ABU QIR PETROLEUM

Engineering Division :4.4".41 ;Lava i,141


t Inspection Sector A.pLL
& -11 tual

Rubber tu
kucic1 s

'he attention of: Deputy Operations General Manager for A/Q Fields
Deputy HS&E General Manager for A/Q fields.
Issue Date: MAY 26t h , 2016
Inspection Date: MAY 23 th, 2016
Area: A/Q Offshore.
Location: P-I Platform.
Criticality: Urgent
File: Offshore Reports (P-I)

Page 1 of 1
lor Bum • er Fixed on L -I P/F Report
BARGE BUMPER Type of pipe Seamless
DATA: Grade API 5L Gr B
Diameter 18" (Nominal Diameter)
Nominal Wall Thickness 19.05 mm
PIPE Scheduled 60
Drawing No. 626-95-116

INSPECTION Internal Inspection. Hydrostatic Testing.


ACTIVITIES • External Inspection. Hardness Measurements.
COVERED
Visual Inspection. Borescope Inspection.
• U.T. Thickness Measurements Surface Temperature Measurements

1111 U.T. Welding Testing. Cathodic Protection Measurements


Radiography Testing. Holiday Detection Test.
• Magnetic Particle Testing. Paint Pin Hole Test.
Dye Penetrant Testing. Paint Pull off Test.
Pitting Measurements Paint Film Thickness

III. INTRODUCTION Barge bumpers at P-I P/F were inspected during the last under water survey
conducted on 2014 and all barge bumpers were found in fair condition with no signs
of dents or cracks as per the UWS reports.
During the approach of the supply boat M/V Miser Gulf 13 to the platform on
05/04/2016, an impact was occurred between the a/m marine vessel and the
platform barge bumper fixed on leg Bl.
Inspection sector crew directed to the location of incident on 05/04/2016 to evaluate
the current condition and Preliminary Inspection Note was issued on 06/04/2016
with initial findings and recommendations. (See Attachment#1).

IV. FINDING AND During the initial visually survey on 05/04/2016 the following were observed :
OBSERVATION Damage and cracks were observed in the weld seam of the upper fixation
for the subject barge bumper. (See Attachment#3, Figs. 1 & 2).
Dent, deformation and rupture were observed in the subject barge bumper
body itself (18" pipe). (See Attachment#3, Figs. 3 & 4).
After Scaffolding and sand-blasting activities have been finished, thorough inspection
was performed on the subject barge bumper on 23/05/2016 especially on the upper
welded fixation point of the barge bumper to platform main leg (B1), and the
following were observed:-
Crack was observed on the upper weld seam between upper beam support
& the barge bumper. (See Attachment#2 and Attachment#3 Figs. 5 & 6).
Crack was observed on the lower weld between upper beam support & the
barge bumper. (See Attachment#2 and Attachment#3 Figs. 7 & 8).
Dent, deformation and rupture with length of 35 cm were observed on the
barge bumper body (18" pipe). (See Attachment#2 and Attachment#3 Figs.
9 & 10).
Magnetic Particle Inspection (MPI) was performed for all welds between
the barge bumper and leg B1 and there is no sign of cracks. (See
Attachment #3, Figs. # 11 & 12).
UT Thickness Measurements were performed for the support beam and the
barge bumper and found in fair condition except for the ruptured area.
(See Attachment #2)
. DISCUSSION'' As per the MPI Inspection most of the above water welds between leg B1 & barge
bumper were found in fair condition, except where cracks were found in welds
between upper beam support & barge bumper.
UT Thickness Measurements shows that the barge bumper in fair condition and no
metal loss were observed.
All the dent, deformation, rupture and weld cracks were occurred due to the impact
between the supply boat M/V Miser Gulf 13 and the barge bumper at the time of
incident.

In order to keep the integrity of the subject P/F and to avoid any damage or
catastrophic failure consequences, the following are needed to be done:
Underwater inspection for the underwater part of the barge bumper to be
performed to evaluate the condition of the underwater welds between leg B1 &
barge bumper.
All necessary action must be taken to replace the defected portion of barge bumper.

REPORT PREPARED
Eng. Mostafa Gad Inspection Senior Engineer 9.4
BY Ni>

REPORT REVIEWED
Eng. Amr Habib Ali Head Of Inspection Department ilia
BY,.

Eng. Ahmed Ezzat Abdc I Gawad Inspection Assistant Gen. Mgr.

ge 3 Q
I /0 17 Dited

t 1y non •3ssv
Itriz3 p3ttitiv
9 /-Z//,'

11111‘1,1(1(IV

iel.ti n .N.I 'Tip: ;imps, Iii


11)0 3.11 ,111 1 w•in (II .1.3( I WO(' Oe:117..1 all I Ja I Illii NI II. Hp' !I ; rim,) v,
\ —71i1111:111111P, , n

:Ito tin uotn:$(.1sill toin ( 1ioli) Ituoji.ld 01 inpl() (1! rut! \ow , ti, •srli

( p No f h 1110114 'Zit pmpeila ..N.ls


Jotliting 3..I.IIN ilniqns ntil til plAilcqo niam uo!irumvp 1 ur limo . ...7itql(ng 11119.).1/1.111
IF, :y looloild 'zry pvrttiu aos) • .1.1thunq NUN .x11 qii.511:14.1.11”.1.11,
',pop .ockln mil uotimeti Jo 5tim1nS% mil iii HA 1.1:go ctlm :Itirtini •

T.' II' :"I) 110 1) .1 I1u 1l l.1il scl.%1 1,Ii tiow.xlstil n.I170111111.).1,1 •

( I ts Pm prIIII .1 1S) • I fl ';I I tio P a mi i3ditinti ;Iiiirkl


11) in.lt, III 111101111(.1 al.II IMP 1:1,,S(1,5 (MII.11,(11 ill(II Otil 1 1(10%\ 1 :4 1 IVIIIII.110 linii.1111)11.11111
CUM 1:7111dU11 illi . 1.1.1.1(9 ► N11 Nu (N) CI Ali!) Nwilsi AilAj irog ;•1,1(11)•
)til (i) iinrcutidt? otil :lump win FtwoJut Lii.lq •illi )( ► N:1,. (1,111,01,1‘111 .

1 n I ,"I'l 110 p:Ixii .1.111ffin1I anicli ilino.1.,s.,(1 (11111)..1

wit
H i ' lilting .17'01 11'1-d • 1..10/6V .)pc) )111111)4
1$111
q ppu (yv Jo) .talfilli qv. litiati3 . ) cifn!ir.i(1(10 ;111(1.1(1 ), I

J)11Itirk: III.13tIZ19 11001111)0.1,i


.10131S 11(41 1311 'm i : 1()11 I (I I 1 q
JaNtmE IV l u. "" a 9 aailmolli !”1 n1 : 01 (131ISSI

:9,10ZIO tiO aa&tti'' o 1 or 1-1 ,91):7.1.1 V(I L)N:I


i lf

aloN tiolj3acisiq k.ili.iiiiiiiia.iti

310N NOILMISNI MIVNIWl1 ai t#1 VORA,


p odati did I-d 4e Ta Sal uo paxI4 Jedwn8 eale8
n"


1131 uo p;)xil ladtunq ;n .111S .INCS‘.1P1111 ;110 1” I;ClIp.107!
ill uniiiittr itr.:11 rift; itr,n I 170 r.-Au .1.)dtiing f:WP.ILI(1

.1.111w..1,-Tur 'Li) 1.t11"


Atn It r Illt!Nli IiiirriTi7±A‘Ifl It! 01?ntiTtin th , rn • vi Inikting ...s '111!Ci In..q11.111,1

ztiluat11137-
.211Ti

310N NO1133dS IT V 1 crammt


fua

limmemmasommr -wixammvamm
1111.111,.

ACHMENT #2 DRAWINGS

Crack in upper
weld between
an beam support
& barge
bumper

Crack in lower
weld between
beam support
& barge
bumper

Dent & Crack


on the Barge
Bumper

1 22.4 8 15.6
2 20.9 9 15.3
3 21.6 10 19.4
4 22 11 18.6
Abu Qir Pet. )9941 3,;4
;4
5 21.3 12 18.5 Engineering Division

Abu Qir Gas District


4...114.111;j1.1)
p

6 15,9 13 18.2
P-I P/F
7 15.7 14 18.9 Barge Bumper Fixed on Leg B1
S '211

Z t *2!J

wifire.‘"
*

+.1
,

• ,•,` • ..1*14,05