09% 15% 0.10% 20%

15% 0.36% 15% 0.36% 15% 0.36% 15%


5% 0.14% 10% 0.28% 15% 0.42% 20%
0.00%
50% 0.86% 50% 0.86% 51% 0.87% 52.00%
0.00%
0.00% 0.00% 0.00%
0.00%
0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00%
0.00% 0.00% 10% 0.35% 15%
0.00% 0.00% 0.00%
0.00%
5.00% 0.18% 5.00% 0.18% 5% 0.18% 5%
5.00% 0.20% 5.00% 0.20% 10% 0.41% 13%
0.00%
0.00% 0.00% 0.00%

0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.07% 19.47% 20.70%
0.38% 0.40% 1.24%
sept 10-16 sept 17-23 sept 24-30 oct 1-7

0.45% 70% 0.45% 70% 0.45% 0.00%


0.00%
0.25% 92% 0.25% 92% 0.25% 0.00%

0.37% 40% 0.37% 40% 0.37% 0.00%


0.38% 44% 0.40% 46% 0.42% 0.00%
0.00%
0.11% 100% 0.11% 100% 0.11% 0.00%
0.98% 100% 0.98% 100% 0.98% 0.00%
0.27% 85% 0.27% 85% 0.27% 0.00%
0.28% 85% 0.28% 85% 0.28% 0.00%
0.31% 70% 0.31% 70% 0.31% 0.00%

2.06% 100% 2.06% 100% 2.06% 0.00%


2.22% 95% 2.22% 95% 2.22% 0.00%
0.64% 35% 0.64% 35% 0.64% 0.00%
2.88% 100% 2.88% 100% 2.88% 0.00%
0.42% 15% 0.63% 15% 0.63% 0.00%
1.79% 40% 1.79% 40% 1.79% 0.00%
0.13% 5% 0.13% 5% 0.13% 0.00%
0.00% 0.00% 0.00% 0.00%
2.32% 40% 2.32% 40% 2.32% 0.00%
0.52% 20% 0.61% 25% 0.76% 0.00%
0.00% 0.00% 0.00% 0.00%
1.16% 40% 1.16% 40% 1.16% 0.00%
0.59% 42% 0.62% 42% 0.62% 0.00%
0.13% 25% 0.17% 0.00% 0.00%

0.36% 15% 0.36% 15% 0.36% 0.00%


0.56% 22% 0.61% 25%
0.00% 0.00% 0.00% 0.00%
0.89% 53% 0.91% 53% 0.91% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 10% 0.87% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.53% 18% 0.63% 18% 0.63% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.18% 5% 0.18% 5% 0.18% 0.00%
0.53% 14% 0.57% 15% 0.61% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
21.30% 21.90% 22.20% 0.00%
0.59% 0.60% 0.30% -22.20%

208,498.23
oct 8-14 oct 15-21 oct 22-28 oct 29-nov 4

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

1st billing
2nd billing
oct 29-nov 4 nov 5-11 nov 12-18 nov 19-25

0.00% 0.00% 0.00% 0.00%


0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

25%
51.17%
nov 26-dec 1 dec 2-8 dec 9-15 dec 16-22

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00%
0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
dec 16-22 dec 23-29 dec 30-jan 5 jan 6-12

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

Approved by:

Engr. Rolando S. Jamero


Chief CDMO
jan 6-12 jan 13-19 jan 20-26 jan 27-feb 2

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
feb 3-9 feb 10-16 feb 17-23 feb 24-march 2

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%


0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
feb 24-march 2 march 3-9 march 10-16 march 17-23 march 24-30

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
march 31-april 6 april 7-13 april 14-20 april 21-27 april 28-may 2

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
may 3-9 may 10-16

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%
0.00% 0.00%

0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%

0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%

0.00% 0.00%

0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
Name of Project : Proposed School of Technology (SOTECH) Building Phase 2
Location : UPV Campus, Miagao, Iloilo
Contractor : FFJJ CONSTRUCTION
Contract Amount : Php 69,321,351.72
Start of Contract : March 26, 2017
Date of Completion : May 14, 2018

Item DESCRIPTION Quantity Unit


No.

I. GENERAL REQUIREMENT 1 lot.

1. Mobilization/Demobilization 1.00 lot.

2. Temporary Facilities

a. Fence Enclosure/Bunkhouse and Office 1.00 lot.

b. Provision and Consumption of Electricity/Water lot.


1.00
c. Safety and Health 1.00 lot.

II. SITE WORK 451 sq.m.

1. Clearing, Grubbing & Lay -out 1.00 lot.

2. Excavation 1.00 lot.

3. Gravel Base 289.80 cu.m.

4. Backfilling 511.00 cu.m.

5 Soil Treatment 3450.00 sq.m.

III. CONCRETE WORKS 1.00 lot.

1. Footing 1.00 lot.

2. Column(ground flr) 1.00 lot.

3 Tie Beam 1.00 lot.

4 Column (2nd Flr) 1.00 lot.

5 2nd Floor Beam 1.00 lot.

6 Slab(2nd Floor) 1.00 lot.

7 3rd Floor Beams 1.00 lot.

8 1.00 lot.
Slab(3rd Floor)
9 Slab (Ground) 1.00 lot.

10 Stainless Steel Grating 1.00 lot.

11 Entrance Canopy 1.00 lot.


12 Stairs 1.00 lot.

13 Elevator Shaf 1.00 lot.

14 1.00 lot.
Ramps

IV. MASONRY 826.83 sq.m.

1 Wall (Ground Floor) 1.00 lot.

2 Wall (2nd Floor) 2.00 lot.

V. FORMWORKS & SCAFFOLDINGS 1.00 lot.

VI. THERMAL & MOISTURE PROTECTION 451.00 sq.m.

VII. DOORS, WINDOWS & HARDWARES 1.00 lot.

VIII. FINISHES 1.00 lot.

1. 1.00 lot.
Floor Finishes
2. 1.00 lot.
Ceiling Works
3 1.00 lot.
Painting Works

IX. PLUMBING WORKS 1.00 lot.

X. ELECTRICAL 1.00 lot.

1. Ground Floor 1.00 lot.

2. Second Floor 1.00 lot.

XI. MECHANICAL WORKS 1.00 lot.

1. Sprinkler system 1.00 lot.

2 Ventilation System 2.00 lot.

3 3.00 lot.
Centralized Ducting Works

XII. ELECTRONICS & COMMUNICATIONS 1.00 lot.


TOTAL

PHYSICAL ACCOMPLISHMENT
PLAN
FINANCIAL ACCOMPLISHMENT

PHYSICAL ACCOMPLISHMENT
ACTUAL
FINANCIAL ACCOMPLISHMENT
FINANCIAL ACCOMPLISHMENT

LEGEND:

AS PER PLAN
ACTUAL

Prepared by: Recommended:

RICAR D. FRANCISCO ROLANDO S. JA


Inspector/Project-in-Charge Chief, CDM

Validated/Certified:

MARIO M. MORANO EMELIZA C. LO


Civil Engineer, CDMO Dean, School of Te
LEGEND : DRIVER = 1
FM = FOREMAN SO = 1
M = MASON FM = 1
SM = STEEL MAN L = 15
C = CARPENTER
E = ELECTRICIAN
L = LABOR / HELPER
S0 = SAFETY OFFICER
TECH) Building Phase 2
.

1ST WEEK 2nd WEEK 3rd WEEK

AMOUNT % Weight No. of Days March 26-april 1 april 2-8 april 9-15

1,898,400.00 2.74%

442,960.00 0.64% 40 0.11% ###

189,840.00 0.27% 20
0.08% 0.10%
632,800.00 0.91% 32
0.20%
632,800.00 0.9128501% 436 0.0001465585 0.0001465585 0.0001465585

1,502,558.29 2.17%

73,404.80 0.11% 10

677,096.00 0.98% 25

220,062.53 0.32% 10

226,352.56 0.33% 15

305,642.40 0.44% 10

27,903,632.40 40.25%

1,428,216.94 2.06% 25

1,622,220.77 2.34% 20

1,999,407.54 2.88% 15

1,268,042.61 1.83% 30

2,899,413.66 4.18% 25

2,874,240.88 4.15% 25

3,103,782.75 4.48% 25

4,025,177.52 5.81% 25

1,752,400.38 2.53% 30

2,103,427.20 3.03% 40

1,321,450.93 1.91% 25
2,010,684.03 2.90% 40

1,028,983.42 1.48% 25

466,183.76 0.67% 40

3,571,928.19 5.15%

1,641,078.21 2.37% 50

1,930,849.98 2.79% 38

1,186,500.00 1.71% 140

1,045,306.50 1.51% 30

6,037,367.62 8.71% 34

8,954,032.03 12.92%

4,895,632.51 7.06% 50

1,780,319.52 2.57% 30

2,278,080.00 3.29% 46

2,438,798.54 3.52% 30

5,341,452.14 7.71%

2,514,747.20 3.63% 30

2,826,704.94 4.08% 30

8,460,536.00 12.20%

2,657,760.00 3.83% 30

1,056,776.00 1.52% 20

4,746,000.00 6.85% 30
1.38% 1.55%
0.13%
0.24% 0.55%
980,840.00 1.41% 36 0.00%

69,321,351.72 100.00%
Weekly 0.13% 0.11% 0.31%
Cumulative 0.13% 0.24% 0.55%
Weekly 87,677.63 78,185.63 215,028.63
Cumulative 87,677.63 165,863.27 380,891.90
Weekly 0.81% 0.58% 0.17%
Cumulative 0.81% 1.38% 1.55%
Weekly 560,241.89 399,560.68 117,551.46
Cumulative 560,241.89 959,802.56 1,077,354.02
SLIPPAGE 0.68% 1.15% 1.00%

Prepared by :

JAYZON T. ANDOY
Resident Engineer
FFJJ Construction

ded: Recommending Approval:

ROLANDO S. JAMERO RAUL R. OLAGUER


Chief, CDMO Vice Chancellor for Administ

EMELIZA C. LOZADA EVELYN T. BELLEZA


Dean, School of Technology Vice Chancellor for planning an

START March 26-april 1 april 2-8 april 9-15

0 0.13% 0.24% 0.55%


0 0.81% 1.38% 1.55%
FM = 1
L = 15
4th WEEK 5th WEEK 6th WEEK 7th WEEK 8th WEEK 9th WEEK

april 16-22 april 23-29 april 30-may 6 may 7-13 may 14-20 may 21-27

0.10%

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

0.07% 0.03%

0.16% 0.27% 0.27% 0.27%

0.22% 0.10%

### 0.31%
`

``

### 0.43% ###


0.06% 0.09% 0.09% 0.09% 0.05%

4.66%
3.64%
2.59% 2.94%
2.34%
1.87% 3.46%
2.72%
2.08%
1.65%
0.66% 0.93%

0.11% 0.27% 0.72% 0.43% 0.64% 0.74%


0.66% 0.93% 1.65% 2.08% 2.72% 3.46%
63 76,603.63 188,454.17 495,718.04 301,339.60 443,679.52 513,614.95
90 457,495.53 645,949.70 1,141,667.74 1,443,007.34 1,886,686.86 2,400,301.81
0.31% 0.48% 0.24% 0.36% 0.69% 1.02%
1.87% 2.34% 2.59% 2.94% 3.64% 4.66%
46 217,821.02 330,038.99 167,338.90 246,253.23 481,650.02 708,097.88
02 1,295,175.05 1,625,214.04 1,792,552.94 2,038,806.17 2,520,456.20 3,228,554.08
1.21% 1.41% 0.94% 0.86% 0.91% 1.19%

Verified by : Validated/Certified:

OSMEÑA L. PALANGGALAN MARIO M. MORANO


Owner/ Gen. Manager Civil Engineer, CDMO
FFJJ Construction

Approved:

R ROMMEL A. ESPINOSA
istration Chancellor

ZA
and Development

april 16-22 april 23-29 april 30-may 6 may 7-13 may 14-20 may 21-27

0.66% 0.93% 1.65% 2.08% 2.72% 3.46%


1.87% 2.34% 2.59% 2.94% 3.64% 4.66%
10th WEEK 11th WEEK 12th WEEK 13th WEEK 14th WEEK 15th WEEK

may 28-june 3 june 4-10 june 11-17 june 18-24 june 25-july 1 july 2-8

0.11%

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

### 0.15% 0.0015237902

###

0.58% 0.58% 0.58% 0.33%

0.35% 0.82% 0.82%


1.15% 1.35% ###
0.33%

0.05% 0.09% 0.09% 0.09%

11.65%

9.90% 8.16%
7.54%
6.92%
5.77% 6.16%
5.22% 7.48%

5.40%
4.73%
4.14%

0.68% 0.59% 0.66% 2.09% 2.42% 1.75%


4.14% 4.73% 5.40% 7.48% 9.90% 11.65%
95 471,188.86 410,060.38 459,050.55 1,446,726.67 1,675,949.95 1,211,118.52
81 2,871,490.67 3,281,551.05 3,740,601.60 5,187,328.27 6,863,278.21 8,074,396.73
0.56% 0.55% 0.40% 0.76% 0.62% 0.62%
5.22% 5.77% 6.16% 6.92% 7.54% 8.16%
88 388,451.62 382,230.82 274,274.38 523,899.68 430,197.69 430,197.69
08 3,617,005.70 3,999,236.52 4,273,510.89 4,797,410.57 5,227,608.26 5,657,805.95
1.08% 1.04% 0.77% -0.56% -2.36% -3.49%

Recommended:

ROLANDO S. JAMERO
Chief, CDMO

may 28-june 3 june 4-10 june 11-17 june 18-24 june 25-july 1 july 2-8

4.14% 4.73% 5.40% 7.48% 9.90% 11.65%


5.22% 5.77% 6.16% 6.92% 7.54% 8.16%
16th WEEK 17th WEEK 18th WEEK

july 9-15 july 16-22 july 23-29

###

0.0001465585 0.0001465585 0.0001465585

0.35%

0.67% 1.17% 1.17%

0.25%
0.33%

0.09% 0.09% ###

18.34% 18.57%
20.15%
18.11%
17.59%
18.88%
17.61%

15.84%
12.99%
14.39%
13.12%
9.83%

1.47% 1.27% 1.45%


13.12% 14.39% 15.84%
52 1,017,548.88 881,320.46 1,005,710.50
73 9,091,945.62 9,973,266.08 10,978,976.57
1.67% 3.16% 4.60%
9.83% 12.99% 17.59%
69 1,156,023.21 2,192,471.53 3,186,242.92
95 6,813,829.16 9,006,300.69 12,192,543.61
-3.29% -1.39% 1.75%

Recommending Approval:

EMELIZA C. LOZADA
Dean, School of Technology

july 9-15 july 16-22 july 23-29

13.12% 14.39% 15.84%


9.83% 12.99% 17.59%
19th WEEK 20th WEEK 21st WEEK 22nd WEEK 23rd WEEK 24th WEEK

july 30-aug 5 aug 6-12 aug 13-19 aug 20-26 aug 27-sept 2 sept 3-9

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

1.17%

0.50% 1.16%

1.25% 1.25% 1.25% 0.72%

0.59%
0.05% 0.09% 0.09%

24.04%
22.78%
21.47% 19.29% 19.69%
18.57% 18.90%
18.11% 18.34% 20.15%
18.88%
17.61%

1.78% 1.27% 1.27% 1.32% 1.31% 1.26%


17.61% 18.88% 20.15% 21.47% 22.78% 24.04%
1,230,888.88 879,218.80 879,218.80 913,118.80 910,998.78 874,272.08
12,209,865.46 13,089,084.26 13,968,303.06 14,881,421.87 15,792,420.65 16,666,692.73
0.52% 0.23% 0.23% 0.34% 0.38% 0.40%
18.11% 18.34% 18.57% 18.90% 19.29% 19.69%
361,671.78 157,828.93 157,828.93 234,811.45 265,694.12 277,080.21
12,554,215.39 12,712,044.31 12,869,873.24 13,104,684.69 13,370,378.80 13,647,459.02
0.50% -0.54% -1.58% -2.56% -3.49% -4.36%

Approved:

RAUL R. OLAGUER ROMMEL A. ES


Vice Chancellor for Administration Chancello

july 30-aug 5 aug 6-12 aug 13-19 aug 20-26 aug 27-sept 2 sept 3-9

17.61% 18.88% 20.15% 21.47% 22.78% 24.04%


18.11% 18.34% 18.57% 18.90% 19.29% 19.69%
25th WEEK 26th WEEK 27th WEEK 28th WEEK 29th WEEK 30th WEEK

sept 10-16 sept 17-23 sept 24-30 oct 1-7 oct 8-14 oct 15-21

0.11%

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

1.16% 1.16% ###

1.39% 1.63% 1.63% 1.16%

0.38% 0.53%
0.36% 0.51%

###

0.08% 0.12%

0.09% 0.09% 0.09% ###

34.91%
33.50%
31.86%
30.21%
28.55%

26.13%

22.12% 22.42%
21.52%
20.92%

2.09% 2.42% 1.66% 1.65% 1.64% 1.41%


26.13% 28.55% 30.21% 31.86% 33.50% 34.91%
1,446,808.95 1,675,823.70 1,150,496.87 1,145,684.34 1,137,209.34 975,031.81
18,113,501.68 19,789,325.38 20,939,822.26 22,085,506.59 23,222,715.93 24,197,747.74
1.24% 0.59% 0.60% 0.30%
20.92% 21.52% 22.12% 22.42%
856,632.50 412,166.31 416,531.36 208,498.23
14,504,091.51 14,916,257.82 15,332,789.18 15,541,287.42
-5.21% -7.03% -8.09% -9.44%

ESPINOSA
ellor

sept 10-16 sept 17-23 sept 24-30 oct 1-7 oct 8-14 oct 15-21

26.13% 28.55% 30.21% 31.86% 33.50% 34.91%


20.92% 21.52% 22.12% 22.42%
31st WEEK 32nd WEEK 33rd WEEK 34th WEEK 35th WEEK 36th WEEK

oct 22-28 oct 29-nov 4 nov 5-11 nov 12-18 nov 19-25 nov 26-dec 2

###

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

0.43% 0.43% 0.37%


0.42% 0.42% 0.42% ###

0.37% 0.51% 0.51%


38.99%
38.46%
37.93%
37.07%
36.21%
35.35%

0.45% 0.86% 0.86% 0.87% 0.53% 0.53%


35.35% 36.21% 37.07% 37.93% 38.46% 38.99%
309,348.99 594,151.60 594,151.60 600,146.04 365,842.52 365,842.52
24,507,096.73 25,101,248.34 25,695,399.94 26,295,545.97 26,661,388.50 27,027,231.02
oct 22-28 oct 29-nov 4 nov 5-11 nov 12-18 nov 19-25 nov 26-dec 2

35.35% 36.21% 37.07% 37.93% 38.46% 38.99%


37th WEEK 38th WEEK 39th WEEK 40th WEEK 41st WEEK 42nd WEEK

dec3-9 dec 10-16 dec 17-23 dec 24-30 dec 31-jan 6 jan 7-13

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

0.0058985206
49.45%

0.0011768691 \ 0.0011768691
46.60% 0.0011768691

44.07%

0.33%
41.30%
0.51% 40.04%
0.51% 0.37%
39.52%

### 1.79% 1.79% 1.79%

0.36% 0.85% 0.60%

0.53% 0.53% 1.26% 2.77% 2.53% 2.85%


39.52% 40.04% 41.30% 44.07% 46.60% 49.45%
365,842.52 365,842.52 870,832.83 1,921,503.59 1,753,853.77 1,973,373.61
27,393,073.55 27,758,916.07 28,629,748.90 30,551,252.49 32,305,106.27 34,278,479.88
dec3-9 dec 10-16 dec 17-23 dec 24-30 dec 31-jan 6 jan 7-13

39.52% 40.04% 41.30% 44.07% 46.60% 49.45%


CATCH UP PLAN
43rd WEEK 44th WEEK 45th WEEK 46th WEEK 47th WEEK 48th WEEK

jan 14-20 jan 21-27 jan 28-feb 3 feb 4-10 feb11-17 feb 18-24

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

70.17%

67.48%

65.08%

61.88%

0.0058985206 0.0050558748
57.79%

0.53%

52.98% ### 0.53% 0.53% 0.53% ###


52.98%

0.005075921 0.005075921 0.005075921 0.005075921

0.0011768691

0.12% 0.33% 0.33% 0.33% 0

0.35%

1.8% 1.02%

0.42% 0.99% 0.99% 0.99% 0.99%

0.82% 0.82% ###

### 0.95% 0.95%

### 0.89% 0.77%

0.53%

3.53% 4.81% 4.09% 3.20% 2.41% 2.69%


52.98% 57.79% 61.88% 65.08% 67.48% 70.17%
2,448,371.84 3,331,701.42 2,838,291.59 2,216,228.09 1,667,429.00 1,864,433.75
36,726,851.72 40,058,553.14 42,896,844.72 45,113,072.82 46,780,501.82 48,644,935.57
jan 14-20 jan 21-27 jan 28-feb 3 feb 4-10 feb11-17 feb 18-24

52.98% 57.79% 61.88% 65.08% 67.48% 70.17%


49th WEEK 50th WEEK 51st WEEK 52nd WEEK 53rd WEEK 54th WEEK

feb 25-march 3 march 4-10 march 11-17 march 18-24 march 25-31 april 1-7

0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585

84.02%

80.32%
78.67%
77.37%

74.94%

72.59%

0.53% 0.53% 0.53%


0.09% 0.09% 0.09% 0.09%

0.35% 0.35% 0.35% ###

0.99% 0.99% 0.71%

0.60% 0.60% 0.60% 0.60%

### 0.50% 0.50% 0.50%

0.89%

0.53% 0.46%

### 1.60%

2.42% 2.34% 2.43% 1.30% 1.66% 3.69%


72.59% 74.94% 77.37% 78.67% 80.32% 84.02%
1,677,424.39 1,624,585.59 1,685,507.34 901,243.97 1,147,956.87 2,559,100.87
50,322,359.97 51,946,945.56 53,632,452.90 54,533,696.87 55,681,653.74 58,240,754.61
feb 25-march 3 march 4-10 march 11-17 march 18-24 march 25-31 april 1-7

72.59% 74.94% 77.37% 78.67% 80.32% 84.02%


55th WEEK 56th WEEK 57th WEEK 58th WEEK 59th WEEK 60th WEEK

april 8-14 april 15-21 april 22-28 april 29-may 5 may 6-12 may 13-19

98.49%
96.93%
0.11% 0.20% 0.20%
94.64%
0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0.0001465585 0
92.51%

89.58%

87.22%
###

###

0.50% 0.50% 0.50% ###

### 0.82% 0.82%

0.85% 0.85% ###


0.95% 0.95% ###

0.89% ###

1.60% 1.60% 1.60%

0.20% 0.28% 0.28%

3.20% 2.36% 2.93% 2.14% 2.29% 1.56%


87.22% 89.58% 92.51% 94.64% 96.93% 98.49%
2,220,005.95 1,634,109.27 2,033,276.97 1,480,361.71 1,585,642.36 1,082,692.92
60,460,760.56 62,094,869.82 64,128,146.80 65,608,508.50 67,194,150.86 68,276,843.77
april 8-14 april 15-21 april 22-28 april 29-may 5 may 6-12 may 13-19

87.22% 89.58% 92.51% 94.64% 96.93% 98.49%


61st WEEK 62nd WEEK 63rd WEEK

may 20-26 may 27-june 2 june 3-5

0.10% 0.11% 0.05%

99.62% 100.00%
99.21%

0.20%

0.0001465585 0.0001465585 6E-05


0.28% 0.28% 0.12%

0.72% 0.40% 0.38%


99.21% 99.62% 100.00%
499,971.02 278,396.52 266,140.40
68,776,814.79 69,055,211.32 69,321,351.72
Prepared by:

may 20-26 may 27-june 2 june 3-5

99.21% 99.62% 100.00%


0.64%

0.00%
0%
0.27%

0.91%

0.91494375%
0.00%

0.00%

0.11%

0.98%

0.32%

0.33%

0.44%
0.00%

0.00%

2.06%

2.34%

2.88%

1.83%

4.18%

4.15%

4.48%

5.81%

2.53%

3.03%

1.91%
2.90%

1.48%

0.67%
0.00%

0.00%

2.15%

2.79%
0.00%

1.71%
0.00%

1.51%
0.00%

8.71%
0.00%

0.00%

7.06%

2.57%

3.29%
0.00%

3.52%
0.00%

0.00%

3.63%
4.08%
0.00%

0.00%

3.83%

1.52%

6.85%
0.00%

1.41%
0.00%

99.79%

100.00%
Validated/Certified:
0.912850%

0.91%
Recommended:
Name of Project : Design of the School of Technology (SOTECH) Building and Construction of Phase 1
Location : UPV Campus, Miagao, Iloilo
Contractor : KRIS DB Construction & Supply
Contract Amount : Php 20,273,643.57
Start of Contract : June 7, 2016
Target Date of Completion : March 3, 2016
5 7 7 7

Item No. of
DESCRIPTION Quantity Unit AMOUNT % Weight June 7-11 June 12-18 June 19-25 June 26-July
No. Days

I. GENERAL REQUIREMENT 1 lot. 4,435,200.00 21.88% 60 1.82% 2.55% 2.55% 2.55%

II. SITE WORK 451 sq.m. 758,674.56 3.74% 30 0.62% 0.87% 0.87% 0.87%

III. CONCRETE WORKS 1.00 lot. 5,290,913.38 26.10% 90

IV. MASONRY 826.83 sq.m. 948,984.96 4.68% 30

V. FORMWORKS & SCAFFOLDINGS 1.00 lot. 1,147,587.84 5.66% 60

VI. THERMAL & MOISTURE PROTECTION 451.00 sq.m. 190,323.84 0.94% 30

VII. DOORS, WINDOWS & HARDWARES 1.00 lot. 1,440,499.20 7.11% 60

VIII. FINISHES 1.00 lot. 2,017,894.17 9.95% 60

IX. PLUMBING WORKS 1.00 lot. 672,340.62 3.32% 30

X. ELECTRICAL 1.00 lot. 1,024,650.00 5.05% 30

XI. MECHANICAL WORKS 1.00 lot. 1,151,150.00 5.68% 30 13.95% 13.95%


5.87% 13.95% 13.95%
12.72%
2.45% 9.30%
0.00%
XII. ELECTRONICS & COMMUNICATIONS 1.00 lot. 1,195,425.00 5.90% 30
TOTAL 20,273,643.57 100.00%
Weekly 2.45% 3.43% 3.43% 3.43%
PHYSICAL ACCOMPLISHMENT
Cumulative 2.45% 5.87% 9.30% 12.72%
PLAN
Weekly 496,045.76 694,464.06 694,464.06 694,46
FINANCIAL ACCOMPLISHMENT
Cumulative 496,045.76 1,190,509.82 1,884,973.89 2,579,43
Weekly 13.95% 0.00% 0.00% 0.00%
PHYSICAL ACCOMPLISHMENT
Cumulative 13.95% 13.95% 13.95% 13.95%
ACTUAL
Weekly 2,828,173.28 - -
FINANCIAL ACCOMPLISHMENT
Cumulative 2,828,173.28 2,828,173.28 2,828,173.28 2,828,17
SLIPPAGE 11.50% 8.08% 4.65% 1.23%

LEGEND: Note: slippage = actual accomplishment - accomplishment as per plan


AS PER PLAN + slippage → ahead the schedule
ACTUAL - slippage → behind the schedule
7 4 3

une 26-July 2 July 3-9

2.55% 1.46%

0.87% 0.50%

0.87%

0.28%

36
34.62%
32.59%
30.09%
27.40%
25.08%
23.05%
21.03%
18.52%
15.83% 21

14.41% 14.41% 14.54% 15.71% 15.82%


%
% 13.95% 13.95% 13.95% 14.15%
3.43% 3.11%
12.72% 15.83%
694,464.06 630,579.78
2,579,437.95 3,210,017.73
0.00% 0.00%
13.95% 13.95%
- -
2,828,173.28 2,828,173.28
1.23% -1.88%
7 7 7 7
7 5 2 7 7 4 3 7 5 2 7 7 4

July 10-16 July 17-23 July24-30 July 31-Aug 6 Aug 7-13 Aug 14-20 Aug 21-27 Aug 28-Sep 3 Sep 4-10 Sep 11-17

2.03% 2.03% 2.03% 2.03% 2.03% 2.03% 2.03% 2.03% 2.03% 2.03%

0.66% 0.47% 0.28% 0.66% 0.47%

38.96%
36.65%
34.62%
32.59%
30.09%
27.40%
25.08%
23.05%
21.03%
18.52%
21.24% 22.03%

14.41% 14.41% 14.54% 15.71% 15.82%


13.95% 13.95% 14.15%
2.69% 2.50% 2.03% 2.03% 2.31% 2.69% 2.50% 2.03% 2.03% 2.31%
18.52% 21.03% 23.05% 25.08% 27.40% 30.09% 32.59% 34.62% 36.65% 38.96%
545,400.73 507,147.81 411,515.49 411,515.49 468,894.88 545,400.73 507,147.81 411,515.49 411,515.49 468,894.8
3,755,418.46 4,262,566.27 4,674,081.75 5,085,597.24 5,554,492.12 6,099,892.85 6,607,040.66 7,018,556.14 7,430,071.63 7,898,966.5
0.00% 0.00% 0.20% 0.26% 0.00% 0.13% 1.17% 0.11% 5.42% 0.78%
13.95% 13.95% 14.15% 14.41% 14.41% 14.54% 15.71% 15.82% 21.24% 22.03%
- - 40,547.29 52,711.47 - 26,355.74 237,627.03 22,706.48 1,099,389.34 158,844.0
2,828,173.28 2,828,173.28 2,868,720.57 2,921,432.04 2,921,432.04 2,947,787.78 3,185,414.80 3,208,121.28 4,307,510.63 4,466,354.6
-4.57% -7.08% -8.90% -10.67% -12.99% -15.55% -16.88% -18.80% -15.41% -16.94%
7 7
3 7 5 2

p 11-17 Sep 18-24 Sep 25-Oct 1

.03% 2.03% 2.03%

0.28% 0.66% 0.47%


52.47% 53.51%
49.87% 51.42%
46.74% 48.11%
44.15% 45.65%
41.65%
96%

29.05% 30.64%
25.66% 27.08%
25.00%
03% 22.22%
.31% 2.69% 2.50%
8.96% 41.65% 44.15%
468,894.88 545,400.73 507,147.81
898,966.50 8,444,367.24 8,951,515.04
.78% 0.19% 2.78%
2.03% 22.22% 25.00%
158,844.00 38,519.92 562,968.62
466,354.62 4,504,874.55 5,067,843.16
6.94% -19.44% -19.15%
7
3 4 7 4 3 7 5 2 7 7 7 7 7

Oct 2-8 Oct 9-15 Oct 16-22 Oct 23-29 Oct 30-Nov 5 Nov 6-12 Nov 13-19 Nov 20-26 Nov 27-Dec 3 Dec 4-10

0.87%

0.62% 1.09% 1.09% 1.09% 0.78%

0.28% 0.66% 0.47%


55.61% 56.44%
53.51% 54.56%
51.42% 52.47%
49.87% 0.06% 0.22% 0.22% 0.22% 0.22%
46.74% 48.11%
45.65%
0.24% 0.83% 0.83% 0.83% 0.83% 0.83%

29.05% 30.64%
25.66% 27.08%
1.49% 1.09% 1.38% 1.75% 1.55% 1.05% 1.05% 1.05% 1.05% 0.83%
45.65% 46.74% 48.11% 49.87% 51.42% 52.47% 53.51% 54.56% 55.61% 56.44%
302,895.11 221,429.82 278,809.22 355,315.07 314,501.38 212,467.14 212,467.14 212,467.14 212,467.14 168,058.2
9,254,410.15 9,475,839.97 9,754,649.19 10,109,964.26 10,424,465.64 10,636,932.77 10,849,399.91 11,061,867.04 11,274,334.18 11,442,392.4
0.66% 1.42% 1.96% #REF! #REF! #REF! #REF! #REF! #REF!
25.66% 27.08% 29.05% #REF! 30.64% #REF! #REF! #REF! #REF!
134,414.26 287,885.74 398,293.99 #REF! #REF! #REF! #REF! #REF! #REF!
5,202,257.42 5,490,143.16 5,888,437.15 #REF! #REF! #REF! #REF! #REF! #REF!
-19.98% -19.66% -19.07% #REF! -20.78% #REF! #REF! #REF! #REF!
7 7

ec 4-10 Dec 11-17

89.39%
85.68%
81.44%
76.80%
71.66%
65.84%
61.12%
59.11%
56.44% 57.27%

.83% 0.83%
.83% 0.83%
6.44% 57.27%
168,058.24 168,058.24
442,392.42 11,610,450.66
7 3 7
1 6 7 2 5 7 7 7 4 3 7 7 7

Dec 18-24 Dec 25-31 Jan 1-7 Jan 8-14 Jan 15-21 Jan 22-28 Jan 29-Feb 4 Feb 5-11 Feb 12-18 Feb 19-25

96
1.09% 2.55% 2.55% 93.10% 2.55%
89.39%
85.68%
81.44%
76.80%
71.66%
65.84%
61.12%
59.11%
%

0.83% 0.83% 0.24%

0.83% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16% 1.16%

0.55% 0.77% 0.77% 0.77% 0.44%

1.01% 1.18% 0.34% 0.84% 1.18% 0.51%

0.95% 1.32% 1.32% 1.32% 0.76%

0.98% 1.38% 1.38% 1.38% 0.79%


1.84% 2.01% 4.73% 5.82% 5.14% 4.64% 4.24% 3.71% 3.71% 3.71%
59.11% 61.12% 65.84% 71.66% 76.80% 81.44% 85.68% 89.39% 93.10% 96.82%
372,988.24 407,143.24 958,412.09 1,178,919.63 1,042,299.63 939,834.63 859,703.07 752,860.99 752,860.99 752,860.9
11,983,438.90 12,390,582.14 13,348,994.23 14,527,913.86 15,570,213.49 16,510,048.12 17,369,751.19 18,122,612.18 18,875,473.17 19,628,334.1

Prepared: Validated/Certified: Noted:

RICAR D. FRANCISCO MARIO M. MORANO ROLANDO S


Inspector/Project-in-Charge Civil Engineer Chief, C
7 6

b 19-25 Feb 26-Mar 3

96.82% 100.00%
.55% 2.19%

.16% 1.00%
.71% 3.18%
6.82% 100.00%
752,860.99 645,309.42
628,334.15 20,273,643.57

LANDO S. JAMERO
Chief, CDMO
CAMPUS DEVELOPM
University o

PROJECT AC
as o

Project Name : Design of the School of Technology (SOTECH) Build


Location : UPV Campus, Miagao, Iloilo
Contractor : KRIS DB Construction & Supply
Contract Amount : Php 20,273,643.57

Item
Description
No.

I. GENERAL REQUIREMENT
1. Mobilization/Demobilization/Provision of Road
2. Temporary Facilities
a. Fence Enclosure/Bunkhouse & Office
b. Provision & Consumption of Electricity/Water
c. Safety & Health
3. Professional Fees, Design Consultancy, Permits & Material Testing
II. SITE WORK
1. Clearing, Grubbing & Lay-out
2. Excavation
3. Gravel Base
4. Backfilling
5. Lean Concrete
6. Soil Treatment
III. CONCRETE WORKS
1. Footing
2. Tie Beam
3. Columns
4. 2nd Floor Beams & Lintel Beams
5. Ground Floor Slab 2500 psi
6. 2nd Floor Slab
7. Stairs
IV. MASONRY
1 1 unit Masonry
V. FORMWORKS & SCAFFOLDINGS
1. Forms & Scaffoldigns
VI. THERMAL & MOISTURE PROTECTION
1. Waterproofing
VII. DOORS, WINDOWS & HARDWARES
1. Doors
2. Glass Wall w/ Complete Accessories
VIII. FINISHES
1. Plain Plaster Finish
2. Tile Works
a. Comfort Rooms (Walls & Floors)
b. Ground Floor
c. Stair Tiles
3. Ceiling Works
IX. PLUMBING WORKS
1. Pipes & Fittings
2. Fixtures
3. Catch Basins
4. Septic Tank
5. Cistern Tank
X. ELECTRICAL
1. Wires & Fittings
2. Fixtures
3. Panel Boards
XI. MECHANICAL WORKS
1. Mechanical Works (ACU, FASS,DUCTS, etc.)
XII. ELECTRONICS & COMMUNICATION WORKS
1. Electronics & Communications
TOTAL
CAMPUS DEVELOPMENT AND MAINTENANCE OFFICE
University of the Philippines Visayas
Miagao, Iloilo

PROJECT ACCOMPLISHMENT REPORT


as of October 1-7, 2016

logy (SOTECH) Building and Construction of Phase 1

Quantity Unit Unit Cost TOTAL AMOUNT % Weight

1.00 lot. 1,008,000.00 1,008,000.00 4.97%

1.00 lot. 403,200.00 403,200.00 1.99%


1.00 lot. 672,000.00 672,000.00 3.31%
1.00 lot. 336,000.00 336,000.00 1.66%
1.00 lot. 2,016,000.00 2,016,000.00 9.94%

451.00 sq.m. 672.00 303,072.00 1.49%


144.00 cu.m. 403.20 58,060.80 0.29%
45.10 cu.m. 2,016.00 90,921.60 0.45%
100.80 cu.m. 403.20 40,642.56 0.20%
45.10 cu.m. 4,704.00 212,150.40 1.05%
451.00 sq.m. 119.35 53,827.20 0.27%

28.80 cu.m. 16,073.96 462,930.05 2.28%


24.00 cu.m. 20,353.42 488,482.18 2.41%
21.60 cu.m. 29,188.32 630,467.71 3.11%
44.00 cu.m. 17,651.97 776,686.85 3.83%
45.10 cu.m. 9,986.87 450,408.00 2.22%
45.10 cu.m. 52,116.04 2,350,433.57 11.59%
7.00 cu.m. 18,786.43 131,505.02 0.65%

826.83 sq.m. 1,147.74 948,984.96 4.68%

1.00 lot. 1,147,587.84 1,147,587.84 5.66%

541.00 sq.m. 351.80 190,323.84 0.94%


1.00 lot. 940,800.00 940,800.00 4.64%
190.67 lot. 2,620.75 499,699.20 2.46%

34.00 cu.m. 12,082.69 410,811.61 2.03%

153.60 sq.m. 2,214.75 340,185.75 1.68%


451.00 sq.m. 1,882.90 849,187.25 4.19%
30.00 sq.m. 2,264.19 67,925.76 0.34%
451.00 sq.m. 775.57 349,783.80 1.73%

1.00 lot. 188,160.00 188,160.00 0.93%


1.00 lot. 188,160.00 188,160.00 0.93%
15.00 units 6,585.60 98,784.00 0.49%
1.00 lot. 64,411.62 64,411.62 0.32%
1.00 unit 132,825.00 132,825.00 0.66%

1.00 lot. 354,200.00 354,200.00 1.75%


1.00 lot. 493,350.00 493,350.00 2.43%
1.00 lot. 177,100.00 177,100.00 0.87%

1.00 lot. 1,151,150.00 1,151,150.00 5.68%

1.00 lot. 1,195,425.00 1,195,425.00 5.90%


20,273,643.57 100.00%
% ACCOMPLISHMENT

Previous
Sept. 17-23
Present To Date
to date

2.98% 2.98% 60.00%

1.79% 1.79% 90.00%


2.06% 2.06% 62.00%
0.73% 0.73% 44.00%
6.96% 6.96% 70.00%

1.49% 1.49% 100.00%


0.29% 0.29% 100.00%
0.32% 0.32% 72.00%
0.14% 0.14% 70.00%
1.05% 1.05% 100.00%
0.13% 0.13% 50.00%

2.28% 2.28% 100.000%


0.60% 0.12% 0.73% 25.00%
1.24% 0.16% 1.40% 40.00%
0.38% 0.38% 0.76% 10.00%

2.55% 2.55% 45.00%


25.00% 0.66% 25.66%
CAMPUS DEVELO
University

PROJECT A
as

Project Name : Design of the School of Technology Building and


Location : UPV Campus, Miagao, Iloilo
Contractor : KRIS DB Construction and Supply
Contract Amount : Php 20,273,643.57

Item No. DESCRIPTION

I. GENERAL REQUIREMENT
60.0% II. SITE WORK
III. CONCRETE WORKS
90.0% IV. MASONRY
62.0% V. FORMWORKS & SCAFFOLDINGS
44.0% VI. THERMAL & MOISTURE PROTECTION
70.0% VII. DOORS, WINDOWS & HARDWARES
VIII. FINISHES
100.0% IX. PLUMBING WORKS
100.0% X. ELECTRICAL
72.0% XI. MECHANICAL WORKS
70.0% XII. ELECTRONICS & COMMUNICATIONS
100.0% TOTAL
50.0%

100.0%
30.1%
45.1%
19.9%

45.0%
footing 1/19

5.26%

0.66%
CAMPUS DEVELOPMENT AND MAINTENANCE OFFICE
University of the Philippines Visayas
Miagao, Iloilo

PROJECT ACCOMPLISHMENT REPORT


as of September 24-30, 2016

f Technology Building and Construction of Phase 1 Notice to Proceed


Target date of Completion
and Supply

% ACCOMPLISH
Quantity Unit AMOUNT % Weight
Previous
Sept.17-23
1 lot. 4,435,200.00 21.88% #REF!
451 sq.m. 758,674.56 3.74% #REF!
1.00 lot. 5,290,913.38 26.10% #REF!
826.83 sq.m. 948,984.96 4.68%
1.00 lot. 1,147,587.84 5.66% #REF!
451.00 sq.m. 190,323.84 0.94%
1.00 lot. 1,440,499.20 7.11%
1.00 lot. 2,017,894.17 9.95%
1.00 lot. 672,340.62 3.32%
1.00 lot. 1,024,650.00 5.05%
1.00 lot. 1,151,150.00 5.68%
1.00 lot. 1,195,425.00 5.90%
20,273,643.57 100.00% #REF!
Proceed : May 7,2016
te of Completion : March 3, 2017

% ACCOMPLISHMENT

Present To Date

0.00% #REF! #REF!


0.00% #REF! #REF!
0.66% 4.51% 17%

0.00% #REF! #REF!

0.66% #REF!
October Nov
1-8 9-15 16-22 23-31 1-5
November December
1-5 6-12 13-19 20-26 27-30 1-10 11-17 18-24
ember January 2017
18-24 25-31 1-7 8-14 15-21 22-31
February 2017 March 2017
1-4 5-11 12-18 19-28 1-2