SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

I. COLD START UP PROCEDURE


For 500MW SIMULATOR Only

( These are not intended as Operating Instructions For use in 500MW Units)

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 1 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

Running Simulator

Step 1 : Start all machines DPU-Stn and sim-stn


Step 2: Wait until the 53 DPUS(mxts) should come from the dpu-stn and ensure the startup done
should come in maxstation start up pop up.
Step 3: In sim-stn ensure the startup done should come in maxstation start up pop up. The sim
transport all station icons should come in yellow color.
Step 4: In sim-stn computer goto c:\runtime\BIN folder and run (double click) the applications
 ModelSvr
 HmiInterface_Test
 Sim
Press Kaph screen
Existing session as KORADI
Press Generate
Type : COLDSTART (generating COLDSTART initial condition)
Wait till RUN comes
Press RUN
Now The simulator is in running condition
Now start the Plant operations
Open maxview Runtime from Desktop

SU01 COOLING WATER SYSTEM


SU0101 Starting CWP1

Go to Cooling Water System screen from BOP Menu

SU010101 Open the Cond.CW inlet BFV-L CW13


SU010102 Open the Cond. CW inlet BFV-R CW18
SU010103 Open the Cond.CW outlet BFV-L CW19
SU010104 Open the Cond.CW outlet BFV-R CW24
SU010115 Switch On the CWP-1 Pump
SU010116 Open CWP-1 Disch. Valve CW-1
Observe that Common header pressure reaches 5.0 Kg/ cm2

SU0102 Starting CWP2


SU010201 Ensure that discharge valve is closed
SU010202 Switch On the CW Pump-2
SU010203 Open CWP-2 Disch. Valve CW-2

Cooling Water system to BOP & TG Auxiliaries

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 2 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU0103 Starting ACWP-A


Go to ACW Sys screen from BOP Menu

SU010301 Switch On ACW Pump-A


SU010302 Ensure that discharge valve ACW-4 opens in Auto

SU0104 Starting ACWP-B

SU010401 Switch On ACW pump-B


SU010402 Ensure the discharge valve ACW-8 opens in Auto

Observe that ACW Disch header pressure reaches 5.0 Kg/ cm2

SU0105 Starting ACW Pump-A Booster Pump

SU010501 Ensure that the suction and discharge valves of ACW-


A Booster Pump in open condition
SU010502 Switch On ACW Pump-A Booster Pump

SU0106 Starting ACW Pump-B Booster Pump optional

SU010601 Ensure that the suction and discharge valves of ACW-


B Booster Pump in open condition
SU010602 Switch On ACW Pump-B Booster Pump

SU0107 Starting CW-HC & CW-PC valves


SU010701 Open CW-HC valve to Hydrogen coolers
SU010702 Open CW-PC valve to Primary water coolers
SU010703 Open MDBFP-C AUX CLR valve

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 3 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU02 PLANT START-UP PREPARATION


SU0201 Ensuring normal level in Condenser Hot well
Goto HOTWELL LVL CNTRL screen from BOP-SLD menu

SU020101 Set the Hot well Normal level Set Point to 0 mm


SU020102 Set the Normal level controller in Auto (DM38)
SU020103 Set the Emergency level controller in Auto (DM63)
SU020104 Set the Cond Excess dump controller in Auto (CD43)

HOTWELL NORMAL 0 mm

SU0202 Starting CT PMP-A


Go to CONDENSATE TR SYS screen from BOP Menu

SU020201 Ensure Cond Storage Tank level Normal


SU020202 Open the discharge valve DMV-15
SU020203 Start the CT pump-A motor

CT PMP-B starting optional

SU0202 Starting CT PMP-B

SU020201 Ensure Cond Storage Tank level Normal


SU020202 Open the discharge valve DMV-18
SU020203 Start the CT pump-B motor

Generate snapshot as CWSYSTEM

SU0211 Deaerator Initial Filling & Boiler filling


Go to CONDENSATE TR SYS screen from BOP Menu (DOUBT)

SU021101 Line up BOILER FILL PUMP A


SU021102 Start Boiler Fill Pump A
SU021103 Rate of Filling can be increased by selecting Fast mode
SU021104 Start Boiler Fill Pump B

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 4 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

Open Drum Vents

SU0212 Starting Boiler Fill PMP-A


SU021201 Ensure Cond Storage Tank level Normal
SU021202 Ensure BFLP-A Disch VLV Open
SU021203 Ensure BFLP-A Suc VLV Open
SU021204 Start the Boiler Fill pump-A motor

Starting Boiler Fill PMP-B


SU021205 Ensure Cond Storage Tank level Normal
SU021206 Ensure BFLP-B Disch VLV Open
SU021207 Ensure BFLP-B Suc VLV Open
SU021208 Start the Boiler Fill pump-B motor

OBSERVE DEAERATOR LEVEL REACHES 0 mm

OBSERVE DRUM LEVEL REACHES - 52 mm

Generate snapshot as DRUMINTFILL

SU0213 Charging LT / HT Auxiliary Steam Header from station


Auxiliary Steam Header
Go to AUX PRDS SYSTEM screen from BOP Menu

SU021301 Line up Auxilary PRDS


SU021302 Ensure HT PRDS Pressure >12 ata and Temp >320
deg.c
SU021303 Open ASV-35
SU021304 Open CDV-89 valve
SU021305 Regulate CDV-90 valve
SU021306 Observe that LT Aux. Stm Header Pressure >12 ata
SU021307 Observe that LT Aux. Stm Tempearature >220 deg.c
SU021308 Open ASV-67 to allow steam to Turbine Gland seals

SU0214 CEP System Starting CEP-A


Go to COND.EXT.PUMPS screen from BOP Menu

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 5 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU021401 Line up CEP-A


Ensure the suc vlv opens
SU021402 Open the CEP-A Rec Valve CD-10 to 100%
SU021403 Ensure CEP-A dis.vent vlv. VAV7 in Open position
SU021404 Ensure CEP-A dis. Vlv. CD4 in Close position
SU021405 Ensure CEP-A dis. Byp vlv. CD7 in Close position
SU021406 Switch On CEP-A Pump
SU021407 Ensure CEP-A Vent vlv. VA7 Closes
SU021408 Ensure CEP-A Dis. Byp valve CD7 Opens in Auto
SU021409 Ensure CEP-A Dis. valve CD4 Opens in Auto
SU021410 Ensure CEP-A Dis. Byp valve CD7 Closes
Goto SLD CEP-A RCV CTRL Page
SU021411 Set CEP-A MREC Flow SP to 500 TPH
SU021412 Set CEP-A Rec. vlv. CD10 to Auto
Goto SLD GSC MIN FLOW CTRL Page
SU021413 Set GSC MIN Flow SP to 200 TPH
SU021414 Set GSC Rec. vlv. CD39 to Auto
SU021415 Set Cond. Excess vlv. CD43 to Auto ( Setting 50 mm )

OBSERVE CEP DISCH. HEADER PRESS AROUND 30 kg/cm2

SU0215 Condensate Path Opened


Go to LPH&DRN CLRS screen from BOP Menu

SU021501 Open LPH-1 I/L AND O/L VALVES


SU021502 Open LPH-2 I/L AND O/L VALVES
SU021503 Open LPH-3 I/L AND O/L VALVES

SU0216 Deaerator Charging


Go to DEAERATOR & HOTWELL screen from BOP Menu

SU021601 Open Deaerator level cv-1 inlet isolation valve CD21


Goto SLD DEA LVL CTRL Page
SU021602 Set Deaerator level SP to 0 mmwc.
Set CEP Disch Hdr Press to 25 kg
SU021603 Set Deaerator level CV-1 controller, CD22, to Auto
SU021604 Open Deaerator Start up vent SM22
Goto SLD DEA PRESS CTRL Page
SU021605 set Deaerator Steam pressure SP to 1.5KG/CM2

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 6 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU021606 Set Auxiliary Steam Deaerator pressure CV AS-8 in Auto


SU021607 Close Deaerator Start up vent valve SM22

ENSURE DEAERATOR OUTLET WATER


TEMPERATURE >1000C
ENSURE DEAERATOR OUTLET WATER Pressure
=1.5 KG/ CM2

SU0217 Drum level controller in Auto


Go to DRUM,FEED CTRL STATION screen from BOP Menu

SU021701 Open Economiser inlet IBV-1 E003


SU021702 Open Economiser inlet IBV-2 E002
SU021703 Open Economiser inlet Valve E0212
SU021704 Open Low Load FCV FD14 (>20%)
SU021705 Ensure the FCS inlet FD13 IBV opens in Auto
SU021706 Ensure the FCS inlet FD13 opens in Auto

Goto SLD DRUM LEVEL CTRL Page


SU021707 Set Drum Level SP to –50MMWC
Keep LOW LOAD FCV FDV14 in AUTO
Goto FEED WATER CYCLE screen from BOP
Menu
SU021708 Open HPH FW 100% Byp Valve FD11
Open HPH FW 100% Valve FD11

SU0218 Boiler Drum IBD Valves


Go to DRUMS & DRAINS screen from BOP Menu
SU021801 Close Emgency Drum Drain valve B-096 & B098
SU021802 Close Emgency Drum Drain valve B-097 & B099 (0 %)
Close Drum CBD Valves B-091 & B094 (0%)

SU0219 Starting MD BFP-C


Go to MTR DRVN BFP-C screen from BOP Menu

SU021901 Line up MD BFP-C Systems


SU021902 Switch On BFP-C AOP
SU021903 Ensure the MD BFP-C Disch Byp Valve FD6B closes
SU021904 Start the MD BFP-C AOP
SU021905 Open BFP-C Recirculation valve FC-5
SU021906 Start the MD BFP-C Motor

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 7 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU021907 Ensure the MD BFP-C Disch Byp Valve FD6B Opens


in Auto
SU021908 Ensure the MD BFP-C Disch Valve FD6 Opens in
Auto
SU021909 Ensure the MD BFP-C Disch Byp Valve FD6B closes
in Auto
SU021910 Ensure the Feedline path availability (BFP disch. to
Drum)
SU021911 Set Low Load FCV FD14 Into Auto

BFP DISCHARGE HEADER PRESS >58 Kg/cm2


DRUM LEVEL SHOULD BE -50 mmwc
FCS LOWLOAD CV IN OPERATION
Stop Boiler Filling Pumps

SU0220 Starting BCW Pumps

Go to BCW PUMP screen from BOP Menu

SU022001 Line up BCW A System


SU022002 Ensure the Diff Temp.Between BCW Pump-A casing &
Suction Manifold <380C.
SU022003 Close Drum Vents
SU022004 Close B001
SU022005 Close B002
SU022008 Start the BCWP-A , B , C
SU022009 Ensure the Diff Temp.Between BCW Pump-B casing &
Suction Manifold <380C.
SU022010 Open Drum Vents
SU022011 Start the BCWP-B Motor

BCW Pumps A AND B On & DP > 25 psi

SU03 BOILER DRAFT SYSTEM


SU0301 Preparation of Air & Flue Gas Path
Go to AIR&FG SYSTEM screen from BOP Menu
SU030101 Ensure that FDF-A o/l damper is in Full open position
SU030102 Ensure that FDF-A blade pitch is in maximum position
SU030103 Open EP-A Inlet Gate1
SU030104 Open EP-A Inlet Gate2
SU030105 Open EP-A Outlet Gate1
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 8 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU030106 Open EP-A Outlet Gate2


SU030107 Open all EP-B,EP-C,EP-D I/L and O/L Gates
Go to AIRHTRS screen from BOP Menu

SU030108 Switch On AH-A ElectricMotor


SU030109 Open AH-A SA SCAPH-A I/L AND O/L ISO damper
SU030110 Open AH-A SA air o/l damper
SU030111 Open AH-A flue gas i/l damper GD-1A
SU030112 Open AH-A flue gas o/l damper GD-2A
SU030113 Open AH-A PA I/L damper PAD-3A
SU030114 Open AH-A PA air o/l damper PAD-4A
SU030115 Switch On AH-B ElectricMotor
SU030116 Open AH-B SA SCAPH-A I/L AND O/L ISO damper
Open AH-B SA air o/l damper
Open AH-B flue gas i/l damper GD-1A
Open AH-B flue gas o/l damper GD-2A
Open AH-B PA I/L damper PAD-3B
Open AH-B PA air o/l damper PAD-4B

FLUE GAS PATH AVAILABLE

SU0302 IDF-A Start Sequence


Go to ID FANS screen from BOP Menu

SU030201 Start IDF-A LOP-A On


SU030202 Close the inlet gate 1&2
SU030204 Close the outlet gate 1&2
SU030205 Set IDF-A control damper to minimum
SU030206 Set the IDF-A ch1 SRC Breaker On
SU030207 Set the IDF-A ch2 SRC Breaker On
SU030208 Set the IDF-A VFD ch1 On
SU030209 Set the IDF-A VFD ch2 On
SU030210 Observe that the ID Fan-A Motor On indicator appears
SU030211 Observe the inlet and outlet gates are fully opened on
interlock.
SU030501 Set ID Fan-A Control Damper to 60%
SU030502 Set ID Fan-A VFD Drive to 15%

SU0303 FDF-A Start Sequence


Go to FD FANS screen from BOP Menu
SU030301 Set The FD Fan-A Control Damper Position To
Minimum [0%]

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 9 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU030302 Start FD Fan-A Lop-A or Lop-B


SU030303 Close FD Fan-A Outlet Gate
SU030304 Ensure the Permissive Available
SU030305 Start the FD Fan-A
SU030306 Observe FD Fan-A motor On indication appears.
SU030307 Ensure FD Fan-A Outlet Gate opens after 20 seconds
delay IN Auto
Adjust the FD Fan-A Control Damper so that the
Secondary Airflow is greater than 650 TPH.

SU0305 Furnace Pressure Control in Auto


Go to SLD FURNACE PRESSURE CTRL screen from BOP-SLD Menu
SU030501 Set the Furnace Pressure SP to –10 mmwc
SU030502 Set the ID Fan-A I/L Control to Auto mode
SU030503 Set the ID Fan-A VFD Drive Control to Auto mode
SU030504 Set the FUR PRESS MASTER to Auto mode when the
Furnace Pressure reaches the SP

AIR flow >650 TPH


Furnace Pressure = -10mmwc

SU0306 Stator water coolinq system


Go to GENERATOR PRIMARY WATER SYSTEM screen from TG Menu

SU030601 Start the PW Pump 1


SU030602 Observe that Primary water flow Generator phases T,
S , R main bush is > 1.5 m3/hr
SU030603 Observe that Primary water flow at stator winding
outlet shows > 54 m3/hr
SU030604 Set the PW temp controller to auto mode
Select the TGV and set to 40 degc and press confirm

SU0307 Gen Seal Oil System


Go to GENERATOR SEAL OIL SYSTEM screen from TG Menu

SU030701 Line up the Seal oil system


SU030702 Start AC SOP-1 & AC SOP-4
SU030703 Start B.C EX FAN-1
SU030704 Observe Hydrogen side seal oil pump started and Oil
pressure > 7kg/cm2
SU030705 The seal oil to hydrogen differential pressure starts
showing at the indicator both at TE & EE

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 10 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

Observe in the GENERATOR GAS SYSTEM

H2 PRESS IN GEN CASING >3.5 KG/CM2


H2 PURITY IN AIR >95%

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 11 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU0308 SGC Turbine Oil System


Go to TURBINE OIL SYSTEM screen from TG Menu

SU030801 Start AOP1


Start JOP1
SU030802 Start Oil vapour extractor FAN1
SU030803 SET Oil temperature controller to auto
Select the TGV and set to 45 degc and press confirm
SU030804 Ensure Lub oil discharge hdr pressure goes above 4.8
kg/cm2
SU030805 Ensure Jacking oil header pressure > 135 kg/cm2
SU030806 Open Gate valve grng
SU030807 Turbine speed comes to approx 120 rpm with vacuum
otherwise 80 rpm

Go to TURBINE HPCF SYSTEM screen from TG


Menu
SU030811 Start HP control fluid pump 1
SU030812 Start anyone of the HP control fluid vapour EXTR-1 FAN
SU030813 Start anyone of the HPCF recirculation pump
SU030814 HP control fluid pressure comes over 32 kg/cm2
SU030815 Switch on Control fluid heater l
SU030816 SET HPCF Oil temperature controller to auto
Select the TGV and set to 45 degc and press confirm

SU0309 Vacuum Building


Go to CONDENSATE & EVACUATION SYSTEM screen from TG Menu

SU030901 Ensure that atleast One CEP is on


SU030902 LINE UP open Air Header IV from local operatons
Go to SEAL STEAM SYSTEM screen from TG
Menu
SU030903 Switch on Seal Steam Cond Exh 1
SU030904 Switch on Seal Steam Vap Exh 1 isol valve
SU030905 Open Seal Steam Cond seal valve
SU030906 Close Seal Cond safety valve 1
Open SSIV valve
SU030907 Close Vacuum breaker
SU030908 Ensure the gland steam control valve close
Observe the temp 320 deg c and press >300 mmwc
Go to CONDENSATE & EVACUATION SYSTEM
screen from TG Menu
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 12 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU030909 Switch on Vacuum pump 1


SU030910 Open Solenoid valve IV 1
SU030911 Switch on Vacuum pump 2
SU030912 Open Solenoid valve IV 2
SU030913 Switch on Recirculation Pump 1
SU030914 Switch on Recirculation Pump 2
SU030915 Condenser vac. begins to increase
SU030916 Gland steal stm press cntrler is switched on to auto mode
SU030917 Observe gland stm pressure is maintained at the set value
SU030918 Observe Condenser vacuum comes to -0.9 kg/cm2

CONDENSER PRESS < - 0.85kg/cm2 AP526 PS332


TURBINE LUBE OIL PRESS >4.8 KG/CM2 AP511 PS209
TURBINE SPEED >80 RPM AP278 PS209
TRIP FLUID PRESS >30 KG/CM2

SU04 PURGE
Go to CAUSE OF MFT&PURGE screen from SG Menu

SU040101 Ensure all the Purge Permits are available


SU040102 Start a Purge cycle on the furnace by pressing the "Push
to Purge” switch
SU040103 During purging, “Purging” lamp comes on. After 9 minutes
"purging" lamp and "Push to Purge" goes out and "purge
complete" lamp comes on
SU040104 Set the Aux. Air (SADC) in Auto
Observe that WB-Furnace DP is maintained at 40 mmwc

FURNANCE PURGE COMPLETED

SU05 DRAINS AND VENTS

Opening Final Super Heater Outlet Header Air Vents


Go to SH STM & VENTS screen from BOP Menu
SU050205 Open S036
SU050206 Open S037 to 100%
Open S034
Open S035 to 100%

SU0501 Boiler Drum Air Vents


___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 13 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU050101 Open B98


SU050102 Open B99
SU050103 Open B100
SU050104 Open B101
SU050105 Open B104
SU050106 Open B105
SU050107 Open B102
SU050108 Open B103

SU0502 Div.Panel Super Heater Air Vents


SU050201 Open S68
SU050202 Open S69
SU050203 Open S70
SU050204 Open S71

Opening Final Super Heater Outlet Header Air Vents


SU050205 Open S79 CE 658 PS342
SU050206 Open S80 CE 659 PS342

Opening Roof Super Heater Air Vents


SU050207 Open S11 CE 637 PS342
SU050208 Open S12 to 60% CE 638 PS342
SU050209 Open S13 CE 639 PS342
SU050210 Open S14 to 60% CE 640 PS342
SU0503 Super Heater Header Drains
SU050301 Open S25 to 60% CE 645 PS342
SU050302 Open S26 to 60% CE 647 PS342
SU050303 Open S23 CE 644 PS342
SU050304 Open S24 CE 646 PS342
SU050305 Open S21 CE 641 PS342
SU050306 Open S22 to 60% CE 642 PS342
SU050307 Open S82 CE 660 PS342
SU050308 Open S84 to 60% CE 660 PS342
SU050309 Open S81 CE 656 PS342
SU050310 Open S83 to 60% CE 657 PS342
SU050311 Open S19 to 60% CE 636 PS342
SU050312 Open S74 to 60% CE 653 PS342
SU050313 Open S75 to 60% CE 654 PS342
SU050314 Open S77 to 60% CE 655 PS342

SU0504 Economiser / Water wall drains


SU050401 Close E17 CE 682 PS340

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 14 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU050402 Close E16 CE 681 PS340


SU050403 Close B115 CE 683 PS340
SU050404 Close E19 CE 682 PS340
SU050405 Close E18 CE 681 PS340
SU050406 Close B118 CE 683 PS340
SU050407 Open E21 CE 624 PS339

SU0505 CRH / HRH Drains


SU050501 Open HRH125 CE 1290 PS345
SU050502 Open HRH101 CE 1288 PS345
SU050503 Open HRH102 CE 1289 PS345
SU050504 Open HRH127 CE 1294 PS345
SU050505 Open HRH105 CE 1292 PS345
SU050506 Open HRH106 CE 1293 PS345
SU050507 Open HRH109 CE 1295 PS204
SU050508 Open HRH110 CE 1296 PS204
SU050509 Open HRH113 CE 1297 PS204
SU050510 Open HRH114 CE 1298 PS204

SU0506 RH Vents
SU050601 Open R75 CE 663 PS204
SU050602 Open R74 CE 662 PS204
SU050603 Open R7 CE 665 PS204
SU050604 Open R6 CE 664 PS204
SU050605 Open R10 CE 666 PS344

SU0507 MS Drains
SU050701 Open MS101 CE 1125 PS343
SU050702 Open MS102 CE 1142 PS343

MS/HRH DRAINS AND RH Vents

SU0508 HRH / MS LINE STNR DRAIN TO UFT


SU050801 Open MS117 CE 1287 PS343
SU050802 Open MS105 CE 1285 PS343
SU050803 Open MS106 CE 1286 PS343

SU0509 HRH/MS LINE STNR DRN TO SDFT Open


SU050901 Open MS119 CE 1301 PS343
SU050902 Open MS109 CE 1299 PS343
SU050903 Open MS110 CE 1300 PS343

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 15 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU06 AB- LIGHT OIL STARTUP:

SU060101 AB Elevation Light oil Lined up


SU060102 Start one LDO pump-A / B
Put LORV on Auto with Setting 25 Kg/cm2
SU060103 Select L ight Oil
SU060105 Ensure opening of Manual isolating valves for atomizing
air, Light Oil lines at each corner
SU060106 Ensure Oil guns are engaged properly and are in retract
position
SU060107 Ensure Atomising air pressure is 8.00 kg/cm2
SU060109 Open LOTV L030

SU060111 Set LO Flow Control CV on Auto with Setting 8 Kg/Cm2


SU060112 Start pair 1&3
SU060113 Observe that LONV 1 is open after some time
SU060114 Observe that LONV 3 opens after time delay
SU060115 Start pair 2&4
SU060116 Observe that LONV 2 is open after some time
SU060117 Observe that LONV 4 opens after time delay

SU06 AB- HEAVY OIL STARTUP:


Go to OIL-AB HFO screen from SG Menu

SU060101 Line up AB Elevation Heavy oil


SU060102 Select Heavy OIL
SU060103 Open HORV
SU060104
SU060105 Go to HFO system screen from BOP Menu
SU060106 Press mode selector to Auto
SU060107 Start HFO Pump and Open HO11A to 20%
Go to SLD HFO HTR-A O/L TEMP page
SU060108 Keep the SP to 110 degc
SU060109 Set the HFO TEMP AT HTRA O/LController into
Auto
Go to SLD HFO Press CTRL page
SU060110 Set the HFO pump O/L Press Controller into Auto
SU060111 Keep HFO pump o/l Press SP to 30 kg

Go to SLD HFO Flow CTRL page


SU060112 Set the HO33 Controller into Auto
SU060113 Keep HFO Flow Control SP to 10 kg

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 16 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

Go to SLD ATOM STM PR CTRL page


SU060114 Set the OS33 Controller into Auto
SU060115 Keep ATOM STM Press SP to 12 kg
Open HOTV
Go to OIL-AB HFO screen from SG Menu
SU060116 Ensure opening of Manual isolating valves for atomizing
air, Heavy Oil lines at each corner
SU060117 Ensure Oil guns are engaged properly and are in retract
position

Go to OIL-AB HFO screen from SG Menu


SU060119 Start pair 1&3
SU060120 Observe that HONV 1 is open after some time
SU060121 Observe that HONV 3 opens after time delay
SU060122 Start pair 2&4
SU060123 Observe that HONV 2 is open after some time
SU060124 Observe that HONV 4 opens after time delay

Observe that Drum level starts raisng when steaming takes place in the Drum due to
swelling.
Observe that Boiler Drum Pressure starts increasing. When Drum Pressure crosses 2.0
Kg/sq.cm close drum vents and all the drains

Gradually close Start Up Vents S83 & S84 after charging HP/LP bypass

After pressure reaches 5kgs start Main steam path

SU07 MAIN STEAM LINE CHARGING

SU00701 Main Steam Valves


GOTO MAIN STM screen from BOP Menu

SU070103 Open MSSV(R) IBV1 MS4


SU070104 Open MSSV(R) IBV2 MS6 >2%
SU070105 Observe MS pressure and Temp. rise
SU070106 Open MSSV(L) MS1 after warming up MS line
SU070107 Open MSSV(L) MS2 after warming up MS line
SU070108 Observe that MSSV(L) IBV1 MS3 closes on Auto
SU070109 Observe that MSSV(L) IBV2 MS5 closes on Auto
SU070110 Observe that MSSV(L) IBV1 MS4 closes on Auto
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 17 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU070111 Observe that MSSV(L) IBV2 MS6 closes on Auto

OBSERVE MS PRESSURE EXCEEDING 8 KG/CM2

SU0702 MS Drains
SU070201 Close MS101 CE 1125 PS343
SU070202 Close MS102 CE 1142 PS343
SU0703 HRH / MS LINE STNR DRAIN TO UFT
SU070301 Close MS117 CE 1287 PS343
SU070302 Close MS105 CE 1285 PS343
SU070303 Close MS106 CE 1286 PS343

SU0704 HRH/MS LINE STNR DRN TO SDFT Close


SU070401 Close MS119 CE 1301 PS343
SU070402 Close MS109 CE 1299 PS343
SU070403 Close MS110 CE 1300 PS343

Boiling will start after 2 pairs of Heavy oil and it will take 8 minutes to Boiling
complete. Observe the Drum Pressure starts building.

When Main Steam Pressure crosses 8.0 Kg/sq.cm charge HP & LP Bypass

SU09 PRESSURE AND TEMPERATURE CONTROL


SU0901 HP Bypass Charging
Go to HP BYPASS screen from SG Menu
Start Oil Supply Unit
SU090101 Open Warm Up Drain Valve BP 101
SU090102 Open Warm Up Drain Valve BP 102
SU090103 Open HPBP(L) Warmup Line Isov BP3
SU090104 Open HPBP (R ) Warmup Line Isov BP4
SU090105 Close Warm Up Drain Valve BP 101
SU090106 Close Warm Up Drain Valve BP 102
SU090107 Set HP Temp set point 320 Deg.
SU090108 Open Block valve BD
SU090109 Set HPBP-1 Valve >2%
SU090110 Set HPBP-2 Valve >2%
SU090111 Observe that BPE-1 & BPE-2 valves switch over to Auto
SU090112

SU0902 CRH / HRH Drains


SU090201 Close HRH125
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 18 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU090202 Close HRH101


SU090203 Close HRH102
SU090204 Close HRH127
SU090205 Close HRH105
SU090206 Close HRH106
SU090207 Close HRH109
SU090208 Close HRH110
SU090209 Close HRH113
SU090210 Close HRH114

SU0903 LP Bypass charging


Go to LP BYPASS screen from TG Menu

SU090301 Set Fixed setpoint at 2.0 kg/sqcm


SU090302 Switch on Auto Control Interface
SU090303 Put LPBP Controller in Auto
SU090304 Observe that Injection valve 1 & 3 Open
SU090305 Observe that Stop valve 1 & 2 Opens
SU090306 Observe that LPBP Valve-1 opens
SU090307 Observe that LPBP Valve-2 opens
SU090308 Set point is to be raised gradually to 6.0 kg/sqcm at the
time of rolling

After pressure reaches 25kgs start CD Heavy OIL

SU08 CD- HEAVY OIL START-UP:


Go to OIL-CD HFO screen from SG Menu

SU080101 Open heavy oil return valve HORV


SU080102 Open HOTV
SU080103 Switch On pair 1&3
SU080104 Observe that CD HOnV 1 is open after some time
SU080105 Observe that CD HOnV 3 opens after time delay
SU080106 Start pair 2&4
SU080107 Observe that CD HOnV 2 is open after some time
SU080108 Observe that CD HOnV 4 opens after time delay
SU080109 Switch On pair 2&4
SU080110 Set the Heavy Oil Pressure Controller to Auto
SU080111 Set the Atomising Steam Pressure Controller to Auto

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 19 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

Keep on opening HP Bypass valves 1&2 till the following Rolling parameters are
reached

Drum Pressure >50 KG/CM2


MS flow > 200TPH
MAIN STEAM Pressure >40 KG/CM2
MAIN STEAM TEMPERATURE >3500C
RH STEAM TEMPERATURE >3200C

Keep the Press SP to 40 kgs and put the HP Bypass valves to Auto

Turbine Drains to be opened through SLC

SU10 TURBINE START-UP


SU1001 SGC TURBINE STARTUP
Go to MAIN TURBINE SGCS screen from TG Menu
Go To Generator Gas Cooling & put Temp Ctrl on Auto Setting = 40 Deg C

GotoTURBINE EHTC screen from TG Menu


SU100101 Select the Press. CTR Mode to LP mode
SU100102 Set the PRMAX set point to 525 MW
GotoTURBINE DRAINS SYSTEM screen from TG
Menu
SU100103 Open drain before HPCV1&HPCV2 to 100%
SU100104 Set TSC On Lined up
SU100105 Switch On the Load controller
SU100106 Select TSC mode to Normal
SU100107 Observe the X1 Criteria fulfillness
SU100108 Plunger coil –On Line up
Goto MAIN TURBINE SGCS screen from TG
Menu
SU100109 Select SGC Turbine
SU100110 Select Auto mode( 3rd sel in the small pop up)
SU100111 Select ‘Start’
SU100112 Observe ESVs opening at Step 6
SU100113 Observe IVs opening at Step 9
SU100114 Observe Turbine Speed crossing 300 rpm at step 13
SU100115 Observe Turbine Speed crossing 2950rpm at step 17
SU100116 Observe Generator Field breaker is on at step 18
SU100117 Observe Synchroniser switches on & closes the
Generator breaker at step 21
SU100118 Observe Generator Load crosses 50 MW and EHTC

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 20 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

switches over to Load Control mode at step 23


SU100119 If the load doesnot cross 50 MW raise speed ref
SU100120 Close HP Bypass valves
SU100121 Set HP Bypass Pressure SP to 175 KG/CM2
SU100122 Set HP Bypass Pressure Controller to Auto
SU100123 Observe that LP Bypass valves Closed
SU100124 Close Start Up Vents

Steps bypass
1. Bypass step 102 : press semi and press Advance.
Press auto to go further
2. Bypass step 107
3. Bypass step 110
4. Bypass step 111 : GEN CNDNS FLFLLED
5. Bypass step 114
6. Bypass step 118 : DVR Exciitation
7. Bypass step 119
8.

UNIT SYNCHRONISED AND LOAD >50 MW

Close Economiser recirculation valve E21.


After synchronisation further loading will be done by bringing in additional mills
and establishing suitable main steam process parameters (pressure and
temperature)

SU11 MILLS IN SERVICE

SU1102 PAF-A Start


Go to PA FANS screen from BOP Menu

SU110203 Switch On PA Fan-A LOP-A or LOP-B


SU110204 Set the PA Fan-A control damper position to 0%
SU110205 Start the PA Fan-A
SU110206 Observe PA Fan-A Outlet Gate opens after 20 seconds
delay
SU110207 Raise the control damper PA Fan-A till the PA Header
pressure reaches 800 mmwc
SU110208 Observe that PA Header pressure starts raising
SU110209 Set the PA Header Press,Setpoint to 850 mmwc
SU110210 Set the control damper PA Fan-A to Auto
SU110211 Set the PA Master to Auto

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 21 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU1103 First Coal Elevation Lightup


Go to COAL-A screen from SG Menu
SU110301 Mill-A lined up
SU110302 Switch On the Pulv. lub oil pump
SU110303 Open Pulv-A disch Valve
SU110304 Open Cold air Gate A
SU110305 Switch On Pulveriser motor A
SU110306 Open Hot air Gate A
SU110307 Open CAD to 25% cold air damper Mill-A
SU110308 Open HAD to 75% Hotair damper Mill-A
SU110309 Ensure Mill outlet temp. reaches >50degc
SU110310 Open the FDR O/L Gate
SU110311 Set the Mill O/L temp. setpoint to 850 C
SU110312 Switch On the Feeder – A
SU110313 Set the HAD & CAD into Auto mode
SU110314 Increase the loading on the pulveriser by increasing the
feeder speed
SU110315 Repeat the above steps to take other Pulverisers into
service

Raising the Load


GotoTURBINE EHTC screen from TG Menu
1 Observe that Turbine is in Load control mode
2 Observe that Pressure control mode is Limit Pr mode
3 Set the Load rate SP to 25 MW/Min
4 Raise the load SP to the desired load
5 Observe that load gradually raises to the SP
6 Increase the Fuel input when the Main steam pressure
falls
7 Observe gradual rising of flue gas temperature
8 Observe gradual rising of main steam temperature
9 Observe gradual rising of total fuel flow
10 Observe gradual rising of steam flow

When Load crosses 150 MW Open FD-16. Take MD BFP C Scoop controller in Auto
and Feed Water Master controller in Auto

SU1104 Charging LP Heaters ( when load=200MW)

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 22 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

LPH-1 Charging (LPH-1 is to be taken into service before steam admission into
condenser)
Goto LPH&DRN CLRS screen from BOP Menu

SU110401 Open LPH-1 inlet isolation valve CD28 IBV


SU110402 Open LPH-1 inlet isolation valve CD28
SU110403 Open LPH-1 outlet isolation valve CD29
SU110404 Close LPH-1 inlet isolation valve CD28 IBV
SU110405 Close LPH-1 bypass valve CD30

LPH-2 Charging
SU110406 Open LPH2 inlet isolation valve CD31 IBV
SU100407 Open Ext LPH2 drain valve EX119
SU110408 Open LPH2 inlet isolation valve CD31
SU110409 Open LPH2 outlet isolation valve CD32
SU110410 Close LPH2 inlet isolation valve CD31 IBV
SU110411 Close Condenser bypass valve CD33 (0%)
SU110412 Open Ext LPH2 valve EX11
SU110413 Close Ext LPH2 drain valve EX119
SU110414 Set the NWL set point to -25mm
SU110415 Set the HWL set point to 18mm
SU110416 Set the LPH2 drain CV DR34 to Auto
SU110417 Set the LPH2 drain CV DR37 to Auto

LPH-3 Charging
SU110418 Open LPH3 inlet isolation valve CD34 IBV
SU110419 Open Ext LPH3 drain valve EX118
SU110420 Open LPH3 inlet isolation valve CD34
SU110421 Open LPH3 outlet isolation valve CD35
SU110422 Close LPH3 inlet isolation valve CD34 IBV
SU110423 Close Condenser bypass valve CD36 (0%)
SU110424 Open LPH2 EXT valve EX12
SU110425 Close EXT LPH2 DRN valve EX118
SU110426 Set the NWL set point to -25mm
SU110427 Set the HWL set point to 18mm
SU110428 Set the LPH3 drain CV DR28 to Auto
SU110429 Set the LPH3 drain CV DR31 to Auto

Open Deaerator extraction valve Ex13.

When Load crosses 200 MW second set of auxiliaries to be started

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 23 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU12 STARTING SECOND SET OF AUXILIARIES


SU1202 AH-B Start Sequence
Goto AIR HETERS screen from BOP menu
SU120201 Switch On the AH-B ElectricMotor
SU120202 Open the AH-B FG I/L Damper -1 &2
SU120203 Open the AH-B FG O/L Damper
SU120204 Open the SCAPH-B I/L SAD-3B & SAD-4B O/L
dampers
SU120205 Open the SAD-6B SA O/L damper
SU120206 Open the PA I/L Damper PAD-3B
SU120207 Open the PA O/L Damper PAD-4B

SU1203 IDF-B Start Sequence


Goto ID FANS screen from BOP menu
SU120301 Line up IDF-B System
SU120302 Set IDF-B LOP-A or LOP-B On
SU120303 Set the IDF-B ch1 SRC Breaker On
SU120304 Set the IDF-B ch2 SRC Breaker On
SU120305 Set the IDF-B VFD ch1 On
SU120306 Set the IDF-B VFD ch2 On
SU120307 Ensure the ID Fan-B Motor On indicator appear

SU1204 FDF-B Start Sequence


Goto FD FANS screen from BOP menu
SU120401 Set The FD Fan-B Control Damper Position To Min
SU120402 Start FD Fan-B Lop-A or Lop-B
SU120403 Close FD Fan-B Outlet Gate
SU120404 Ensure the Permissive Available
SU120405 Start the FD Fan-B
SU120406 Observe the pump is On, red light appears.
SU120407 Ensure FD Fan-B Outlet Gate opens after 20 seconds
delay

SU13 UNIT LOAD RAISING TO FULL LOAD


SU1302 PAF-B Start
Goto PA FANS screen from BOP menu
SU130201 Line Up PAF-B System
SU130202 Switch On PA Fan-B Lop-A or Lop-B

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 24 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU130203 Ensure the PA Fan-B control damper position to


minimum
SU130204 Start the PA Fan-B
SU130205 Ensure PA Fan-B Outlet Gate opens after 20 seconds
delay
SU130206 Set the PA Header Press,Setpoint to 800 mmwc
SU130207 Set the control damper PA Fan-B to25%and set to ‘auto’
SU130208 Raise the PA Header Master position to control damper
position of PAF-B
SU130209 Set the PA Master to Auto

SU1303 TD BFP-A Oil System


Goto BFPDT-A LUBE/JACK OIL SHEME screen from TG menu
SU130301 Start TD BFP-A Main Aux oil(LOP) pump A/B
SU130302 Observe theBFPT-A lub oil header pressure increases
to > 3.0 Kg/ cm2
SU130303 Change the TDBFP-A EOP Auto to On status
SU130304 Start TDBFP-A JOP
Strat oil vap ex-fan 1
SU130305 Open the Gate Valve Gearing

SU1304 TD BFP-A Start


Goto BFPDT-A CONTROL SHEME screen from TG menu

SU130401 Line up TD BFP-A


SU130402 Ensure Deaerator level around 0 mmwcl
SU130403 Ensure Condenser press < -0.85 kg/cm2
SU130404 Ensure Suction valve for BFP A opened
SU130405 Open steam drain valve before ESV of BFPT-A
SU130406 Open drain vlv D/S of TDBFP-A aux CV
SU130407 Open IP/LP common drain vlv Ex 109
SU130408 Open Aux stm to TDBFP-A
SU130409 Open CRH stm to BFPT-A block valve CRH1
SU130410 Open BFPT-A vent valve U/S of ESV
SU130411 Open TDBFP-A exhaust vlv to condenser EX27
SU130412 Open TDBFP-A warmup Aux CV
SU130413 Open TDBFP-A casing drain vlv
SU130414 Open TDBFP-A casing cross drain vlv
SU130415 Set Gland steam Ref to 180mmwc
SU130416 Set TDBFP-A Gland steam Controller to Auto(control
action should be Reverse)
SU130417 Observe that Gland steam pressure raises to 180 mmwcl
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 25 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU130418 Open IP bleed stm common block vlv


SU130419 Open TDBFP-A recirculation valve
SU130420 Ensure TDBFP-A control valve closed
SU130421 BFPDT-A Trip reset On
SU130422 Ensure all start permissives are met
SU130423 Open TDBFP-A ESV
SU130424 Observe the Oil pressure below piston rises to 8.0 kg/cm2
SU130425 Observe the Oil pressure above piston rises to 8.0 kg/cm2
SU130426 Observe the Oil pressure below piston falls to 0.0 kg/cm2
SU130427 Observe the Full opening of ESV
SU130428 Raise the speed set point of TDBFP-A slowly to match
the speed of MDBFP and then put it in Auto when both
the speeds are matching
SU130429 Open TDBFP-A discharge bypass valve
SU130430 Open TDBFP-A discharge valve

SU1305 TD BFP-B Oil System


Goto BFPDT-B LUBE/JACK OIL SHEME screen from TG menu
SU130501 Start TD BFP-B Main Aux oil pump A/B
SU130502 Observe theBFPT-B lub oil header pressure increases
to > 3.0 Kg/ cm2
SU130503 Change the TDBFP-B EOP Auto to On status
SU130504 Start TDBFP-B JOP
SU130505 Open the Gate Valve Gearing

TDBFP-B speed reaches >400 rpm

SU1306 TD BFP-B Start


Goto BFPDT-B CONTROL SHEME screen from TG menu
SU130601 Line up TD BFP-B & put on turning gear
SU130602 Ensure Deaerator level Normal
SU130603 Ensure Condenser press < -0.85 kg/cm2
SU130604 Ensure Suction valve for BFP A opened
SU130605 Open steam drain valve before ESV of BFPT-B
SU130606 Open drain vlv D/S of TDBFP-B aux CV
SU130607 Open IP/LP common drain vlv Ex 109
SU130608 Open Aux stm to TDBFP-B drain vlv
SU130609 Open CRH stm to BFPT-B block valve CRH1
SU130610 Open BFPT-B vent valve U/S of ESV
SU130611 Open TDBFP-B exhaust vlv to condenser EX27
SU130612 Open TDBFP-B warmup Aux CV
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 26 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU130613 Open TDBFP-B casing drain vlv


SU130614 Open TDBFP-B casing cross drain vlv
SU130615 Set Gland steam Ref to 180mmwc
SU130616 Set TDBFP-B Gland steam Controller to Auto
SU130617 Observe that Gland steam pressure raises to 180 mmwcl
SU130618 Open IP bleed stm common block vlv
SU130619 Open TDBFP-B recirculation valve
SU130620 Ensure TDBFP-B control valve closed
SU130621 BFPDT-B Trip reset On
SU130622 Ensure all start permissives are met
SU130623 Open TDBFP-B ESV
SU130624 Observe the Oil pressure below piston rises to 8.0 kg/cm2
SU130625 Observe the Oil pressure above piston rises to 8.0 kg/cm2
SU130626 Observe the Oil pressure below piston falls to 0.0 kg/cm2
SU130627 Observe the Full opening of ESV
SU130628 Raise the speed set point of TDBFP-B slowly to match
the speed of MDBFP and then put it in Auto when both
the speeds are matching
SU130629 Open TDBFP-B discharge bypass valve
SU130630 Open TDBFP-B discharge valve

SU1307 Starting CEP-B


Goto COND.EXT.PUMPS SCHEME screen from BOP menu
SU130701 Line up CEP-B
SU130702 Open the CEP-B Rec Valve CD-12
SU130703 Ensure CEP-B dis.vent vlv. VA8 in Open position
SU130704 Ensure CEP-B dis. Vlv. CD5 in Close position
SU130705 Ensure CEP-B dis. Byp vlv. CD8 in Close position
SU130706 Switch On CEP-B Pump
SU130707 Ensure CEP-B Vent vlv. VA8 Closes
SU130708 Ensure CEP-B Dis. Byp valve CD8 Opens
SU130709 Ensure CEP-B Dis. valve CD5 Opens
SU130710 Ensure CEP-B Dis. Byp valve CD8 Closes
SU130711 Set CEP-B Flow SP to 500 TPH
SU130712 Set CEP-B Rec. vlv. CD12 to Auto
SU130713 Keep CEP-C in standby

SU1308 CEP-C in Stand by


SU130801 Line up CEP-C
SU130802 Set CEP-C Flow SP to 500 TPH
SU130803 Set CEP-C Rec. vlv. CD14 to Auto
___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 27 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU130804 Set CEP C in Stand by mode


SU130805 Observe CEP-C dis. Vlv. CD6 in Close position
SU130806 Observe CEP-C dis. Byp vlv. CD9 in Close position

SU1309 HPH Charge (When Load crosses 300 MW)

HPH-5A and 6A Charging


Goto HP HEATERS scheme screen from BOP menu
SU130901 Open HPH-5A inlet isolation valve IBV FD7 IBV
SU130902 Open HPH-6A outlet isolation valve IBV FD8 IBV
SU130903 Open HPH-5A/5B EXT STM DRN valve EX147
SU130904 Open HPH-6A EXT STM DRN valve EX101
SU130905 Open HPH-5A inlet isolation valve FD7
SU130906 Open HPH-6A outlet isolation valve FD8
SU130907 Close HPH-5A inlet isolation valve IBV FD7 IBV
SU130908 Close HPH-6A outlet isolation valve IBV FD8 IBV
SU130909 Close HPH FW 50% Byp valve FD12
SU130910 Open HPH FW 50% Byp valve FD12 IBV
SU130911 Open HPH FW 50% Byp valve FD12
SU130912 Close HPH FW 50% Byp valve FD12 IBV
SU130913 Close HPH FW 100% Byp valve FD11
SU130914 Close HPH FW 100% Byp valve FD11 IBV
SU130915 Open HPH-5A EXT STM inlet valve EX21
SU130916 Open HPH-6A EXT STM inlet valve EX23
SU130917 Open HPH-6A EXT STM inlet valve EX24
SU130918 Close HPH-5A/5B EXT STM DRN valve EX147
SU130919 Close HPH-6A EXT STM DRN valve EX101
SU130920 Set the HPH 5A NWL set point to -90mm
SU130921 Set the HPH 5A HWL set point to -15mm
SU130922 Set the HPH 5A drain CV DR15 to Auto
SU130923 Set the HPH 5A drain CV DR18 to Auto
SU130924 Set the HPH 6A NWL set point to -90mm
SU130925 Set the HPH 6A HWL set point to -15mm
SU130926 Set the HPH 6A drain CV DR2 to Auto
SU130927 Set the HPH 6A drain CV DR5 to Auto

HPH-5B and 6B Charging


SU130928 Open HPH-5B inlet isolation valve IBV FD9 IBV
SU130929 Open HPH-6B outlet isolation valve IBV FD10 IBV
SU130930 Open HPH-6B EXT STM DRN valve EX102
SU130931 Open HPH-5B inlet isolation valve FD9

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 28 of 29
SAT Procedure for Dynamic Analysis -- NTPC, SIMHADRI

SU130932 Open HPH-6B outlet isolation valve FD10


SU130933 Close HPH-5B inlet isolation valve IBV FD9 IBV
SU130934 Close HPH-6B outlet isolation valve IBV FD10 IBV
SU130935 Close HPH FW 50% Byp valve FD12 IBV
SU130936 Open HPH-5B EXT STM inlet valve EX22
SU130937 Open HPH-6B EXT STM inlet valve EX25
SU130938 Open HPH-6B EXT STM inlet valve EX26
SU130939 Close HPH-6B EXT STM DRN valve EX102
SU130940 Set the HPH 5B NWL set point to -90mm
SU130941 Set the HPH 5B HWL set point to -15mm
SU130942 Set the HPH 5B drain CV DR22 to Auto
SU130943 Set the HPH 5B drain CV DR25 to Auto
SU130944 Set the HPH 6B NWL set point to -90mm
SU130945 Set the HPH 6B HWL set point to -15mm
SU130946 Set the HPH 6B drain CV DR8 to Auto
SU130947 Set the HPH 6B drain CV DR11 to Auto
----------------------------------------------------------------------------------------------------------------

___________________________________________________________
Power Plant Dynamics & Simulator Group, BHEL R&D, Hyderabad-93.
Page 29 of 29