( These are not intended as Operating Instructions For use in 500MW Units)
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 1 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
Running Simulator
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 2 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
Observe that ACW Disch header pressure reaches 5.0 Kg/ cm2
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 3 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
HOTWELL NORMAL 0 mm
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 4 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 5 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 6 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 7 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 9 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 10 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 11 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
SU04 PURGE
Go to CAUSE OF MFT&PURGE screen from SG Menu
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 14 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
SU0506 RH Vents
SU050601 Open R75 CE 663 PS204
SU050602 Open R74 CE 662 PS204
SU050603 Open R7 CE 665 PS204
SU050604 Open R6 CE 664 PS204
SU050605 Open R10 CE 666 PS344
SU0507 MS Drains
SU050701 Open MS101 CE 1125 PS343
SU050702 Open MS102 CE 1142 PS343
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 15 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 16 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
Observe that Drum level starts raisng when steaming takes place in the Drum due to
swelling.
Observe that Boiler Drum Pressure starts increasing. When Drum Pressure crosses 2.0
Kg/sq.cm close drum vents and all the drains
Gradually close Start Up Vents S83 & S84 after charging HP/LP bypass
SU0702 MS Drains
SU070201 Close MS101 CE 1125 PS343
SU070202 Close MS102 CE 1142 PS343
SU0703 HRH / MS LINE STNR DRAIN TO UFT
SU070301 Close MS117 CE 1287 PS343
SU070302 Close MS105 CE 1285 PS343
SU070303 Close MS106 CE 1286 PS343
Boiling will start after 2 pairs of Heavy oil and it will take 8 minutes to Boiling
complete. Observe the Drum Pressure starts building.
When Main Steam Pressure crosses 8.0 Kg/sq.cm charge HP & LP Bypass
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 19 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
Keep on opening HP Bypass valves 1&2 till the following Rolling parameters are
reached
Keep the Press SP to 40 kgs and put the HP Bypass valves to Auto
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 20 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
Steps bypass
1. Bypass step 102 : press semi and press Advance.
Press auto to go further
2. Bypass step 107
3. Bypass step 110
4. Bypass step 111 : GEN CNDNS FLFLLED
5. Bypass step 114
6. Bypass step 118 : DVR Exciitation
7. Bypass step 119
8.
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 21 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
When Load crosses 150 MW Open FD-16. Take MD BFP C Scoop controller in Auto
and Feed Water Master controller in Auto
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 22 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
LPH-1 Charging (LPH-1 is to be taken into service before steam admission into
condenser)
Goto LPH&DRN CLRS screen from BOP Menu
LPH-2 Charging
SU110406 Open LPH2 inlet isolation valve CD31 IBV
SU100407 Open Ext LPH2 drain valve EX119
SU110408 Open LPH2 inlet isolation valve CD31
SU110409 Open LPH2 outlet isolation valve CD32
SU110410 Close LPH2 inlet isolation valve CD31 IBV
SU110411 Close Condenser bypass valve CD33 (0%)
SU110412 Open Ext LPH2 valve EX11
SU110413 Close Ext LPH2 drain valve EX119
SU110414 Set the NWL set point to -25mm
SU110415 Set the HWL set point to 18mm
SU110416 Set the LPH2 drain CV DR34 to Auto
SU110417 Set the LPH2 drain CV DR37 to Auto
LPH-3 Charging
SU110418 Open LPH3 inlet isolation valve CD34 IBV
SU110419 Open Ext LPH3 drain valve EX118
SU110420 Open LPH3 inlet isolation valve CD34
SU110421 Open LPH3 outlet isolation valve CD35
SU110422 Close LPH3 inlet isolation valve CD34 IBV
SU110423 Close Condenser bypass valve CD36 (0%)
SU110424 Open LPH2 EXT valve EX12
SU110425 Close EXT LPH2 DRN valve EX118
SU110426 Set the NWL set point to -25mm
SU110427 Set the HWL set point to 18mm
SU110428 Set the LPH3 drain CV DR28 to Auto
SU110429 Set the LPH3 drain CV DR31 to Auto
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 23 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 24 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 28 of 29