Northeast Utilities

Overhead Transmission Line Standards

Technical Requirements for Steel Pole Structures


Northeast Utilities I I OTRM 160 I Rev. 2
Approved by: KMS (eT/MAI, JJJ (NHI Procurement I Page 22 of 29 I 07/19/2010
Northeast Utilities
Overhead Transmission Line Standards

~.QMe
w,"""""""""""""""""

Technical Requirements for Steel Pole Structures


Northeast Utilities I I OTRM 160 I Rev. 2
Approved by: KMS (eT/MAI, JJJ (NHI Procurement I Page 29 of 29 I 07/19/2010
ENGINEERING DOCUMENT Doc.# SP.06.01.407
nationa gr·d Specification: Transmission Page 21 of 28
Steel Pole Transmission Structures Version 2.0 –8/24/2009

5,5,
4'

3/+" ROD (A-3fi) BAIL


STEP - GALVA~IZED

WG FOR BAIL
STEP AlTACHME~

~~
<0
POLE SHAFT

~g
~~ BAIL STEP ASSEMBLY I"
z@ ~
°I I ~

~r ~
",2
o ~n ~i ~
;;~ DE-BURR INSIDE AHD
~1li OUTSIDE (1'rP ,J i3
~g

OJ ~
00 ~

~~ ~ ~
c~ ~

~8J W. ~
~S
s= ~
~~ '" ~
o~ F
~~
~::'i
~
LL
zm .
8~ @
r~ LUG FOR BAIL "GO-GAGE" 1:3
~,,:>~ LLJ
STEP ATTACHMENT 1'1'100=""" OF 1Jf". "-0. """"0 .E""'''OAL
T\JBI~ C!lRBON 5'TEEL WELDED cp eWEr- TOOET1-IER,

g~ (PLATE 3/16" X J-1/2R X 4) ~~~~!iU~~U~!I~L~U~~~!~~~~~: ~


ri/JI ••• LL BAIL STEP LUGS. ~

~~ d
~~ 1---------------P-~-E~-AR-ED-B"(--LR-G"""'I'-OB-I-2-4/-8-4 ••••----- ----------1 s
~~ S TAN DAR 0 DE TA I L
:=-
I-RE\'l-E'Iilll-B"(-+----+--'------'------1 §

Ii
Q,"
WORKING ATTACHMENTS
FOR STEEL POLES SHEET 1
MrS
OF 1
nationalgrid I
~
§~ •.•._IN_DE_X_ ••••••••S ••
P •••.
O•••6_.0•• 1••.•••
4 ••0_7•••• •••••• ~

SP.06.01.407.002

PRINTED COPIES ARE NOT DOCUMENT CONTROLLED.


FOR THE LATEST AUTHORIZED VERSION PLEASE REFER TO THE ENGINEERING DEPARTMENT DOCUMENTS CABINET IN DOCUMENTUM
File: SP.06.01.407 Steel Pole Transmission Originating Department: Sponsor:
Structures Transmission Line Engineering Mark S. Browne